I-603 - FINISH MATERIAL SCHEDULE.pdf

PDF 118 KB Posted

Attached to
LINCOLN HALL RENOVATION, BLDG. 607 Federal contract opportunity
Solicitation number
W912DS23R0009
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

This document package includes a finish material schedule and specifications for the renovation of Lincoln Hall at the United States Military Academy in West Point, New York. The U.S. Army Corps of Engineers, New York District is soliciting proposals for the project under solicitation number W912DS23R0009. Renovation work includes interior finishes, millwork, plumbing fixtures, and other interior build-outs for spaces such as corridors, offices, conference rooms, retail areas, and restrooms. Materials specified include terrazzo, stone, carpet, luxury vinyl tile, porcelain tile, wall coverings, and ceiling treatments. The project appears to be a best value procurement with an emphasis on interior design and build-out quality.

View the file

Other files for this federal contract opportunity

Other files attached to LINCOLN HALL RENOVATION, BLDG. 607, newest first.
File Type Posted
W912DS23R0009-0005.pdf PDF
Amendment 0004.pdf PDF
I-604 - FINISH MATERIAL SCHEDULE.pdf PDF
S-502.pdf PDF
A-202.pdf PDF
A-204.pdf PDF
A-401.pdf PDF
A-562 - MILLWORK DETAILS - BRIEFING ROOM.pdf PDF
Supplmental laydown area at Ordnance road.pptx PPTX presentation
A-429 - ENLARGED BRIEFING ROOM PLANS AND ELEVATIONS.pdf PDF
I-103 - LEVEL B1 FLOOR PLAN - FINISH.pdf PDF
I-602 - FINISH MATERIAL SCHEDULE.pdf PDF
L-502.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
21 30 00-001.2_R3 Fire Pump House Submittal (Cullum).pdf PDF
Lincoln Hall Specification Changes 22 JUN 2023.pdf PDF
C-001.pdf PDF
W912DS23R0009 0001.pdf PDF
CD101.pdf PDF
CS103.pdf PDF
2023.06.20 Lincoln Hall site walk through sign in sheet.pdf PDF
Lincoln Hall Drawing Changes 22 JUN 2023.pdf PDF
AS BUILT DRAWING 1A - Approximate Location of Knox BatteryAmend 1.pdf PDF
LH- H-101.pdf PDF
W912DS23R0009.pdf PDF
JA 006-23 Belden Brick.pdf PDF
JA 008-23-Ruabon Quarry Tile.pdf PDF
JA 010-23 Best Hardware Lock Cylinders and Cores.pdf PDF
Vol 1 WP Lincoln Hall Revised RTA Specifications 1 MAR 2023.pdf PDF
LH_VOLUME 03_Revised_RTA_2023-03-01.pdf PDF
Vol 2 WP Lincoln Hall Revised RTA Specifications 1 MAR 2023.pdf PDF
Vol 3 WP Lincoln Hall Revised RTA Specifications 1 MAR 2023.pdf PDF
LH_VOLUME 01_Revised_RTA_2023-03-01.pdf PDF
LH_VOLUME 04_Revised_RTA_2023-03-01.pdf PDF
JA 007-23 Distributed Antenna System.pdf PDF
JA 013-23 Monaco.pdf PDF
LH_VOLUME 02_Revised_RTA_2023-03-01.pdf PDF
JA 009-23 Avaya Switch.pdf PDF
JA 011-23 Ventrol AHU.pdf PDF
JA 012-23 Identiv Card Access System.pdf PDF
JA 014-23 Shark Meter.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES & REMARKS

1. INSTALL CORNER GUARD, CG-2. SEE FINISH PLANS ON I-101 TO I-107 FOR

LOCATIONS.

2. PROVIDE STONE SEALER, STS-1 AT ALL BLUE STONE LOCATIONS.

3. PROVIDE ENTRANCE MAT, EM-1 AT ENTRY. SEE FINISH FLOOR PLANS ON

I-101 TO I-107 FOR LOCATION.

4. SEE ENLARGED FINISH PLANS ON I-400 TO I-406 FOR FLOORING PATTERNS.

5. SEE RESTROOM ELEVATIONS ON A-401 FOR FINISH LOCATIONS.

6. TOILET PARTITIONS TO BE FINISH TP-1. SEE COLOR MATERIAL LEGEND ON

I-600 AND I-601.

7. SEE INTERIOR DETAILS FOR INFORMATION ON WINDOW FILM INSTALLATION.

8. INSTALL CORNER GUARD, CG-1. SEE FINISH PLANS FOR LOCATIONS.

9. INSTALL WT-1/WT-2. SEE FINISH PLANS ON I-101 TO I-107 FOR LOCATIONS.

10. INSTALL WT-3/WT-4. SEE FINISH PLANS ON I-101 TO I-107 FOR LOCATIONS.

11. INSTALL WT-5/WT-6. SEE FINISH PLANS ON I-101 TO I-107 FOR LOCATIONS.

12. PROVIDE ENTRANCE MAT, EM-2 AT ENTRY. SEE FINISH PLANS ON I-101 TO

I-107 FOR LOCATION.

13. STAIRS TO BE TRZ-ST1

14. PROVIDE ACOUSTIC FLOOR UNDERLAYMENT, AFU-1

15. REPAINT EXISTING RAILINGS. MATCH EXISTING COLOR AND FINISH.

16. CREST MADE OUT OF RT-5 - RT-12. SEE B2/I-406 FOR DETAILS.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

I-603

F

IN

IS

H

M A

T E

R

IA

L S

C H

E D

U L E

B U

IL

D

IN

G

S

/6

R

E N

O V

A T

IO

N

L

IN

C O

L N

H A

L L

L

IN

C O

L N

H A

L L

W E

S T

P O

IN

T

N

E W

Y O

R K

A S

C H

A F

E R

A S

C H

A F

E R

D M

A N

T Y

M

A R

C H

W D

S -1

-R

-0

W D

S -1

-C

-0 -L

REVISED RTA SUBMISSION 03/01/2023

MATERIAL ABBREVIATIONS

ACT ACOUSTIC CEILING TILE & GRID

AFU ACOUSTIC FLOOR UNDERLAYMENT

APC ACOUSTICAL PANEL CLOUD

ASC ACOUSTICAL SUSPENDED CLOUD

AWP ACOUSTICAL WALL PANEL

BS BLUE SLATE

CG CORNER GUARD

CPT MODULAR CARPET TILE

CU CURTAIN FABRIC

EC ELEVATOR CEILING

EF ELEVATOR FLOOR

EM ENTRANCE MAT FLOORING

EWP ELEVATOR WALL PANEL

EX EXISTING TO REMAIN

EX-CS EXISTING CONCRETE STAIR - REFURBISHED

EX-QFT/

BS

EXISTING QUARRY FLOOR TILE AND BLUE SLATE - REFURBISHED

EXP EXPOSED

GRT GROUT

GWB GYPSUM WALL BOARD

LVT LUXURY VINYL TILE

MB MARKER BOARD

MCT METAL CEILING TILE

MES METAL EDGE STRIP

MWT MOSAIC WALL TILE

OTS OPEN TO STRUCTURE

PBN PORCELAIN BULLNOSE

PFT PORCELAIN FLOOR TILE

PL PLASTIC LAMINATE

PT PAINT

PTB PORCELAIN TILE - COVE BASE

PWT PORCELAIN WALL TILE

QFT QUARRY FLOOR TILE

QZ QUARTZ

RB RESILIANT BASE

RE RESIN EPOXY - POURED

RT RUBBER TILE

SC SEALED CONCRETE

SDT STATIC DISSIPATIVE TILE

SN STAIR NOSING

SS SOLID SURFACE

STS SEALED STONE FINISH

TB TACK BOARD

TP TOILET PARTITION

TRB TERRAZZO COVE BASE - POURED

TRZ TERRAZZO - POURED FLOORING

TRZ-ST TERRAZZO - PREFABRICATED STAIR TREAD AND RISER

TS TRANSITION STRIP

WB WOOD BASE

WC WALL COVERING

WD WOOD DOOR FINISH

WDT WOOD TRIM

WF WINDOW FILM

WP WALL PROTECTION - SHEET

WPC WOOD PANEL CEILING

WT WINDOW TREATMENT - ROLLE SHADE

WWP WOOD WALL PANEL

INTERIOR ROOM FINISH SCHEDULE - LEVEL 1

ROOM # ROOM NAME

FLOOR

BASE FINISH WAINSCOT

WALL FINISH CLG CABINETS/

MILLWORK COUNTER TOP NOTES & REMARKSFINISH NORTH EAST SOUTH WEST FINISH

100A CORRIDOR EM-1, TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1/ APC-1 3, 4

100B CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1/ APC-1 4

100C CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1/ APC-1 1, 4

101 CENTRAL STAIR/ENTRY EX-QFT-1/ BS-1 EX PT-12, PT-14,

WDT-1, &

WWP-1

PT-5 PT-5 PT-5 PT-5 PT-9a 2, 4

102 WAITING AREA EX-QFT-1/ BS-1 EX PT-12, PT-14,

WDT-1, &

WWP-1

PT-1 PT-1 PT-1 PT-1 PT-9a 2, 4

110 RECEPTION CPT-1 RB-1 WC-1 WC-1 WC-1 WC-1 OTS-1 7

111 INTERVIEW ROOM CPT-2 RB-1 PT-1 PT-1 WC-3 PT-1 ACT-1

112 INTERVIEW ROOM CPT-2 RB-1 PT-1 PT-1 WC-3 PT-1 ACT-1

113 INTERVIEW ROOM CPT-2 RB-1 PT-1 PT-1 WC-3 PT-1 ACT-1

120 BREAK ROOM LVT-1/ LVT-2 RB-1 PT-4, TB-1 PT-1 PT-1, PWT-3 PT-4 OTS-1 PL-1 SS-1 1, 4

121 JANITOR'S CLOSET RE-3 RB-1 WP-1 PT-15 PT-15 PT-15 PT-15 EXP

130 ADMISSIONS OPEN OFFICE CPT-1 RB-1 PT-3 PT-1 PT-3, PT-1 PT-1, AWP-3 OTS-1/ APC-2 5, 7

131 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1

132 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1

133 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1

134 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1

135 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1

140 ADMISSIONS OPEN OFFICE CPT-1 RB-1 PT-3 PT-1 PT-1 PT-1 OTS-1/ APC-2 5, 7

141 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-1, PT-2 ACT-1 5

142 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1

143 STORAGE LVT-1 RB-1 PT-1 PT-1 PT-1 PT-1 OTS-1

145 TELECOM SDT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

146 ELECTRICAL CLOSET RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

150 VISITOR BRIEFING ROOM CPT-3 WB-1 WC-1 WC-1 WC-1 PT-1, WC-1 WPC-1/ PT-9c 5, 9

160 CAFE PFT-3, RE-1 RB-1 PWT-2, MWT-1, PT-1 PT-1 PT-1 PT-1 OTS-2/ MCT-1 PL-2 QZ-2 4, 5

170 RETAIL STORE LVT-1/ LVT-2 RB-1 PT-1 PT-1 PT-1, WWP-2 PT-1 OTS-2 4, 5, 12, 13

171 STORE DISPLAY TRZ-1, TRZ-2 & TRZ-3 TRB-1 WC-2 N/A N/A N/A PT-9a 4, 5

172 RETAIL OPEN OFFICE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1, PT-3 OTS-1/ APC-2 7

173 DRESSING LVT-1 RB-1 PT-1 PT-1 PT-1 PT-1 OTS-2

174 OFFICE CPT-2 RB-1 PT-1 PT-1 PT-2 PT-1 ACT-1

181 ELECTRICAL CLOSET RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

182 SUPPLY CLOSET RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

183 WOMEN'S RESTROOM PFT-1, PFT-2 PBT-1 PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-9b PL-1 QZ-1 4, 5, 6

184 MEN'S RESTROOM PFT-1, PFT-2 PBT-1 PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-9b PL-1 QZ-1 4, 5, 6

354 CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1 4

355 CORRIDOR EX-QFT-1/ BS-1 RB-1 N/A PT-1 N/A PT-1 OTS-1 2, 4, 12

398 SERVICE ELEVATOR EF-1 N/A EWP-1 EWP-1 EWP-1 EWP-1 EC-1

603 CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1 1, 4

604 CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 N/A OTS-1 4

X1-101 STAIR A EX-CS EX PT-1 PT-1 PT-1 PT-1 PT-9a 15

X1-102 STAIR B EX-CS EX PT-1 PT-1 PT-1 PT-1 PT-9a 15

INTERIOR ROOM FINISH SCHEDULE - LEVEL 2

ROOM # ROOM NAME

FLOOR

BASE FINISH WAINSCOT

WALL FINISH CLG CABINETS/

MILLWORK COUNTER TOP NOTES & REMARKSFINISH NORTH EAST SOUTH WEST FINISH

200A CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 N/A PT-1 PT-1 PT-1 OTS-1/APC-1 4

200B CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1/APC-1 4, 8

201 CENTRAL STAIR QFT-1/ BS-1 QTB-1 PT-5, PT-12,

PT-14, &

WDT-1

PT-1 PT-1 PT-1 PT-1 PT-9a 2, 4

202 WAITING AREA QFT-1/ BS-1 QTB-1 PT-5, PT-12,

PT-14, &

WDT-1

PT-1 PT-1 PT-1 PT-1 PT-9a 2, 4

205 STORAGE LVT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

206 JANITOR'S CLOSET RE-3 RB-1 WP-1 PT-15 PT-15 PT-15 PT-15 EXP

207 WELLNESS ROOM LVT-1 RB-1 PT-1 PT-1 PT-1 PT-4, TB-1 ACT-1/ PT-9a PL-1 SS-1

208 BREAK ROOM LVT-1/ LVT-2 RB-1 PT-1, TB-1, PWT-3 PT-1, PWT-3 PT-1 PT-4 OTS-1 PL-1 SS-1 4, 8

209 ELECTRICAL CLOSET RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

210 OUTREACH OPEN OFFICE CPT-1 RB-1 PT-3 PT-1 PT-1, PT-3 PT-1, AWP-3 OTS-1/ APC-2 5, 7

211 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1/ PT-9a

212 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1/ PT-9a

213 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1/ PT-9a

214 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1/ PT-9a

215 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1/ PT-9a

216 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1/ PT-9a

218 EXECUTIVE OPEN OFFICE CPT-1 RB-1 PT-1 PT-3 PT-1 PT-1 ACT-1/ PT-9a

219 TELECOM SDT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

220 CONFERENCE ROOM CPT-4 RB-1 PT-1 PT-1, AWP-2 PT-1, MB-2 PT-1, AWP-2, MB-1 APC-3/ PT-9a 5, 9

221 STORAGE LVT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

222 OFFICE CPT-2 RB-1 PT-1 PT-1 PT-2 PT-1 ACT-1/ PT-9a

223 OFFICE CPT-2 RB-1 PT-2 PT-1 PT-1 PT-1 ACT-1/ PT-9a

224 EXECUTIVE CONFERENCE ROOM CPT-4 RB-1 PT-1, MB-2 PT-1 PT-1, AWP-1 PT-1 ACT-1/ PT-9a 5, 9

226 OFFICE CPT-2 RB-1 PT-1 PT-1 PT-2 PT-1 ACT-1/ PT-9a

230 RETAIL STORE LVT-1/ LVT-2 RB-1 PT-1 PT-1 PT-1, WWP-2 PT-1 OTS-2/ ASC-1 4, 5, 13

231 RETAIL STORE DISPLAY TRZ-1, TRZ-2 & TRZ-3 TRB-1 WC-2 N/A N/A N/A PT-9a 4, 5

233 STORAGE LVT-1 RB-1 PT-1 PT-1 PT-1 PT-1 OTS-2

234 MANAGER'S OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1/ PT-9a

235 RETAIL OPEN OFFICE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1, PT-3 OTS-1/ APC-2 7

236 OFFICE CPT-2 RB-1 PT-1 PT-1 PT-2 PT-1 ACT-1

241 ELECTRICAL CLOSET RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

242 TELECOM SDT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

243 WOMEN'S RESTROOM PFT-1. PFT-2, & PFT-3 PBT-1 PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-9b PL-1 QZ-1 4, 5, 6

244 MEN'S RESTROOM PFT-1. PFT-2, & PFT-3 PBT-1 PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-9b PL-1 QZ-1 4, 5, 6

356 CORRIDOR QFT-1/ BS-1 QTB-1 PT-5, PT-12,

PT-14 & WDT-1

PT-1 PT-1 PT-1 PT-1 PT-9a 2, 4

X2-101 STAIR A EX-CS EX PT-1 PT-1 PT-1 PT-1 PT-9a 15

X2-102 STAIR B EX-CS EX PT-1 PT-1 PT-1 PT-1 PT-9a 15

M A

R K

D E

S C

R

IP

T I O

N D

A T

E

IS

S U

E D

V

IA

A M

E N

D M

E N

T /1

/2

1 1

1 1

1 1

Sheets
A-429 - ENLARGED BRIEFING ROOM PLANS AND ELEVATIONS
A-562 - MILLWORK DETAILS - BRIEFING ROOM
I-103 - LEVEL B1 FLOOR PLAN - FINISH
I-602 - FINISH MATERIAL SCHEDULE
I-603 - FINISH MATERIAL SCHEDULE
I-604 - FINISH MATERIAL SCHEDULE

File details come from the government source that posted it. Updated .