I-604 - FINISH MATERIAL SCHEDULE.pdf

PDF 107 KB Posted

Attached to
LINCOLN HALL RENOVATION, BLDG. 607 Federal contract opportunity
Solicitation number
W912DS23R0009
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

This document contains a finish material schedule and specifications for the renovation of Lincoln Hall at the United States Military Academy in West Point, New York. The project includes refinishing floors, walls, ceilings, and millwork throughout the building using various materials such as carpet, paint, stone, and wood. Specific rooms and areas are identified along with the required finish materials. Restrooms will feature porcelain tile floors and walls with plastic laminate countertops. The project is being conducted under solicitation number W912DS23R0009 issued by the U.S. Army Corps of Engineers, New York District for a firm-fixed price renovation contract of Building 607, Lincoln Hall.

View the file

Other files for this federal contract opportunity

Other files attached to LINCOLN HALL RENOVATION, BLDG. 607, newest first.
File Type Posted
W912DS23R0009-0005.pdf PDF
Amendment 0004.pdf PDF
I-603 - FINISH MATERIAL SCHEDULE.pdf PDF
S-502.pdf PDF
A-562 - MILLWORK DETAILS - BRIEFING ROOM.pdf PDF
Supplmental laydown area at Ordnance road.pptx PPTX presentation
A-202.pdf PDF
A-204.pdf PDF
A-401.pdf PDF
A-429 - ENLARGED BRIEFING ROOM PLANS AND ELEVATIONS.pdf PDF
I-103 - LEVEL B1 FLOOR PLAN - FINISH.pdf PDF
I-602 - FINISH MATERIAL SCHEDULE.pdf PDF
L-502.pdf PDF
Amendment 0003.pdf PDF
21 30 00-001.2_R3 Fire Pump House Submittal (Cullum).pdf PDF
Amendment 0002.pdf PDF
Lincoln Hall Specification Changes 22 JUN 2023.pdf PDF
CD101.pdf PDF
CS103.pdf PDF
2023.06.20 Lincoln Hall site walk through sign in sheet.pdf PDF
C-001.pdf PDF
W912DS23R0009 0001.pdf PDF
Lincoln Hall Drawing Changes 22 JUN 2023.pdf PDF
AS BUILT DRAWING 1A - Approximate Location of Knox BatteryAmend 1.pdf PDF
LH- H-101.pdf PDF
W912DS23R0009.pdf PDF
JA 006-23 Belden Brick.pdf PDF
JA 008-23-Ruabon Quarry Tile.pdf PDF
JA 010-23 Best Hardware Lock Cylinders and Cores.pdf PDF
Vol 1 WP Lincoln Hall Revised RTA Specifications 1 MAR 2023.pdf PDF
LH_VOLUME 03_Revised_RTA_2023-03-01.pdf PDF
JA 007-23 Distributed Antenna System.pdf PDF
JA 013-23 Monaco.pdf PDF
LH_VOLUME 02_Revised_RTA_2023-03-01.pdf PDF
Vol 2 WP Lincoln Hall Revised RTA Specifications 1 MAR 2023.pdf PDF
Vol 3 WP Lincoln Hall Revised RTA Specifications 1 MAR 2023.pdf PDF
LH_VOLUME 01_Revised_RTA_2023-03-01.pdf PDF
LH_VOLUME 04_Revised_RTA_2023-03-01.pdf PDF
JA 009-23 Avaya Switch.pdf PDF
JA 011-23 Ventrol AHU.pdf PDF
JA 012-23 Identiv Card Access System.pdf PDF
JA 014-23 Shark Meter.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES & REMARKS

1. INSTALL CORNER GUARD, CG-2. SEE FINISH PLANS ON I-101 TO I-107 FOR

LOCATIONS.

2. PROVIDE STONE SEALER, STS-1 AT ALL BLUE STONE LOCATIONS.

3. PROVIDE ENTRANCE MAT, EM-1 AT ENTRY. SEE FINISH FLOOR PLANS ON

I-101 TO I-107 FOR LOCATION.

4. SEE ENLARGED FINISH PLANS ON I-400 TO I-406 FOR FLOORING PATTERNS.

5. SEE RESTROOM ELEVATIONS ON A-401 FOR FINISH LOCATIONS.

6. TOILET PARTITIONS TO BE FINISH TP-1. SEE COLOR MATERIAL LEGEND ON

I-600 AND I-601.

7. SEE INTERIOR DETAILS FOR INFORMATION ON WINDOW FILM INSTALLATION.

8. INSTALL CORNER GUARD, CG-1. SEE FINISH PLANS FOR LOCATIONS.

9. INSTALL WT-1/WT-2. SEE FINISH PLANS ON I-101 TO I-107 FOR LOCATIONS.

10. INSTALL WT-3/WT-4. SEE FINISH PLANS ON I-101 TO I-107 FOR LOCATIONS.

11. INSTALL WT-5/WT-6. SEE FINISH PLANS ON I-101 TO I-107 FOR LOCATIONS.

12. PROVIDE ENTRANCE MAT, EM-2 AT ENTRY. SEE FINISH PLANS ON I-101 TO

I-107 FOR LOCATION.

13. STAIRS TO BE TRZ-ST1

14. PROVIDE ACOUSTIC FLOOR UNDERLAYMENT, AFU-1

15. REPAINT EXISTING RAILINGS. MATCH EXISTING COLOR AND FINISH.

16. CREST MADE OUT OF RT-5 - RT-12. SEE B2/I-406 FOR DETAILS.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

I-604

F

IN

IS

H

M A

T E

R

IA

L S

C H

E D

U L E

B U

IL

D

IN

G

S

/6

R

E N

O V

A T

IO

N

L

IN

C O

L N

H A

L L

L

IN

C O

L N

H A

L L

W E

S T

P O

IN

T

N

E W

Y O

R K

A S

C H

A F

E R

A S

C H

A F

E R

D M

A N

T Y

M

A R

C H

W D

S -1

-R

-0

W D

S -1

-C

-0 -L

REVISED RTA SUBMISSION 03/01/2023

INTERIOR ROOM FINISH SCHEDULE - LEVEL 3

ROOM # ROOM NAME

FLOOR

BASE FINISH WAINSCOT

WALL FINISH CLG CABINETS/

MILLWORK COUNTER TOP NOTES & REMARKSFINISH NORTH EAST SOUTH WEST FINISH

300A CORRIDOR RT-1, RT-2 & RT-3 RB-1 PT-1 PT-1 PT-1 PT-1 OTS-1/ APC-1 4, 14

300B CORRIDOR RT-1, RT-2 & RT-3 RB-1 N/A PT-1, AWP-4 PT-1 PT-1, AWP-4 OTS-1/ APC-2 4, 14

300C CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1/ APC-1 4, 8

300D VESTIBULE TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1 4, 8

301 CENTRAL STAIR QFT-1/ BS-1 QTB-1 PT-5, PT-12,

PT-14 & WDT-1

PT-1 PT-1 PT-1 PT-1 PT-9a 2, 4

302 WAITING AREA QFT-1/ BS-1 QTB-1 PT-5, PT-12,

PT-14 & WDT-1

PT-1 PT-1 PT-1 PT-1 PT-9a 2, 4

310 JANITOR'S CLOSET RE-3 RB-1 WP-1 PT-15 PT-15 PT-15 PT-15 EXP

311 PCR SDT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9

312 MECH SDT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1

313 WORKSHOP / BROADCAST ENGINEER SDT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9

314 SERVER ROOM / MCR SDT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

315 VESTIBULE RT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1

316 ELECTRICAL RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

317 TELEVISION STUDIO RE-2 RB-2 PT-6 PT-6 PT-6 PT-6 OTS-4 11

320 OUTREACH OPEN OFFICE CPT-1 RB-1 N/A PT-1 PT-3 PT-1 OTS-1/ APC-2 7

321 OFFICE CPT-2 RB-1 PT-2 PT-1 N/A PT-1 ACT-1

322 OFFICE CPT-2 RB-1 PT-2 PT-1 N/A PT-1 ACT-1

323 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1

325 TELECOM SDT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

330 IT OPEN OFFICE CPT-1 RB-1 PT-1 PT-1 PT-3 PT-1 OTS-1/ APC-2 7

331 HUDDLE ROOM CPT-1 RB-1 N/A PT-1 PT-1 PT-2 ACT-1

332 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1

333 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-1, PT-2 ACT-1 5

334 COPY / PRINT / MAILROOM LVT-1 RB-1 PT-1 PT-1 PT-1 PT-1 OTS-1

335 STORAGE LVT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

336 BREAK ROOM LVT-1/ LVT-2 RB-1 PT-1, PWT-3 PT-1 PT-4, TB-1 PT-4 OTS-1 PL-1 SS-1 4

337 ELECTRICAL CLOSET RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

338 CHANGING ROOM CPT-2 RB-1 PT-1 PT-1 PT-1 PT-1 OTS-1

339 CHANGING ROOM CPT-2 RB-1 PT-1 PT-1 PT-1 PT-1 OTS-1

340 GREEN ROOM CPT-2 RB-1 PT-1 PT-1 PT-1 PT-1 OTS-1

341 PHOTO STUDIO RT-4 RB-1 PT-7, PT-8, CR-1 PT-7, PT-8, CR-1 PT-7, PT-8, CR-1 PT-7, PT-8, CR-1 OTS-3/ ACT-2 5, 10, 16

342 VIDEO EDITING SUITE LVT-1 RB-1 PT-7 PT-7 PT-7 PT-7 ACT-1/ PT-9a

343 VIDEO EDITING SUITE LVT-1 RB-1 PT-7 PT-7 PT-7 PT-7 ACT-1/ PT-9a 10

344 VIDEO EDITING SUITE LVT-1 RB-1 PT-7 PT-7 PT-7 PT-7 ACT-1/ PT-9a 10

345 VIDEO EDITING SUITE LVT-1 RB-1 PT-7 PT-7 PT-7 PT-7 ACT-1/ PT-9a 10

346 VIDEO CORRIDOR LVT-1 RB-1 PT-1 PT-1 PT-1 PT-1 OTS-1

350 DIVISION CHIEF CPT-2 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1

351 TEAM MEETING AREA CPT-2 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1

360 VESTIBULE TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1 4

361 ELECTRICAL CLOSET RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

362 VIDEO EDITING SUITE LVT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1/ PT-9a 10

363 WOMEN'S RESTROOM PFT-1. PFT-2, & PFT-3 PBT-1 PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-9b PL-1 QZ-1 4, 5, 6

364 MEN'S RESTROOM PFT-1. PFT-2, & PFT-3 PBT-1 PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-9b PL-1 QZ-1 4, 5, 6

370 MECHANICAL RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

596 CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1 4, 8

598 CENTRAL STAIR QFT-1/ BS-1 QTB-1 PT-5, PT-12,

PT-14 & WDT-1

PT-1 PT-1 PT-1 PT-1 PT-9a 2, 4

X3-101 STAIR A EX-CS EX PT-1 PT-1 PT-1 PT-1 PT-9a 15

X3-102 STAIR B EX-CS EX PT-1 PT-1 PT-1 PT-1 PT-9a 15

INTERIOR ROOM FINISH SCHEDULE - LEVEL 4

ROOM # ROOM NAME

FLOOR

BASE FINISH WAINSCOT

WALL FINISH CLG CABINETS/

MILLWORK COUNTER TOP NOTES & REMARKSFINISH NORTH EAST SOUTH WEST FINISH

400 CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1/ APC-1 4, 8

401 CENTRAL STAIR QFT-1/ BS-1 QTB-1 PT-5, PT-12, &

WDT-1

PT-1 PT-1 PT-1 PT-1 PT-9a 2, 4

402 WAITING AREA QFT-1/ BS-1 QTB-1 PT-5, PT-12, &

WDT-1

PT-1 PT-1 PT-1 PT-1 PT-9a 2, 4

404 ROOF ACCESS RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

410 PRINTING/LAMINATING RT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP 14

411 SHARED CONFERENCE ROOM CPT-4 RB-1 PT-1, AWP-2 PT-1 PT-1, MB-3 PT-1 APC-3 5, 9

412 EQUIPMENT LOAN LVT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

413 BROADCAST ENGINEER CPT-2 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

420 JANITOR'S CLOSET RE-3 RB-1 WP-1 PT-15 PT-15 PT-15 PT-15 EXP

421 ELECTRICAL CLOSET RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

422 TELECOM SDT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

423 WOMEN'S RESTROOM PFT-1. PFT-2, & PFT-3 PBT-1 PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-9b PL-1 QZ-1 4, 5, 6

424 MEN'S RESTROOM PFT-1. PFT-2, & PFT-3 PBT-1 PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-9b PL-1 QZ-1 4, 5, 6

599 CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1/ APC-1 4, 8

X4-102 STAIR B EX-CS EX PT-1 PT-1 PT-1 PT-1 PT-9a 15

MATERIAL ABBREVIATIONS

ACT ACOUSTIC CEILING TILE & GRID

AFU ACOUSTIC FLOOR UNDERLAYMENT

APC ACOUSTICAL PANEL CLOUD

ASC ACOUSTICAL SUSPENDED CLOUD

AWP ACOUSTICAL WALL PANEL

BS BLUE SLATE

CG CORNER GUARD

CPT MODULAR CARPET TILE

CU CURTAIN FABRIC

EC ELEVATOR CEILING

EF ELEVATOR FLOOR

EM ENTRANCE MAT FLOORING

EWP ELEVATOR WALL PANEL

EX EXISTING TO REMAIN

EX-CS EXISTING CONCRETE STAIR - REFURBISHED

EX-QFT/

BS

EXISTING QUARRY FLOOR TILE AND BLUE SLATE - REFURBISHED

EXP EXPOSED

GRT GROUT

GWB GYPSUM WALL BOARD

LVT LUXURY VINYL TILE

MB MARKER BOARD

MCT METAL CEILING TILE

MES METAL EDGE STRIP

MWT MOSAIC WALL TILE

OTS OPEN TO STRUCTURE

PBN PORCELAIN BULLNOSE

PFT PORCELAIN FLOOR TILE

PL PLASTIC LAMINATE

PT PAINT

PTB PORCELAIN TILE - COVE BASE

PWT PORCELAIN WALL TILE

QFT QUARRY FLOOR TILE

QZ QUARTZ

RB RESILIANT BASE

RE RESIN EPOXY - POURED

RT RUBBER TILE

SC SEALED CONCRETE

SDT STATIC DISSIPATIVE TILE

SN STAIR NOSING

SS SOLID SURFACE

STS SEALED STONE FINISH

TB TACK BOARD

TP TOILET PARTITION

TRB TERRAZZO COVE BASE - POURED

TRZ TERRAZZO - POURED FLOORING

TRZ-ST TERRAZZO - PREFABRICATED STAIR TREAD AND RISER

TS TRANSITION STRIP

WB WOOD BASE

WC WALL COVERING

WD WOOD DOOR FINISH

WDT WOOD TRIM

WF WINDOW FILM

WP WALL PROTECTION - SHEET

WPC WOOD PANEL CEILING

WT WINDOW TREATMENT - ROLLE SHADE

WWP WOOD WALL PANEL

M A

R K

D E

S C

R

IP

T I O

N D

A T

E

IS

S U

E D

V

IA

A M

E N

D M

E N

T /1

/2

1 1

Sheets
A-429 - ENLARGED BRIEFING ROOM PLANS AND ELEVATIONS
A-562 - MILLWORK DETAILS - BRIEFING ROOM
I-103 - LEVEL B1 FLOOR PLAN - FINISH
I-602 - FINISH MATERIAL SCHEDULE
I-603 - FINISH MATERIAL SCHEDULE
I-604 - FINISH MATERIAL SCHEDULE

File details come from the government source that posted it. Updated .