LH- H-101.pdf
PDF 99 KB Posted
- Attached to
- LINCOLN HALL RENOVATION, BLDG. 607 Federal contract opportunity
- Solicitation number
- W912DS23R0009
About this file
This document includes plans for hazardous material abatement as part of the renovation of Building 607, Lincoln Hall at West Point, New York. The plans detail plaster, lead paint, mold and asbestos remediation required in specific areas of level B3, and reference applicable federal and state regulations for abatement of identified hazardous materials. Accompanying the plans is a solicitation from the U.S. Army Corps of Engineers, New York District to award a firm-fixed price contract for renovation of the building, to be procured as an unrestricted Best Value Trade Off solicitation via a Request for Proposal. The solicitation number is provided as W912DS23R0009 and describes the scope of work to include supporting renovation efforts.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PUMP
ROOM
B302
MECHANICAL
ROOM
B300
MECHANICAL
ROOM
B301
MECHANICAL
ROOM
B301A
MECHANICAL
ROOM
B305
CL S
CL N
MECHANICAL
XB301
UTILITY TUNNEL
XB300
STAIR B
XB3-102
UNEXCAVATED
AREA
UTILITY TUNNEL
UNEXCAVATED
AREA
UNEXCAVATED
NO PLANNED ABATEMENT OF PLASTER ON B3
REFER TO GENERAL NOTES FOR HAZARDOUS
MATERIAL SCOPE
GENERAL NOTES
1. WARNING! PLASTER CONTAINS ASBESTOS. WORKER PROTECTIONS AND
ENVIRONMENTAL CONTROLS MUST BE IN PLACE PRIOR TO PERFORMING ANY WORK THAT
WILL IMPACT SUSPECT ASBESTOS CONTAINING MATERIALS (ACM)
2. THE CONTRACTOR MAY, AT HIS EXPENSE, PERFORM TESTING TO EXCLUDE MATERIALS
FROM CONSIDERATION AS ACM
3. ANY SUSPICIOUS MATERIAL SHOULD BE ASSUMED TO BE ACM UNTIL IT IS TESTED
4. ANY MATERIAL LISTED IN THE HAZMAT REPORT AS ACM, AND THAT IS SCHEDULED FOR
DEMOLITION AS ACM MUST BE REMEDIATED IN ACCORDANCE WITH APPLICABLE FEDERAL
AND STATE REGULATIONS
5. LEAD BASED PAINT PRESENT IN AREAS INDICATED IN HAZMAT REPORT. WORKER
PROTECTION IS REQUIRED.
6. MOLD WAS FOUND TO BE PRESENT IN LATEST HAZMAT REPORT (2018) AS INCLUDED IN
SPECIFICATIONS. CONTRACTOR MUST PERFORM VISUAL INSPECTION TO DETERMINE IF
ADDITIONAL MOLD IS PRESENT, AND REMEDIATE ANY INSTANCES OF MOLD IDENTIFIED.
CORRECTIVE ACTIONS MUST MITIGATE WATER INTRUSION OR SOURCE OF MOISTURE IN
MOLD-AFFECTED AREAS PRIOR TO RECONSTRUCTION.
7. PLASTER CEILING ABATEMENT IN THE CENTRAL STAIR ON THE FIRST FLOOR WILL BE
ABOVE COFFERED CEILING ELEMENTS TO REMAIN. WITH ABATEMENT ENSURE THAT
EXISTING ELEMENTS TO REMAIN ARE NOT DAMAGED OR REMOVED.
LEGEND
CEILING PLASTER TO BE ABATED - REFER TO KEYNOTE 3
PLASTER TO BE ABATED AT CORRIDOR WALLS - REFER TO KEYNOTE 2
PLASTER TO REMAIN AT EXTERIOR/INTERIOR WALLS - REFER TO KEYNOTE 1
CEILING PLASTER TO REMAIN - REFER TO KEYNOTE 6
MOLD TO BE REMEDIATED - REFER TO KEYNOTE 7
HAZMAT DRAWINGS ARE INCLUDED FOR BIDDING PURPOSES AND TO
CONVEY DESIGN INTENT. HAZMAT ABATEMENT TO BE PERFORMED IN
ACCORDANCE WITH HAZMAT SPECIFICATIONS
N
8'4' 16'0
SCALE: 1/8"=1'-0"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
H-101
L E
V E
L B
H
A Z
M A
T P
L A
N
B U
IL
D
IN
G
S
/6
R
E N
O V
A T
IO
N
L
IN
C O
L N
H A
L L
L
IN
C O
L N
H A
L L
W E
S T
P O
IN
T
N
E W
Y O
R K
A F
L O
R A
A F
L O
R A
D S
T E
L T
Z E
R
M
A R
C H
W D
S -1
-R
-0
W D
S -1
-C
-0 -L
REVISED RTA SUBMISSION 03/01/2023
1/8" = 1'-0" C1
LEVEL B3 HAZMAT PLAN
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
IS
S U
E D
B Y
A M
E N
D M
E N
T
/1
/2
| Sheets |
| H-101 - LEVEL B3 HAZMAT PLAN |
File details come from the government source that posted it. Updated .