This solicitation seeks maintenance dredging services for portions of the Newark Bay Federal Navigation Project in New Jersey. The contractor will be required to dredge approximately 600,000 cubic yards of selected shoals from the Main and Port Newark Channels to depths of -40 to -50 feet MLLW plus one foot allowable overdepth using mechanical dredging equipment. The dredged material, consisting primarily of silt and clay, must be processed, transported, dewatered and placed at an upland placement site secured by the contractor. Multiple barges and tugboats will be needed to support dredging, dewatering and unloading operations. The apparent low bidder must submit permit and approval documentation for material placement within 35 days of notification. Work is estimated to cost between $25-100 million and shall commence within five days of notice to proceed, maintaining a production rate of at least 2,500 cubic yards per day. Anticipated performance is between August 2022 and March 2023.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
Revise and Reissue Bid Schedule Revise Plans and Specs.
Revise Period of performance and clause 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) to 144 calendar days Bid opening date remains 30-June-2022 at 2:00 P.M. EST NOTE: Bidders must acknow ledge receipt of this amendment by date specif ied in the bid (or as amended) by one of the follow ing methods:
In space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE
WITHDRAWAL OF BID (FAR 14.304)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Jun-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS22B0010
X 9B. DATED (SEE ITEM 11)
17-May-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Jun-2022
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS22B0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY
SECTION 00 10 00 - SOLICITATION
The contractor period of performance end date has decreased by 45 days from 189 days to 144 days.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Mobilization and Demobilization
FFP
Mobilization and Demobilization FOB: Destination
PSC CD: Y1KZ
NET AMT
0002 51,280 Cubic
Yard
Basic Work - Dredging Area 1
FFP
DDredging (to -40 feet MLLW + 1 foot allowable overdepth), Dewatering, Offloading, Processing, Transportation and Placement (Sheet 3 of 6 of the contract drawings). Removal of material (51,280 CY) except ledge rock lying above the plane of 40 feet below mean lower low water (MLLW), plus 1 foot allowable overdepth from Newark Bay, NJ, Federal Navigation Project (Port Newark Channel) with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s).
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 57,100 Cubic
Yard Basic Work - Dredging Area 3
FFP
Dredging (to -40 feet MLLW + 1 foot allowable overdepth), Dewatering, Offloading, Processing, Transportation and Placement (Sheets 4 and 5 of 6 of the contract drawings) Removal of material (57,100 CY) except ledge rock lying above the plane of 40 feet below mean lower low water (MLLW), plus 1 foot allowable overdepth from Newark Bay, NJ, Federal Navigation Project (Main Channel – 40’ Reach) with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s).
FOB: Destination
PSC CD: Y1KZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 224,795 Cubic
Yard Basic Work - Dredging Area 4
FFP
Dredging (to -50 feet MLLW + 1 foot allowable overdepth), Dewatering, Offloading, Processing, Transportation and Placement (Sheet 5 of 6 of the contract drawings) Removal of material (224,795 CY) except ledge rock lying above the plane of 50 feet below mean lower low water (MLLW), plus 1 foot allowable overdepth from Newark Bay, NJ, Federal Navigation Project (Main Channel – 50’ Reach) with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s).
FOB: Destination
0005 1 Job Black Box Monitoring Unit
FFP
See specifications section 35 20 29
0006 25,335 Cubic
OPTION Option 1 - Dredging Area 5
Dredging (to -50 feet MLLW + 1 foot allowable overdepth), Dewatering, Offloading, Processing, Transportation and Placement (Sheet 6 of 6 of the contract drawings) Removal of material (25,335 CY) except ledge rock lying above the plane of 50 feet below mean lower low water (MLLW), plus 1 foot allowable overdepth from Newark Bay, NJ, Federal Navigation Project (Main Channel – 50’ Reach) with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s).
0007 70,765 Cubic
OPTION Option 2 - Dredging Area 6
Dredging (to -50 feet MLLW + 1 foot allowable overdepth), Dewatering, Offloading, Processing, Transportation and Placement (Sheets 5 and 6 of 6 of the contract drawings) Removal of material (70,765 CY) except ledge rock lying above the plane of 50 feet below mean lower low water (MLLW), plus 1 foot allowable overdepth from Newark Bay, NJ, Federal Navigation Project (Main Channel – 50’ Reach) with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s).
0008 39,160 Cubic
OPTION Option 3 - Dredging Area 2
Dredging (to -40 feet MLLW + 1 foot allowable overdepth), Dewatering, Offloading, Processing, Transportation and Placement (Sheet 3 of 6 of the contract drawings) Removal of material (39,160 CY) except ledge rock lying above the plane of 40 feet below mean lower low water (MLLW), plus 1 foot allowable overdepth from Newark Bay, NJ, Federal Navigation Project (Port Newark Channel) with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s).
TOTALS/NOTES
TOTAL BASE BID (CLINs 0001 THRU 0005)…………..………………...……….. $ ___________________
TOTAL OPTION BID (CLINs 0006 THRU 0008)...……..………………...……….. $ ___________________
TOTAL BID (CLINs 0001 THRU 0008)…………...……..………………...……….. $ ___________________
NOTES TO BIDDERS:
NOTE 1: Bidders must bid on all items. Failure to bid on all work will be cause for rejection of the bid as nonresponsive.
NOTE 2: Award of contract will be based on the responsible and responsive bidder with the lowest total price for the total of the CLINs 0001 through 0008.
NOTE 3: The unit prices for CLINs 0002, 0003, 0004, 0006, 0007, and 0008 represent the cost per cubic yard for the removal of the estimated quantities of dredged material (all material except ledge rock lying above the planes of -40 feet, -40 feet, -50 feet, -50 feet, -50 feet, and -40 feet mean lower low water (MLLW) respectively, plus 1 foot allowable overdepth), in the Basic Work (contract Dredging Areas 1, 3, and 4) and Options (contract Dredging Areas 5, 6, and 2) contract areas of Newark Bay, respectively. The dredged material from CLINs 0002, 0003, 0004, 0006, 0007, and 0008 must subsequently be transported, processed, and placed at a contractor furnished, state permitted, Government approved upland placement site(s).
NOTE 4: All bidders are hereby advised that the execution of the Options are subject to the availability of funds.
NOTE 5: Exercise of the Options are at the discretion of the Government and may be exercised within one hundred forty (140) calendar days of receipt by the contractor of the Notice to Proceed (Basic Work). If exercised, the options listed above may not be exercised in numerical order. If options are exercised, their performance periods will be consecutive to that of the Basic Work. If exercised, the time for contract completion of each option will be based on the rate of one (1) additional calendar day for each 2,500 cubic yards in the Option.
NOTE 6: All bidders are hereby advised that the estimated dredge quantities for placement in the price schedule are estimated and based on the survey data collected on 27-28 January, and 01 February 2022.
NOTE 7: The Government may reject a bid as non–responsive if the prices bid are materially unbalanced between line items and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low bid.
NOTE 8: Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidder himself may render the proposal non-responsive and may be cause for its rejection.
NOTE 9: The apparent low bidder shall submit the documents specified in Section 01 30 00, Administrative Requirements, paragraph 1.4, Contractor-Identified Offloading, Processing and Disposal Site Compliance. If the apparent low bidder does not submit the required information within 35 calendar days from the date the apparent low bidder is notified of being the low bidder, the bidder may be considered non-responsible and his bid will no longer be considered. Information provided by the apparent low bidder regarding the 35 day submittal will be the final version. If the apparent low bidder requests to make changes to the 35 day submittal, they can only be made with approval from the Government.
NOTE 10: It is the contractor’s responsibility to comply with all conditions and requirements of the contractor furnished placement site(s).
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within five (5) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 144 calendar days from the notice to proceed.
(End of clause)
(End of Summary of Changes)