W912DS-16-B-0002_-_Amendment_0005.pdf

PDF 96 KB Posted

Attached to
Thule Consolidation 1 (Base Shops & Base Supply Facility) Federal contract opportunity
Solicitation number
W912DS-16-B-0002
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

Amendment 0005

View the file

Other files for this federal contract opportunity

Other files attached to Thule Consolidation 1 (Base Shops & Base Supply Facility), newest first.
File Type Posted
Bid_Abstract_-_W912DS-16-B-0002.pdf PDF
C-106.pdf PDF
C-103.pdf PDF
Greenland_-_DBA_Waiver_-_Greenland.pdf PDF
C-107.pdf PDF
C-304.pdf PDF
C-303.pdf PDF
Thule_Consol_1_CE_shop_-_100__ELECT_SPEC_27_10_00_(Rev_1)_25_April_2016.pdf PDF
Thule_Consol_1_CE_shop_-_100__ELECT_SPEC_(REGISTER)_27_10_00_(Rev_1)_25_April_2016.pdf PDF
C-104.pdf PDF
C-105.pdf PDF
W912DS-16-B-0002_Amendment_0004.pdf PDF
Consoliation_1_Revised_Drwgs_Amd_0004.pdf PDF
Thule_Consol_1_CE_Shop_-_Updated_100__CID_Package_25_April_2016.pdf PDF
Thule_Consol_1_CE_shop_-_100__ELECT_SPEC_27_10_00_(Rev_1)_25_April_2016.pdf PDF
Thule_Consol_1_CE_shop_-_100__ELECT_SPEC_(REGISTER)_27_10_00_(Rev_1)_25_April_2016.pdf PDF
W912DS-16-B-0002_Amendment_0003.pdf PDF
ES-601_-_SITE_ELEC_REVISED_(25_APR_2016).pdf PDF
ES-601A_-_FEEDER_SCHEDULE(4-25-2016).pdf PDF
ES-102A_-_NEW_REVISED_SITE_FOR_CE_SHOP(4-25-2016).pdf PDF
W912DS-16-B-0002_Amendment_0002.pdf PDF
W912DS-16-B-0002_-_Amendment_0001.pdf PDF
Package_2_-_Thule_Consolidation_1_-_Specifications_100.pdf PDF
W912DS-16-B-0002.pdf PDF
Appendix_C_-_Conservation_Mgmt_Plan.pdf PDF
Appendix_A_-_Active_Landfills.pdf PDF
Appendix_K_-_FGS-GL_(Environmental_Protection).pdf PDF
Appendix_F_-_PPM_Plan.pdf PDF
Appendix_I_-_Slug_Mgmt_Plan.pdf PDF
Package_1_-_Thule_Consolidation_1_-_Plans_100.pdf PDF
Appendix_H_-_Storm_Water_Mgmt_Plan.pdf PDF
Appendix_L_-_Affirmative_Proc_Plan.pdf PDF
Package_3_-_Thule_Consolidation_1_-_SID_ _CID.pdf PDF
Appendix_R_-_Demo_(Lead_ _Asbestos_Survey _As-Builts).pdf PDF
Appendix_G_-_Solid_Waste_Mgmt_Plan.pdf PDF
Appendix_M_-_PCB_Repl_Plan.pdf PDF
Appendix_D_-_HWM_Plan.pdf PDF
Appendix_W_-_Natural_Resources_Management_Plan.pdf PDF
Appendix_B_-_NFS_Material_Borrow_Sites.pdf PDF
Appendix_T_-_Fuel_Pricing_and_DLA_info.pdf PDF
Appendix_N_-_Asbestos_Mgmt_Plan.pdf PDF
Appendix_Q_-_Thule_Site_Topo_Survey.dwg DWG drawing
Appendix_O_-_Lead_Paint_Mgmt_Plan.pdf PDF
Appendix_E_-_Spill_Prevention-Response_Plan.pdf PDF
Appendix_U_-_Shipping_Rates_Gov_Furnished_Transport.pdf PDF
Appendix_P_-_DBA_Waiver.pdf PDF
Appendix_J_-_Installation_HAZMAT_Management_Plan.pdf PDF
Appendix_V_-_Geotechnical_Investigation.pdf PDF
Appendix_S_-_FY14_-_FY17_Sealift_Rates.pdf PDF
Appendix_X_-_Pacer_Goose_Shipping_Instructions.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE60221088

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Amend bid schedule

2. Amend Draw ings C-103, C-104, C-105, C-106, C-107, C-303 and C-304.

3. Amend Specification Section 27 10 00.

4. Amend Appendix P - DBA Waiver.

5. Provide responses to questions received from interested vendors, for informational purposes only.

The bid opening date is unchanged and remains 11 May 2016 at 3:00PM local time (Copenhagen).

NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing Methods: In the space provided on the SF1442, by separate letter, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-May-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-B-0002

X 9B. DATED (SEE ITEM 11)

08-Mar-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-May-2016

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-16-B-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0005

FY16 Thule Consolidation 1 Thule Air Base, Greenland

Invitation for Bid

Amendment 0005

Section Supplies or Services and Price

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Construction

FFP

Construction of FY16 Consolidated 1 Facility, Thule Air Base: All work (includes all plant, labor, and material) for the FY16 Thule Consolidation 1 as described in the plans and specifications except for work included in items below.

FOB: Destination

PURCHASE REQUEST NUMBER: W16ROE60221088

NET AMT

Section 00 10 00 - SOLICITATION/CONTRACT FORM

0002 1 Job Site work

FFP

Construction of FY16 Consolidated 1 Facility, Thule Air Base: Site work, all work outside the five-foot line of the building perimeter.

0003 1 Job Final Record Drawing

FFP

Construction of FY16 Consolidated 1 Facility, Thule Air Base: All work for the Final Record Drawing Submission (See paragraph 11 of Section 007300). ***

THIS CLIN IS A SET PRICE OF 300,000 DKK ***

Government Furnished Transportation

FFP

Construction of FY16 Consolidated 1 Facility, Thule Air Base: Transportation: All Government Furnished Transportation From Norfolk, Virginia to Thule Air Base.

*** THIS CLIN IS NOT PRICED. BIDDERS ARE TO ENTER TONNAGE

VOLUME ***

Government Furnished Transportation

FFP

Construction of FY16 Consolidated 1 Facility, Thule Air Base: Transportation: All Government Furnished Transportation From Thule Air Base to Norfolk, Virginia.

*** THIS CLIN IS NOT PRICED. BIDDERS ARE TO ENTER TONNAGE

VOLUME ***

0006 1 Job Transportation from Denmark

FFP

Construction of FY16 Consolidated 1 Facility, Thule Air Base: Transportation:

Furnished From Denmark to Thule AB

0007 1 Job

OPTION OPTION 1

FFP

Construction of FY16 Consolidated 1 Facility, Thule Air Base: All work (includes all plant, labor, and material) for the connection of Thermistor Strings to the Building Automation System (BAS) as described in the plans and specifications.

0008 1 Job

OPTION OPTION 2

FFP

Construction of FY16 Consolidated 1 Facility, Thule Air Base: All work (includes all plant, labor, and material) for providing and installing BACnet Networked Thermostat for Hot Water Unit Heaters and Panel Radiators for remote monitoring and control by the BAS as described in the plans and specifications.

0009 1 Job

OPTION OPTION 3

FFP

Construction of FY16 Consolidated 1 Facility, Thule Air Base: All work (includes all plant, labor, and material) for the demolition of Building 1091 as described in the plans and specifications.

0010 1 Job

OPTION OPTION 4

FFP

Construction of FY16 Consolidated 1 Facility, Thule Air Base: All work (includes all plant, labor, and material) for the demolition of Building 629 as described in the plans and specifications.

0011 1 Job

OPTION OPTION 5

FFP

Construction of FY16 Consolidated 1 Facility, Thule Air Base: All work (includes all plant, labor, and material) for the demolition of Building 551 as described in the

0012 1 Job

OPTION OPTION 6

FFP

Construction of FY16 Consolidated 1 Facility, Thule Air Base: All work (includes all plant, labor, and material) for the demolition of Building 553 as described in the

0013 1 Job

OPTION OPTION 7

FFP

Construction of FY16 Consolidated 1 Facility, Thule Air Base: All work (includes all plant, labor, and material) for the demolition of Building 571 as described in the

0014 1 Job

OPTION OPTION 8

FFP

Construction of FY16 Consolidated 1 Facility, Thule Air Base: Additional Demolition Equipment inclusive of transportation from Norfolk, Virginia and/or Denmark to Thule AB and return to Norfolk, Virginia and/or Denmark for completing demolition work as outlined in Options No 3 thru No 7.

If using Government provided Transportation, provide Tonnage:

Volume from Norfolk, Virginia to Thule Air Base

___________________(MT)

Volume from Thule Air Base to Norfolk, Virginia

___________________(MT)

0015 5,400 Cubic

Meter

OPTION OPTION 9

FFP

All work (includes all plant, labor, and material) for the additional excavation of material to a depth(s) beyond elevation 52.25 as may be directed by the contracting officer, the furnishing of additional NFS material and its placement as backfill to elevation 52.25. Work shall be performed as described in the plans and specifications. See note 17. (ESTIMATED QUANTITY)

0016 5,400 Cubic

OPTION OPTION 10

All work (includes all plant, labor, and material) for the additional excavation of material to a depth(s) as directed by the contracting officer, the furnishing of additional NFS material and its placement as backfill to replace additional materials excavated under this option. Work shall be performed as described in the plans and specifications. See note 18. (ESTIMATED QUANTITY)

TOTALS:

TOTAL BID

TOTAL BASE BID PRICE FOR LINE ITEMS 0001- 0006 _____________________

TOTAL OPTIONS BID PRICE FOR LINE ITEMS 0007- 0016 _____________________

TOTAL BASE BID WITH OPTIONAL BID LINE ITEMS 0001 – 0016 _____________________

BID SCHEDULE NOTES

NOTES:

1. All goods must be wrapped accordingly. It should be protected to withstand handling as well as storage and transportation by sea. Due to packing in containers, in warehouse and on ship every package must be able to withstand a pressure from above of at least it's own weight. If you have any questions please contact Royal Arctic Line Helle Christensen by phone: 99 30 32 26 or by e-mail: hch@ral.dk.

2. “Transportation from Denmark" means that the U.S. Embassy will provide a ship from Denmark to Thule AB, GL. The Contractor shall use the FY14 thru FY17 shipping rates provided in this amendment to estimate his volume and shipping costs which he will coordinate with the U.S. Embassy POC to palletize and ship his materials and supplies through. The amount bid on CLIN0005 will be used to evaluate the low bidder, however, this transportation cost will not be a part of the contractor’s firm fixed-price bid. CLIN 0005 will not be awarded to the contractor; those costs will be provided to the US Embassy directly for the shipping costs. See revised paragraph 35 (g) TRANSPORTATION AND PROCESSING OF PERSONNEL MATERIALS AND EQUIPMENT in this amendment for all transportation information.

The bidders are advised that applicable shipping costs (freight) of any goods from manufacturers/suppliers to port (Norfolk/Aalborg) only, if any, shall be included in the contractors price for any particular CLIN that the item is part of; DO NOT include this cost in CLIN 0005.

3. Bids must be in Danish Kroners.

4. Construction Award will not include Government Furnished Transportation.

5. Contractors not utilizing Government Furnished Transportation shall include shipping costs in their Base Bid Items, as applicable. In such cases, the applicable transportation price schedule should be marked “NOT APPLICABLE” or “0.”.

6. The Contractor shall be billed for all quantities over the amount stated in the bid items for Government Furnished Transportation or shall ship at his own expense through private carrier all items over the amounts stated in the bid items.

7. The Basis of evaluation will be the lowest responsive/responsible bidder calculated based on ABSOLUTE VALUES of each CLIN: Base Bid (sum of CLIN 0001 thru 0006) plus Option No 1 thru Option No 10 (CLIN 0007 thru CLIN 0016).

8. Bidders are required to bid on the Base Bid and all Optional Bid Items or their bids will be rejected.

9. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidder himself thereto may render the bid non-responsive and be cause for its rejection.

10. Option #1, #2, #8: At any time prior to 90 calendar days after written notice to proceed, the Government at its option, may execute these Options. Execution of these options will not alter the project completion date of the contract.

11. Option #3 thru #7: At any time prior to 90 calendar days after written notice to proceed, the Government at its option, may execute these Options. Execution of these options will extend the contract duration by 120 calendar days.

12. Option #8 shall be executed if and only if any option(s) #3 thru #7 is/are executed.

13. Line Item Number 0003 is pre-priced at 300,000DKK, it’s a firm fixed line item, and the price shown may not be changed, see paragraph 11(i) of Section 00 73 00.

14. Bid Acceptance Period: Bidders Bids are to be valid for 30 calendar days for bid acceptance from the Bid Opening.

15. NOTE: The items mentioned in the CID package under paragraphs 2.2 and 2.3 are NOT IN CONTRACT: i.e. refrigerators, microwaves, dishwashers, washers, dryers, furniture (tables, chairs, office shelving, desks, computers and computer equipment, non-built in work surfaces, trash bins).

16. Defense Base Act (DBA) Insurance if required. Refer to Appendix P - DBA Waiver, Paragraph D, and Section 00 73 00 Paragraph 76 - DBA Insurance Rates, for applicability.

17. Option #9: At any time prior to 30 calendar days after written notice to proceed, the Government at its option, may execute this Option. Execution of this option will not extend the contract duration. Quantity stated is in situ volume of earth and/or incompetent rock.

18. Option #10: At any time within 30 calendar days after the completion of the work under Option 9 is completed, the Government at its option, may execute this Option. Execution of this option will extend the contract duration by 90 calendar days. Quantity stated is in situ volume of earth and/or incompetent rock.

19. Excavation work; Final volume will be determined by topographic survey conducted by the contractor of the final excavation and as approved by the contracting officer.

AMENDMENT 0002 to DRAWINGS and SPECIFICATIONS for Consolidation #1, Thule Air Base, Greenland

TO OFFORERS

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWING(S) have been REVISED but NOT REISSUED:

None

2. The following DRAWING(S) have been REVISED and REISSUED:

C-103, DEMOLITION PLAN – LOCATION #1

C-104, DEMOLITION PLAN – LOCATION #2

C-105, DEMOLITION PLAN – LOCATION #3 & #4

C-106, DEMOLITION PLAN – LOCATION #5

C-107, EXCAVATION PLAN

C-303, SITE PROFILES

C-304, THERMISTOR PROFILES

3. The following DRAWING(S) have been ADDED:

SPECIFICATIONS

1. The following SPECIFICATION SECTION(S) have been ADDED and are provided in their entirety herein:

2. The following SPECIFICATIONS SECTION(S) have been DELETED in their entirety:

3. The following SPECIFICATIONS SECTION(S) have been REVISED and REISSUED:

SECTION 27 10 00 - BUILDING TELECOMMUNICATIONS CABLING SYSTEM with accompanying revised submittal register requirements to replace those SECTION 01 33 00.00 18, Submittal Procedures, for this section only.

Appendix P, DBA waiver. Valid thru April 2019

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

Section 31 23. 00.00 20, EXCAVATION AND FILL, Paragraph 3.3, Excavation; Delete the text of this paragraph as it appears in its entirety and replace it with the following:

“Paragraph 3.3, Excavation

Excavate to contours, elevation, and dimensions indicated. During excavation, removal of all thaw-unstable soil and rock to the surface of ice-poor bedrock must be ensured.

The contractor will provide gravimetric moisture contents and pictures of bedrock material when ice-free or ice-poor bedrock material is suspected of being encountered.

Dry density will then determine if ice-free or ice-poor material has been encountered.

Gravimetric moisture contents and photographs of the pre-thawed still frozen, and also of the oven thawed samples will be provided to the COR prior to dry density determination. The photographs will be of sufficient resolution, close range, and clearness to show individual soil particles and ice crystals. It is the COR’s discretion to determine when dry density tests will be required. The dry density will be calculated on an intact frozen bulk volume basis. Final acceptance of the material as competent ice-free or ice-poor will be determined based on the dry density and it will be the COR’s discretion to determine thaw-stable bedrock has been obtained and excavation can be terminated at that location. Reuse excavated materials that meet the specified requirements for the material type required at the intended location. Keep excavations free from water. Excavate soil disturbed or weakened by Contractor's operations, soils softened or made unsuitable for subsequent construction due to exposure to weather.

Excavations below indicated depths will not be permitted except to remove unsatisfactory material. Unsatisfactory material encountered below the grades shown shall be removed as directed. Refill with NSF material and compact to 95 percent of ASTM D 1557 maximum density, or as shown on plans. Unless specified otherwise, refill excavations cut below indicated depth with NSF material and compact to 95 percent of ASTM D 1557 maximum density. Satisfactory material removed below the depths indicated, without specific direction of the Contracting Officer, shall be replaced with satisfactory materials to the indicated excavation grade; except as specified for spread footings. Determination of elevations and measurements of approved over depth excavation of unsatisfactory material below grades indicated shall be done under the direction of the Contracting Officer.”

BIDDER’S QUESTIONS AND GOVERNMENT REPLY

(Questions that may be of general interest to all bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors/Bidders for information only and do not alter the plans and specifications as issued.)

18. Question: Reference is made to Appendix P; "The DBA Waiver issued as

Appendix P expires on December 31, 2015. Please confirm that the Waiver will be extended to cover the entire project."

Response: Appendix P contents are replaced with a more current waive DBA waiver that is valid thru April 2019

19. Question: Reference is made to Solicitation, offer and award, standard form 1442

"If the bid date is 7th of April 2016 and the entire 90 calendar days of acceptance is used, NTP will be 6th of July. This gives 1 month before the last ship will close for delivery of material in Aalborg. This is a very short period for preparing prefab foundation drawings, approval from USACE of prefab foundation drawings and fabrication of prefab foundations. We kindly ask you to reduce the 90 calendar days of acceptance or extend the timeframe of the project. " Response: Under this amendment the bid acceptance period has been reduced from 90 to 30 calendar days.

20. Question: Reference is made to Drawing S-501; It's indicated that foundations are prefabricated footings and bottom plates, but the reinforcement is showed as in-situ?

Response: The foundation details on S-501 provide typical sections for the precast concrete units. The precast units are reinforced and but not necessarily in-situ. A detail for footing splices is also provided; Detail 6. Requirements Lap Splicing of Reinforcing Bars are provide within tables and notes on drawings S- 001 and 002. The Contractor and precast manufacturer will coordinate the required locations for the footing splices based on constructability and transportation to the site. These are the same foundation details utilized on many other construction projects at Thule.

21. Question: Is it allowed to fly a drone over the construction site area, for construction purposes?

Response: The flying of drones over the site is not permitted at this time, since the site is in a designated "no-fly" zone.

22. Question: Is it possible to receive drawings as .dwg instead of .pdf?

Response: Yes, these will be made available to the successful bidder.

23. Question: Is it possible to get the 3D BIM models that the drawings are based on?

Response: Yes, these will be made available to the successful bidder.

24. Question: Reference is made to Amendment 0002; The bid date is extended to the 11th of May. With 90 calendar days of acceptance period, the contract award (NTP) will be 9th of August. This is after the last ship departing from Aalborg. This means that no production can be made on site in the first 10 month (300 days).

The actual building period is in this case reduced to approx. 420 days unless an extension of the timeframe is given. Will such an extension be given?

Response: See response to question 19.

SECTION 00 72 00 - CONTRACT CLAUSES

The following have been added by reference:

52.211-18 Variation in Estimated Quantity APR 1984

SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS

The following Acceptance/Inspection Schedule was added for CLIN 0015:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for CLIN 0016:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION/CONTRACT FORM

The offeror acceptance period has decreased by 60 from 90 to 30.

CLIN 0015 is added as follows:

0015 5,400 Cubic

OPTION OPTION 9

All work (includes all plant, labor, and material) for the additional excavation of material to a depth(s) beyond elevation 52.25 as may be directed by the contracting officer, the furnishing of additional NFS material and its placement as backfill to elevation 52.25. Work shall be performed as described in the plans and specifications. See note 17. (ESTIMATED QUANTITY)

CLIN 0016 is added as follows:

0016 5,400 Cubic

OPTION OPTION 10

All work (includes all plant, labor, and material) for the additional excavation of material to a depth(s) as directed by the contracting officer, the furnishing of additional NFS material and its placement as backfill to replace additional materials excavated under this option. Work shall be performed as described in the plans and specifications. See note 18. (ESTIMATED QUANTITY)

(End of Summary of Changes)