Supersedes FY-14 edition FY-15
CDRL CEV–15J
SLUG MANAGEMENT PLAN
Thule Air Base, Greenland
FINAL, FY-15
OPR: GREENLAND CONTRACTORS
Chief of Environmental Engineering DSN 629-3840 ext. 2698 Contract No. FA2523-05-C-9001
CDRL CEV-15J Slug Management Plan
Thule Air Base, Greenland 3/23 FY-15
TABLE OF CONTENTS
1 LETTER OF INSTRUCTION
1.1 Security and Administrative Instructions
2 GENERAL
2.1 Purpose
2.2 Scope
2.3 Regulatory Overview
3 ORGANIZATIONAL ROLES AND RESPONSIBILITIES
3.1 Installation Commander, 821 ABG/CC
3.2 Danish Liaison Officer, DLO
3.3 Environmental Engineering, GC/EE
3.4 Utilities and Facilities Maintenance, GC/OMUFM
3.5 Fire Protection, GC/AMF
4 POTENTIAL SPILLS AND BATCH DISCHARGES (SLUGS)
4.1 Introduction
4.2 Facility Layout of the Sanitary Wastewater System (SWWS)
4.3 Discharge Practices
4.3.1 Discharges of sanitary wastewater collected by truck
4.3.2 Water from boilers and heating system
4.3.3 Water from washing of aircraft/vehicles
4.3.4 Water from the laundry shop
4.3.5 Water from parts washers
4.3.6 Discharge of water from swimming pool
4.3.7 Intrusion of Storm Water
4.4 Storage of Chemicals, Toxic Organic Pollutants and Solvents
4.5 Floor Drains
4.5.1 Bldg. 118 – Hospital
4.5.2 Bldg. 107 – Dundas Buffet Restaurant
4.5.3 Bldg. 4016 – Power Plant, J-site
4.5.4 Bldg. 236 – TOW Club
4.6 Conclusion
5 SLUG MANAGEMENT AND OPERATIONS
5.1 Discharge Practice and Non-routine Batch Discharges
5.1.1 Discharge practice for trucked and hauled waste
5.1.2 Discharge practice for trucked sanitary wastewater
5.1.3 Intentional non-routine batch discharge
5.2 Handling of Chemicals and Control of Toxic Organic Pollutants and Solvents
5.2.1 Rooms with floor drain directly to the SWWS
5.2.2 Rooms with floor drain indirectly to the SWWS
5.3 Buildings, Containment Structures and Equipment
Thule Air Base, Greenland 4/23 FY-15
5.3.1 Planning of new building, containment structures and equipment
5.3.2 Inspection and Maintenance of the SWWS
5.3.3 Oil/water Separators
5.3.4 Sand/Grease Traps
5.3.5 Cross Connections
5.4 Accidental Spill Prevention
5.5 Emergency Response
5.6 Employee Training
5.7 Sludge Disposal
6 SEWAGE SPILL/RELEASE INCIDENTS
6.1 Response
6.2 Notification of USAF
6.3 Non-Routine Discharge of Sewage
7 EFFLUENT MONITORING
8 WATER POLLUTION COMPLAINTS
APPENDIX 1: DEFINITIONS AND TERMS
APPENDIX 2: SEWAGE SYSTEM
APPENDIX 3: DISTRIBUTION LIST
APPENDIX 4: REVIEW COMMENTS 2014
Thule Air Base, Greenland 5/23 FY-15
1 LETTER OF INSTRUCTION
1.1 Security and Administrative Instructions
Title
: The title of this document is “Slug Management Plan” CDRL CEV-15J. The acronym SMP is used throughout the document.
Classification
: The document is unclassified.
Responsibilities
: Greenland Contractors, Environmental Engineering (GC/EE) is the office of primary responsibility (OPR) for establishing, implementing and maintaining the SMP. The instructions given in the SMP are applicable to all organizations and tenant units at Thule AB.
Organizations and tenant units are authorized to extract and reproduce those sections of the SMP that are essential in the planning and preparation of supporting documents and reports.
Reviews/changes
: The SMP will be reviewed and updated annually IAW the CDRL and distributed accordingly. A draft is submitted to 21 CES/CEIE by 1 Nov for review. Review comments, if any, will be provided within 60 days. Review comments received will be incorporated in the final version of the plan within 30 days; thereafter the document will be submitted to 821 ABG/CC for signature. The signed plan will then be submitted as the final edition.
Furthermore, the SMP is subject to change if any of the applicable laws, regulations, or requirements are altered.
Distribution
: The SMP is distributed to organizations listed in the distribution list (APPENDIX 3).
Thule Air Base, Greenland 6/23 FY-15
2 GENERAL
2.1 Purpose
The purpose of the SMP is to identify activities that have a significant potential for spills or batch discharges (slugs) to the sanitary wastewater system at Thule AB, and provide guidelines or instructions for prevention and control.
2.2 Scope
The scope of the SMP is to describe the sanitary wastewater system at Thule AB, and identify activities that have a significant potential for spills or batch discharges (slugs). Storm water runoff is not drained to the sanitary wastewater system. Activities and best management practices related to storm water runoff are outlined in the Storm Water Management Plan, CDRL
CEV-15G.
Related environmental plans may need to be consulted:
• Spill Prevention and Response Plan, CDRL CEV–15C
• Hazardous Waste Management Plan, CDRL CEV-15B
• Hazardous Material Management Plan
The provisions of the SMP apply throughout Thule AB and to all personnel. Certain responsibilities are assigned to selected individuals identified in Section 3.
2.3 Regulatory Overview
In accordance with USAF policy, Thule AB is required to comply with the following public laws and their respective regulations:
In accordance with the Final Governing Standards for the Environmental Protection by United States Forces in Greenland (FGS-GL) 24 July 2003 C4.3.2.1.6: “Activities or installations that have a significant potential for spills or batch discharges will develop a slug prevention plan”.
The Clean Water Act (CWA) requires industrial facilities to reduce, minimize, or eliminate sources of pollution exposed to storm water runoff. The goals of the CWA are to make the rivers, lakes and streams fishable, swimmable and drinkable.
Thule Air Base, Greenland 7/23 FY-15
3 ORGANIZATIONAL ROLES AND RESPONSIBILITIES
In order to ensure that spills and batch discharges (slugs) are handled in an environmentally correct manner, it is important that personnel are fully aware of their responsibilities in the SMP.
The following outlines responsibilities:
3.1 Installation Commander, 821 ABG/CC
The Installation Commander has the overall responsibility for the management of the SMP at Thule AB. The responsibility is implemented through the base Environmental, Safety, Occupational Health Council (ESOHC), of which the Installation Commander is the chairperson.
3.2 Danish Liaison Officer, DLO
The Danish Liaison Officer serves as the official representative of Denmark and the Greenland Self Rule concerning environmental issues at Thule AB.
3.3 Environmental Engineering, GC/EE
Greenland Contractors, Environmental Engineering (GC/EE) is the office of primary responsibility (OPR) for establishing, implementing and maintaining the SMP.
3.4 Utilities and Facilities Maintenance, GC/OMUFM
The responsibility of GC/OMUFM stated as the domestic wastewater treatment system (DWTS) in the FGS:
• Batch discharges of trucked wastewater.
• Inspection and maintenance of the wastewater pipe system.
3.5 Fire Protection, GC/AMF
The Fire Chief serves as designated Incident Commander for emergency response actions.
Thule Air Base, Greenland 8/23 FY-15
4 POTENTIAL SPILLS AND BATCH DISCHARGES (SLUGS)
4.1 Introduction
A plan for spills and batch discharges is required by C4.3.2.1.6 of the FGS. Activities or installations that have a significant potential for spills or batch discharges (into the wastewater system) will develop a slug prevention plan. Each plan must contain the following minimum requirements:
• Description of discharge practices, including non-routine batch discharges.
• Description of stored chemicals.
• Plan for immediately notifying the domestic wastewater treatment system (DWTS) of slug discharges and discharges that violate prohibitions under this section, including procedures for subsequent written notification within five days.
• Necessary practices to prevent accidental spills. This would include proper inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, and worker training.
• Proper procedures for building containment structures or equipment.
• Necessary measures to control toxic organic pollutants and solvents.
• Proper procedures and equipment for emergency response, and any subsequent plans necessary to limit damage suffered by the treatment plant or the environment.
4.2 Facility Layout of the Sanitary Wastewater System (SWWS)
Thule AB is situated in an area with a very low population density, approximately 65 miles from the nearest village. The climate is described as arctic desert.
Due to very low temperatures, the sanitary wastewater system (SWWS) on base consists of insulated black steel pipes located above ground with heat tracing. The wastewater runs gravitationally through the steel pipes to Bldg. 984, where it is discharged through an underwater pipeline into the North Star Bay.
At 12 SWS, wastewater is directed to a septic tank, from where it is dispersed over a mountainside.
Wastewater from Bldg. 107, 555, 605, 1201, 1307, 1951, 1971 and 1824 (Det 1) is collected in a tank. A special truck collects the contents. The contents are discharged into the SWWS at Bldg. 984.
The majority of water directed to the SWWS originates from household sources like showers, washrooms, laundry rooms and kitchens. The only direct drainage from floors outside the dormitories are in Bldg. 107, 118, 236 and 4016. In all other situations, the water is pumped or manually poured into the SWWS.
No storm water leads to the SWWS.
Consult Appendix 2 for a diagram of the SWWS on the main base.
Thule Air Base, Greenland 9/23 FY-15
4.3 Discharge Practices
The main discharges made to the SWWS are what can be expected for at place where 700 people are living and with some craftsman-like activities but without any industrial activities.
4.3.1 Discharges of sanitary wastewater collected by truck
Some of the wastewater is transported by truck, as mentioned in section 4.2.
4.3.2 Water from boilers and heating system
On main base, the primary source of heating is a high-pressure steam system. Heat is produced at three different locations: Bldg. 1391, 241, and 341. Due to high levels of impurities in the boiler water, it is necessary to replace the water and discharge to the SWWS.
To prevent corrosion, a number of additives are used and subsequently discharged into the
SWWS.
Further heating is produced on low-pressure systems at Bldg. 1401, 1824 and 4016. From those places, only small amounts of boiler water are expected to be discharged to the SWWS – primarily in case of maintenance of the systems.
Blowdown water from boilers does not contain any regulated pollutants and is discharged to host nation water bodies.
4.3.3 Water from washing of aircraft/vehicles
Aircraft are not washed at Thule AB, except for the small helicopter operated by Air Greenland.
The helicopter is washed in HG-4 (Bldg. 606), where the water is directed through an oil/water separator to the sewage system.
Vehicles are washed at the following facilities: Bldg. 580, 622, and 1408 . In all facilities, the wash water is directed to an oil/water separator. From there the water is discharged through the sewage system directly to the North Star Bay.
The outdoor wash ramp near the harbor (no facility number assigned) was abandoned and dismantled during summer 2014.
During summer 2011 a new wash ramp has been established in Bldg. 605 (Hangar 3). The wash ramp is intended for washing larger vehicles from the Pavement and Ground Department. These vehicles were washed previously in bldg. 836. Bldg 836 is now scheduled for demolition in accordance with the consolidation plan for Thule AB and the wash ramp has been abandoned.
4.3.4 Water from the laundry shop
In the laundry shop, Bldg. 237, clothes are rinsed or washed. The rinsing process is designated as a dry-cleaning process. Methylene chloride was previously used, but has been substituted with Hydroclene Fluid. Residuals from the rinsing process are required to be treated as hazardous waste and collected for disposal to ensure nothing is introduced to the SWWS.
Conventional detergents are used for the washing process. Water from the washing process is led to the SWWS directly from the machines. In case of spillage, the water will be recovered in a drain, from which the water will be pumped to the SWWS.
Thule Air Base, Greenland 10/23 FY-15
4.3.5 Water from parts washers
There is only one existing parts washer at Thule AB. It is located in Bldg 580 (Vehicle Maintenance).
The water from the parts washer in Bldg. 580 is directed to an oil/water separator and from there to the SWWS. Any remaining slug is transferred to storage drums.
4.3.6 Discharge of water from swimming pool
During the summer 2006, an endless pool was installed at the Sport and Fitness Center in Bldg.
608. The endless pool is emptied out and cleaned every second month. The volume of water introduced to the SWWS is estimated to be 12 m3. The concentration of sodiumhypochlorite is
1.5 ppm. There are no emergency response related to slug management.
Beside the normal use of chlorine, the water is sanitized using a treatment filter that releases small quantities of copper and silver.
4.3.7 Intrusion of Storm Water
Although the SWWS is segregated from the storm water drainage system, the division might be compromised. The pipes of the SWWS are situated in the ditches and culverts that form the storm water drainage system. As the segregation between the SWWS and the storm water drainage system is the guarantee against unintended pollutants that have been washed off by the surface water, it is important to keep the SWWS without leaks.
4.4 Storage of Chemicals, Toxic Organic Pollutants and Solvents Handling and storage of hazardous materials are at Thule AB managed by the Hazardous Material Management Plan. Major storages are kept in Bldg. 555, 580, 605, 629, 801, 1391, and 4002.
Handling and storage of hazardous waste at Thule AB is managed by the Hazardous Waste Management Plan (CDRL CEV-15B). Major storages are kept in Bldg. 552, 563, 604, and 935.
The potential of accidental spillage of chemicals that might contaminate the SWWS is where sumps and floor drains are leading directly to the SWWS. In all other cases, the chemicals have to be manually poured or pumped into the drains. Temporary drain covers are used to prevent accidental chemical spills from reaching the SWWS. The covers can be removed for floor cleaning and other activities requiring use of the drain.
4.5 Floor Drains
As mentioned in section 4.2, the only direct drainages into the SWWS from floors outside the dormitories are in Bldg. 107, 118, 236, and 4016. Special interest has to be made to these locations, as they are the only places where accidental release of chemicals can occur.
Temporary drain covers are used to prevent accidental chemical spills from reaching the SWWS. The covers can be removed for floor cleaning and other activities requiring use of the drain.
4.5.1 Bldg. 118 – Hospital
There are only floor drains from showers – for both staff and patients.
Thule Air Base, Greenland 11/23 FY-15
All decontamination incidents are handled by the Fire Department in an outdoor mobile emergency system. The system collects all decontamination water for hazardous waste characterization.
As a part of the Environmental Awareness Program at Thule AB (newcomer briefings), all personnel are informed to return expired medical supplies to the hospital or DRMO.
All X-rays are performed with digital computer technology leaving no hazardous waste like mercury, silver, formaldehyde etc.
4.5.2 Bldg. 107 – Dundas Buffet Restaurant
In the kitchen in Bldg 107 several floor drains are installed. From the floor drains, water is directed to a grease trap, where grease and other low-density liquids with low solubility in water can be withheld. The water is subsequently discharged to the SWWS.
4.5.3 Bldg. 4016 – Power Plant, J-site
Storage of petroleum, oil and lubricants (POL), and hazardous materials at the auxiliary power plant at J-site is located in a room with a sump drained directly to the SWWS. The waste is stored in four 55-gallon steel and plastic drums situated horizontally and with secondary containment to collect spillage of chemicals.
4.5.4 Bldg. 236 – TOW Club
Water discharged to the SWWS through the floor drains in the kitchen is also led through a grease interceptor.
4.6 Conclusion
The SWWS at Thule AB is situated above the ground. At the same time, it is totally segregated from the storm water drainage system. Hereby eliminating that outdoor spills of chemicals, POL and other contaminants might run off into the SWWS – except for the possibility that it might enter through a leakage during the short period, where the storm drains are flooded and thereby partly submerging the SWWS.
Thule Air Base, Greenland 12/23 FY-15
5 SLUG MANAGEMENT AND OPERATIONS
Based on the analyses in section 4, the following management and operation plan is established.
5.1 Discharge Practice and Non-routine Batch Discharges
The main risk of damaging the SWWS or the recipient comes from the different routine discharges and non-routine batch discharges.
5.1.1 Discharge practice for trucked and hauled waste
According to the FGS, C4.3.2.1.7: “The discharge of trucked and hauled waste into the DWTS, except at locations specified by the DWTS operator is prohibited”.
As there is no wastewater treatment plant on Thule AB, the only function responsible for the SWWS is GC Utilities and Facilities Maintenance. As such, GC Utilities and Facilities Maintenance has the right to specify discharge of trucked and hauled waste. To prevent damage on the environment beside wastewater all discharges of trucked and hauled waste have to be done after consultation with GC Environmental Engineering.
The FGS, Chapter 4.3.3 includes the general requirements for the discharged batch. GC Utilities and Facilities Maintenance must retain records of the discharge for three years.
5.1.2 Discharge practice for trucked sanitary wastewater
As mentioned in paragraph 4.2, an amount of the collected wastewater is not transported by the SWWS but by truck to Bldg. 984, where it is discharged into the SWWS by the grit system. The same procedure is used for materials collected from septic tanks.
There is no limitation on the amount of trucked wastewater and no record has to be made, as long as the discharge is measured as a part of the ongoing registration of wastewater.
5.1.3 Intentional non-routine batch discharge
Intentional non-routine batch discharges, e.g. when water from a boiler is discharged due to maintenance, are recorded IAW GC Utilities and Facilities Maintenance instructions.
5.2 Handling of Chemicals and Control of Toxic Organic Pollutants and Solvents Hazardous Material Management Plan and Hazardous Waste Management Plan (CDRL CEV- 15B) govern handling of hazardous substances.
5.2.1 Rooms with floor drain directly to the SWWS
In areas with a floor drain and storage of hazardous substances or POL, the rules outlined in the Spill Prevention and Response Plan have to be observed. Temporary drain covers are used when chemicals may spill. The covers can be removed for floor cleaning and other activities requiring use of the drain.
5.2.2 Rooms with floor drain indirectly to the SWWS
In some areas, water from floor drains is pumped to the SWWS. In case a spill occur during pump operation, the pump must be stopped immediately and spill response initiated.
Thule Air Base, Greenland 13/23 FY-15
5.3 Buildings, Containment Structures and Equipment
5.3.1 Planning of new building, containment structures and equipment When planning a new building, containment structures and equipment, it is essential to ensure no spill is directed to the SWWS. The measures are:
• To plan buildings for storage of pollutants in a way with no direct outlet to the SWWS.
• To locate showers, toilets and other drains in building areas, where no pollutants are stored.
• To establish secondary containment for pollutants stored in areas with floor drains.
• To secure floor drains by installing a pump system, that can be manually stopped in case of an accident.
To secure that a proper measure has been chosen, all projects have to be reviewed by GC Environmental Engineering.
5.3.2 Inspection and Maintenance of the SWWS
Inspection and maintenance of the SWWS is the responsibility of GC Utilities and Facilities Maintenance and part of the maintenance program at Thule AB.
The maintenance of the SWWS is important as the segregation between the SWWS and the storm water drainage system is a major part of the safety measures against pollution of the SWWS with spilled materials.
5.3.3 Oil/water Separators
The discharge of petroleum oil, non-biodegradable cutting oil, and products of mineral oil origin is prohibited. In places where oil is removed from objects with water and soap, e.g. where cars are washed, an oil/water separator system has been installed to withhold the oil and non-emulsifying soap (Masava) is applied for the washing process.
GC Utilities and Facilities Maintenance is responsible for the maintenance of the oil/water separators.
Maintenance of oil water separators involves draining them and cleaning them. The drained liquid is collected by a mud pump and left for evaporation on a weathering bed. The weathering bed is located near the land farm area in the western part of the main base area. The bed consists of an earth dike with a liner to protect the surroundings from leaking.
If solid and semi-solid sludge is present in the oil water separator it will be disposed of via the
DRMO.
5.3.4 Sand/Grease Traps
The discharge of solid or viscous pollutants that might obstruct the SWWS is prohibited.
GC Utilities and Facilities Maintenance is responsible for the maintenance of the sand/grease separators.
Thule Air Base, Greenland 14/23 FY-15
5.3.5 Cross Connections
Cross connections between the SWWS and the drinking water system is a problem related to drinking water. The Backflow Prevention Program includes control and removal of cross connections in accordance with AFI 32-1066, and is not a part of this plan.
5.4 Accidental Spill Prevention
As many times previously mentioned the backbone of spill prevention in relations to the SWWS is the segregation. A description of correct handling of hazardous materials is stated under 6.2, but there are other types of unwanted materials as listed in FGS Chapter 4.3.1, 4.3.2 and 4.3.3.
From the perspective of the SWWS, they have to be treated like hazardous substances.
More information on accidental spill prevention is included in the Hazardous Waste Management Plan (CDRL CEV-15B) and the Spill Prevention and Response Plan (CDRL CEV-15C).
5.5 Emergency Response
Emergency Response procedures are included in the Spill Prevention and Response Plan
(CDRL CEV-15C).
Non-routine discharge of wastewater is approved by GC Environmental Engineering.
5.6 Employee Training
GC personnel and non-GC employees who handle hazardous substances or perform activities that could contribute to spill or batch discharges should be trained in appropriate Best Management Practices by the individual shop. Such training should emphasize pollution prevention, awareness of possible pollution sources and local measures to contain spillage in a way that makes it possible to contain the spillage, e.g. how to stop pumps that discharges water from floors into the SWWS.
GC Environmental Engineering training programs include:
• Hazardous Waste Handling, in accordance with “Hazardous Waste Management Plan
(CDRL CEV-15B)”
• Chemical Hazard Communication, in accordance with “Hazardous Material Plan”
• Spill Response Training, in accordance with “Spill Prevention & Response Plan (CDRL
CEV-15C)”
Scheduled training dates are communicated through GC’s Personnel Department, and sign up is available for everyone through GC’s intranet.
The individual participant will receive a certificate from GC Environmental Engineering. GC Environmental Engineering will keep a record of the training for 3 years.
5.7 Sludge Disposal
A wastewater treatment plant is not been installed at Thule AB, therefore, no wastewater treatment sludge is produced.
Thule Air Base, Greenland 15/23 FY-15
6 SEWAGE SPILL/RELEASE INCIDENTS
6.1 Response
All Thule AB personnel are obligated to notify the Consolidated Communication Center or CCC (GC/LGCM) immediately in case of a sewage spill/release to the storm water drainage system.
The Consolidated Communication Center provides the dispatch to Service Call (ext 2111).
When the sewage spill/release incident is non-reportable (below 110 gallons), the Consolidated Communication Center immediately activates:
• GC Utilities Facilities Maintenance (GC/OMUFM)
• GC Environmental Engineering (GC/EE)
If the sewage spill/release incident is reportable (110 gallons or above), the Consolidated Communication Center will also notify location and volume of the sewage spill/release by telephone or pager to:
• GC Site Manager (GC/CC)
• GC Operations Manager (GC/OPS)
• GC Base Civil Engineer (GC/CE)
• GC Chief of Environmental Engineering (GC/EE)
GC Utilities Facilities Maintenance acts as first responder and is tasked to:
• Stop or minimize the sewage spill/release.
• Confine the sewage spill/release.
• Coordinate with GC Environmental Engineering to estimate volume of sewage spill/release.
• Request GC Transportation for assistance to remove and transport any sewage spill/release remains to the effluent building (bldg. #984) at DeLong Pier.
• Repair damaged heat-tracing system, pipes and assemblies.
• Evaluate existing maintenance procedures in the Preventive Maintenance Program
(PMP).
• Assist GC Environmental Engineering in identifying possible root causes.
6.2 Notification of USAF
GC Environmental Engineering is tasked to notify and report sewage spill/release incidents to
USAF.
Upon discovering a sewage spill/release incident the 821 SPTS/CE must be notified within 15 minutes via phone call. If 821 SPTS is unavailable GC Environmental Engineering will call 821 ABG/CC and/or 821 ABG/CD until one of them is contacted.
If the sewage spill/release incident is considered reportable (110 gallons or above), GC Environmental Engineering must prepare and submit an initial spill/release report (CDRL CEV-
19) within 18 hours of discovering the incident. Additionally, an OPREP-3 BEELINE 7C report must be prepared and coordinated with 21 CES/CEIE, if 10,000 gallons or above.
Thule Air Base, Greenland 16/23 FY-15
Reportable sewage spill-release incidents are divided into four (4) categories:
• Category 1: Spill-Release >10,000 gallons
• Category 2: Spill-Release 1,000-10,000 gallons
• Category 3: Spill-Release 110-1,000 gallons
• Category 4: Spill-Release, the Installation Commander (821 ABG/CC) deems necessary to investigate
Sewage spill/release incidents below 110 gallons are considered non-reportable, and no initial spill/release report (CDRL CEV-19) is required. Instead, GC Environmental Engineering prepares spill/release memos for internal recording. These memos are available upon request.
6.3 Non-Routine Discharge of Sewage
Intentional non-routine discharge of sewage is required when heat-tracing system, pipes and assemblies must be repaired or maintained, and harsh arctic weather conditions do not leave any other option.
Intentional non-routine discharge of sewage must be approved by GC Environmental Engineering prior to discharge. The responsible GC/OMUFM supervisor will justify scope of work and fill in a Non-Routine Discharge of Sewage Form.
Thule Air Base, Greenland 17/23 FY-15
7 EFFLUENT MONITORING
The daily volume of direct effluent discharge from Bldg. 984 to North Star Bay is monitored by an open channel flow meter based on standardized Venturi flume principles. The flow meter was installed in January 2009.
The daily volume of direct effluent discharge from Bldg. 4002 (12 SWS) to Wolsteinholme Fjord is monitored by an on-line flow meter based on inductive measure principles. The flow meter was installed in summer 2012.
IAW FGS, Table C4.T2, sampling of effluent is performed monthly at Bldg. 984 and 4002. Grab samples are collected manually.
IAW FGS, Paragraph C4.3.1.3 the monthly collected effluent samples are tested for conventional pollutants as pH, Total Suspended Solids (TSS) and Biochemical Oxygen Demand
(BOD5).
IAW FGS, Paragraph C4.3.1.4 the records on date, time and exact place of sampling and testing, analyst, test results, procedures and daily volume are retained for at least 3 years.
Thule Air Base, Greenland 18/23 FY-15
8 WATER POLLUTION COMPLAINTS
In general, USAF remains current with Greenland environmental activities and regulations IAW Statement of Work, Paragraph 18.11.
All official environmental correspondence sent to organizations outside of the 21 SW is approved by 821 ABG/CC and 21 CES/CEIE prior to release. In addition, copies of all official incoming environmental correspondence are forwarded to 821 ABG/CC and 21 CES/CEIE within five days of receipt.
IAW FGS, Paragraph C4.3.1.5 and C4.3.2.2, water pollution complaints from individuals or host nation water pollution control authorities are investigated, involving the Environmental Executive Agent, as appropriate.
All correspondence and investigations are documented and records are retained for 10 years.
So far, no complaints are received.
Thule Air Base, Greenland 19/23 FY-15
APPENDICES
Thule Air Base, Greenland 20/23 FY-15
APPENDIX 1: DEFINITIONS AND TERMS
Thule AB
Thule Air Base
DWTS Domestic Wastewater Treatment System
Any DoD or host nation facility designed to treat wastewater before discharging to waters of the host nation and in which the majority of such wastewater is made of domestic sewage.
SWWS Sanitary Wastewater System; defined as the existing piping system for wastewater on Thule AB
Seasonal Contractors A company awarded a contract by the government for construction or repair projects. Usually projects performed during the summer season at Thule AB.
Tenant Units These are other organizations assigned to Thule Air Base, which occupy some base facilities.
Process Wastewater Any water originated from manufacturing processes – including water coming from military installations
New sources A source built or substantially modified on or after 1 October 1994, that directly or indirectly discharges pollutants to the wastewater system
Substantial Modification Any modification to a facility the cost of which exceeds $1,000,000, regardless of the funding source
Waters of the Host Nation Surface waters including the territorial seas recognized under customary international law
Hazardous substances
A substance that is defined as either hazardous materials or hazardous waste in accordance with Appendix 1 of the
FGS
ESOHC
Environmental, Safety, Occupational Health Council
Facility Manager An individual appointed to a facility/building whose primary responsibility is to ensure the facility is kept in a good state of repair. This includes ice and snow removal in front of doorways, stairways, ramps etc. during the winter.
Thule Air Base, Greenland 21/23 FY-15
APPENDIX 2: SEWAGE SYSTEM
Thule Air Base, Greenland 22/23 FY-15
APPENDIX 3: DISTRIBUTION LIST
The document is distributed as PDF-format via email IAW the CDRL Distribution List.
21st Space Wing
21 CES/CEIE
Donald.Chase@us.af.mil
21 SW/PMD 21sw.pmd.thule@us.af.mil
821st Air Base Group
821 ABG/CC
821SPTS.cc.wf@us.af.mil
821st Support Squadron
821 SPTS/CE
821SPTSCEDISTRO@us.af.mil
Greenland Contractors, Thule AB All GC organizations on GC LAN
GC Intranet mailto:Donald.Chase@us.af.mil� mailto:21sw.pmd.thule@peterson.af.mil� mailto:821SPTS.cc.wf@peterson.af.mil� mailto:821SPTSCEDISTRO@us.af.mil�
Thule Air Base, Greenland 23/23 FY-15
APPENDIX 4: REVIEW COMMENTS 2014
| CEV-15J Slug Mgmt Plan FY-15, Final |
| 1 LETTER OF INSTRUCTION |
| 1.1 Security and Administrative Instructions |
| 2 GENERAL |
| 2.1 Purpose |
| 2.2 Scope |
| 2.3 Regulatory Overview |
| 3 ORGANIZATIONAL ROLES AND RESPONSIBILITIES |
| 3.1 Installation Commander, 821 ABG/CC |
| 3.2 Danish Liaison Officer, DLO |
| 3.3 Environmental Engineering, GC/EE |
| 3.4 Utilities and Facilities Maintenance, GC/OMUFM |
| 3.5 Fire Protection, GC/AMF |
| 4 potential spills and batch discharges (SLUGS) |
| 4.1 Introduction |
| 4.2 Facility Layout of the Sanitary Wastewater System (SWWS) |
| 4.3 Discharge Practices |
| 4.3.1 Discharges of sanitary wastewater collected by truck |
| 4.3.2 Water from boilers and heating system |
| 4.3.3 Water from washing of aircraft/vehicles |
| 4.3.4 Water from the laundry shop |
| 4.3.5 Water from parts washers |
| 4.3.6 Discharge of water from swimming pool |
| 4.3.7 Intrusion of Storm Water |
| 4.4 Storage of Chemicals, Toxic Organic Pollutants and Solvents |
| 4.5 Floor Drains |
| 4.5.1 Bldg. 118 – Hospital |
| 4.5.2 Bldg. 107 – Dundas Buffet Restaurant |
| 4.5.3 Bldg. 4016 – Power Plant, J-site |
| 4.5.4 Bldg. 236 – TOW Club |
4.6 Conclusion
| 5 Slug Management AND OPERATIONS |
| 5.1 Discharge Practice and Non-routine Batch Discharges |
| 5.1.1 Discharge practice for trucked and hauled waste |
| 5.1.2 Discharge practice for trucked sanitary wastewater |
| 5.1.3 Intentional non-routine batch discharge |
| 5.2 Handling of Chemicals and Control of Toxic Organic Pollutants and Solvents |
| 5.2.1 Rooms with floor drain directly to the SWWS |
| 5.2.2 Rooms with floor drain indirectly to the SWWS |
| 5.3 Buildings, Containment Structures and Equipment |
| 5.3.1 Planning of new building, containment structures and equipment |
| 5.3.2 Inspection and Maintenance of the SWWS |
| 5.3.3 Oil/water Separators |
| 5.3.4 Sand/Grease Traps |
| 5.3.5 Cross Connections |
| 5.4 Accidental Spill Prevention |
| 5.5 Emergency Response |
| 5.6 Employee Training |
| 5.7 Sludge Disposal |
| 6 Sewage spill/release incidents |
| 6.1 Response |
| 6.2 Notification of USAF |
| 6.3 Non-Routine Discharge of Sewage |
| 7 Effluent monitoring |
| 8 Water pollution Complaints |
| APPENDIX 1: Definitions And terms |
| APPENDIX 2: Sewage System |
| APPENDIX 3: Distribution List |
| APPENDIX 4: REVIEW COMMENTS 2014 |
| CEV-15J Slug Mgmt Plan FY-15, signatur page |
| CEV-15J Slug Mgmt Plan FY-15, Final |
| 1 LETTER OF INSTRUCTION |
| 1.1 Security and Administrative Instructions |
| 2 GENERAL |
| 2.1 Purpose |
| 2.2 Scope |
| 2.3 Regulatory Overview |
| 3 ORGANIZATIONAL ROLES AND RESPONSIBILITIES |
| 3.1 Installation Commander, 821 ABG/CC |
| 3.2 Danish Liaison Officer, DLO |
| 3.3 Environmental Engineering, GC/EE |
| 3.4 Utilities and Facilities Maintenance, GC/OMUFM |
| 3.5 Fire Protection, GC/AMF |
| 4 potential spills and batch discharges (SLUGS) |
| 4.1 Introduction |
| 4.2 Facility Layout of the Sanitary Wastewater System (SWWS) |
| 4.3 Discharge Practices |
| 4.3.1 Discharges of sanitary wastewater collected by truck |
| 4.3.2 Water from boilers and heating system |
| 4.3.3 Water from washing of aircraft/vehicles |
| 4.3.4 Water from the laundry shop |
| 4.3.5 Water from parts washers |
| 4.3.6 Discharge of water from swimming pool |
| 4.3.7 Intrusion of Storm Water |
| 4.4 Storage of Chemicals, Toxic Organic Pollutants and Solvents |
| 4.5 Floor Drains |
| 4.5.1 Bldg. 118 – Hospital |
| 4.5.2 Bldg. 107 – Dundas Buffet Restaurant |
| 4.5.3 Bldg. 4016 – Power Plant, J-site |
| 4.5.4 Bldg. 236 – TOW Club |
4.6 Conclusion
| 5 Slug Management AND OPERATIONS |
| 5.1 Discharge Practice and Non-routine Batch Discharges |
| 5.1.1 Discharge practice for trucked and hauled waste |
| 5.1.2 Discharge practice for trucked sanitary wastewater |
| 5.1.3 Intentional non-routine batch discharge |
| 5.2 Handling of Chemicals and Control of Toxic Organic Pollutants and Solvents |
| 5.2.1 Rooms with floor drain directly to the SWWS |
| 5.2.2 Rooms with floor drain indirectly to the SWWS |
| 5.3 Buildings, Containment Structures and Equipment |
| 5.3.1 Planning of new building, containment structures and equipment |
| 5.3.2 Inspection and Maintenance of the SWWS |
| 5.3.3 Oil/water Separators |
| 5.3.4 Sand/Grease Traps |
| 5.3.5 Cross Connections |
| 5.4 Accidental Spill Prevention |
| 5.5 Emergency Response |
| 5.6 Employee Training |
| 5.7 Sludge Disposal |
| 6 Sewage spill/release incidents |
| 6.1 Response |
| 6.2 Notification of USAF |
| 6.3 Non-Routine Discharge of Sewage |
| 7 Effluent monitoring |
| 8 Water pollution Complaints |
| APPENDIX 1: Definitions And terms |
| APPENDIX 2: Sewage System |
| APPENDIX 3: Distribution List |
| APPENDIX 4: REVIEW COMMENTS 2014 |
File details come from the government source that posted it. Updated .