W912DS-16-B-0002_Amendment_0002.pdf

PDF 86 KB Posted

Attached to
Thule Consolidation 1 (Base Shops & Base Supply Facility) Federal contract opportunity
Solicitation number
W912DS-16-B-0002
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to Thule Consolidation 1 (Base Shops & Base Supply Facility), newest first.
File Type Posted
Bid_Abstract_-_W912DS-16-B-0002.pdf PDF
C-304.pdf PDF
C-106.pdf PDF
C-103.pdf PDF
W912DS-16-B-0002_-_Amendment_0005.pdf PDF
Greenland_-_DBA_Waiver_-_Greenland.pdf PDF
C-107.pdf PDF
C-303.pdf PDF
Thule_Consol_1_CE_shop_-_100__ELECT_SPEC_27_10_00_(Rev_1)_25_April_2016.pdf PDF
Thule_Consol_1_CE_shop_-_100__ELECT_SPEC_(REGISTER)_27_10_00_(Rev_1)_25_April_2016.pdf PDF
C-104.pdf PDF
C-105.pdf PDF
Consoliation_1_Revised_Drwgs_Amd_0004.pdf PDF
W912DS-16-B-0002_Amendment_0004.pdf PDF
Thule_Consol_1_CE_Shop_-_Updated_100__CID_Package_25_April_2016.pdf PDF
Thule_Consol_1_CE_shop_-_100__ELECT_SPEC_27_10_00_(Rev_1)_25_April_2016.pdf PDF
Thule_Consol_1_CE_shop_-_100__ELECT_SPEC_(REGISTER)_27_10_00_(Rev_1)_25_April_2016.pdf PDF
ES-601_-_SITE_ELEC_REVISED_(25_APR_2016).pdf PDF
ES-601A_-_FEEDER_SCHEDULE(4-25-2016).pdf PDF
W912DS-16-B-0002_Amendment_0003.pdf PDF
ES-102A_-_NEW_REVISED_SITE_FOR_CE_SHOP(4-25-2016).pdf PDF
W912DS-16-B-0002_-_Amendment_0001.pdf PDF
Appendix_F_-_PPM_Plan.pdf PDF
Appendix_I_-_Slug_Mgmt_Plan.pdf PDF
Package_1_-_Thule_Consolidation_1_-_Plans_100.pdf PDF
Appendix_H_-_Storm_Water_Mgmt_Plan.pdf PDF
Package_2_-_Thule_Consolidation_1_-_Specifications_100.pdf PDF
W912DS-16-B-0002.pdf PDF
Appendix_C_-_Conservation_Mgmt_Plan.pdf PDF
Appendix_A_-_Active_Landfills.pdf PDF
Appendix_K_-_FGS-GL_(Environmental_Protection).pdf PDF
Appendix_L_-_Affirmative_Proc_Plan.pdf PDF
Package_3_-_Thule_Consolidation_1_-_SID_ _CID.pdf PDF
Appendix_R_-_Demo_(Lead_ _Asbestos_Survey _As-Builts).pdf PDF
Appendix_G_-_Solid_Waste_Mgmt_Plan.pdf PDF
Appendix_M_-_PCB_Repl_Plan.pdf PDF
Appendix_D_-_HWM_Plan.pdf PDF
Appendix_W_-_Natural_Resources_Management_Plan.pdf PDF
Appendix_B_-_NFS_Material_Borrow_Sites.pdf PDF
Appendix_T_-_Fuel_Pricing_and_DLA_info.pdf PDF
Appendix_N_-_Asbestos_Mgmt_Plan.pdf PDF
Appendix_Q_-_Thule_Site_Topo_Survey.dwg DWG drawing
Appendix_O_-_Lead_Paint_Mgmt_Plan.pdf PDF
Appendix_E_-_Spill_Prevention-Response_Plan.pdf PDF
Appendix_U_-_Shipping_Rates_Gov_Furnished_Transport.pdf PDF
Appendix_P_-_DBA_Waiver.pdf PDF
Appendix_J_-_Installation_HAZMAT_Management_Plan.pdf PDF
Appendix_V_-_Geotechnical_Investigation.pdf PDF
Appendix_S_-_FY14_-_FY17_Sealift_Rates.pdf PDF
Appendix_X_-_Pacer_Goose_Shipping_Instructions.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE60221088

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Provide responses to questions received from interested vendors, for informational purposes only.

2. Extend the bid opening date to 11 May 2016 at 3:00PM local time (Copenhagen).

NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing Methods: In the space provided on the SF1442, by separate letter, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Apr-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-B-0002

X 9B. DATED (SEE ITEM 11)

08-Mar-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Apr-2016

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-16-B-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 20-Apr-2016 03:00 PM to 11-May-2016 03:00 PM.

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

FY16 Thule Consolidation 1 Thule Air Base, Greenland

Invitation for Bid

W912DS-16-B-0002

Amendment 0002

AMENDMENT 0002 to DRAWINGS and SPECIFICATIONS for Consolidation #1, Thule Air Base, Greenland

TO OFFORERS

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED but NOT REISSUED:

None

2. The following DRAWINGS have been REVISED and REISSUED:

None

3. The following DRAWINGS have been ADDED:

None

SPECIFICATIONS

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

None

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

None

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

None

BIDDER’S QUESTIONS AND GOVERNMENT REPLY

(Questions that may be of general interest to all bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors/Bidders for information only and do not alter the plans and specifications as issued.)

1. Question: Drawing P-402, P-502 and specification section 21.00.00 Plumbing.

In the specification and drawings there are not any requirement for Insulation and heat-tracing of Sewage pipes below floor, 1 floor level and on Sewage ejector pumping station.

Please clarify if there are any requirement for insulation and heat tracing on this installations!

Response: During the design phase a conclusion was made that no insulation or heat trace was needed on any underground equipment or sanitary piping within the foot print of the building below the first floor level slab.

2. Question: Drawing ES‐601; Feeder Note 3 ‐ New MV Breakers for K‐12 and

K119, in K Plant 01401 MV SWGR? Need to know Gear MFG and Details of what is required? Response: Response: The reply to this question will appear in a forthcoming amendment.

3. Question: Drawing ES‐102A; Key Note 13 ‐ New Service Panel PNL630 400A?

Need panel schedule and Details of what is required? Response: The reply to this question will appear in a forthcoming amendment.

4. Question: Drawing E‐111; Several exterior outlets shown along module line 5 on second floor. Please advise, if this is as intended? Response: Those outlets that appear on E‐111 are in fact the block heater outlets shown on E‐100.

They were placed in the Revit model for circuiting to panel L2‐4. They should have been “hidden” on drawing E‐111, and therefore should not have appeared.

5. Question: In the Specification section 336002 Item 1.2, 2.2.1, 2.2.2 and 2.2.3

"The above ground heat distribution system" specify the piping as Steam and Condensate. See also supply and return on drawing M-701.

Drawing C-301 specify the piping for HHW S/R as 200mm (8") and on drawing M- 602 the Heat exchangers are specified as Water to Water. Shall the Above ground heating system be Hot water or Steam distribution system?

Response: SHWS indicated on M-701 is Source hot water supply (abbreviations shown on M-001). You are correct; the above ground heating system is hot water.

6. Question: On drawing M-301 "Mech. room pump wall" the primary supply and return for HW are 150mm. Shall the pipes from the branch on the 200mm HHW to Mechanical room be 150mm pipes? Response: Yes. Please provide the facility with 150mm Hot water supply and return piping to support the heat exchangers.

7. Question: In section 10 56 26 Mobile Storage Shelving, page 3, item 2.2.3 is mentioned that Carriage Width and Length can be found in the Drawings. Please provide the Reference Numbers and Title of the drawings. Response: Refer to drawing Q-501 – Equipment Details for carriage widths and heights. Carriage length was inadvertently omitted from drawings. Carriages in Mobile Shelf System 1 shall be approximately 3810 mm long. Carriages in Mobile Shelf Systems 2 and 3 shall be approximately 7470 mm long.

8. Question: There is no insulation showed underneath the building. Is this correct?

Response: That is correct; however there is insulation at the perimeter as shown on drawing A-501, Details 1 and 2.

9. Question: Drawing S-001; It's stated that "foundations will be designed". Does this means that the drawings are not finished? Response: The foundations for this project ARE designed. Bid this work as shown.

10. Question: Drawing S-505; It's indicated that pipe dimensions are not final. Who determine pipe dimensions? Response: The bidders must refer to Mechanical, Electrical and Plumbing (MEP) sections of the plans and specification or to the specific manufacturer selected by the bidder for final sizes.

11. Question: Drawing S-509; It's stated that sawdust collector and cranes are to be selected. Who will select the sawdust collector and the cranes? Response: The Government has provided requirements for the sawdust collector and crane, as well as other equipment for this project. The Contractor is responsible for the selection the manufacturer that meets our requirements. Approval of the Contractor’s selection is accomplished through submittal process after award of the contract for construction.

12. Question: We kindly ask you to approve as-built drawings in the version of Revit, valid when handing over as-built drawings. Response: Revit 2015 is acceptable.

13. Question: Section 1.3 CADD standards We kindly ask you to shorten the length of the project code. It is very long and it will complicate the archiving. Response: We are willing to consider reducing its length, but reluctant to do so without knowing specifically how large or much of a reduction is proposed.

14. Question: Are we to expect 2D elements in the Revit model? Response:

All elements shall be modeled in 3D except for details.

15. Question: Who are responsible for equipment layout? (Q-drawings) Response:

See section 00 73 00, paragraph 77, titled “Relocation and Installation of

Owner Furnished Equipment.”

16. Question: At what date are we to receive the complete final design? Response:

The plans and specifications as issued are of the final design.

17. Question: Drawing Q‐601 contains a Schedule named "INDUSTRIAL EXHAUST

FAN SCHEDULE".

Question: Are the contractor supposed to:

1. Provide and install the mentioned equipment? or

2. Move and install existing equipment? or

3. Connect already installed equipment?

Response: All the items listed in the “Industrial Exhaust Fan Schedule” on drawing Q-601 are to be provided and installed by the contractor. Note that some of the fans are parts of equipment systems such as WO27Saw Dust Collector and PR5 Paint Box. Refer to specification sections 23 35 19.00 20 - Industrial Ventilation and Exhaust and 41 34 23.33 Dry Filter Paint Box System for information on the related equipment to be provided and installed.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .