Consoliation_1_Revised_Drwgs_Amd_0004.pdf

PDF 644 KB Posted

Attached to
Thule Consolidation 1 (Base Shops & Base Supply Facility) Federal contract opportunity
Solicitation number
W912DS-16-B-0002
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

Amended Plans

View the file

Other files for this federal contract opportunity

Other files attached to Thule Consolidation 1 (Base Shops & Base Supply Facility), newest first.
File Type Posted
Bid_Abstract_-_W912DS-16-B-0002.pdf PDF
C-106.pdf PDF
C-103.pdf PDF
W912DS-16-B-0002_-_Amendment_0005.pdf PDF
Greenland_-_DBA_Waiver_-_Greenland.pdf PDF
C-107.pdf PDF
C-303.pdf PDF
Thule_Consol_1_CE_shop_-_100__ELECT_SPEC_27_10_00_(Rev_1)_25_April_2016.pdf PDF
Thule_Consol_1_CE_shop_-_100__ELECT_SPEC_(REGISTER)_27_10_00_(Rev_1)_25_April_2016.pdf PDF
C-104.pdf PDF
C-304.pdf PDF
C-105.pdf PDF
W912DS-16-B-0002_Amendment_0004.pdf PDF
Thule_Consol_1_CE_Shop_-_Updated_100__CID_Package_25_April_2016.pdf PDF
Thule_Consol_1_CE_shop_-_100__ELECT_SPEC_27_10_00_(Rev_1)_25_April_2016.pdf PDF
Thule_Consol_1_CE_shop_-_100__ELECT_SPEC_(REGISTER)_27_10_00_(Rev_1)_25_April_2016.pdf PDF
W912DS-16-B-0002_Amendment_0003.pdf PDF
ES-601_-_SITE_ELEC_REVISED_(25_APR_2016).pdf PDF
ES-601A_-_FEEDER_SCHEDULE(4-25-2016).pdf PDF
ES-102A_-_NEW_REVISED_SITE_FOR_CE_SHOP(4-25-2016).pdf PDF
W912DS-16-B-0002_Amendment_0002.pdf PDF
W912DS-16-B-0002_-_Amendment_0001.pdf PDF
Package_2_-_Thule_Consolidation_1_-_Specifications_100.pdf PDF
W912DS-16-B-0002.pdf PDF
Appendix_C_-_Conservation_Mgmt_Plan.pdf PDF
Appendix_A_-_Active_Landfills.pdf PDF
Appendix_K_-_FGS-GL_(Environmental_Protection).pdf PDF
Appendix_L_-_Affirmative_Proc_Plan.pdf PDF
Package_3_-_Thule_Consolidation_1_-_SID_ _CID.pdf PDF
Appendix_R_-_Demo_(Lead_ _Asbestos_Survey _As-Builts).pdf PDF
Appendix_G_-_Solid_Waste_Mgmt_Plan.pdf PDF
Appendix_M_-_PCB_Repl_Plan.pdf PDF
Appendix_D_-_HWM_Plan.pdf PDF
Appendix_F_-_PPM_Plan.pdf PDF
Appendix_I_-_Slug_Mgmt_Plan.pdf PDF
Package_1_-_Thule_Consolidation_1_-_Plans_100.pdf PDF
Appendix_H_-_Storm_Water_Mgmt_Plan.pdf PDF
Appendix_W_-_Natural_Resources_Management_Plan.pdf PDF
Appendix_B_-_NFS_Material_Borrow_Sites.pdf PDF
Appendix_T_-_Fuel_Pricing_and_DLA_info.pdf PDF
Appendix_N_-_Asbestos_Mgmt_Plan.pdf PDF
Appendix_Q_-_Thule_Site_Topo_Survey.dwg DWG drawing
Appendix_O_-_Lead_Paint_Mgmt_Plan.pdf PDF
Appendix_E_-_Spill_Prevention-Response_Plan.pdf PDF
Appendix_U_-_Shipping_Rates_Gov_Furnished_Transport.pdf PDF
Appendix_P_-_DBA_Waiver.pdf PDF
Appendix_J_-_Installation_HAZMAT_Management_Plan.pdf PDF
Appendix_V_-_Geotechnical_Investigation.pdf PDF
Appendix_S_-_FY14_-_FY17_Sealift_Rates.pdf PDF
Appendix_X_-_Pacer_Goose_Shipping_Instructions.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INTERIOR FINISH MATERIALS KEY:

ACT ACOUSTICAL CEILING TILE

CG CORNER GUARD

CONC CONCRETE

CPT CARPET TILE

CT CERAMIC TILE

FG FOOT GRILLE

GB GYPSUM BOARD

LK LOCKER

MBW MARKER BOARD WALL COVERING

MF MINERAL FIBER

PLAM PLASTIC LAMINATE

PT PAINT

RB RUBBER BASE

RT RUBBER TILE

SC SEALED CONCRETE

SF SHOWER FLOOR

SS SOLID SURFACE MATERIAL

STN WOOD STAIN

TWP TACKABLE WALL PANEL

VCT VINYL COMPOSITION TILE

WT WINDOW TREATMENT

GENERAL NOTES

1. FOR THE INTERIOR FINISH MATERIALS SCHEDULE

REFER TO SHEET I-601

2. ALL EXTERIOR AND INTERIOR COLORS SHALL BE

SUBMITTED FOR APPROVAL . COLOR BOARDS AND

PROPOSED SAMPLES SHALL NOT BE SUBMITTED

INDIVIDUALLY BUT IN A COMPLETE SET WITH ALL

SAMPLES.

3. CONCRETE SLAB (FIRST FLOOR)

-EXPOSED CONCRETE SLABS IN INTERIOR ROOMS

NOT RECEIVING A FINISH SHALL HAVE A SEALER AND

ATROWEL FINISH.

-CONCRETE SLABS IN INTERIOR ROOMS TO RECEIVE

VCT OR CARPET SHALL HAVE A TROWEL FINISH. A

FILLER SHALL BE ADDED AS NEEDED AT CONCRETE

CONTROL JOINTS TO ENSURE THAT THE JOINTS DO

NOT BLEED THROUGH THE VCT.

-CONCRETE SLABS IN INTERIOR ROOMS TO RECEIVE

CERAMIC TILE SHALL HAVE A STEEL TROWEL AND

FINE BROOM FINISH FREE OF CURING COMPOUNDS.

4. BOLLARDS / CORNER GUARDS SHALL BE LOCATED

AS INDICATED ON FLOOR PLANS.

5. SEE INTERIOR DESIGN DRAWINGS FOR WALL AND

FLOOR TILE PATTERNS.

FINISH SCHEDULE NOTES

1. RECESSED FLOOR MAT SHALL BE PROVIDED AT

MAIN ENTRANCE.

2. TILE INSTALLATION IN LOCKER ROOMS AND

RESTROOMS SHALL UTILIZE THE FOLLOWING TILE

COUNCIL OF NORTH AMERICA, INC. METHODS:

FLOOR: F113-09

WALL (GYP. BD.): W243-09

WALL (CEMENT BD.): *W244C-09

* SHOWER FLOORS/WALL B422-09

* FLOORS ADJACENT TO SHOWERS F122-09

-SHOWER AREAS SHALL BE CERAMIC WALL TILE AS

SHOWN. SEE RESTROOMS ENLARGED PLANS &

INTERIOR ELEVATIONS FOR DETAILS.

-PROVIDE VERTICAL AND HORIZONTAL MOVEMENT

JOINTS IN TILE FINISH IN ACCORDANCE WITH TILE

COUNCIL OF NORTH AMERICA, INC. - EJ171-09

UNLESS THE TILE MANUFACTURER’S

RECOMMENDED A METHOD THAT PROVIDES

GREATER PROTECTION.

3. PROVIDE 19MM FIRE RETARDANT TREATED

PLYWOOD FINISH WALL SURFACES AT TELECOM &

ELECT ROOMS. PLYWOOD SHALL BE MOUNTED

WITH THE BASE OF THE BOARD AT 609MM A.F.F. AND

EXTEND TO 1829MM A.F.F. WALLS SHALL BE GYPSUM

BOARD WITH PLYWOOD ATTACHED TO STUDS

BEHIND AND PAINTED TO MATCH INTERIOR WALL

PAINT COLOR. REFERENCE GENERAL NOTE 1 FOR

FINISH AND COLOR. COORDINATE WITH

ELECTRICAL/COMMUNICATION DRAWINGS FOR

PANEL PLACEMENT.

4. RUBBER TILES SHALL BE AS LOCATED ON THE

PATTERN PLAN. RESILIENT FLOORING SHALL BE ON

THE INTERMEDIATE STAIR LANDING, TREADS AND

RISERS. ALL EXPOSED METAL SURFACES OF STAIR

ASSEMBLY SHALL BE PAINTED.

US Army Corps of Engineers New York District

SY

M

BO

L

R

EV

IS

IO

N D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

U

.S .A

R M

Y C

O R

PS

O

FE

N

G

IN

EE

R

S N

EW

Y

O R

K D

IS

TR

IC

T ht tp w w w

.n an

.u sa ce .a rm y.

m il

SHEET

REFERENCE

NUMBER:

***SAFETY PAYS***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:

FILE PATH:

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

ED

ER

AL

P

LA

ZA

R O

O M

N

EW

Y

O R

K, N

Y

8-

A N

SI

D

DA

TE

SO

LI

C

IT

A

TI

O N

N O

C O

N

TR

A C

T N

O

FI

LE

N U

M B

ER

FI

LE

N A

M E:

PL

O

T D

A

TE

C K

D B

Y:

D

W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B

M

IT

TE

D

B Y:

PL

O

T

SC

A

LE

SI

ZE

PR

O

JE

CT

S

TA

TU

S:

C:\Users\E3ENDLGR\Documents\CES_SPL-DMMA-MDL-2015-NLVRS_E3ENDLGR.rvt

4/26/2016 7:18:52 AM

R

EV

IS

IO

N

- C H

AN

G

ES

T

O R

O O

M F

IN

IS

H

ES

S C

H

ED

4/

/1

A s in di ca te d

A-611

C O

N

SO

LI

D

AT

ED

C

IV

IL

E

N G

IN

EE

R

IN

G

SH

O

PS

A N

D S

U

PP

LY

F

AC

IL

IT

Y

R O

O M

F

IN

IS

H

SC

H

ED

U

LE

TH

U

LE

A

B

G R

E

EN

LA

N

D

W W

C X1

O

C T

LG

R

LG

R

M J

0%

S ub m is si on

ROOM FINISHES SCHEDULE

ROOM NO ROOM NAME

WALL FINISH BASE

FINISH

FLOOR CEILING

NOTES & REMARKS (SEE NOTES)NORTH EAST SOUTH WEST MAT. FIN. MAT. FIN. HEIGHT

101 EXIT AIR LOCK P-1 P-1 P-1 P-1 SB-2 CONC MAT-1/SC-1 GB P-3 2750 FOOTGRILLE OFFSET 153 MM FROM PARITION.

102 BASE SUPPLY P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS. PT-4 AT COLUMNS.

103 COUNTER AREA (WO) P-1 P-1 P-1 P-1 SB-2 CONC VFC-1 MF ACT-1 3050

104 OFFICE (WO) P-1 P-1 P-1 P-1 SB-1 CONC VFC-1 MF ACT-1 3050

106 EXIT AIR LOCK P-1 P-1 P-1 P-1 SB-2 CONC MAT-1/SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE.

107 GOODS RECEIPT P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS. PT-4 AT COLUMNS.

108 AIR LOCK P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS.

109A METAL SHOP ASE P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS. PT-4 AT COLUMNS.

109B METAL SHOP PLUMB P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS.

109C METAL SHOP MACH TL P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS. PT-4 AT COLUMNS.

109D METAL SHOP SHEET MTL P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS. PT-4 AT COLUMNS.

110 WELDING SHOP P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS. PT-4 AT COLUMNS.

111 EXIT AIR LOCK P-1 P-1 P-1 P-1 SB-2 CONC MAT-1/SC-1 GB P-3 3360 FOOTGRILLE OFFSET 153 MM FROM PARITION.

112 EXIT STAIR P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - -

113 WOOD SHOP P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS. PT-4 AT COLUMNS.

114 TOOLS P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS. PT-4 AT COLUMNS.

115 SIGN SHOP P-1 P-1 P-1 P-1 SB-2 CONC VFC-1 MF ACT-1 2750

115A PAINT ROOM P-1 P-1 P-1 P-1 SB-2 CONC SC-1 GB P-3 2750

115B PNT STO CLO P-1 P-1 P-1 P-1 SB-2 CONC SC-1 GB P-3 2750

116 TOILET PT-1 PT-1 PT-1 PT-1/PT-2 PTB-1 CONC PT-1 GB P-4 2440 CT-2 AS WALL BASE, CT-2 WALL, CT-4 ACCENT. REFER TO ENLARGED FINISH FLOOR PLAN & ELEVATIONS.

117 EXIT STAIR P-1 P-1 P-1 P-1 SB-1 CONC SC-1 - -

118 AUTOMATION P-1 P-1 P-1 P-1 SB-2 CONC VFC-1 MF ACT-1 3050

120 ELECT RM P-1 P-1 P-1 P-1 SB-2 CONC SC-1 GB P-3 3970

121 TELCO RM P-1 P-1 P-1 P-1 SB-2 CONC SC-1 GB P-3 3970

122 MECH RM P-1 P-1 P-1 P-1 SB-2 CONC SC-1 GB P-3 3970

123 JAN CLO P-2 P-2 P-2 P-2 SB-2 CONC SC-1 GB P-4 2440

201 EXIT STAIR P-1 P-1 P-1 P-1 SB-2 CONC SC-1 GB P-3 3360

202 ASSEMBLY AREA P-1 P-1 P-1 P-1 SB-2 GB RT-1/RT-2 MF ACT-1 3360 SEE FINISH PLAN FOR FLOOR PATTERN.

203A OPEN OFFICE P-1/GFC-1 - P-1 - SB-1 GB CPT-1 ACT-1

203B OPEN OFFICE EAST P-1 P-1 P-1 P-1/GFC-1 SB-1 GB CPT-1 MF ACT-1 3360

204 BREAK RM P-1 P-1 P-1 P-1/GFC-1 SB-2 GB RT-1/RT-2 GB P-3 2750 SEE FINISH PLAN FOR FLOOR PATTERN.

205 MEN LOCKERS / TOILET P-1/PT-1/PT-2 P-1/PT-1/PT-2 P-1/GFC-2 P-1/PT-1/PT-2 PTB-1 GB PT-1 GB P-4 3360 CT-2 AS WALL BASE, CT-2 WALL, CT-3 & CT-4 ACCENT. REFER TO ENLARGED FINISH FLOOR PLAN & ELEVATIONS.

206 JAN CLO P-2 P-2 P-2 P-2 SB-2 GB VFC-1 GB P-4 3360

207 VESTIBULE P-1 P-1 P-1 P-1 SB-2 GB VFC-1 MF ACT-1 3360

208 WOMEN LOCKERS / TOILET P-1/PT-1/PT-2 P-1/PT-1/PT-2 P-1/GFC-2 P-1/PT-1/PT-2 PTB-1 GB PT-1 GB P-4 3360 CT-2 AS WALL BASE, CT-2 WALL, CT-3 & CT-4 ACCENT. REFER TO ENLARGED FINISH FLOOR PLAN & ELEVATIONS.

209 TELCO RM P-1 P-1 P-1 P-1 SB-2 GB VFC-1 GB P-3 3360

210 CONF RM P-1/MBW-1 P-1/TWP P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750

210A STORAGE P-1 P-1 P-1 P-1 SB-2 GB VFC-1 MF ACT-1 2750

211 OFFICE (EN) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750

212 OFFICE (OM) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750

213 OFFICE (OM) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750

214 OFFICE (SM) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750

215 OFFICE (EL) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750

216 OFFICE (EN) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750

217 PRINTER ROOM P-1 P-1 P-1 P-1 SB-2 GB VFC-1 MF ACT-1 2750

218 OFFICE (PM) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750

219 OFFICE (UF) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750

220 OFFICE (OP) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750

221 EXIT STAIR P-1 P-1 P-1 P-1 SB-2 CONC SC-1 GB P-3 3360

223 OPEN OFFICE WEST P-1/GFC-1 P-1 P-1 P-1 SB-2 GB RT-1/RT-2 MF ACT-1 3360 SEE FINISH PLAN FOR FLOOR PATTERN.

JB

JB

JB

M

M

M

M

M

M

JBM

M

M

JB

JB

M

JB

JB

M

M

M

JB

M M

2.1

A B C

B.1 C.1

PANEL L3-4

PANEL DPL1

PANEL DPL2PANEL L1-1

PANEL LCP-L1

PANEL L1-2

PANEL L2-3

L2-1

GOODS RECEIPT

EXIT AIR LOCK

ELECT RM

TELCO RM

MECH RM

METAL SHOP ASE

109A

METAL SHOP

PLUMB

109B

AUTOMATION

G

E-401

17 17

1 1

3 3

GFCI

WP9

PL2

PL12

PL11

PL10

PL14

PL9

PL8

8,10,12

13,15,17

14,16

UH-1

UH-1

UH-2 UH-2

UH-1

Sm

Sm

Sm

Sm Sm

Sm

L2-1:1

L2-1:1

L2-1:2

L2-1:2

L2-1:2

L2-1:3

L2-1:5

E-401

L1-1:14, 16,18

UH-1

Sm

L2-1:3

PL7

TV

EF-8

DPL3:15

AS3

AS6 AS6

AS5

AS4

AS11 AS11AS11

AS10

AS10

AS9

AS8

AS8

AS8

AS8

AS1AS2

AS6

AS6

AS6

AS6 AS6

AS6

AS6

AS6

5 5

19 19

Sm

L2-1 - 7,9

DF-2

7,9

DF-3

L2-1 - 29,31

29,31

DF-4

L2-1: 29,31 Sm

Sm

MS 3

PANEL L1-1 - 19

PANEL L1-1 - 2

N

TRUE NORTH

WIND

PLAN NORTH

0 5,000MM 10,000MM

SCALE 1:100 (MILLIMETERS)

US Army Corps of Engineers New York District

SY

M

BO

L

R

EV

IS

IO

N D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

U

.S .A

R M

Y C

O R

PS

O

FE

N

G

IN

EE

R

S N

EW

Y

O R

K D

IS

TR

IC

T ht tp w w w

.n an

.u sa ce .a rm y.

m il

SHEET

REFERENCE

NUMBER:

***SAFETY PAYS***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:

FILE PATH:

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

ED

ER

AL

P

LA

ZA

R O

O M

N

EW

Y

O R

K, N

Y

8-

A N

SI

D

DA

TE

SO

LI

C

IT

A

TI

O N

N O

C O

N

TR

A C

T N

O

FI

LE

N U

M B

ER

FI

LE

N A

M E:

PL

O

T D

A

TE

C K

D B

Y:

D

W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B

M

IT

TE

D

B Y:

PL

O

T

SC

A

LE

SI

ZE

PR

O

JE

CT

S

TA

TU

S:

C:\Users\ONeillJ1\Documents\2015 E_FP Central_ONeillJ1.rvt

4/12/2016 12:27:05 PM

R

EV

IS

IO

N

- I T/

C O

M M

R

EV

IS

IO

N S

4/

/1

A s in di ca te d

E-110A

C O

N

SO

LI

D

AT

ED

C

IV

IL

E

N G

IN

EE

R

IN

G

SH

O

PS

A N

D S

U

PP

LY

F

AC

IL

IT

Y

FI

R

ST

F

LO

O

R P

O W

ER

PL

AN

PA

R

T A

TH

U

LE

E

EN

LA

N

D

W W

C X1

O

C T

JK

T

D C

P

BE

M

0%

S ub m is si on

1. PROVIDE EXPANSION TYPE FITTINGS FOR RACEWAY

CROSSINGS AT BUILDING CONTROL EXPANSION JOINTS.

REFER TO STRUCTURAL DRAWINGS FOR LOCATIONS.

2. ALL ELECTRICAL DEVICES AND ASSOCIATED CONDUITS

MOUNTED ON EXTERIOR WALLS ARE TO BE SURFACE

MOUNTED.

3. POWER FEEDERS TO EQUIPMENT MAY BE ROUTED IN

CEILING SPACE OR IN FLOOR SLAB. COORDINATE IN-SLAB

FEEDER LOCATIONS WITH STRUCTURAL DRAWINGS.

CONFIRM EXACT EQUIPMENT LOCATIONS WITH

GOVERNMENT PRIOR TO INSTALLATION.

POWER CORD REEL DROP ASSEMBLY MOUNTED AT 8'-0"

AFF. REFER TO DETAIL 1/E-110.

EMERGENCY POWER OFF SYSTEM CONTROL PANEL.

REFER TO DETAIL 1/E-504.

ALL RECEPTACLES ARE TO BE SURFACE MOUNTED IN

THIS SPACE, UNLESS NOTED OTHERWISE.

DRAWING NOTES

GENERAL NOTES

ALL CONDUITS IN THIS SPACE BETWEEN FINISHED FLOOR

AND 8'-0" AFF SHALL BE RIGID (RGS) TYPE UNLESS NOTED

OTHERWISE.

OBSTRUCTION LIGHT CONTROL PANEL.

CIRCUIT DEVICES IN THIS AREA TO POWER PANEL L3-4,

UNLESS OTHERWISE NOTED.

CIRCUIT DEVICES IN THIS AREA TO POWER PANEL L1-1,

UNLESS OTHERWISE NOTED.

1 : 1001 FIRST FLOOR POWER

M

AT

C H

L

IN

E

SE

E 1/

E1

B

MATCH

LINE

1/E110C

PART A

KEY PLAN

PART B

PART C PART D

5 4

FIRE ALARM CONTROL PANEL.

9 MOUNT THE TWO (2) QUAD OUTLETS SHOWN WITHIN THE

SECURED GOVERNMENT CABINET (NIC); COORDINATE

THE INSTALLATION WITH CONTRACTING OFFICER.

DN

R

EF

D

W

FD

FD

JBJB

JB

MM

M

M

M

JB

JB

JB JB

JBJBJB

JBJB

J

J

JB

JB

JB

JB

JB

2.1

3.1

C D E F

3.2

D.1 E.1B.1 C.1

PANEL L1-4PANEL L1-3

PANEL L2-2

G

ASSEMBLY AREA

CONF RM

TELCO RM

EXIT STAIR WEST

OFFICE (OM)

OFFICE (SM)

OFFICE (EN)

OFFICE (PM)

OFFICE (EN)

OFFICE (UF)

WOMEN LOCKERS

/ TOILET

JAN. CLOS.

MEN LOCKERS /

TOILET

G

G

G

BREAK RM

1 112

16 4

6 6

G

G

G

F

F F

F

G

11G

G

G

12 12 12

G G

L2-2:25 G

L2-2:29

F

F

20 20 20 20 20 21 21 21 21 21

18EWC

L1-3:

23,25

L1-3:

24,26

L1-3:

27,29

L1-3:

28,30

L1-3:31, 33,35

L1-3:32, 34,36

L2-2:1,3,5

L2-2:2,4,6

L2-2:7,9,11 L2-2:8,10,12

L2-2:13, 15,17

L2-2:19

L2-2:20

7 6 6 5 516 4 3 3

L2-2:18,20

L2-2:26

AHU-1

AHU-3

AHU-4 AHU-5

L2-2:28

L2-2:30

L2-2:14

L2-2:16

TV

TV

TV

TV

TV TV TV TV

TV TV TV TV TV TV

G

PRINTER ROOM

OFFICE (OP)

OFFICE (OM)

OPEN OFFICE

EAST

203B

EXIT STAIR EAST

(PANEL L2-2) - (32)

N

TRUE NORTH

WIND

PLAN NORTH

0 5,000MM 10,000MM

SCALE 1:100 (MILLIMETERS)

US Army Corps of Engineers New York District

SY

M

BO

L

R

EV

IS

IO

N D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

U

.S .A

R M

Y C

O R

PS

O

FE

N

G

IN

EE

R

S N

EW

Y

O R

K D

IS

TR

IC

T ht tp w w w

.n an

.u sa ce .a rm y.

m il

SHEET

REFERENCE

NUMBER:

***SAFETY PAYS***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:

FILE PATH:

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

ED

ER

AL

P

LA

ZA

R O

O M

N

EW

Y

O R

K, N

Y

8-

A N

SI

D

DA

TE

SO

LI

C

IT

A

TI

O N

N O

C O

N

TR

A C

T N

O

FI

LE

N U

M B

ER

FI

LE

N A

M E:

PL

O

T D

A

TE

C K

D B

Y:

D

W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B

M

IT

TE

D

B Y:

PL

O

T

SC

A

LE

SI

ZE

PR

O

JE

CT

S

TA

TU

S:

C:\Users\ONeillJ1\Documents\2015 E_FP Central_ONeillJ1.rvt

4/12/2016 12:27:20 PM

R

EV

IS

IO

N

- I T/

C O

M M

R

EV

IS

IO

N S

4/

/1

A s in di ca te d

E-111

C O

N

SO

LI

D

AT

ED

C

IV

IL

E

N G

IN

EE

R

IN

G

SH

O

PS

A N

D S

U

PP

LY

F

AC

IL

IT

Y

SE

C

O N

D F

LO

O

R P

O W

ER

PL

AN

TH

U

LE

E

EN

LA

N

D

W W

C X1

O

C T

JK

T

D C

P

BE

M

0%

S ub m is si on

CIRCUIT DEVICES IN THIS AREA TO POWER PANEL L1-3

UNLESS NOTED OTHERWISE.

CEILING MOUNTED RECEPTACLE FOR PROJECTOR.

PROVIDE A RACK MOUNTED SPECIAL RECEPTACLE NEMA

TYPE L14-30R. SEE SERVER RACK POWER DETAIL NO. 5

SHEET E-505.

DRAWING NOTES

JUNCTION BOX FOR LAVATORY AND WATER CLOSET.

EMERGENCY POWER OFF SYSTEM CONTROL PANEL.

REFER TO DETAIL 1/E-504.

1 : 1001 SECOND FLOOR POWER

1. PROVIDE EXPANSION TYPE FITTINGS FOR RACEWAY

CROSSINGS AT BUILDING CONTROL EXPANSION

JOINTS. REFER TO STRUCTURAL DRAWINGS FOR

LOCATIONS.

2. ALL ELECTRICAL DEVICES AND ASSOCIATED CONDUIT

MOUNTED ON EXTERIOR WALLS ARE TO BE SURFACE

MOUNTED.

GENERAL NOTES

KEY PLAN

SECOND FLOOR

4 JUNCTION BOX FOR MULTI-SERVICE FLUSH FLOOR BOX

BELOW FLOOR SLAB.

MOUNT THE TWO (2) QUAD OUTLETS SHOWN WITHIN THE

SECURED GOVERNMENT CABINET (NIC); COORDINATE

THE INSTALLATION WITH CONTRACTING OFFICER.

US Army Corps of Engineers New York District

SY

M

BO

L

R

EV

IS

IO

N D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

U

.S .A

R M

Y C

O R

PS

O

FE

N

G

IN

EE

R

S N

EW

Y

O R

K D

IS

TR

IC

T ht tp w w w

.n an

.u sa ce .a rm y.

m il

SHEET

REFERENCE

NUMBER:

***SAFETY PAYS***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:

FILE PATH:

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

ED

ER

AL

P

LA

ZA

R O

O M

N

EW

Y

O R

K, N

Y

8-

A N

SI

D

DA

TE

SO

LI

C

IT

A

TI

O N

N O

C O

N

TR

A C

T N

O

FI

LE

N U

M B

ER

FI

LE

N A

M E:

PL

O

T D

A

TE

C K

D B

Y:

D

W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B

M

IT

TE

D

B Y:

PL

O

T

SC

A

LE

SI

ZE

PR

O

JE

CT

S

TA

TU

S:

C:\Users\ONeillJ1\Documents\2015 E_FP Central_ONeillJ1.rvt

4/12/2016 12:27:28 PM

R

EV

IS

IO

N

- I T/

C O

M M

R

EV

IS

IO

N S

4/

/1

E-701

C O

N

SO

LI

D

AT

ED

C

IV

IL

E

N G

IN

EE

R

IN

G

SH

O

PS

A N

D S

U

PP

LY

F

AC

IL

IT

Y

PA

N

EL

S

C H

ED

U

LE

S

TH

U

LE

E

EN

LA

N

D

W W

C X1

O

C T

JK

T

D C

P

BE

M

0%

S ub m is si on

Notes:

Total Demand + 25% Spare: 45231 VA

Receptacle 15900 VA 81.45% 12950 VA Total Est. Demand: 36185 VA Power 11750 VA 92.55% 10875 VA Total Conn. Load: 42370 VA Other 14720 VA 83.97% 12360 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Load: 13430 VA 15440 VA 13500 VA 71 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 72 69 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 70 67 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 68 65 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 66 63 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 64 61 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 62 59 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 60 57 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 58 55 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 56 53 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 54 51 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 52 49 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 50 47 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 48 45 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 46 43 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 44 41 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 42 39 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 40 37 Receptacle COPIER PRINTER RM 217 20 A 1 720 VA 720 VA 1 20 A Power QUAD FLOOR BOX CONF RM 210 38 35 -- -- -- 1000... 1000... -- -- -- 36 33 -- -- -- 1000... 1000... -- -- -- 34 31 Other FURNITURE SYSTEM OPEN OFFICE... 20 A 3 1000... 1000... 3 20 A Other FURNITURE SYSTEM OPEN OFFICE... 32 29 -- -- -- 1000... 1000... -- -- -- 30 27 Other FURNITURE SYSTEM RM 202 20 A 2 1000... 1000... 2 20 A Other FURNITURE SYSTEM RM 202 28 25 -- -- -- 1000... 1000... -- -- -- 26 23 Other FURNITURE SYSTEM RM 202 20 A 2 1000... 1000... 2 20 A Other FURNITURE SYSTEM RM 202 24 21 Power "TV MONITORS OFFICES 216-220 20 A 1 1660... 720 VA 1 20 A Receptacle PRINTER/SCANNER RM 217 22 19 Power "TV MONITORS ASSEMBLY AREA 202 20 A 1 740 VA 1850... 1 20 A Power "TV MONITORS OFFICE 211-215 20 17 PROJECTION SCREEN CONF RM 210 20 A 1 1000... 740 VA 1 20 A Power "TV MONITORS CONF RM 210 OFFIC... 18 15 Receptacle PLOTTER PRINT ROOM 211 20 A 1 1500... 900 VA 1 20 A Receptacle OFFICE 211 16 13 Receptacle MULTI RM 221 20 A 1 900 VA 720 VA 1 20 A Receptacle Countertop 14 11 Receptacle LOCKERS / TOILET 207 20 A 1 1260... 900 VA 1 20 A Receptacle OFFICE 209 12 9 Receptacle LOCKERS / TOILET 204, 207 20 A 1 1800... 1440... 1 20 A Receptacle CONF RM 219 10 7 Receptacle OFFICE 212 20 A 1 900 VA 1080... 1 20 A Receptacle OPEN OFFICE 202 8 5 Receptacle OFFICE 215, 216 20 A 1 1800... 1800... 1 20 A Receptacle OFFICE 213, 215 6 3 Receptacle OFFICE 218, 219 20 A 1 1800... 1620... 1 20 A Receptacle OPEN OFFICE 217, 218 4 1 Receptacle OPEN OFFICE 202 20 A 1 720 VA 1080... 1 20 A Receptacle MULTI RM 221 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Mounting: Surface Wires: 4 MCB Rating: 225 A

Enclosure: Type 1 Phases: 3 Mains Rating: 225 APa... PANEL L1-3 Location: Volts: 120/208 Wye A.I.C. Rating: 10k

Notes:

Total Demand + 25% Spare: 29243 VA

Receptacle 7920 VA 100.00% 7920 VA Total Est. Demand: 23394 VA Power 7794 VA 100.00% 7794 VA Total Conn. Load: 23394 VA Other 7680 VA 100.00% 7680 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Load: 8961 VA 7691 VA 6741 VA 41 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 42 39 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 40 37 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 38 35 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 36 33 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 34 31 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 32 29 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 30 27 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 28 25 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 26 23 Spare 20 A 1 0 VA 1500... 1 20 A MS1 MOBILE STORAGE UNIT 24 21 MS1 MOBILE STORAGE UNIT 20 A 1 1500... 1500... 1 20 A MS2 MOBILE TORAGE UNIT 22 19 MS2 MOBILE TORAGE UNIT 20 A 1 1500... 730 VA 1 20 A Power TV MONITOR ROOM 118 20 17 Receptacle AUTOMATION 118 20 A 1 1080... 1271... -- -- -- 18 15 Receptacle AUTOMATION 118 20 A 1 900 VA 1271... -- -- -- 16 13 Power COUNTER AREA 103 20 A 1 1080... 1271... 3 20 A Power LIFT MOTOR LIFT RM 106 14 11 Receptacle 20 A 1 180 VA 370 VA 1 20 A Power EWC GOODS RECEIPT 107 12 9 Receptacle 20 A 1 180 VA 180 VA 1 20 A Receptacle 10 7 Receptacle BASE SUPPLY 102 20 A 1 900 VA 1080... 1 20 A Receptacle BASE SUPPLY 102 8 5 Receptacle BASE SUPPLY 102 20 A 1 1260... 1080... 1 20 A Receptacle OFFICE 104 6 3 Receptacle GOODS RECEIPT 107 20 A 1 1080... 1080... 1 20 A Receptacle BASE SUPPLY 102 4 1 Receptacle ELECT RM 120 20 A 1 900 VA 1500... 1 20 A MS3 MOBILE STORAGE UNIT 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Mounting: Surface Wires: 4 MCB Rating: 100 A

Enclosure: Type 1 Phases: 3 Mains Rating: 100 APa... PANEL L1-1 Location: ELECT RM 120 Volts: 120/208 Wye A.I.C. Rating: 10k

Notes:

Total Demand + 25% Spare: 13500 VA

Receptacle 360 VA 100.00% 360 VA Total Est. Demand: 10800 VA Power 8940 VA 100.00% 8940 VA Total Conn. Load: 10800 VA Other 1500 VA 100.00% 1500 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Load: 3580 VA 3220 VA 4000 VA 23 Spare 20 A 1 0 VA 0 VA -- -- -- 24 21 Spare 20 A 1 0 VA 0 VA -- -- -- 22 19 Spare 20 A 1 0 VA 0 VA 3 30 A TVSS DEVICE 20 17 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 18 15 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 16 13 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 14 11 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 12 9 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 10 7 Spare 20 A 1 0 VA 2500... -- -- -- 8

5 SECURITY SYSTEM POWER SUPPLY... 20 A 1 1500... 2500... -- -- -- 6

3 SECURED CABINET (NIC) 20 A 1 720 VA 2500... 3 30 A Power RACK MTD L14-30R RECEP RM 121 4 1 Receptacle TELCO RM 121 20 A 1 720 VA 360 VA 1 20 A Receptacle TELCO RM 121 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Mounting: Surface Wires: 4 MCB Rating: 100 A

Enclosure: Type 1 Phases: 3 Mains Rating: 100 APa... PANEL L1-2 Location: TELECO RM 121 Volts: 120/208 Wye A.I.C. Rating: 10k

Notes:

Total Demand + 25% Spare: 11400 VA

Total Est. Demand: 9120 VA Receptacle 180 VA 100.00% 180 VA Total Conn. Load: 9120 VA Power 8940 VA 100.00% 8940 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Load: 2680 VA 3220 VA 3220 VA 23 24 21 22 19 20 17 18 15 16 13 14 11 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 12 9 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 10 7 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 8

5 SECURED CABINET (NIC) 20 A 1 720 VA 2500... -- -- -- 6

3 QUAD WALL OUTLETS 20 A 1 720 VA 2500... -- -- -- 4

1 Receptacle 20 A 1 180 VA 2500... 3 30 A Power RACK MTD L14-30R RECEP RM 209 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Mounting: Surface Wires: 4 MCB Rating: 100 A

Enclosure: Type 1 Phases: 3 Mains Rating: 100 APa... PANEL L1-4 Location: TELECO RM 209 Volts: 120/208 Wye A.I.C. Rating: 10k

Notes:

Receptacle 24360 VA 70.53% 17180 VA Total Demand + 25% Spare 84663 VA Lighting - Exterior 2184 VA 100.00% 2184 VA Total Est. Demand: 67730 VA Power 37424 VA 63.36% 23712 VA Total Conn. Load: 103277 VA Other 39309 VA 62.72% 24654 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Conn. Load: 103277 VA 8 Space -- -- -- 0 VA -- 7 Space -- -- -- 0 VA -- 6 Spare 3 -- 100 A 0 VA

5 LCP-L1 3 100 A 100 A 17497 VA

4 L1-4 3 100 A 100 A 9120 VA

3 L1-3 3 225 A 225 A 42370 VA

2 L1-2 3 100 A 100 A 10800 VA

1 L1-1 3 100 A 100 A 23394 VA

CKT Circuit Description # of Poles Frame Size Trip Rating Load Remarks

Mounting: FLOOR Wires: 4 MCB Rating: 400 A Enclosure: Type 1 Phases: 3 Mains Rating: 400 ASwitchboard PANEL... Location: ELECT RM 120 Volts: 120/208 Wye A.I.C. Rating: 22k

WITH 120V SHUNT TRIP

WITH 120V SHUNT TRIP

TVSS 3 100 A 30 A 0 VA

100 A

DPL1

Notes:

Total Demand + 25% Spare: 55806 VA

Receptacle 6720 VA 100.00% 6720 VA Total Est. Demand: 44645 VA Power 64770 VA 57.72% 37385 VA Total Conn. Load: 72030 VA Other 540 VA 100.00% 540 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Load: 24291 VA 24479 VA 23259 VA 41 Recp METAL SHOP SHEET MTL 109D "SM5" 20 A 1 1920... 0 VA 1 20 A Spare 42 39 Recp METAL SHOP SHEET MTL 109D "SM5" 20 A 1 1920... 0 VA 1 20 A Spare 40 37 -- -- -- 5000... 0 VA 1 20 A Spare 38 35 -- -- -- 5000... 0 VA 1 20 A Spare 36 33 Power METAL SHOP SHEET MTL 109D "SM1" 60 A 3 5000... 791 VA -- -- -- 34

31 -- -- -- 250 VA 791 VA -- -- -- 32

29 -- -- -- 250 VA 791 VA 3 20 A Power PAINT ROOM 115A" PR5" 30 27 Power METAL SHOP SHEET MTL 109D "DP2" 20 A 3 250 VA 1248... -- -- -- 28 25 -- -- -- 250 VA 1248... 2 20 A Power PAINT ROOM 115A "PR4" 26

23 -- -- -- 250 VA 1248... -- -- -- 24

21 Power METAL SHOP SHEET MTL 109D "PG1" 20 A 3 250 VA 1248... 2 20 A Power PAINT ROOM 115A "PR3" 22 19 -- -- -- 3667... 720 VA 1 20 A Receptacle PAINT ROOM 115A 20 17 -- -- -- 3667... 180 VA 1 20 A Other METAL SHOP MACH TL 109D "EPO" 18 15 Power METAL SHOP SHEET MTL 109D "BR2" 40 A 3 3667... 360 VA 1 20 A Retractable Recp METAL SHOP MACH TL... 16 13 -- -- -- 6000... 2080... -- -- -- 14 11 -- -- -- 6000... 2080... 2 30 A Power METAL SHOP SHEET MTL 109D "SM4" 12 9 Power METAL SHOP SHEET MTL 109D 70 A 3 6000... 1872... -- -- -- 10 7 Receptacle METAL SHOP SHEET MTL 109D 20 A 1 540 VA 1872... 2 30 A Power METAL SHOP SHEET MTL 109D "SM3" 8 5 Receptacle METAL SHOP SHEET MTL 109D 20 A 1 540 VA 1333... -- -- -- 6 3 Receptacle METAL SHOP SHEET MTL 109D 20 A 1 540 VA 1333... -- -- -- 4 1 Receptacle METAL SHOP SHEET MTL 109D 20 A 1 540 VA 1333... 3 20 A Power METAL SHOP SHEET MTL 109D "SM2" 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Mounting: Surface Wires: 4 MCB Rating: 225 A

Enclosure: Type 1 Phases: 3 Mains Rating: 225 APa... PANEL L3-5 Location: METAL SHOP... Volts: 120/208 Wye A.I.C. Rating: 10k

Spare Spare Spare

Spare Spare Spare

Spare Spare Spare

Spare Spare Spare

20 A

20 A 20 A

20 A 20 A

20 A

20 A

20 A 20 A

20 A 20 A

20 A

0 VA 0 VA

0 VA 0 VA

0 VA 0 VA

0 VA 0 VA

0 VA 0 VA

0 VA 0 VA

W

W

PANEL L1-4

PANEL L1-2

0 2,500MM 5,000MM

SCALE: 1:50 (MILLIMETERS)

US Army Corps of Engineers New York District

SY

M

BO

L

R

EV

IS

IO

N D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

U

.S .A

R M

Y C

O R

PS

O

FE

N

G

IN

EE

R

S N

EW

Y

O R

K D

IS

TR

IC

T ht tp w w w

.n an

.u sa ce .a rm y.

m il

SHEET

REFERENCE

NUMBER:

***SAFETY PAYS***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:

FILE PATH:

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

ED

ER

AL

P

LA

ZA

R O

O M

N

EW

Y

O R

K, N

Y

8-

A N

SI

D

DA

TE

SO

LI

C

IT

A

TI

O N

N O

C O

N

TR

A C

T N

O

FI

LE

N U

M B

ER

FI

LE

N A

M E:

PL

O

T D

A

TE

C K

D B

Y:

D

W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B

M

IT

TE

D

B Y:

PL

O

T

SC

A

LE

SI

ZE

PR

O

JE

CT

S

TA

TU

S:

C:\Users\ONeillJ1\Documents\2015 E_FP Central_ONeillJ1.rvt

4/12/2016 12:27:46 PM

R

EV

IS

IO

N

- I T/

C O

M M

R

EV

IS

IO

N S

4/

/1

T-401

C O

N

SO

LI

D

AT

ED

C

IV

IL

E

N G

IN

EE

R

IN

G

SH

O

PS

A N

D S

U

PP

LY

F

AC

IL

IT

Y

EN

LA

R G

ED

F

LO

O

R

PL

AN

S

TH

U

LE

E

EN

LA

N

D

W W

C X1

O

C T

JK

T

JK

T

BE

M

0%

S ub m is si on

DRAWING NOTES

GENERAL NOTES

1 : 502

ENLARGED FLOOR PLAN - TELECOM

ROOM 209

1 : 501

ENLARGED FLOOR PLAN - TELECOM

ROOM 121

1 2

RACK 1

RACK 1

1. ALL DEVICES AND ASSOCIATED CONDUITS MOUNTED ON

EXTERIOR WALLS ARE TO BE SURFACE MOUNTED.

TE

LC

O R

O O

M S

EN

LA

R G

ED

FL

O O

R P

LA

N

S

3/4" FIRE RATED PLYWOOD BACKBOARD ON ALL WALLS.

SERVICE ENTRANCE CONDUITS. COORDINATE.

(4) - 4" CONDUIT SLEEVES WITH FIRE PROOFING.

WALL MOUNTED "TMGB" GROUND BAR AT +24" AFF.

CONTRACTOR SHALL ARRANGE THE SERVICE ENTRY

ENCLOSED RACK IN A MANNER TO ALLOW A SECOND

RACK TO BE MOUNTERD ADJACENT TO THE INSTALLED

RACK SHOULD FUTURE CABLE SYSYSTEM

REQUIREMENTS ARISE.

GOVERNMENT FREESTANDING SECURED, ENCLOSED

CABINET. COORDINATE INSTALLATION AND MAINTAIN

CLEARANCES AT ALL ACCESS POINTS AND BRTWEEN

THE OTHER RACKS THAT CARE/WILL BE INSTALLED IN

THAT ROOM.

WALL MOUNTED "TGB" GROUND BAR AT +96" AFF.

TELECOM ROOM 209 - SECOND FLOOR

48 - STRAND SINGLE MODE (SM) FIBER

OPTIC SERVICE ENTRANCE CABLE

FROM BUILDING 1411.

OPTICAL NETWORK

TERMINAL (ONT) (NIC)

TELECOM ROOM 121 - FIRST FLOOR

FTP

FBPPP

VoIP SWITCH (NIC)

DATA SWITCH (NIC)

DATA SWITCH (NIC)

CATV SWITCH (NIC)

24 PORT HPP

24 PORT HPP

24 PORT HPP

24 PORT HPP

FBPP

VoIP SWITCH (NIC)

DATA SWITCH (NIC)

DATA SWITCH (NIC)

CATV SWITCH (NIC)

24 PORT HPP

24 PORT HPP

24 PORT HPP

24 PORT HPP

4" CONDUIT WITH 3- 2"

FABRIC INNERDUCTS

SEAL CONDUIT

AT ENTRY

48 - STRAND

SINGLE MODE (SM)

2 - STRAND (SM)

CAT 6 PATCH CABLESCAT 6 PATCH

CABLES

24 - STRAND (SM)

BACKBONE CABLE

CAT 6 PATCH CABLES

CONDUIT SIZE INDICATED

ON FLOOR PLAN

TO VOICE JACKS

WITH YELLOW

JACKET COLOR

TO DATA JACKS

WITH BLUE

JACKET COLOR

TO CATV JACKS

WITH GREY

JACKET COLOR

TO VOICE JACKS

WITH YELLOW

JACKET COLOR

TO DATA JACKS

WITH BLUE

JACKET COLOR

TO CATV JACKS

WITH GREY

JACKET COLOR

FUTURE 48 - STRAND SINGLE MODE

(SM) FIBER OPTIC SERVICE ENTRANCE

CABLE TO FUTURE VMF SHOP.

TO CARD ACCESS

CONTROL PANEL

TO FIRE ALARM

CONTROL PANEL

TO IP SPEAKER JACKS

ABOVE CEILING

CAT 6 CABLES

MTGB

TGB

OPTICAL NETWORK

TERMINAL (ONT) (NIC)

2 - STRAND (SM)

CAT 6 PATCH

CABLES

PA SWITCH

2 - STRAND (SM)

2 - STRAND (SM)

TELCO ROOM - 2ND FLOOR

POE SWITCH WITH FIBER

AND CAT6 INTERFACE

IEEE 802.3AT-2009

ENABLED 10/100BASE-TX

PORTS

STANDARD

NETWORK

INTERFACE

TELCO ROOM - 1ST FLOOR

MECH ROOM &

ELEC ROOM

UTILITY SPACE

SMFOC FROM FIBER PATCH

PANEL IN 1ST FLOOR RACK

CORR &

COMMON

MECH ROOM &

ELEC ROOM

UTILITY SPACE

HIGH BAY AREAS CORR &

COMMON

DETAIL NOTES:

WHERE CEILING SPEAKERS ARE SPECIFIED, COORDINATE WITH ARCHITECTURAL

CEILING TILE AND THULE BCE PERSONNEL FOR THE TYPE OF CEILING SPEAKERS

(ROUND OR SQUARE 2'x 2') TO BE INSTALLED.

THE ALPHACOM AUDIO SERVER THAT WILL SUPPORT THE PA SYSTEM IS LOCATED IN

BUILDING 1411 SERVER ROOM.

SEE TELECOM RISER FOR SWITCHING EQUIPMENT AND SYSTEM CONNECTION POINT

1.

2.

3.

POE SWITCH WITH FIBER

AND CAT6 INTERFACE

IEEE 802.3AT-2009

ENABLED 10/100BASE-TX

PORTS

WALL

FACEPLATE

CEILING

FACEPLATE

UXGA VIDEO CABLE AND CAT 6

CABLE IN 1 1/4" CONDUIT CAT 6 CABLE TO

PATCH PANEL

CAT 6 CABLE TO

PATCH PANELS

US Army Corps of Engineers New York District

SY

M

BO

L

R

EV

IS

IO

N D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

U

.S .A

R M

Y C

O R

PS

O

FE

N

G

IN

EE

R

S N

EW

Y

O R

K D

IS

TR

IC

T ht tp w w w

.n an

.u sa ce .a rm y.

m il

SHEET

REFERENCE

NUMBER:

***SAFETY PAYS***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:

FILE PATH:

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

ED

ER

AL

P

LA

ZA

R O

O M

N

EW

Y

O R

K, N

Y

8-

A N

SI

D

DA

TE

SO

LI

C

IT

A

TI

O N

N O

C O

N

TR

A C

T N

O

FI

LE

N U

M B

ER

FI

LE

N A

M E:

PL

O

T D

A

TE

C K

D B

Y:

D

W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B

M

IT

TE

D

B Y:

PL

O

T

SC

A

LE

SI

ZE

PR

O

JE

CT

S

TA

TU

S:

C:\Users\ONeillJ1\Documents\2015 E_FP Central_ONeillJ1.rvt

4/12/2016 12:27:56 PM

R

EV

IS

IO

N

- I T/

C O

M M

R

EV

IS

IO

N S

4/

/1

T-601

C O

N

SO

LI

D

AT

ED

C

IV

IL

E

N G

IN

EE

R

IN

G

SH

O

PS

A N

D S

U

PP

LY

F

AC

IL

IT

Y

TE

LE

C O

M R

IS

ER

D

IA

G R

AM

TH

U

LE

E

EN

LA

N

D

W W

C X1

O

C T

JK

T

D P

BE

M

0%

S ub m is si on

FOR ELECTRICAL NOTES, ABBREVIATIONS, AND SYMBOLS

REFER TO DRAWING E-001.

EQUIPMENT PLACEMENTS ARE DIAGRAMMATIC IN NATURE.

FOR EQUIPMENT RACK ELEVATIONS REFER TO SHEET T-602.

INSTALLATIONS METHOD SHALL COMPLY WITH TIA/EIA 569-B,

NEC, AND RELEVANT STANDARDS.

PROVIDE JUNCTION BOXES IN CONDUIT RUNS SO THAT THERE

ARE NO MORE THAN (2) 90 DEGREE BENDS BETWEEN PULL

POINTS (JUNCTION BOXES, ETC) OR CONDUIT RUNS WHICH

EXCEED 100-FEET, OR IF NECESSARY, INSERT ADDITIONAL PULL

BOXES. SIZE JUNCTION BOXES IN ACCORDANCE WITH TIA-EIA-

569-B.

ALL CONDUITS USED FOR INTERIOR DISTRIBUTION CABLE

ROUTING SHALL BE EMT, UNLESS OTHERWISE NOTED. SERVICE

ENTRY CONDUITS STUBS SHALL BE RIGID STEEL WITH

INSULATED GROUND BUSHINGS.

DRAWING NOTES

GENERAL NOTES

SERVICE ENTRANCE FIBER OPTIC CABLE SHALL BE GLASS-

ARMOURED MULTIFIBER LOOSE-TUBE, GEL-FILLED CABLE

WITH PE JACKET, 4x2012-STRAND (48-STRAND), HUMBER +

SUHNER 4X12 E9/125, 48-12 EO/WSN (ZNG) Y-Z150 OR

APPROVED EQUAL.

OUTDOOR FIBER OPTIC CABLE WILL BE SPLICED IN A WALL

MOUNTED FIBER OPTIC SPLICE BOX, AND THE INDIVIDUAL

FIBER STRANDS WIL BE SPLICED TO THE INDOOR FIBER

CABLES.

FIBER OPTIC PATCH PANEL (SM-SINGLE MODE) SHALL BE

PROVIDED WITH SUFFICIENT PATCH PANELS FOR CABLE

TERMINATIONS.

INDOOR FIBER OPTIC CABLE IS PRE-FABRICATED 24-

STRAND SINGLE MODE WITH CONNECTORS INSTALLED AT

BOTH ENDS. THE CABLE REEL COMES WITH DATA- AND -

SHEETS FOR ALL INDIVIDUAL STRANDS AND CONNECTORS.

THE CABLE REEL IS ORDERED TO THE LENGTH REQUIRED

(LENGTH FROM 1ST FLOOR RACK TO 2ND FLOOR RACK +

10 METERS FOR INSTALLATION AND TERMINATION).

PROVIDE AN INSULATED 3/0 COPPER GROUND CONDUCTOR

IN 1 1/4" EMT BETWEN THE MTGB AND THE 2ND FLOOR

TGB. INSTALL INSULATED GROUND BUSHINGS AT EACH END

OF THE CONDUIT RUN AND BOND THE BUSHINGS TO EACH

GROUND BUS WITH A MINIMUM #6 AWG COPPER

CONDUCTOR.

PROVIDE AN INSULATED #2 AWG COPPER GROUND

CONDUCTOR IN 1" EMT BETWEN THE TELECOM ROOM

GROUND BUS AND THE GROUND BUS IN THE PANELBOARD

INSTALLED IN THAT ROOM. INSTALL INSULATED GROUND

BUSHINGS AT EACH END OF THE CONDUIT RUN AND BOND

THE BUSHINGS TO THE TELECOM ROOM GROUND BUS AND

THE PANEL BUS WITH A MINIMUM #6 AWG COPPER

CONDUCTOR.

PROVIDE AN INSULATED #6 COPPER GROUND CONDUCTOR

IN 1 1/4" EMT BETWEN THE TELECOM ROOM GROUND BUS

AND THE NEAREST BUILDING STEEL. INSTALL INSULATED

GROUND BUSHINGS AT EACH END OF THE CONDUIT RUN

AND BOND THE BUSHINGS AT THE GROUND BUS AND STEEL

MEMBER WITH A MINIMUM #6 AWG COPPER CONDUCTOR.

PROVIDE A BARE #6 AWG COPPER GROUND CONDUCTOR

IN 1 1/4" EMT BETWEN THETELECOM ROOM GROUND BUS

TO THE CABLE TRAY SYSTEM, TO EACH RACK, AND TO ALL

TELECOM EQUIPMENT CABINETS AND ENCLOSURES.

NOT TO SCALE1 TELECOM RISER DIAGRAM

NOT TO SCALE2 PAGING RISER DIAGRAM

NOT TO SCALE3 PROJECTOR WIRING DETAIL

1.

2.

3.

4.

5.

5 6 7 8

5 6 7 8

48-STRAND FBBPP

(SM)

48-STRAND SM

FIBER TERMINATION PANEL

CABLE TRAY

FLOOR

RACK 1

ANCHOR

TO FLOOR

6-

IN

C H

W

IR

E M

AN

AG

ER

6-

IN

C H

W

IR

E M

AN

AG

ER

UPS BATTERY MODULE

UPS BATTERY MODULE

UPS BATTERY MODULE

UPS/PDU

5kVA

CABLE MANAGER

CABLE MANAGER

UPS BATTERY MODULE

24 PORT CAT 6 Voip SWITCH

CABLE MANAGER

24 PORT CAT 6 DATA SWITCH

CABLE MANAGER

24 PORT CAT 6 DATA SWITCH

CABLE MANAGER

24 PORT CAT 6 CATV SWITCH

CABLE MANAGER

24 PORT CAT 6 HPP

CABLE MANAGER

24 PORT CAT 6 HPP

CABLE MANAGER

24 PORT CAT 6 HPP

CABLE MANAGER

24 PORT CAT 6 HPP

CABLE MANAGER

PDU

CABLE TRAY

FLOOR

RACK 1

ANCHOR

TO FLOOR

6-

IN

C H

W

IR

E M

AN

AG

ER

6-

IN

C H

W

IR

E M

AN

AG

ER

UPS BATTERY MODULE

UPS BATTERY MODULE

UPS BATTERY MODULE

UPS/PDU

5kVA

UPS BATTERY MODULE

24 PORT CAT 6 Voip SWITCH

CABLE MANAGER

24 PORT CAT 6 DATA SWITCH

CABLE MANAGER

24 PORT CAT 6 DATA SWITCH

CABLE MANAGER

24 PORT CAT 6 CATV SWITCH

CABLE MANAGER

24 PORT CAT 6 HPP

CABLE MANAGER

24 PORT CAT 6 HPP

CABLE MANAGER

24 PORT CAT 6 HPP

CABLE MANAGER

24 PORT CAT 6 HPP

CABLE MANAGER

CABLE MANAGER

CABLE MANAGER

24-STRAND

FBBPP (SM)

PDU

PLAN VIEW

ISOMETRIC

SIDE VIEW

FRONT VIEW

DETAIL NOTE:

1. COORDINATE BOX DIMENSIONS AND ANTENNA OPENINGS WITH WAP DEVICE PROVIDED.

NEMA 1 ENCLOSURE

FULLY HINGED LOCKABLE DOOR

KNOCKOUT FOR ANTENNA

WAP

SIDE VIEW

ISOMETRIC

SIDE VIEWREFLECTED PLAN VIEW

DETAIL NOTE:

1. COORDINATE BOX DIMENSIONS AND ANTENNA OPENINGS WITH WAP DEVICE PROVIDED.

FULLY HINGED LOCKABLE DOOR

KNOCK-OUTS FOR ANTENNA

NEMA 1 PLENUM RATED ENCLOSURE

WAP

US Army Corps of Engineers New York District

SY

M

BO

L

R

EV

IS

IO

N D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

U

.S .A

R M

Y C

O R

PS

O

FE

N

G

IN

EE

R

S N

EW

Y

O R

K D

IS

TR

IC

T ht tp w w w

.n an

.u sa ce .a rm y.

m il

SHEET

REFERENCE

NUMBER:

***SAFETY PAYS***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:

FILE PATH:

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

ED

ER

AL

P

LA

ZA

R O

O M

N

EW

Y

O R

K, N

Y

8-

A N

SI

D

DA

TE

SO

LI

C

IT

A

TI

O N

N O

C O

N

TR

A C

T N

O

FI

LE

N U

M B

ER

FI

LE

N A

M E:

PL

O

T D

A

TE

C K

D B

Y:

D

W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B

M

IT

TE

D

B Y:

PL

O

T

SC

A

LE

SI

ZE

PR

O

JE

CT

S

TA

TU

S:

C:\Users\ONeillJ1\Documents\2015 E_FP Central_ONeillJ1.rvt

4/12/2016 12:28:06 PM

R

EV

IS

IO

N

- I T/

C O

M M

R

EV

IS

IO

N S

4/

/1

T-602

C O

N

SO

LI

D

AT

ED

C

IV

IL

E

N G

IN

EE

R

IN

G

SH

O

PS

A N

D S

U

PP

LY

F

AC

IL

IT

Y

TE

LE

C O

M R

AC

K

EL

EV

AT

IO

N S

AN

D

D

ET

AI

LS

TH

U

LE

E

EN

LA

N

D

W W

C X1

O

C T

JK

T

D P

BE

M

0%

S ub m is si on

CATEGORY 6 HORIZONTAL CABLE PATCH PANELS

SWITCH HINGED PANELS.

1. FOR TELECOM NOTES, ABBREVIATIONS, AND SYMBOLS

REFER TO DRAWING E-003.

2. SEE FLOOR PLAN FOR ROOM LAYOUT.

3. PROVIDE ALL PATCH PANELS AS REQUIRED TO

SUFFICIENTLY TERMINATE ALL CABLES SPECIFIED.

SPACE OPTIMIZATION STRATEGY SHALL BE EMPLOYED TO

CONSERVE SPACE.

4. DRAWINGS ARE DIAGRAMMATIC ONLY. EXACT

ARRANGEMENT FOR EQUIPMENT AND PATCH PANELS

SHALL BE COORDINATED AND OPTIMIZED IN THE FIELD.

5. ALL TELECOM SWITCHING EQUIPMENT SUCH FOR

DATA/VOIP/CATV WILL BE PROVIDED BY THE

GOVERNMENT.

45U ENCLOSED 2-POST EQUIPMENT RACK WITH VERTICAL

CABLE MANAGER (TYPICAL).

48-PORT FIBER PATCH PANEL WITH DUPLEX SC

ADAPTORS. CONTRACTOR SHALL PROVIDE EQUIPMENT

BASED ON SPACE OPTIMIZATION STRATEGY.

208V - 208/120V DOUBLE CONVERSION ONLINE UPS WITH 2

HOURS or 70 AH MINIMUM POWER RESERVE AT FULL LOAD.

PROVIDE WITH (4) NEMA 5-20R, (1) L14-30R, AND (1) NEMA

L6-30R OUTPUT RECEPTACLES AND NEMA L14-30P INPUT

PLUG WITH 10' (3) CORD-APC SMART-UPS OR EQUAL.

DRAWING NOTES

GENERAL NOTES

24-PORT SWITCH, (NIC) (TYPICAL).

RACK PDU WITH (10) NEMA 5-20R RECEPTACLES AND

NEMA 5-20P INPUT PLUG ON 12' (3.6m) CORD. APC RACK

PDU OR EQUAL.

NOT TO SCALE1 TELECOM RACK ELEVATION RM 121

NOT TO SCALE2 TELECOM RACK ELEVATION RM 209

NOT TO SCALE3

TELECOM WALL MTD WIRELESS ACCESS

POINT ENCLOSURE

NOT TO SCALE4

TELECOM RECESSED CEILING MTD

WIRELESS ACCESS POINT ENCLOSURE

24-PORT FIBER PATCH PANEL WITH DUPLEX SC

ADAPTORS. CONTRACTOR SHALL PROVIDE EQUIPMENT

BASED ON SPACE OPTIMIZATION STRATEGY.

CONTRACTOR SHALL INSTALL FREESTANDING SECURE

ENCLOSED CABINET ADJACENT TO RACK #1. VERIFY

CABINET SIZE AND COORDINATE REQUIRED CLEARANCES

FOR THE CABINET WITH THE CONTRACTING OFFICER.

UP

UP

2.1

3.1

EXIT AIR LOCK

ELECT RM

TELCO RM

MECH RM

METAL SHOP ASE

109A

GOODS RECEIPT

BASE SUPPLY

OFFICE (WO)

COUNTER AREA

(WO)

EXIT AIR LOCK

EXIT STAIR

JAN CLO

AIR LOCK

TOILET

AUTOMATION

METAL SHOP

PLUMB

109B

METAL SHOP

MACH TL

109C

METAL SHOP

SHEET MTL

109D

WELDING SHOP

TOOLS

WOOD SHOP

SIGN SHOP

PAINT ROOM

115A

PNT STO CLO

115B

EXIT AIR LOCK

EXIT STAIR

EXP/P-3

P-1

SB-2

MAT-1/SC-1

P-3 P-1

SB-2

SC-1

P-3 P-1

SB-2

SC-1

P-3 P-1

SB-2

SC-1

EXP/P-3

P-1

SB-2

SC-1

EXP/P-3

P-1

SB-2

SC-1

P-4 P-2

SB-2

SC-1

P-4

PT-1/PT-2

PTB-1

PT-1

ACT-1

P-1

SB-1

VFC-1

ACT-1

P-1

SB-2

VFC-1

P-1

SB-1

SC-1

P-3 P-1

SB-2

MAT-1/SC-1

EXP/P-3

P-1

SB-2

SC-1

EXP/P-3

P-1

SB-2

SC-1

EXP/P-3

P-1

SB-2

SC-1

P-3 P-1

SB-2

SC-1

P-3 P-1

SB-2

SC-1

P-3 P-1

SB-2

MAT-1/SC-1

P-1

SB-2

SC-1

EXP/P-3

P-1

SB-2

SC-1

EXP/P-3

P-1

SB-2

SC-1

EXP/P-3

P-1

SB-2

SC-1

EXP/P-3

P-1

SB-2

SC-1

ACT-1

P-1

SB-2

VFC-1

EXP/P-3

P-1

SB-2

SC-1

ACT-1

P-1

SB-2

VFC-1

I-401

I-401

P-1 AT

COLUMN

P-1 AT

COLUMN

P-1 AT

COLUMN

P-1 AT

COLUMN

P-1 AT

COLUMN

PT-4 AT

COLUMN

P-1 AT

COLUMN

P-1 AT

COLUMN

P-1 AT

COLUMN

P-1 AT

COLUMN

PT-7 AT RAILS AND STRINGERS

P-5 AT RAILS AND STRINGERS

1. REFER TO SHEET I-601 FOR INTERIOR FINISH MATERIAL KEY AND INTERIOR FINISH MATERIAL SCHEDULE.

REFER TO SHEET A-611 ROOM FINISH SCHEDULE FOR FULL FINISH APPLICATION.

2. REFER TO REFLECTED CEILING PLAN FOR CEILING HEIGHTS AND ADDITIONAL CEILING INFORMATION.

3. REFER TO CID PACKAGE FOR FINISH SAMPLES.

4. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISHES.

GENERAL NOTES

FINISH KEY

CEILING

WALL

BASE

FLOOR

CEILING

ACT ACOUSTICAL CEILING TILE

EXP/P EXPOSED TO STRUCTURE ABOVE - PAINTED

P GYPSUM BOARD - PAINTED

WALLS

GFC GLASS FIBRE CLOTH

PT PORCELAIN TILE

P PAINT

TWP TACKABLE WALL PANEL

MBW MARKER BOARD WALL COVERING

BASE

SB BASE

FLOOR

CPT CARPET TILE

PT PORCELAIN TILE

MAT FOOT GRILLE

RT RUBBER TILE

SC SEALED CONCRETE

VFC VINYL FLOOR COVERING

CPT-1 CARPET TILE

FLOOR FINISH LEGEND

PT-1 PORCELAIN TILE

MAT-1 FOOT GRILLE

RT-1 RUBBER TILE

RT-2 RUBBER TILE

SC-1 SEALED CONCRETE

VFC-1 VINYL FLOOR COVERING

N

TRUE NORTH

WIND

PLAN NORTH

0 10,000MM 20,000MM

SCALE 1:200 (MILLIMETERS)

UNCLASSIFIED//FOR OFFICIAL USE ONLY

US Army Corps of Engineers New York District

SY

M

BO

L

R

EV

IS

IO

N D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

U

.S .A

R M

Y C

O R

PS

O

FE

N

G

IN

EE

R

S N

EW

Y

O R

K D

IS

TR

IC

T ht tp w w w

.n an

.u sa ce .a rm y.

m il

SHEET

REFERENCE

NUMBER:

***SAFETY PAYS***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:

FILE PATH:

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

ED

ER

AL

P

LA

ZA

R O

O M

N

EW

Y

O R

K, N

Y

8-

A N

SI

D

DA

TE

SO

LI

C

IT

A

TI

O N

N O

C O

N

TR

A C

T N

O

FI

LE

N U

M B

ER

FI

LE

N A

M E:

PL

O

T D

A

TE

C K

D B

Y:

D

W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B

M

IT

TE

D

B Y:

PL

O

T

SC

A

LE

SI

ZE

PR

O

JE

CT

S

TA

TU

S:

C:\Users\carterjk\Documents\CE_Shops_Int_Central_bowmanar.rvt

4/25/2016 1:01:58 PM

R ev . 1

A pr

A s in di ca te d

I-101

C O

N

SO

LI

D

AT

ED

C

IV

IL

E

N G

IN

EE

R

IN

G

SH

O

PS

A N

D S

U

PP

LY

F

AC

IL

IT

Y

FI

R

ST

F

LO

O

R F

IN

IS

H

PL

AN

TH

U

LE

E

EN

LA

N

D

W W

C X1

A

PR

A.

Bo w m an

A.

Bo w m an K

.C ha rb on ea u

0%

S ub m is si on

1 : 200I-101

1 FIRST FLOOR FINISH PLAN

FD FD

2.1

3.1

ASSEMBLY AREA

BREAK RM

MEN LOCKERS /

TOILET

WOMEN LOCKERS

/ TOILET

CONF RM

210 TELCO RM

JAN CLO

OPEN OFFICE

EAST

203B

OFFICE (OP)

OFFICE (UF)

OFFICE (PM)

PRINTER ROOM

OFFICE (EN)

OFFICE (EL)

OFFICE (SM)

OFFICE (OM)

OFFICE (OM)

OFFICE (EN)

EXIT STAIR

EXIT STAIR

STORAGE

210A

VESTIBULE

OPEN OFFICE

WEST

ACT-1

P-1/GFC-1

SB-1

CPT-1

P-3 P-1

SB-2

SC-1

ACT-1

P-1/TWP-1/MBW-1

SB-1

CPT-1

P-4

P-2/PT-1/PT-2/GFC-2

PTB-1

PT-1

P-3 P-1

SB-2

VFC-1

ACT-1

P-1

SB-2

VFC-1

P-4 P-2

SB-2

VFC-1

P-4

P-2/PT-1/PT-2/GFC-2

PTB-1

PT-1

P-3

P-1/GFC-1

SB-2

RT-1/RT-2

ACT-1

P-1

SB-2

RT-1/RT-2

ACT-1

P-1/GFC-1

SB-2

RT-1/RT-2

ACT-1

P-1

SB-1

CPT-1

ACT-1

P-1

SB-1

CPT-1

ACT-1

P-1

SB-1

CPT-1

ACT-1

P-1

SB-1

CPT-1

ACT-1

P-1

SB-1

CPT-1

ACT-1

P-1

SB-1

CPT-1

ACT-1

P-1

SB-2

VFC-1

ACT-1

P-1

SB-1

CPT-1

ACT-1

P-1

SB-1

CPT-1

ACT-1

P-1

SB-1

CPT-1

P-3 P-1

SB-2

SC-1

ACT-1

P-1

SB-2

VFC-1

ACT-1

P-1/GFC-1

SB-1

CPT-1

OPEN OFFICE

203A

I-401

I-401

I-401

P-5 AT RAILS

AND STRINGERS

P-5 AT RAILS

AND STRINGERS

P-1

P-1

CPT-1 CARPET TILE

FLOOR FINISH LEGEND

PT-1 PORCELAIN TILE

MAT-1 FOOT GRILLE

RT-1 RUBBER TILE

RT-2 RUBBER TILE

SC-1 SEALED CONCRETE

VFC-1 VINYL FLOOR COVERING

1. REFER TO SHEET I-601 FOR INTERIOR FINISH MATERIAL KEY AND INTERIOR FINISH MATERIAL SCHEDULE.

REFER TO SHEET A-611 ROOM FINISH SCHEDULE FOR FULL FINISH APPLICATION.

2. REFER TO REFLECTED CEILING PLAN FOR CEILING HEIGHTS AND ADDITIONAL CEILING INFORMATION.

3. REFER TO CID PACKAGE FOR FINISH SAMPLES.

4. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISHES.

GENERAL NOTES

FINISH KEY

CEILING

WALL

BASE

FLOOR

CEILING

ACT ACOUSTICAL CEILING TILE

EXP/P EXPOSED TO STRUCTURE ABOVE - PAINTED

P GYPSUM BOARD - PAINTED

WALLS

GFC GLASS FIBRE CLOTH

PT PORCELAIN TILE

P PAINT

TWP TACKABLE WALL PANEL

MBW MARKER BOARD WALL COVERING

BASE

SB BASE

FLOOR

CPT CARPET TILE

PT PORCELAIN TILE

MAT FOOT GRILLE

RT RUBBER TILE

SC SEALED CONCRETE

VFC VINYL FLOOR COVERING

N

TRUE NORTH

WIND

PLAN NORTH

0 10,000MM 20,000MM

SCALE 1:200 (MILLIMETERS)

UNCLASSIFIED//FOR OFFICIAL USE ONLY

US Army Corps of Engineers New York District

SY

M

BO

L

R

EV

IS

IO

N D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

U

.S .A

R M

Y C

O R

PS

O

FE

N

G

IN

EE

R

S N

EW

Y

O R

K D

IS

TR

IC

T ht tp w w w

.n an

.u sa ce .a rm y.

m il

SHEET

REFERENCE

NUMBER:

***SAFETY PAYS***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:

FILE PATH:

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

ED

ER

AL

P

LA

ZA

R O

O M

N

EW

Y

O R

K, N

Y

8-

A N

SI

D

DA

TE

SO

LI

C

IT

A

TI

O N

N O

C O

N

TR

A C

T N

O

FI

LE

N U

M B

ER

FI

LE

N A

M E:

PL

O

T D

A

TE

C K

D B

Y:

D

W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B

M

IT

TE

D

B Y:

PL

O

T

SC

A

LE

SI

ZE

PR

O

JE

CT

S

TA

TU

S:

C:\Users\carterjk\Documents\CE_Shops_Int_Central_bowmanar.rvt

4/25/2016 1:02:00 PM

R ev . 1

A pr

A s in di ca te d

I-102

C O

N

SO

LI

D

AT

ED

C

IV

IL

E

N G

IN

EE

R

IN

G

SH

O

PS

A N

D S

U

PP

LY

F

AC

IL

IT

Y

SE

C

O N

D F

LO

O

R F

IN

IS

H

PL

AN

TH

U

LE

E

EN

LA

N

D

W W

C X1

A

PR

A.

Bo w m an

A.

Bo w m an K

.C ha rb on ea u

0%

S ub m is si on

1 : 200I-102

1 SECOND FLOOR FINISH PLAN

P-1

SB-1

P-1

MBW-1

MARKER TRAY

50 P-1 P-1

SB-1

TWP-1TWP-1 TWP-1 TWP-1 TWP-1 TWP-1

693 1219 1219 1219 1219 1219 1219 695

P-1

P-1

TV3

STN-1

P-5

SB-1

TO

C

EN

TE

R L

IN

E

O F

TV

STN-1P-5

SB-1 SB-1

P-5

P-1 P-1

MBW-1

MARKER TRAY

ART1 ART1

0 1,000MM 2,000MM

SCALE 1:20 (MILLIMETERS)

UNCLASSIFIED//FOR OFFICIAL USE ONLY

US Army Corps of Engineers New York District

SY

M

BO

L

R

EV

IS

IO

N D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

U

.S .A

R M

Y C

O R

PS

O

FE

N

G

IN

EE

R

S N

EW

Y

O R

K D

IS

TR

IC

T ht tp w w w

.n an

.u sa ce .a rm y.

m il

SHEET

REFERENCE

NUMBER:

***SAFETY PAYS***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:

FILE PATH:

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

ED

ER

AL

P

LA

ZA

R O

O M

N

EW

Y

O R

K, N

Y

8-

A N

SI

D

DA

TE

SO

LI

C

IT

A

TI

O N

N O

C O

N

TR

A C

T N

O

FI

LE

N U

M B

ER

FI

LE

N A

M E:

PL

O

T D

A

TE

C K

D B

Y:

D

W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B

M

IT

TE

D

B Y:

PL

O

T

SC

A

LE

SI

ZE

PR

O

JE

CT

S

TA

TU

S:

C:\Users\carterjk\Documents\CE_Shops_Int_Central_bowmanar.rvt

4/25/2016 1:02:01 PM

R ev . 1

A pr

A s in di ca te d

I-201

C O

N

SO

LI

D

AT

ED

C

IV

IL

E

N G

IN

EE

R

IN

G

SH

O

PS

A N

D S

U

PP

LY

F

AC

IL

IT

Y

IN

TE

R

IO

R E

LE

VA

TI

O

N S

TH

U

LE

E

EN

LA

N

D

W W

C X1

A

PR

A.

Bo w m an

A.

Bo w m an K

.C ha rb on ea u

0%

S ub m is si on

1 : 20I-201

1 RM 210 - NORTH ELEV

1 : 20I-201

2 RM 210 - EAST ELEV

1 : 20I-201

3 RM 210 - SOUTH ELEV

1 : 20I-201

4 RM 210 - WEST ELEV

PT-2

PT-1

PT-1

P-5

PTB-1

PT-1

PTB-1

P-2

PT-2

PT-1

P-5

STN-1 STN-1 STN-1

PTB-1

PT-1

P-2

PT-2

PTB-1

PT-1

PT-2

PT-1

P-2

PT-2

PT-1

PT-1

PLAM-1 COUNTERTOP

& BACKSPLASH

PTB-1

PT-1

GFC-2

PT-2

PT-1

PT-1

P-2

P-2 AT SINK

ALCOVE WALLS

PLAM-1

COUNTERTOP

& BACKSPLASH

PTB-1

0 1,000MM 2,000MM

SCALE 1:20 (MILLIMETERS)

UNCLASSIFIED//FOR OFFICIAL USE ONLY

US Army Corps of Engineers New York District

SY

M

BO

L

R

EV

IS

IO

N D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

U

.S .A

R M

Y C

O R

PS

O

FE

N

G

IN

EE

R

S N

EW

Y

O R

K D

IS

TR

IC

T ht tp w w w

.n an

.u sa ce .a rm y.

m il

SHEET

REFERENCE

NUMBER:

***SAFETY PAYS***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:

FILE PATH:

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

ED

ER

AL

P

LA

ZA

R O

O M

N

EW

Y

O R

K, N

Y

8-

A N

SI

D

DA

TE

SO

LI

C

IT

A

TI

O N

N O

C O

N

TR

A C

T N

O

FI

LE

N U

M B

ER

FI

LE

N A

M E:

PL

O

T D

A

TE

C K

D B

Y:

D

W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B

M

IT

TE

D

B Y:

PL

O

T

SC

A

LE

SI

ZE

PR

O

JE

CT

S

TA

TU

S:

C:\Users\carterjk\Documents\CE_Shops_Int_Central_bowmanar.rvt

4/25/2016 1:02:03 PM

R ev . 1

A pr

A s in di ca te d

I-202

C O

N

SO

LI

D

AT

ED

C

IV

IL

E

N G

IN

EE

R

IN

G

SH

O

PS

A N

D S

U

PP

LY

F

AC

IL

IT

Y

IN

TE

R

IO

R E

LE

VA

TI

O

N S

TH

U

LE

E

EN

LA

N

D

W W

C X1

A

PR

A.

Bo w m an

A.

Bo w m an K

.C ha rb on ea u

0%

S ub m is si on

1 : 20I-202

1 RM 116 - WEST ELEV

1 : 20I-202

2 RM 116 - SOUTH ELEV

1 : 20I-202

3 RM 205 - WEST ELEV - RESTROOM TYPICAL

1 : 20I-202

4 RM 205 - EAST ELEV - RESTROOM TYPICAL

1 : 20I-202

5 RM 205 - WEST ELEV - SINKS

1 : 20I-202

6 RM 208 - EAST ELEV - SINKS

PT-2

P-2

PTB-1

PT-1

P-2

PT-2

60P-5

P-2

LK-1

P-2P-2

LK-1 LK-1

P-2

PT-2

SF-1

PLAM-2 UPPER CABINETS PLAM-2 UPPER CABINETS

PLAM-2 BASE CABINETS

PLAM-1 COUNTER TOP

& BACKSPLASH

PLAM-1 COUNTER TOP

& BACKSPLASH

P-1 AT SOFFIT P-1 AT SOFFIT

P-1

AT COLUMN

P-1

PLAM-2 BASE CABINETS

P-1

RNG1

DWR1

RFG1

MCW1

SB-2SB-2

0 1,000MM 2,000MM

SCALE 1:20 (MILLIMETERS)

PT-1

P-2

PT-2

SF-1

P-5

PT-1

SB-1

UNCLASSIFIED//FOR OFFICIAL USE ONLY

US Army Corps of Engineers New York District

SY

M

BO

L

R

EV

IS

IO

N D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

U

.S .A

R M

Y C

O R

PS

O

FE

N

G

IN

EE

R

S N

EW

Y

O R

K D

IS

TR

IC

T ht tp w w w

.n an

.u sa ce .a rm y.

m il

SHEET

REFERENCE

NUMBER:

***SAFETY PAYS***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:

FILE PATH:

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

ED

ER

AL

P

LA

ZA

R O

O M

N

EW

Y

O R

K, N

Y

8-

A N

SI

D

DA

TE

SO

LI

C

IT

A

TI

O N

N O

C O

N

TR

A C

T N

O

FI

LE

N U

M B

ER

FI

LE

N A

M E:

PL

O

T D

A

TE

C K

D B

Y:

D

W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B

M

IT

TE

D

B Y:

PL

O

T

SC

A

LE

SI

ZE

PR

O

JE

CT

S

TA

TU

S:

C:\Users\carterjk\Documents\CE_Shops_Int_Central_bowmanar.rvt

4/25/2016 1:02:05 PM

R ev . 1

A pr

A s in di ca te d

I-203

C O

N

SO

LI

D

AT

ED

C

IV

IL

E

N G

IN

EE

R

IN

G

SH

O

PS

A N

D S

U

PP

LY

F

AC

IL

IT

Y

IN

TE

R

IO

R E

LE

VA

TI

O

N S

TH

U

LE

E

EN

LA

N

D

W W

C X1

A

PR

A.

Bo w m an

A.

Bo w m an K

.C ha rb on ea u

0%

S ub m is si on

1 : 20I-203

RM 205 - EAST ELEV

TOILET TYPICAL

1 : 20I-203

RM 205 - NORTH ELEV

TOILET TYPICAL

1 : 20I-203

3 RM 205 - NORTH ELEV - LOCKERS TYPICAL

1 : 20I-203

RM 205 - WEST ELEV

SHOWER TYPICAL

1 : 20I-203

6 RM 204 - EAST ELEV

1 : 20I-203

RM 205 - NORTH ELEV

SHOWER TYPICAL

FD

FD

EXIT AIR LOCK

P-3 P-1

SB-2

MAT-1/SC-1

SC-1 153MM WIDE AT

PERIMETER OF EXIT

AIR LOCK, TYPICAL. 153

MAT-1 OFFSET 153 MM

FROM WALL, TYPICAL.

PT-1/PT-2

PT-1

I-202

1 P-4

PT-1/PT-2

PTB-1

PT-1

TOILET

PT-1

PT-1

I-203 6

P-3

P-1/GFC-1

SB-2

RT-1/RT-2

BREAK RM

RT-1, TYPICAL

RT-2, TYPICAL

P-1

P-1 AT SOFFIT

RFG1

RNG1

DWR1

P-1 AT SOFFIT

MCW1

GFC-1

I-2025

MEN LOCKERS /

TOILET

WOMEN LOCKERS

/ TOILET

I-202 43

I-2034

I-203 1

I-203

I-202 6

P-4

P-2/PT-1/PT-2/GFC-2

PTB-1

PT-1

P-4

P-2/PT-1/PT-2/GFC-2

PTB-1

PT-1

P-2

P-2

P-2 P-2

P-2

P-2/PT-1/PT-2 AT SHOWER

WALLS, TYPICAL.

P-2/PT-2 AT REAR

SHOWER WALL, TYPICAL.

P-2 P-2

P-2/

PT-1/

PT-2

P-2/PT-1/PT-2 AT TOILET

WALLS, TYPICAL.

P-2/PT-2 AT REAR TOILET

WALL, TYPICAL.

P-2 P-2

P-2

P-2

P-2/

PT-1/

PT-2

P-2

P-2

GFC-2GFC-2GFC-2

P-2/

PT-1/

PT-2

P-2/

PT-1/

PT-2

P-2

P-2/

PT-1/

PT-2

P-2/

PT-1/

PT-2

P-2/

PT-1/

PT-2

P-2/PT-1/PT-2

SF-1 AT SHOWER FLOOR,

TYPICAL.

I-2014

CONF RM

ACT-1

P-1/TWP-1/MBW-1

SB-1

CPT-1

MBW-1

P-1

P-1 P-1 TWP-1

P-1

FINISH KEY

CEILING

WALL

BASE

FLOOR

CEILING

ACT ACOUSTICAL CEILING TILE

EXP/P EXPOSED TO STRUCTURE ABOVE - PAINTED

P GYPSUM BOARD - PAINTED

WALLS

GFC GLASS FIBRE CLOTH

PT PORCELAIN TILE

P PAINT

TWP TACKABLE WALL PANEL

MBW MARKER BOARD WALL COVERING

BASE

SB BASE

FLOOR

CPT CARPET TILE

PT PORCELAIN TILE

MAT FOOT GRILLE

RT RUBBER TILE

SC SEALED CONCRETE

VFC VINYL FLOOR COVERING

CPT-1 CARPET TILE

FLOOR FINISH LEGEND

PT-1 PORCELAIN TILE

MAT-1 FOOT GRILLE

RT-1 RUBBER TILE

RT-2 RUBBER TILE

SC-1 SEALED CONCRETE

VFC-1 VINYL FLOOR COVERING

UNCLASSIFIED//FOR OFFICIAL USE ONLY

US Army Corps of Engineers New York District

SY

M

BO

L

R

EV

IS

IO

N D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

U

.S .A

R M

Y C

O R

PS

O

FE

N

G

IN

EE

R

S N

EW

Y

O R

K D

IS

TR

IC

T ht tp w w w

.n an

.u sa ce .a rm y.

m il

SHEET

REFERENCE

NUMBER:

***SAFETY PAYS***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:

FILE PATH:

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

ED

ER

AL

P

LA

ZA

R O

O M

N

EW

Y

O R

K, N

Y

8-

A N

SI

D

DA

TE

SO

LI

C

IT

A

TI

O N

N O

C O

N

TR

A C

T N

O

FI

LE

N U

M B

ER

FI

LE

N A

M E:

PL

O

T D

A

TE

C K

D B

Y:

D

W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B

M

IT

TE

D

B Y:

PL

O

T

SC

A

LE

SI

ZE

PR

O

JE

CT

S

TA

TU

S:

C:\Users\carterjk\Documents\CE_Shops_Int_Central_bowmanar.rvt

4/25/2016 1:02:07 PM

R ev . 1

A pr

A s in di ca te d

I-401

C O

N

SO

LI

D

AT

ED

C

IV

IL

E

N G

IN

EE

R

IN

G

SH

O

PS

A N

D S

U

PP

LY

F

AC

IL

IT

Y

EN

LA

R G

ED

F

IN

IS

H

PL

AN

S

TH

U

LE

E

EN

LA

N

D

W W

C X1

A

PR

A.

Bo w m an

A.

Bo w m an K

.C ha rb on ea u

0%

S ub m is si on 1 : 50I-401

2 EXIT AIR LOCK FINISH PLAN - TYPICAL

1 : 20I-401

1 TOILET RM 116 FINISH PLAN

1 : 50I-401

3 BREAK ROOM RM 204 FINISH PLAN

1 : 50I-401

4 LOCKERS / TOILET ROOMS FINISH PLAN

1 : 50I-401

5 CONFERENCE ROOM FINISH PLAN

0 2,500MM 5,000MM

SCALE 1:50 (MILLIMETERS)

0 1,000MM 2,000MM

SCALE 1:20 (MILLIMETERS)

INTERIOR FINISH MATERIALS KEY

ACT ACOUSTICAL CEILING TILE

CG CORNER GUARD

CPT CARPET TILE

GFC GLASS FIBRE CLOTH

GT GROUT

LK LOCKER

MAT RECSSED ENTRY MAT

LK LOCKER

MBW MARKER BOARD WALL COVERING

P PAINT

PLAM PLASTIC LAMINATE

PT PORCELAIN TILE

PTB PORCELAIN TILE BASE

RT RUBBER TILE

SB SKIRTING BOARD

SC SEALED CONCRETE

SF SHOWER FLOOR

STN WOOD STAIN

TWP TACKABLE WALL PANEL

VFC VINYL FLOOR COVERING

WT WINDOW TREATMENT

GENERAL NOTES

1. ALL FINISHES TO BE INSTALLED AND/OR APPLIED IN ACCORDANCE WITH THE MANUFACTURERS WRITTEN INSTRUCTIONS.

2. ALL FINISHES LISTED ARE BASIS OF DESIGN AND NOT INTENDED TO LIMIT CHOICE OF THE MANUFACTURER FOR EQUAL COLOR/PATTERN.

3. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISHES.

4. ALL FLOOR TRANSITIONS ARE TO OCCUR AT THE CENTERLINE OF THE DOOR, DOORWAY, OR CEILING LINE, UNLESS OTHERWISE NOTED.

5. ALL REDUCER STRIPS SHALL MATCH COLOR OF BASE.

6. ALL GYP BOARD WALLS TO BE PAINTED EGGSHELL FINISH, UNLESS OTHERWISE NOTED. ALL GYP BOARD CEILINGS TO BE PAINTED FLAT FINISH, UNLESS

OTHERWISE NOTED.

7. ALL DOORS AND FRAMES TO BE PAINTED SEMI-GLOSS FINISH, UNLESS OTHERWISE NOTED.

8. PAINT SHALL NOT COVER DOOR HARDWARE, ACCESSORIES, FIRE RATING LABELS OR OTHER CODE REQUIRED LABEL PLATES.

9. REFER TO SHEET A-611 FOR THE ROOM FINISH SCHEDULE.

UNCLASSIFIED//FOR OFFICIAL USE ONLY

US Army Corps of Engineers New York District

SY

M

BO

L

R

EV

IS

IO

N D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

U

.S .A

R M

Y C

O R

PS

O

FE

N

G

IN

EE

R

S N

EW

Y

O R

K D

IS

TR

IC

T ht tp w w w

.n an

.u sa ce .a rm y.

m il

SHEET

REFERENCE

NUMBER:

***SAFETY PAYS***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:

FILE PATH:

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

F

ED

ER

AL

P

LA

ZA

R O

O M

N

EW

Y

O R

K, N

Y

8-

A N

SI

D

DA

TE

SO

LI

C

IT

A

TI

O N

N O

C O

N

TR

A C

T N

O

FI

LE

N U

M B

ER

FI

LE

N A

M E:

PL

O

T D

A

TE

C K

D B

Y:

D

W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B

M

IT

TE

D

B Y:

PL

O

T

SC

A

LE

SI

ZE

PR

O

JE

CT

S

TA

TU

S:

C:\Users\carterjk\Documents\CE_Shops_Int_Central_bowmanar.rvt

4/25/2016 1:02:07 PM

R ev . 1

A pr

I-601

C O

N

SO

LI

D

AT

ED

C

IV

IL

E

N G

IN

EE

R

IN

G

SH

O

PS

A N

D S

U

PP

LY

F

AC

IL

IT

Y

IN

TE

R

IO

R M

AT

ER

IA

LS

FI

N

IS

H

S C

H

ED

U

LE

TH

U

LE

E

EN

LA

N

D

W W

C X1

A

PR

A.

Bo w m an

A.

Bo w m an K

.C ha rb on ea u

0%

S ub m is si on

INTERIOR FINISH MATERIALS SCHEDULE

FINISH

CODE SURFACE MATERIAL MANUFACTURER STYLE COLOR REMARKS

ACT-1 CEILING ACOUSTICAL CEILING TILE ARMSTRONG TILE: 1772 ANGLED TEGULAR 24" X 24" X 5/8” WHITE 15/16" GRID CG-1 WALL CORNER GUARD WALL PROTECTION C/S GROUP C/S ACROVYN CO-8 CORNER GUARD STAINLESS STEEL

CPT-1 FLOOR MODULAR CARPET TILE TANDUS INFINITY 18" X 18" MOONSTONE 55022

GFC-1 WALL GLASS FIBRE CLOTH FLüGGER GLASS FIBRE CLOTH MEDIUM WALL WITH GLUE 378 EXTRA - PRODUCT ID 44135, PRODUCT 33448 GFC-2 WALL GLASS FIBRE CLOTH - WET AREAS FLüGGER GLASS FIBRE CLOTH MEDIUM WALL WITH GLUE 380 WETSAFE - PRODUCT ID 44135, PRODUCT 23850

GT-1 WALL, FLOOR GROUT QUARTZLOCK URETHANE GROUT 240 LINEN -

LK-1 LOCKERS POWDER COATED STEEL LOCKERS HADRIAN, INC. EMPEROR, SINGLE TIER, 12"W X 72"H (305 X 1829 MM) 535 LIGHT GREY MAT-1 FLOOR RECESSED ENTRY MAT MATS INC. FOOT GRILLS - ADVANCED TRACK GRILL: ALUMINUM WITH BOSTON KENMORE GRAY MBW-1 MARKER BOARD WALL COVERING DRY ERASE PROTECTION COVERING WOLF GORDON/EGAN WALL EWP54, 100% WHITE POLYESTER , BACKING NON WOVEN

POLYCARBONATE LEXON, 54"H X 144"W (1372 X 3658 MM)

WHITE APPLY TO NORTH WALL OF CONFERENCE ROOM

P-1 WALL GENERAL WALL PAINT FLüGGER FLUTEX 5 RAW WHITE PRODUCT ID 38105 P-2 WALL WALL PAINT - WET AREAS FLüGGER FLUTEX 205 RAW WHITE PRODUCT ID 76656 P-3 CEILING GENERAL CEILING PAINT FLüGGER FLUTEX 5 RAW WHITE PRODUCT ID 38105 P-4 CEILING CEILING PAINT - WET AREAS FLüGGER FLUTEX 205 RAW WHITE PRODUCT ID 76656 P-5 STAIR RAILINGS, DOOR TRIM STAIR RAILING PAINT AND DOOR TRIM FLüGGER HIGH FINISH GRAY - PLAM-1 COUNTERTOPS PLASTIC LAMINATE, HORIZONTAL SURFACES HTH LAVA DUST 249 - COUNTERTOPS PLAM-2 MILLWORK PLASTIC LAMINATE, VERTICAL SURFACES FORMICA 5882-58 MATTE CITADEL WARP MILLWORK AT BREAK ROOM & COUNTER AREA PT-1 WALL, FLOOR PORCELAIN TILE DALTILE FLORENZA OLIVIA FZ02 12" X 12", 3" X 12" FLOORS AND WALLS

PT-2 WALL PORCELAIN TILE DALTILE FLORENZA SABBIA FZ01 3" X 12" ON WALLS

PTB-1 WALL, ACCENT PORCELAIN TILE, ACCENT DALTILE FLORENZA OLIVIA FZ02 S-36C9T

RT-1 FLOOR RUBBER TILE NORA NORAPLAN SENTICA ED, 24" X 24" (610 X 610 MM) TILE 6521 SUNDAY PAPER STATIC DISSAPATIVE TILE RT-2 FLOOR RUBBER TILE NORA NORAPLAN SENTICA ED, 24" X 24" (610 X 610 MM) TILE 6530 WATERFALL STATIC DISSAPATIVE TILE

SB-1 BASE SKIRTING BOARD - MDF 14 X 65 MM WHITE PRIMED AT CARPET

SB-2 BASE SKIRTING BOARD ARMSTRONG-DK HPR 2525 - PRODUCT ID 220095, AT RESILIENT FLOORING

SC-1 FLOOR SEALED CONCRETE - - - -

SF-1 FLOOR TERRAZZO FIAT MONTEREY SHOWER FLOOR 081 BLACK & WHITE SHOWER PAN AT 2ND FLOOR RESTROOM SHOWERS STN-1 DOOR SOLID CORE WOOD DOOR - BEECH WOOD STAINED TO MATCH STEELCASE 3614 WARM OAK REFER TO A-601 TWP-1 WALL TACKABLE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .