- Thule Consolidation 1 (Base Shops & Base Supply Facility) Federal contract opportunity
- Solicitation number
- W912DS-16-B-0002
About this file
Amended Plans
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTERIOR FINISH MATERIALS KEY:
ACT ACOUSTICAL CEILING TILE
CG CORNER GUARD
CONC CONCRETE
CPT CARPET TILE
CT CERAMIC TILE
FG FOOT GRILLE
GB GYPSUM BOARD
LK LOCKER
MBW MARKER BOARD WALL COVERING
MF MINERAL FIBER
PLAM PLASTIC LAMINATE
PT PAINT
RB RUBBER BASE
RT RUBBER TILE
SC SEALED CONCRETE
SF SHOWER FLOOR
SS SOLID SURFACE MATERIAL
STN WOOD STAIN
TWP TACKABLE WALL PANEL
VCT VINYL COMPOSITION TILE
WT WINDOW TREATMENT
GENERAL NOTES
1. FOR THE INTERIOR FINISH MATERIALS SCHEDULE
REFER TO SHEET I-601
2. ALL EXTERIOR AND INTERIOR COLORS SHALL BE
SUBMITTED FOR APPROVAL . COLOR BOARDS AND
PROPOSED SAMPLES SHALL NOT BE SUBMITTED
INDIVIDUALLY BUT IN A COMPLETE SET WITH ALL
SAMPLES.
3. CONCRETE SLAB (FIRST FLOOR)
-EXPOSED CONCRETE SLABS IN INTERIOR ROOMS
NOT RECEIVING A FINISH SHALL HAVE A SEALER AND
ATROWEL FINISH.
-CONCRETE SLABS IN INTERIOR ROOMS TO RECEIVE
VCT OR CARPET SHALL HAVE A TROWEL FINISH. A
FILLER SHALL BE ADDED AS NEEDED AT CONCRETE
CONTROL JOINTS TO ENSURE THAT THE JOINTS DO
NOT BLEED THROUGH THE VCT.
-CONCRETE SLABS IN INTERIOR ROOMS TO RECEIVE
CERAMIC TILE SHALL HAVE A STEEL TROWEL AND
FINE BROOM FINISH FREE OF CURING COMPOUNDS.
4. BOLLARDS / CORNER GUARDS SHALL BE LOCATED
AS INDICATED ON FLOOR PLANS.
5. SEE INTERIOR DESIGN DRAWINGS FOR WALL AND
FLOOR TILE PATTERNS.
FINISH SCHEDULE NOTES
1. RECESSED FLOOR MAT SHALL BE PROVIDED AT
MAIN ENTRANCE.
2. TILE INSTALLATION IN LOCKER ROOMS AND
RESTROOMS SHALL UTILIZE THE FOLLOWING TILE
COUNCIL OF NORTH AMERICA, INC. METHODS:
FLOOR: F113-09
WALL (GYP. BD.): W243-09
WALL (CEMENT BD.): *W244C-09
* SHOWER FLOORS/WALL B422-09
* FLOORS ADJACENT TO SHOWERS F122-09
-SHOWER AREAS SHALL BE CERAMIC WALL TILE AS
SHOWN. SEE RESTROOMS ENLARGED PLANS &
INTERIOR ELEVATIONS FOR DETAILS.
-PROVIDE VERTICAL AND HORIZONTAL MOVEMENT
JOINTS IN TILE FINISH IN ACCORDANCE WITH TILE
COUNCIL OF NORTH AMERICA, INC. - EJ171-09
UNLESS THE TILE MANUFACTURER’S
RECOMMENDED A METHOD THAT PROVIDES
GREATER PROTECTION.
3. PROVIDE 19MM FIRE RETARDANT TREATED
PLYWOOD FINISH WALL SURFACES AT TELECOM &
ELECT ROOMS. PLYWOOD SHALL BE MOUNTED
WITH THE BASE OF THE BOARD AT 609MM A.F.F. AND
EXTEND TO 1829MM A.F.F. WALLS SHALL BE GYPSUM
BOARD WITH PLYWOOD ATTACHED TO STUDS
BEHIND AND PAINTED TO MATCH INTERIOR WALL
PAINT COLOR. REFERENCE GENERAL NOTE 1 FOR
FINISH AND COLOR. COORDINATE WITH
ELECTRICAL/COMMUNICATION DRAWINGS FOR
PANEL PLACEMENT.
4. RUBBER TILES SHALL BE AS LOCATED ON THE
PATTERN PLAN. RESILIENT FLOORING SHALL BE ON
THE INTERMEDIATE STAIR LANDING, TREADS AND
RISERS. ALL EXPOSED METAL SURFACES OF STAIR
ASSEMBLY SHALL BE PAINTED.
US Army Corps of Engineers New York District
SY
M
BO
L
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
U
.S .A
R M
Y C
O R
PS
O
FE
N
G
IN
EE
R
S N
EW
Y
O R
K D
IS
TR
IC
T ht tp w w w
.n an
.u sa ce .a rm y.
m il
SHEET
REFERENCE
NUMBER:
***SAFETY PAYS***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:
FILE PATH:
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
ED
ER
AL
P
LA
ZA
R O
O M
N
EW
Y
O R
K, N
Y
8-
A N
SI
D
DA
TE
SO
LI
C
IT
A
TI
O N
N O
C O
N
TR
A C
T N
O
FI
LE
N U
M B
ER
FI
LE
N A
M E:
PL
O
T D
A
TE
C K
D B
Y:
D
W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B
M
IT
TE
D
B Y:
PL
O
T
SC
A
LE
SI
ZE
PR
O
JE
CT
S
TA
TU
S:
C:\Users\E3ENDLGR\Documents\CES_SPL-DMMA-MDL-2015-NLVRS_E3ENDLGR.rvt
4/26/2016 7:18:52 AM
R
EV
IS
IO
N
- C H
AN
G
ES
T
O R
O O
M F
IN
IS
H
ES
S C
H
ED
4/
/1
A s in di ca te d
A-611
C O
N
SO
LI
D
AT
ED
C
IV
IL
E
N G
IN
EE
R
IN
G
SH
O
PS
A N
D S
U
PP
LY
F
AC
IL
IT
Y
R O
O M
F
IN
IS
H
SC
H
ED
U
LE
TH
U
LE
A
B
G R
E
EN
LA
N
D
W W
C X1
O
C T
LG
R
LG
R
M J
0%
S ub m is si on
ROOM FINISHES SCHEDULE
ROOM NO ROOM NAME
WALL FINISH BASE
FINISH
FLOOR CEILING
NOTES & REMARKS (SEE NOTES)NORTH EAST SOUTH WEST MAT. FIN. MAT. FIN. HEIGHT
101 EXIT AIR LOCK P-1 P-1 P-1 P-1 SB-2 CONC MAT-1/SC-1 GB P-3 2750 FOOTGRILLE OFFSET 153 MM FROM PARITION.
102 BASE SUPPLY P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS. PT-4 AT COLUMNS.
103 COUNTER AREA (WO) P-1 P-1 P-1 P-1 SB-2 CONC VFC-1 MF ACT-1 3050
104 OFFICE (WO) P-1 P-1 P-1 P-1 SB-1 CONC VFC-1 MF ACT-1 3050
106 EXIT AIR LOCK P-1 P-1 P-1 P-1 SB-2 CONC MAT-1/SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE.
107 GOODS RECEIPT P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS. PT-4 AT COLUMNS.
108 AIR LOCK P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS.
109A METAL SHOP ASE P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS. PT-4 AT COLUMNS.
109B METAL SHOP PLUMB P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS.
109C METAL SHOP MACH TL P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS. PT-4 AT COLUMNS.
109D METAL SHOP SHEET MTL P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS. PT-4 AT COLUMNS.
110 WELDING SHOP P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS. PT-4 AT COLUMNS.
111 EXIT AIR LOCK P-1 P-1 P-1 P-1 SB-2 CONC MAT-1/SC-1 GB P-3 3360 FOOTGRILLE OFFSET 153 MM FROM PARITION.
112 EXIT STAIR P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - -
113 WOOD SHOP P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS. PT-4 AT COLUMNS.
114 TOOLS P-1 P-1 P-1 P-1 SB-2 CONC SC-1 - EXP/P-3 NO CEILING, EXPOSED TO PAINTED STRUCTURE ABOVE. CG-1 CORNER GUARDS. PT-4 AT COLUMNS.
115 SIGN SHOP P-1 P-1 P-1 P-1 SB-2 CONC VFC-1 MF ACT-1 2750
115A PAINT ROOM P-1 P-1 P-1 P-1 SB-2 CONC SC-1 GB P-3 2750
115B PNT STO CLO P-1 P-1 P-1 P-1 SB-2 CONC SC-1 GB P-3 2750
116 TOILET PT-1 PT-1 PT-1 PT-1/PT-2 PTB-1 CONC PT-1 GB P-4 2440 CT-2 AS WALL BASE, CT-2 WALL, CT-4 ACCENT. REFER TO ENLARGED FINISH FLOOR PLAN & ELEVATIONS.
117 EXIT STAIR P-1 P-1 P-1 P-1 SB-1 CONC SC-1 - -
118 AUTOMATION P-1 P-1 P-1 P-1 SB-2 CONC VFC-1 MF ACT-1 3050
120 ELECT RM P-1 P-1 P-1 P-1 SB-2 CONC SC-1 GB P-3 3970
121 TELCO RM P-1 P-1 P-1 P-1 SB-2 CONC SC-1 GB P-3 3970
122 MECH RM P-1 P-1 P-1 P-1 SB-2 CONC SC-1 GB P-3 3970
123 JAN CLO P-2 P-2 P-2 P-2 SB-2 CONC SC-1 GB P-4 2440
201 EXIT STAIR P-1 P-1 P-1 P-1 SB-2 CONC SC-1 GB P-3 3360
202 ASSEMBLY AREA P-1 P-1 P-1 P-1 SB-2 GB RT-1/RT-2 MF ACT-1 3360 SEE FINISH PLAN FOR FLOOR PATTERN.
203A OPEN OFFICE P-1/GFC-1 - P-1 - SB-1 GB CPT-1 ACT-1
203B OPEN OFFICE EAST P-1 P-1 P-1 P-1/GFC-1 SB-1 GB CPT-1 MF ACT-1 3360
204 BREAK RM P-1 P-1 P-1 P-1/GFC-1 SB-2 GB RT-1/RT-2 GB P-3 2750 SEE FINISH PLAN FOR FLOOR PATTERN.
205 MEN LOCKERS / TOILET P-1/PT-1/PT-2 P-1/PT-1/PT-2 P-1/GFC-2 P-1/PT-1/PT-2 PTB-1 GB PT-1 GB P-4 3360 CT-2 AS WALL BASE, CT-2 WALL, CT-3 & CT-4 ACCENT. REFER TO ENLARGED FINISH FLOOR PLAN & ELEVATIONS.
206 JAN CLO P-2 P-2 P-2 P-2 SB-2 GB VFC-1 GB P-4 3360
207 VESTIBULE P-1 P-1 P-1 P-1 SB-2 GB VFC-1 MF ACT-1 3360
208 WOMEN LOCKERS / TOILET P-1/PT-1/PT-2 P-1/PT-1/PT-2 P-1/GFC-2 P-1/PT-1/PT-2 PTB-1 GB PT-1 GB P-4 3360 CT-2 AS WALL BASE, CT-2 WALL, CT-3 & CT-4 ACCENT. REFER TO ENLARGED FINISH FLOOR PLAN & ELEVATIONS.
209 TELCO RM P-1 P-1 P-1 P-1 SB-2 GB VFC-1 GB P-3 3360
210 CONF RM P-1/MBW-1 P-1/TWP P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750
210A STORAGE P-1 P-1 P-1 P-1 SB-2 GB VFC-1 MF ACT-1 2750
211 OFFICE (EN) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750
212 OFFICE (OM) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750
213 OFFICE (OM) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750
214 OFFICE (SM) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750
215 OFFICE (EL) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750
216 OFFICE (EN) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750
217 PRINTER ROOM P-1 P-1 P-1 P-1 SB-2 GB VFC-1 MF ACT-1 2750
218 OFFICE (PM) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750
219 OFFICE (UF) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750
220 OFFICE (OP) P-1 P-1 P-1 P-1 SB-1 GB CPT-1 MF ACT-1 2750
221 EXIT STAIR P-1 P-1 P-1 P-1 SB-2 CONC SC-1 GB P-3 3360
223 OPEN OFFICE WEST P-1/GFC-1 P-1 P-1 P-1 SB-2 GB RT-1/RT-2 MF ACT-1 3360 SEE FINISH PLAN FOR FLOOR PATTERN.
JB
JB
JB
M
M
M
M
M
M
JBM
M
M
JB
JB
M
JB
JB
M
M
M
JB
M M
2.1
A B C
B.1 C.1
PANEL L3-4
PANEL DPL1
PANEL DPL2PANEL L1-1
PANEL LCP-L1
PANEL L1-2
PANEL L2-3
L2-1
GOODS RECEIPT
EXIT AIR LOCK
ELECT RM
TELCO RM
MECH RM
METAL SHOP ASE
109A
METAL SHOP
PLUMB
109B
AUTOMATION
G
E-401
17 17
1 1
3 3
GFCI
WP9
PL2
PL12
PL11
PL10
PL14
PL9
PL8
8,10,12
13,15,17
14,16
UH-1
UH-1
UH-2 UH-2
UH-1
Sm
Sm
Sm
Sm Sm
Sm
L2-1:1
L2-1:1
L2-1:2
L2-1:2
L2-1:2
L2-1:3
L2-1:5
E-401
L1-1:14, 16,18
UH-1
Sm
L2-1:3
PL7
TV
EF-8
DPL3:15
AS3
AS6 AS6
AS5
AS4
AS11 AS11AS11
AS10
AS10
AS9
AS8
AS8
AS8
AS8
AS1AS2
AS6
AS6
AS6
AS6 AS6
AS6
AS6
AS6
5 5
19 19
Sm
L2-1 - 7,9
DF-2
7,9
DF-3
L2-1 - 29,31
29,31
DF-4
L2-1: 29,31 Sm
Sm
MS 3
PANEL L1-1 - 19
PANEL L1-1 - 2
N
TRUE NORTH
WIND
PLAN NORTH
0 5,000MM 10,000MM
SCALE 1:100 (MILLIMETERS)
US Army Corps of Engineers New York District
SY
M
BO
L
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
U
.S .A
R M
Y C
O R
PS
O
FE
N
G
IN
EE
R
S N
EW
Y
O R
K D
IS
TR
IC
T ht tp w w w
.n an
.u sa ce .a rm y.
m il
SHEET
REFERENCE
NUMBER:
***SAFETY PAYS***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:
FILE PATH:
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
ED
ER
AL
P
LA
ZA
R O
O M
N
EW
Y
O R
K, N
Y
8-
A N
SI
D
DA
TE
SO
LI
C
IT
A
TI
O N
N O
C O
N
TR
A C
T N
O
FI
LE
N U
M B
ER
FI
LE
N A
M E:
PL
O
T D
A
TE
C K
D B
Y:
D
W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B
M
IT
TE
D
B Y:
PL
O
T
SC
A
LE
SI
ZE
PR
O
JE
CT
S
TA
TU
S:
C:\Users\ONeillJ1\Documents\2015 E_FP Central_ONeillJ1.rvt
4/12/2016 12:27:05 PM
R
EV
IS
IO
N
- I T/
C O
M M
R
EV
IS
IO
N S
4/
/1
A s in di ca te d
E-110A
C O
N
SO
LI
D
AT
ED
C
IV
IL
E
N G
IN
EE
R
IN
G
SH
O
PS
A N
D S
U
PP
LY
F
AC
IL
IT
Y
FI
R
ST
F
LO
O
R P
O W
ER
PL
AN
PA
R
T A
TH
U
LE
E
EN
LA
N
D
W W
C X1
O
C T
JK
T
D C
P
BE
M
0%
S ub m is si on
1. PROVIDE EXPANSION TYPE FITTINGS FOR RACEWAY
CROSSINGS AT BUILDING CONTROL EXPANSION JOINTS.
REFER TO STRUCTURAL DRAWINGS FOR LOCATIONS.
2. ALL ELECTRICAL DEVICES AND ASSOCIATED CONDUITS
MOUNTED ON EXTERIOR WALLS ARE TO BE SURFACE
MOUNTED.
3. POWER FEEDERS TO EQUIPMENT MAY BE ROUTED IN
CEILING SPACE OR IN FLOOR SLAB. COORDINATE IN-SLAB
FEEDER LOCATIONS WITH STRUCTURAL DRAWINGS.
CONFIRM EXACT EQUIPMENT LOCATIONS WITH
GOVERNMENT PRIOR TO INSTALLATION.
POWER CORD REEL DROP ASSEMBLY MOUNTED AT 8'-0"
AFF. REFER TO DETAIL 1/E-110.
EMERGENCY POWER OFF SYSTEM CONTROL PANEL.
REFER TO DETAIL 1/E-504.
ALL RECEPTACLES ARE TO BE SURFACE MOUNTED IN
THIS SPACE, UNLESS NOTED OTHERWISE.
DRAWING NOTES
GENERAL NOTES
ALL CONDUITS IN THIS SPACE BETWEEN FINISHED FLOOR
AND 8'-0" AFF SHALL BE RIGID (RGS) TYPE UNLESS NOTED
OTHERWISE.
OBSTRUCTION LIGHT CONTROL PANEL.
CIRCUIT DEVICES IN THIS AREA TO POWER PANEL L3-4,
UNLESS OTHERWISE NOTED.
CIRCUIT DEVICES IN THIS AREA TO POWER PANEL L1-1,
UNLESS OTHERWISE NOTED.
1 : 1001 FIRST FLOOR POWER
M
AT
C H
L
IN
E
SE
E 1/
E1
B
MATCH
LINE
1/E110C
PART A
KEY PLAN
PART B
PART C PART D
5 4
FIRE ALARM CONTROL PANEL.
9 MOUNT THE TWO (2) QUAD OUTLETS SHOWN WITHIN THE
SECURED GOVERNMENT CABINET (NIC); COORDINATE
THE INSTALLATION WITH CONTRACTING OFFICER.
DN
R
EF
D
W
FD
FD
JBJB
JB
MM
M
M
M
JB
JB
JB JB
JBJBJB
JBJB
J
J
JB
JB
JB
JB
JB
2.1
3.1
C D E F
3.2
D.1 E.1B.1 C.1
PANEL L1-4PANEL L1-3
PANEL L2-2
G
ASSEMBLY AREA
CONF RM
TELCO RM
EXIT STAIR WEST
OFFICE (OM)
OFFICE (SM)
OFFICE (EN)
OFFICE (PM)
OFFICE (EN)
OFFICE (UF)
WOMEN LOCKERS
/ TOILET
JAN. CLOS.
MEN LOCKERS /
TOILET
G
G
G
BREAK RM
1 112
16 4
6 6
G
G
G
F
F F
F
G
11G
G
G
12 12 12
G G
L2-2:25 G
L2-2:29
F
F
20 20 20 20 20 21 21 21 21 21
18EWC
L1-3:
23,25
L1-3:
24,26
L1-3:
27,29
L1-3:
28,30
L1-3:31, 33,35
L1-3:32, 34,36
L2-2:1,3,5
L2-2:2,4,6
L2-2:7,9,11 L2-2:8,10,12
L2-2:13, 15,17
L2-2:19
L2-2:20
7 6 6 5 516 4 3 3
L2-2:18,20
L2-2:26
AHU-1
AHU-3
AHU-4 AHU-5
L2-2:28
L2-2:30
L2-2:14
L2-2:16
TV
TV
TV
TV
TV TV TV TV
TV TV TV TV TV TV
G
PRINTER ROOM
OFFICE (OP)
OFFICE (OM)
OPEN OFFICE
EAST
203B
EXIT STAIR EAST
(PANEL L2-2) - (32)
N
TRUE NORTH
WIND
PLAN NORTH
0 5,000MM 10,000MM
SCALE 1:100 (MILLIMETERS)
US Army Corps of Engineers New York District
SY
M
BO
L
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
U
.S .A
R M
Y C
O R
PS
O
FE
N
G
IN
EE
R
S N
EW
Y
O R
K D
IS
TR
IC
T ht tp w w w
.n an
.u sa ce .a rm y.
m il
SHEET
REFERENCE
NUMBER:
***SAFETY PAYS***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:
FILE PATH:
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
ED
ER
AL
P
LA
ZA
R O
O M
N
EW
Y
O R
K, N
Y
8-
A N
SI
D
DA
TE
SO
LI
C
IT
A
TI
O N
N O
C O
N
TR
A C
T N
O
FI
LE
N U
M B
ER
FI
LE
N A
M E:
PL
O
T D
A
TE
C K
D B
Y:
D
W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B
M
IT
TE
D
B Y:
PL
O
T
SC
A
LE
SI
ZE
PR
O
JE
CT
S
TA
TU
S:
C:\Users\ONeillJ1\Documents\2015 E_FP Central_ONeillJ1.rvt
4/12/2016 12:27:20 PM
R
EV
IS
IO
N
- I T/
C O
M M
R
EV
IS
IO
N S
4/
/1
A s in di ca te d
E-111
C O
N
SO
LI
D
AT
ED
C
IV
IL
E
N G
IN
EE
R
IN
G
SH
O
PS
A N
D S
U
PP
LY
F
AC
IL
IT
Y
SE
C
O N
D F
LO
O
R P
O W
ER
PL
AN
TH
U
LE
E
EN
LA
N
D
W W
C X1
O
C T
JK
T
D C
P
BE
M
0%
S ub m is si on
CIRCUIT DEVICES IN THIS AREA TO POWER PANEL L1-3
UNLESS NOTED OTHERWISE.
CEILING MOUNTED RECEPTACLE FOR PROJECTOR.
PROVIDE A RACK MOUNTED SPECIAL RECEPTACLE NEMA
TYPE L14-30R. SEE SERVER RACK POWER DETAIL NO. 5
SHEET E-505.
DRAWING NOTES
JUNCTION BOX FOR LAVATORY AND WATER CLOSET.
EMERGENCY POWER OFF SYSTEM CONTROL PANEL.
REFER TO DETAIL 1/E-504.
1 : 1001 SECOND FLOOR POWER
1. PROVIDE EXPANSION TYPE FITTINGS FOR RACEWAY
CROSSINGS AT BUILDING CONTROL EXPANSION
JOINTS. REFER TO STRUCTURAL DRAWINGS FOR
LOCATIONS.
2. ALL ELECTRICAL DEVICES AND ASSOCIATED CONDUIT
MOUNTED ON EXTERIOR WALLS ARE TO BE SURFACE
MOUNTED.
GENERAL NOTES
KEY PLAN
SECOND FLOOR
4 JUNCTION BOX FOR MULTI-SERVICE FLUSH FLOOR BOX
BELOW FLOOR SLAB.
MOUNT THE TWO (2) QUAD OUTLETS SHOWN WITHIN THE
SECURED GOVERNMENT CABINET (NIC); COORDINATE
THE INSTALLATION WITH CONTRACTING OFFICER.
US Army Corps of Engineers New York District
SY
M
BO
L
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
U
.S .A
R M
Y C
O R
PS
O
FE
N
G
IN
EE
R
S N
EW
Y
O R
K D
IS
TR
IC
T ht tp w w w
.n an
.u sa ce .a rm y.
m il
SHEET
REFERENCE
NUMBER:
***SAFETY PAYS***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:
FILE PATH:
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
ED
ER
AL
P
LA
ZA
R O
O M
N
EW
Y
O R
K, N
Y
8-
A N
SI
D
DA
TE
SO
LI
C
IT
A
TI
O N
N O
C O
N
TR
A C
T N
O
FI
LE
N U
M B
ER
FI
LE
N A
M E:
PL
O
T D
A
TE
C K
D B
Y:
D
W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B
M
IT
TE
D
B Y:
PL
O
T
SC
A
LE
SI
ZE
PR
O
JE
CT
S
TA
TU
S:
C:\Users\ONeillJ1\Documents\2015 E_FP Central_ONeillJ1.rvt
4/12/2016 12:27:28 PM
R
EV
IS
IO
N
- I T/
C O
M M
R
EV
IS
IO
N S
4/
/1
E-701
C O
N
SO
LI
D
AT
ED
C
IV
IL
E
N G
IN
EE
R
IN
G
SH
O
PS
A N
D S
U
PP
LY
F
AC
IL
IT
Y
PA
N
EL
S
C H
ED
U
LE
S
TH
U
LE
E
EN
LA
N
D
W W
C X1
O
C T
JK
T
D C
P
BE
M
0%
S ub m is si on
Notes:
Total Demand + 25% Spare: 45231 VA
Receptacle 15900 VA 81.45% 12950 VA Total Est. Demand: 36185 VA Power 11750 VA 92.55% 10875 VA Total Conn. Load: 42370 VA Other 14720 VA 83.97% 12360 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Load: 13430 VA 15440 VA 13500 VA 71 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 72 69 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 70 67 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 68 65 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 66 63 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 64 61 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 62 59 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 60 57 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 58 55 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 56 53 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 54 51 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 52 49 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 50 47 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 48 45 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 46 43 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 44 41 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 42 39 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 40 37 Receptacle COPIER PRINTER RM 217 20 A 1 720 VA 720 VA 1 20 A Power QUAD FLOOR BOX CONF RM 210 38 35 -- -- -- 1000... 1000... -- -- -- 36 33 -- -- -- 1000... 1000... -- -- -- 34 31 Other FURNITURE SYSTEM OPEN OFFICE... 20 A 3 1000... 1000... 3 20 A Other FURNITURE SYSTEM OPEN OFFICE... 32 29 -- -- -- 1000... 1000... -- -- -- 30 27 Other FURNITURE SYSTEM RM 202 20 A 2 1000... 1000... 2 20 A Other FURNITURE SYSTEM RM 202 28 25 -- -- -- 1000... 1000... -- -- -- 26 23 Other FURNITURE SYSTEM RM 202 20 A 2 1000... 1000... 2 20 A Other FURNITURE SYSTEM RM 202 24 21 Power "TV MONITORS OFFICES 216-220 20 A 1 1660... 720 VA 1 20 A Receptacle PRINTER/SCANNER RM 217 22 19 Power "TV MONITORS ASSEMBLY AREA 202 20 A 1 740 VA 1850... 1 20 A Power "TV MONITORS OFFICE 211-215 20 17 PROJECTION SCREEN CONF RM 210 20 A 1 1000... 740 VA 1 20 A Power "TV MONITORS CONF RM 210 OFFIC... 18 15 Receptacle PLOTTER PRINT ROOM 211 20 A 1 1500... 900 VA 1 20 A Receptacle OFFICE 211 16 13 Receptacle MULTI RM 221 20 A 1 900 VA 720 VA 1 20 A Receptacle Countertop 14 11 Receptacle LOCKERS / TOILET 207 20 A 1 1260... 900 VA 1 20 A Receptacle OFFICE 209 12 9 Receptacle LOCKERS / TOILET 204, 207 20 A 1 1800... 1440... 1 20 A Receptacle CONF RM 219 10 7 Receptacle OFFICE 212 20 A 1 900 VA 1080... 1 20 A Receptacle OPEN OFFICE 202 8 5 Receptacle OFFICE 215, 216 20 A 1 1800... 1800... 1 20 A Receptacle OFFICE 213, 215 6 3 Receptacle OFFICE 218, 219 20 A 1 1800... 1620... 1 20 A Receptacle OPEN OFFICE 217, 218 4 1 Receptacle OPEN OFFICE 202 20 A 1 720 VA 1080... 1 20 A Receptacle MULTI RM 221 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Mounting: Surface Wires: 4 MCB Rating: 225 A
Enclosure: Type 1 Phases: 3 Mains Rating: 225 APa... PANEL L1-3 Location: Volts: 120/208 Wye A.I.C. Rating: 10k
Notes:
Total Demand + 25% Spare: 29243 VA
Receptacle 7920 VA 100.00% 7920 VA Total Est. Demand: 23394 VA Power 7794 VA 100.00% 7794 VA Total Conn. Load: 23394 VA Other 7680 VA 100.00% 7680 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Load: 8961 VA 7691 VA 6741 VA 41 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 42 39 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 40 37 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 38 35 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 36 33 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 34 31 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 32 29 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 30 27 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 28 25 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 26 23 Spare 20 A 1 0 VA 1500... 1 20 A MS1 MOBILE STORAGE UNIT 24 21 MS1 MOBILE STORAGE UNIT 20 A 1 1500... 1500... 1 20 A MS2 MOBILE TORAGE UNIT 22 19 MS2 MOBILE TORAGE UNIT 20 A 1 1500... 730 VA 1 20 A Power TV MONITOR ROOM 118 20 17 Receptacle AUTOMATION 118 20 A 1 1080... 1271... -- -- -- 18 15 Receptacle AUTOMATION 118 20 A 1 900 VA 1271... -- -- -- 16 13 Power COUNTER AREA 103 20 A 1 1080... 1271... 3 20 A Power LIFT MOTOR LIFT RM 106 14 11 Receptacle 20 A 1 180 VA 370 VA 1 20 A Power EWC GOODS RECEIPT 107 12 9 Receptacle 20 A 1 180 VA 180 VA 1 20 A Receptacle 10 7 Receptacle BASE SUPPLY 102 20 A 1 900 VA 1080... 1 20 A Receptacle BASE SUPPLY 102 8 5 Receptacle BASE SUPPLY 102 20 A 1 1260... 1080... 1 20 A Receptacle OFFICE 104 6 3 Receptacle GOODS RECEIPT 107 20 A 1 1080... 1080... 1 20 A Receptacle BASE SUPPLY 102 4 1 Receptacle ELECT RM 120 20 A 1 900 VA 1500... 1 20 A MS3 MOBILE STORAGE UNIT 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Mounting: Surface Wires: 4 MCB Rating: 100 A
Enclosure: Type 1 Phases: 3 Mains Rating: 100 APa... PANEL L1-1 Location: ELECT RM 120 Volts: 120/208 Wye A.I.C. Rating: 10k
Notes:
Total Demand + 25% Spare: 13500 VA
Receptacle 360 VA 100.00% 360 VA Total Est. Demand: 10800 VA Power 8940 VA 100.00% 8940 VA Total Conn. Load: 10800 VA Other 1500 VA 100.00% 1500 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Load: 3580 VA 3220 VA 4000 VA 23 Spare 20 A 1 0 VA 0 VA -- -- -- 24 21 Spare 20 A 1 0 VA 0 VA -- -- -- 22 19 Spare 20 A 1 0 VA 0 VA 3 30 A TVSS DEVICE 20 17 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 18 15 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 16 13 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 14 11 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 12 9 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 10 7 Spare 20 A 1 0 VA 2500... -- -- -- 8
5 SECURITY SYSTEM POWER SUPPLY... 20 A 1 1500... 2500... -- -- -- 6
3 SECURED CABINET (NIC) 20 A 1 720 VA 2500... 3 30 A Power RACK MTD L14-30R RECEP RM 121 4 1 Receptacle TELCO RM 121 20 A 1 720 VA 360 VA 1 20 A Receptacle TELCO RM 121 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Mounting: Surface Wires: 4 MCB Rating: 100 A
Enclosure: Type 1 Phases: 3 Mains Rating: 100 APa... PANEL L1-2 Location: TELECO RM 121 Volts: 120/208 Wye A.I.C. Rating: 10k
Notes:
Total Demand + 25% Spare: 11400 VA
Total Est. Demand: 9120 VA Receptacle 180 VA 100.00% 180 VA Total Conn. Load: 9120 VA Power 8940 VA 100.00% 8940 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Load: 2680 VA 3220 VA 3220 VA 23 24 21 22 19 20 17 18 15 16 13 14 11 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 12 9 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 10 7 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 8
5 SECURED CABINET (NIC) 20 A 1 720 VA 2500... -- -- -- 6
3 QUAD WALL OUTLETS 20 A 1 720 VA 2500... -- -- -- 4
1 Receptacle 20 A 1 180 VA 2500... 3 30 A Power RACK MTD L14-30R RECEP RM 209 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Mounting: Surface Wires: 4 MCB Rating: 100 A
Enclosure: Type 1 Phases: 3 Mains Rating: 100 APa... PANEL L1-4 Location: TELECO RM 209 Volts: 120/208 Wye A.I.C. Rating: 10k
Notes:
Receptacle 24360 VA 70.53% 17180 VA Total Demand + 25% Spare 84663 VA Lighting - Exterior 2184 VA 100.00% 2184 VA Total Est. Demand: 67730 VA Power 37424 VA 63.36% 23712 VA Total Conn. Load: 103277 VA Other 39309 VA 62.72% 24654 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Conn. Load: 103277 VA 8 Space -- -- -- 0 VA -- 7 Space -- -- -- 0 VA -- 6 Spare 3 -- 100 A 0 VA
5 LCP-L1 3 100 A 100 A 17497 VA
4 L1-4 3 100 A 100 A 9120 VA
3 L1-3 3 225 A 225 A 42370 VA
2 L1-2 3 100 A 100 A 10800 VA
1 L1-1 3 100 A 100 A 23394 VA
CKT Circuit Description # of Poles Frame Size Trip Rating Load Remarks
Mounting: FLOOR Wires: 4 MCB Rating: 400 A Enclosure: Type 1 Phases: 3 Mains Rating: 400 ASwitchboard PANEL... Location: ELECT RM 120 Volts: 120/208 Wye A.I.C. Rating: 22k
WITH 120V SHUNT TRIP
WITH 120V SHUNT TRIP
TVSS 3 100 A 30 A 0 VA
100 A
DPL1
Notes:
Total Demand + 25% Spare: 55806 VA
Receptacle 6720 VA 100.00% 6720 VA Total Est. Demand: 44645 VA Power 64770 VA 57.72% 37385 VA Total Conn. Load: 72030 VA Other 540 VA 100.00% 540 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Load: 24291 VA 24479 VA 23259 VA 41 Recp METAL SHOP SHEET MTL 109D "SM5" 20 A 1 1920... 0 VA 1 20 A Spare 42 39 Recp METAL SHOP SHEET MTL 109D "SM5" 20 A 1 1920... 0 VA 1 20 A Spare 40 37 -- -- -- 5000... 0 VA 1 20 A Spare 38 35 -- -- -- 5000... 0 VA 1 20 A Spare 36 33 Power METAL SHOP SHEET MTL 109D "SM1" 60 A 3 5000... 791 VA -- -- -- 34
31 -- -- -- 250 VA 791 VA -- -- -- 32
29 -- -- -- 250 VA 791 VA 3 20 A Power PAINT ROOM 115A" PR5" 30 27 Power METAL SHOP SHEET MTL 109D "DP2" 20 A 3 250 VA 1248... -- -- -- 28 25 -- -- -- 250 VA 1248... 2 20 A Power PAINT ROOM 115A "PR4" 26
23 -- -- -- 250 VA 1248... -- -- -- 24
21 Power METAL SHOP SHEET MTL 109D "PG1" 20 A 3 250 VA 1248... 2 20 A Power PAINT ROOM 115A "PR3" 22 19 -- -- -- 3667... 720 VA 1 20 A Receptacle PAINT ROOM 115A 20 17 -- -- -- 3667... 180 VA 1 20 A Other METAL SHOP MACH TL 109D "EPO" 18 15 Power METAL SHOP SHEET MTL 109D "BR2" 40 A 3 3667... 360 VA 1 20 A Retractable Recp METAL SHOP MACH TL... 16 13 -- -- -- 6000... 2080... -- -- -- 14 11 -- -- -- 6000... 2080... 2 30 A Power METAL SHOP SHEET MTL 109D "SM4" 12 9 Power METAL SHOP SHEET MTL 109D 70 A 3 6000... 1872... -- -- -- 10 7 Receptacle METAL SHOP SHEET MTL 109D 20 A 1 540 VA 1872... 2 30 A Power METAL SHOP SHEET MTL 109D "SM3" 8 5 Receptacle METAL SHOP SHEET MTL 109D 20 A 1 540 VA 1333... -- -- -- 6 3 Receptacle METAL SHOP SHEET MTL 109D 20 A 1 540 VA 1333... -- -- -- 4 1 Receptacle METAL SHOP SHEET MTL 109D 20 A 1 540 VA 1333... 3 20 A Power METAL SHOP SHEET MTL 109D "SM2" 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Mounting: Surface Wires: 4 MCB Rating: 225 A
Enclosure: Type 1 Phases: 3 Mains Rating: 225 APa... PANEL L3-5 Location: METAL SHOP... Volts: 120/208 Wye A.I.C. Rating: 10k
Spare Spare Spare
Spare Spare Spare
Spare Spare Spare
Spare Spare Spare
20 A
20 A 20 A
20 A 20 A
20 A
20 A
20 A 20 A
20 A 20 A
20 A
0 VA 0 VA
0 VA 0 VA
0 VA 0 VA
0 VA 0 VA
0 VA 0 VA
0 VA 0 VA
W
W
PANEL L1-4
PANEL L1-2
0 2,500MM 5,000MM
SCALE: 1:50 (MILLIMETERS)
US Army Corps of Engineers New York District
SY
M
BO
L
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
U
.S .A
R M
Y C
O R
PS
O
FE
N
G
IN
EE
R
S N
EW
Y
O R
K D
IS
TR
IC
T ht tp w w w
.n an
.u sa ce .a rm y.
m il
SHEET
REFERENCE
NUMBER:
***SAFETY PAYS***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:
FILE PATH:
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
ED
ER
AL
P
LA
ZA
R O
O M
N
EW
Y
O R
K, N
Y
8-
A N
SI
D
DA
TE
SO
LI
C
IT
A
TI
O N
N O
C O
N
TR
A C
T N
O
FI
LE
N U
M B
ER
FI
LE
N A
M E:
PL
O
T D
A
TE
C K
D B
Y:
D
W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B
M
IT
TE
D
B Y:
PL
O
T
SC
A
LE
SI
ZE
PR
O
JE
CT
S
TA
TU
S:
C:\Users\ONeillJ1\Documents\2015 E_FP Central_ONeillJ1.rvt
4/12/2016 12:27:46 PM
R
EV
IS
IO
N
- I T/
C O
M M
R
EV
IS
IO
N S
4/
/1
T-401
C O
N
SO
LI
D
AT
ED
C
IV
IL
E
N G
IN
EE
R
IN
G
SH
O
PS
A N
D S
U
PP
LY
F
AC
IL
IT
Y
EN
LA
R G
ED
F
LO
O
R
PL
AN
S
TH
U
LE
E
EN
LA
N
D
W W
C X1
O
C T
JK
T
JK
T
BE
M
0%
S ub m is si on
DRAWING NOTES
GENERAL NOTES
1 : 502
ENLARGED FLOOR PLAN - TELECOM
ROOM 209
1 : 501
ENLARGED FLOOR PLAN - TELECOM
ROOM 121
1 2
RACK 1
RACK 1
1. ALL DEVICES AND ASSOCIATED CONDUITS MOUNTED ON
EXTERIOR WALLS ARE TO BE SURFACE MOUNTED.
TE
LC
O R
O O
M S
EN
LA
R G
ED
FL
O O
R P
LA
N
S
3/4" FIRE RATED PLYWOOD BACKBOARD ON ALL WALLS.
SERVICE ENTRANCE CONDUITS. COORDINATE.
(4) - 4" CONDUIT SLEEVES WITH FIRE PROOFING.
WALL MOUNTED "TMGB" GROUND BAR AT +24" AFF.
CONTRACTOR SHALL ARRANGE THE SERVICE ENTRY
ENCLOSED RACK IN A MANNER TO ALLOW A SECOND
RACK TO BE MOUNTERD ADJACENT TO THE INSTALLED
RACK SHOULD FUTURE CABLE SYSYSTEM
REQUIREMENTS ARISE.
GOVERNMENT FREESTANDING SECURED, ENCLOSED
CABINET. COORDINATE INSTALLATION AND MAINTAIN
CLEARANCES AT ALL ACCESS POINTS AND BRTWEEN
THE OTHER RACKS THAT CARE/WILL BE INSTALLED IN
THAT ROOM.
WALL MOUNTED "TGB" GROUND BAR AT +96" AFF.
TELECOM ROOM 209 - SECOND FLOOR
48 - STRAND SINGLE MODE (SM) FIBER
OPTIC SERVICE ENTRANCE CABLE
FROM BUILDING 1411.
OPTICAL NETWORK
TERMINAL (ONT) (NIC)
TELECOM ROOM 121 - FIRST FLOOR
FTP
FBPPP
VoIP SWITCH (NIC)
DATA SWITCH (NIC)
DATA SWITCH (NIC)
CATV SWITCH (NIC)
24 PORT HPP
24 PORT HPP
24 PORT HPP
24 PORT HPP
FBPP
VoIP SWITCH (NIC)
DATA SWITCH (NIC)
DATA SWITCH (NIC)
CATV SWITCH (NIC)
24 PORT HPP
24 PORT HPP
24 PORT HPP
24 PORT HPP
4" CONDUIT WITH 3- 2"
FABRIC INNERDUCTS
SEAL CONDUIT
AT ENTRY
48 - STRAND
SINGLE MODE (SM)
2 - STRAND (SM)
CAT 6 PATCH CABLESCAT 6 PATCH
CABLES
24 - STRAND (SM)
BACKBONE CABLE
CAT 6 PATCH CABLES
CONDUIT SIZE INDICATED
ON FLOOR PLAN
TO VOICE JACKS
WITH YELLOW
JACKET COLOR
TO DATA JACKS
WITH BLUE
JACKET COLOR
TO CATV JACKS
WITH GREY
JACKET COLOR
TO VOICE JACKS
WITH YELLOW
JACKET COLOR
TO DATA JACKS
WITH BLUE
JACKET COLOR
TO CATV JACKS
WITH GREY
JACKET COLOR
FUTURE 48 - STRAND SINGLE MODE
(SM) FIBER OPTIC SERVICE ENTRANCE
CABLE TO FUTURE VMF SHOP.
TO CARD ACCESS
CONTROL PANEL
TO FIRE ALARM
CONTROL PANEL
TO IP SPEAKER JACKS
ABOVE CEILING
CAT 6 CABLES
MTGB
TGB
OPTICAL NETWORK
TERMINAL (ONT) (NIC)
2 - STRAND (SM)
CAT 6 PATCH
CABLES
PA SWITCH
2 - STRAND (SM)
2 - STRAND (SM)
TELCO ROOM - 2ND FLOOR
POE SWITCH WITH FIBER
AND CAT6 INTERFACE
IEEE 802.3AT-2009
ENABLED 10/100BASE-TX
PORTS
STANDARD
NETWORK
INTERFACE
TELCO ROOM - 1ST FLOOR
MECH ROOM &
ELEC ROOM
UTILITY SPACE
SMFOC FROM FIBER PATCH
PANEL IN 1ST FLOOR RACK
CORR &
COMMON
MECH ROOM &
ELEC ROOM
UTILITY SPACE
HIGH BAY AREAS CORR &
COMMON
DETAIL NOTES:
WHERE CEILING SPEAKERS ARE SPECIFIED, COORDINATE WITH ARCHITECTURAL
CEILING TILE AND THULE BCE PERSONNEL FOR THE TYPE OF CEILING SPEAKERS
(ROUND OR SQUARE 2'x 2') TO BE INSTALLED.
THE ALPHACOM AUDIO SERVER THAT WILL SUPPORT THE PA SYSTEM IS LOCATED IN
BUILDING 1411 SERVER ROOM.
SEE TELECOM RISER FOR SWITCHING EQUIPMENT AND SYSTEM CONNECTION POINT
1.
2.
3.
POE SWITCH WITH FIBER
AND CAT6 INTERFACE
IEEE 802.3AT-2009
ENABLED 10/100BASE-TX
PORTS
WALL
FACEPLATE
CEILING
FACEPLATE
UXGA VIDEO CABLE AND CAT 6
CABLE IN 1 1/4" CONDUIT CAT 6 CABLE TO
PATCH PANEL
CAT 6 CABLE TO
PATCH PANELS
US Army Corps of Engineers New York District
SY
M
BO
L
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
U
.S .A
R M
Y C
O R
PS
O
FE
N
G
IN
EE
R
S N
EW
Y
O R
K D
IS
TR
IC
T ht tp w w w
.n an
.u sa ce .a rm y.
m il
SHEET
REFERENCE
NUMBER:
***SAFETY PAYS***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:
FILE PATH:
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
ED
ER
AL
P
LA
ZA
R O
O M
N
EW
Y
O R
K, N
Y
8-
A N
SI
D
DA
TE
SO
LI
C
IT
A
TI
O N
N O
C O
N
TR
A C
T N
O
FI
LE
N U
M B
ER
FI
LE
N A
M E:
PL
O
T D
A
TE
C K
D B
Y:
D
W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B
M
IT
TE
D
B Y:
PL
O
T
SC
A
LE
SI
ZE
PR
O
JE
CT
S
TA
TU
S:
C:\Users\ONeillJ1\Documents\2015 E_FP Central_ONeillJ1.rvt
4/12/2016 12:27:56 PM
R
EV
IS
IO
N
- I T/
C O
M M
R
EV
IS
IO
N S
4/
/1
T-601
C O
N
SO
LI
D
AT
ED
C
IV
IL
E
N G
IN
EE
R
IN
G
SH
O
PS
A N
D S
U
PP
LY
F
AC
IL
IT
Y
TE
LE
C O
M R
IS
ER
D
IA
G R
AM
TH
U
LE
E
EN
LA
N
D
W W
C X1
O
C T
JK
T
D P
BE
M
0%
S ub m is si on
FOR ELECTRICAL NOTES, ABBREVIATIONS, AND SYMBOLS
REFER TO DRAWING E-001.
EQUIPMENT PLACEMENTS ARE DIAGRAMMATIC IN NATURE.
FOR EQUIPMENT RACK ELEVATIONS REFER TO SHEET T-602.
INSTALLATIONS METHOD SHALL COMPLY WITH TIA/EIA 569-B,
NEC, AND RELEVANT STANDARDS.
PROVIDE JUNCTION BOXES IN CONDUIT RUNS SO THAT THERE
ARE NO MORE THAN (2) 90 DEGREE BENDS BETWEEN PULL
POINTS (JUNCTION BOXES, ETC) OR CONDUIT RUNS WHICH
EXCEED 100-FEET, OR IF NECESSARY, INSERT ADDITIONAL PULL
BOXES. SIZE JUNCTION BOXES IN ACCORDANCE WITH TIA-EIA-
569-B.
ALL CONDUITS USED FOR INTERIOR DISTRIBUTION CABLE
ROUTING SHALL BE EMT, UNLESS OTHERWISE NOTED. SERVICE
ENTRY CONDUITS STUBS SHALL BE RIGID STEEL WITH
INSULATED GROUND BUSHINGS.
DRAWING NOTES
GENERAL NOTES
SERVICE ENTRANCE FIBER OPTIC CABLE SHALL BE GLASS-
ARMOURED MULTIFIBER LOOSE-TUBE, GEL-FILLED CABLE
WITH PE JACKET, 4x2012-STRAND (48-STRAND), HUMBER +
SUHNER 4X12 E9/125, 48-12 EO/WSN (ZNG) Y-Z150 OR
APPROVED EQUAL.
OUTDOOR FIBER OPTIC CABLE WILL BE SPLICED IN A WALL
MOUNTED FIBER OPTIC SPLICE BOX, AND THE INDIVIDUAL
FIBER STRANDS WIL BE SPLICED TO THE INDOOR FIBER
CABLES.
FIBER OPTIC PATCH PANEL (SM-SINGLE MODE) SHALL BE
PROVIDED WITH SUFFICIENT PATCH PANELS FOR CABLE
TERMINATIONS.
INDOOR FIBER OPTIC CABLE IS PRE-FABRICATED 24-
STRAND SINGLE MODE WITH CONNECTORS INSTALLED AT
BOTH ENDS. THE CABLE REEL COMES WITH DATA- AND -
SHEETS FOR ALL INDIVIDUAL STRANDS AND CONNECTORS.
THE CABLE REEL IS ORDERED TO THE LENGTH REQUIRED
(LENGTH FROM 1ST FLOOR RACK TO 2ND FLOOR RACK +
10 METERS FOR INSTALLATION AND TERMINATION).
PROVIDE AN INSULATED 3/0 COPPER GROUND CONDUCTOR
IN 1 1/4" EMT BETWEN THE MTGB AND THE 2ND FLOOR
TGB. INSTALL INSULATED GROUND BUSHINGS AT EACH END
OF THE CONDUIT RUN AND BOND THE BUSHINGS TO EACH
GROUND BUS WITH A MINIMUM #6 AWG COPPER
CONDUCTOR.
PROVIDE AN INSULATED #2 AWG COPPER GROUND
CONDUCTOR IN 1" EMT BETWEN THE TELECOM ROOM
GROUND BUS AND THE GROUND BUS IN THE PANELBOARD
INSTALLED IN THAT ROOM. INSTALL INSULATED GROUND
BUSHINGS AT EACH END OF THE CONDUIT RUN AND BOND
THE BUSHINGS TO THE TELECOM ROOM GROUND BUS AND
THE PANEL BUS WITH A MINIMUM #6 AWG COPPER
CONDUCTOR.
PROVIDE AN INSULATED #6 COPPER GROUND CONDUCTOR
IN 1 1/4" EMT BETWEN THE TELECOM ROOM GROUND BUS
AND THE NEAREST BUILDING STEEL. INSTALL INSULATED
GROUND BUSHINGS AT EACH END OF THE CONDUIT RUN
AND BOND THE BUSHINGS AT THE GROUND BUS AND STEEL
MEMBER WITH A MINIMUM #6 AWG COPPER CONDUCTOR.
PROVIDE A BARE #6 AWG COPPER GROUND CONDUCTOR
IN 1 1/4" EMT BETWEN THETELECOM ROOM GROUND BUS
TO THE CABLE TRAY SYSTEM, TO EACH RACK, AND TO ALL
TELECOM EQUIPMENT CABINETS AND ENCLOSURES.
NOT TO SCALE1 TELECOM RISER DIAGRAM
NOT TO SCALE2 PAGING RISER DIAGRAM
NOT TO SCALE3 PROJECTOR WIRING DETAIL
1.
2.
3.
4.
5.
5 6 7 8
5 6 7 8
48-STRAND FBBPP
(SM)
48-STRAND SM
FIBER TERMINATION PANEL
CABLE TRAY
FLOOR
RACK 1
ANCHOR
TO FLOOR
6-
IN
C H
W
IR
E M
AN
AG
ER
6-
IN
C H
W
IR
E M
AN
AG
ER
UPS BATTERY MODULE
UPS BATTERY MODULE
UPS BATTERY MODULE
UPS/PDU
5kVA
CABLE MANAGER
CABLE MANAGER
UPS BATTERY MODULE
24 PORT CAT 6 Voip SWITCH
CABLE MANAGER
24 PORT CAT 6 DATA SWITCH
CABLE MANAGER
24 PORT CAT 6 DATA SWITCH
CABLE MANAGER
24 PORT CAT 6 CATV SWITCH
CABLE MANAGER
24 PORT CAT 6 HPP
CABLE MANAGER
24 PORT CAT 6 HPP
CABLE MANAGER
24 PORT CAT 6 HPP
CABLE MANAGER
24 PORT CAT 6 HPP
CABLE MANAGER
PDU
CABLE TRAY
FLOOR
RACK 1
ANCHOR
TO FLOOR
6-
IN
C H
W
IR
E M
AN
AG
ER
6-
IN
C H
W
IR
E M
AN
AG
ER
UPS BATTERY MODULE
UPS BATTERY MODULE
UPS BATTERY MODULE
UPS/PDU
5kVA
UPS BATTERY MODULE
24 PORT CAT 6 Voip SWITCH
CABLE MANAGER
24 PORT CAT 6 DATA SWITCH
CABLE MANAGER
24 PORT CAT 6 DATA SWITCH
CABLE MANAGER
24 PORT CAT 6 CATV SWITCH
CABLE MANAGER
24 PORT CAT 6 HPP
CABLE MANAGER
24 PORT CAT 6 HPP
CABLE MANAGER
24 PORT CAT 6 HPP
CABLE MANAGER
24 PORT CAT 6 HPP
CABLE MANAGER
CABLE MANAGER
CABLE MANAGER
24-STRAND
FBBPP (SM)
PDU
PLAN VIEW
ISOMETRIC
SIDE VIEW
FRONT VIEW
DETAIL NOTE:
1. COORDINATE BOX DIMENSIONS AND ANTENNA OPENINGS WITH WAP DEVICE PROVIDED.
NEMA 1 ENCLOSURE
FULLY HINGED LOCKABLE DOOR
KNOCKOUT FOR ANTENNA
WAP
SIDE VIEW
ISOMETRIC
SIDE VIEWREFLECTED PLAN VIEW
DETAIL NOTE:
1. COORDINATE BOX DIMENSIONS AND ANTENNA OPENINGS WITH WAP DEVICE PROVIDED.
FULLY HINGED LOCKABLE DOOR
KNOCK-OUTS FOR ANTENNA
NEMA 1 PLENUM RATED ENCLOSURE
WAP
US Army Corps of Engineers New York District
SY
M
BO
L
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
U
.S .A
R M
Y C
O R
PS
O
FE
N
G
IN
EE
R
S N
EW
Y
O R
K D
IS
TR
IC
T ht tp w w w
.n an
.u sa ce .a rm y.
m il
SHEET
REFERENCE
NUMBER:
***SAFETY PAYS***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:
FILE PATH:
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
ED
ER
AL
P
LA
ZA
R O
O M
N
EW
Y
O R
K, N
Y
8-
A N
SI
D
DA
TE
SO
LI
C
IT
A
TI
O N
N O
C O
N
TR
A C
T N
O
FI
LE
N U
M B
ER
FI
LE
N A
M E:
PL
O
T D
A
TE
C K
D B
Y:
D
W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B
M
IT
TE
D
B Y:
PL
O
T
SC
A
LE
SI
ZE
PR
O
JE
CT
S
TA
TU
S:
C:\Users\ONeillJ1\Documents\2015 E_FP Central_ONeillJ1.rvt
4/12/2016 12:28:06 PM
R
EV
IS
IO
N
- I T/
C O
M M
R
EV
IS
IO
N S
4/
/1
T-602
C O
N
SO
LI
D
AT
ED
C
IV
IL
E
N G
IN
EE
R
IN
G
SH
O
PS
A N
D S
U
PP
LY
F
AC
IL
IT
Y
TE
LE
C O
M R
AC
K
EL
EV
AT
IO
N S
AN
D
D
ET
AI
LS
TH
U
LE
E
EN
LA
N
D
W W
C X1
O
C T
JK
T
D P
BE
M
0%
S ub m is si on
CATEGORY 6 HORIZONTAL CABLE PATCH PANELS
SWITCH HINGED PANELS.
1. FOR TELECOM NOTES, ABBREVIATIONS, AND SYMBOLS
REFER TO DRAWING E-003.
2. SEE FLOOR PLAN FOR ROOM LAYOUT.
3. PROVIDE ALL PATCH PANELS AS REQUIRED TO
SUFFICIENTLY TERMINATE ALL CABLES SPECIFIED.
SPACE OPTIMIZATION STRATEGY SHALL BE EMPLOYED TO
CONSERVE SPACE.
4. DRAWINGS ARE DIAGRAMMATIC ONLY. EXACT
ARRANGEMENT FOR EQUIPMENT AND PATCH PANELS
SHALL BE COORDINATED AND OPTIMIZED IN THE FIELD.
5. ALL TELECOM SWITCHING EQUIPMENT SUCH FOR
DATA/VOIP/CATV WILL BE PROVIDED BY THE
GOVERNMENT.
45U ENCLOSED 2-POST EQUIPMENT RACK WITH VERTICAL
CABLE MANAGER (TYPICAL).
48-PORT FIBER PATCH PANEL WITH DUPLEX SC
ADAPTORS. CONTRACTOR SHALL PROVIDE EQUIPMENT
BASED ON SPACE OPTIMIZATION STRATEGY.
208V - 208/120V DOUBLE CONVERSION ONLINE UPS WITH 2
HOURS or 70 AH MINIMUM POWER RESERVE AT FULL LOAD.
PROVIDE WITH (4) NEMA 5-20R, (1) L14-30R, AND (1) NEMA
L6-30R OUTPUT RECEPTACLES AND NEMA L14-30P INPUT
PLUG WITH 10' (3) CORD-APC SMART-UPS OR EQUAL.
DRAWING NOTES
GENERAL NOTES
24-PORT SWITCH, (NIC) (TYPICAL).
RACK PDU WITH (10) NEMA 5-20R RECEPTACLES AND
NEMA 5-20P INPUT PLUG ON 12' (3.6m) CORD. APC RACK
PDU OR EQUAL.
NOT TO SCALE1 TELECOM RACK ELEVATION RM 121
NOT TO SCALE2 TELECOM RACK ELEVATION RM 209
NOT TO SCALE3
TELECOM WALL MTD WIRELESS ACCESS
POINT ENCLOSURE
NOT TO SCALE4
TELECOM RECESSED CEILING MTD
WIRELESS ACCESS POINT ENCLOSURE
24-PORT FIBER PATCH PANEL WITH DUPLEX SC
ADAPTORS. CONTRACTOR SHALL PROVIDE EQUIPMENT
BASED ON SPACE OPTIMIZATION STRATEGY.
CONTRACTOR SHALL INSTALL FREESTANDING SECURE
ENCLOSED CABINET ADJACENT TO RACK #1. VERIFY
CABINET SIZE AND COORDINATE REQUIRED CLEARANCES
FOR THE CABINET WITH THE CONTRACTING OFFICER.
UP
UP
2.1
3.1
EXIT AIR LOCK
ELECT RM
TELCO RM
MECH RM
METAL SHOP ASE
109A
GOODS RECEIPT
BASE SUPPLY
OFFICE (WO)
COUNTER AREA
(WO)
EXIT AIR LOCK
EXIT STAIR
JAN CLO
AIR LOCK
TOILET
AUTOMATION
METAL SHOP
PLUMB
109B
METAL SHOP
MACH TL
109C
METAL SHOP
SHEET MTL
109D
WELDING SHOP
TOOLS
WOOD SHOP
SIGN SHOP
PAINT ROOM
115A
PNT STO CLO
115B
EXIT AIR LOCK
EXIT STAIR
EXP/P-3
P-1
SB-2
MAT-1/SC-1
P-3 P-1
SB-2
SC-1
P-3 P-1
SB-2
SC-1
P-3 P-1
SB-2
SC-1
EXP/P-3
P-1
SB-2
SC-1
EXP/P-3
P-1
SB-2
SC-1
P-4 P-2
SB-2
SC-1
P-4
PT-1/PT-2
PTB-1
PT-1
ACT-1
P-1
SB-1
VFC-1
ACT-1
P-1
SB-2
VFC-1
P-1
SB-1
SC-1
P-3 P-1
SB-2
MAT-1/SC-1
EXP/P-3
P-1
SB-2
SC-1
EXP/P-3
P-1
SB-2
SC-1
EXP/P-3
P-1
SB-2
SC-1
P-3 P-1
SB-2
SC-1
P-3 P-1
SB-2
SC-1
P-3 P-1
SB-2
MAT-1/SC-1
P-1
SB-2
SC-1
EXP/P-3
P-1
SB-2
SC-1
EXP/P-3
P-1
SB-2
SC-1
EXP/P-3
P-1
SB-2
SC-1
EXP/P-3
P-1
SB-2
SC-1
ACT-1
P-1
SB-2
VFC-1
EXP/P-3
P-1
SB-2
SC-1
ACT-1
P-1
SB-2
VFC-1
I-401
I-401
P-1 AT
COLUMN
P-1 AT
COLUMN
P-1 AT
COLUMN
P-1 AT
COLUMN
P-1 AT
COLUMN
PT-4 AT
COLUMN
P-1 AT
COLUMN
P-1 AT
COLUMN
P-1 AT
COLUMN
P-1 AT
COLUMN
PT-7 AT RAILS AND STRINGERS
P-5 AT RAILS AND STRINGERS
1. REFER TO SHEET I-601 FOR INTERIOR FINISH MATERIAL KEY AND INTERIOR FINISH MATERIAL SCHEDULE.
REFER TO SHEET A-611 ROOM FINISH SCHEDULE FOR FULL FINISH APPLICATION.
2. REFER TO REFLECTED CEILING PLAN FOR CEILING HEIGHTS AND ADDITIONAL CEILING INFORMATION.
3. REFER TO CID PACKAGE FOR FINISH SAMPLES.
4. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISHES.
GENERAL NOTES
FINISH KEY
CEILING
WALL
BASE
FLOOR
CEILING
ACT ACOUSTICAL CEILING TILE
EXP/P EXPOSED TO STRUCTURE ABOVE - PAINTED
P GYPSUM BOARD - PAINTED
WALLS
GFC GLASS FIBRE CLOTH
PT PORCELAIN TILE
P PAINT
TWP TACKABLE WALL PANEL
MBW MARKER BOARD WALL COVERING
BASE
SB BASE
FLOOR
CPT CARPET TILE
PT PORCELAIN TILE
MAT FOOT GRILLE
RT RUBBER TILE
SC SEALED CONCRETE
VFC VINYL FLOOR COVERING
CPT-1 CARPET TILE
FLOOR FINISH LEGEND
PT-1 PORCELAIN TILE
MAT-1 FOOT GRILLE
RT-1 RUBBER TILE
RT-2 RUBBER TILE
SC-1 SEALED CONCRETE
VFC-1 VINYL FLOOR COVERING
N
TRUE NORTH
WIND
PLAN NORTH
0 10,000MM 20,000MM
SCALE 1:200 (MILLIMETERS)
UNCLASSIFIED//FOR OFFICIAL USE ONLY
US Army Corps of Engineers New York District
SY
M
BO
L
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
U
.S .A
R M
Y C
O R
PS
O
FE
N
G
IN
EE
R
S N
EW
Y
O R
K D
IS
TR
IC
T ht tp w w w
.n an
.u sa ce .a rm y.
m il
SHEET
REFERENCE
NUMBER:
***SAFETY PAYS***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:
FILE PATH:
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
ED
ER
AL
P
LA
ZA
R O
O M
N
EW
Y
O R
K, N
Y
8-
A N
SI
D
DA
TE
SO
LI
C
IT
A
TI
O N
N O
C O
N
TR
A C
T N
O
FI
LE
N U
M B
ER
FI
LE
N A
M E:
PL
O
T D
A
TE
C K
D B
Y:
D
W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B
M
IT
TE
D
B Y:
PL
O
T
SC
A
LE
SI
ZE
PR
O
JE
CT
S
TA
TU
S:
C:\Users\carterjk\Documents\CE_Shops_Int_Central_bowmanar.rvt
4/25/2016 1:01:58 PM
R ev . 1
A pr
A s in di ca te d
I-101
C O
N
SO
LI
D
AT
ED
C
IV
IL
E
N G
IN
EE
R
IN
G
SH
O
PS
A N
D S
U
PP
LY
F
AC
IL
IT
Y
FI
R
ST
F
LO
O
R F
IN
IS
H
PL
AN
TH
U
LE
E
EN
LA
N
D
W W
C X1
A
PR
A.
Bo w m an
A.
Bo w m an K
.C ha rb on ea u
0%
S ub m is si on
1 : 200I-101
1 FIRST FLOOR FINISH PLAN
FD FD
2.1
3.1
ASSEMBLY AREA
BREAK RM
MEN LOCKERS /
TOILET
WOMEN LOCKERS
/ TOILET
CONF RM
210 TELCO RM
JAN CLO
OPEN OFFICE
EAST
203B
OFFICE (OP)
OFFICE (UF)
OFFICE (PM)
PRINTER ROOM
OFFICE (EN)
OFFICE (EL)
OFFICE (SM)
OFFICE (OM)
OFFICE (OM)
OFFICE (EN)
EXIT STAIR
EXIT STAIR
STORAGE
210A
VESTIBULE
OPEN OFFICE
WEST
ACT-1
P-1/GFC-1
SB-1
CPT-1
P-3 P-1
SB-2
SC-1
ACT-1
P-1/TWP-1/MBW-1
SB-1
CPT-1
P-4
P-2/PT-1/PT-2/GFC-2
PTB-1
PT-1
P-3 P-1
SB-2
VFC-1
ACT-1
P-1
SB-2
VFC-1
P-4 P-2
SB-2
VFC-1
P-4
P-2/PT-1/PT-2/GFC-2
PTB-1
PT-1
P-3
P-1/GFC-1
SB-2
RT-1/RT-2
ACT-1
P-1
SB-2
RT-1/RT-2
ACT-1
P-1/GFC-1
SB-2
RT-1/RT-2
ACT-1
P-1
SB-1
CPT-1
ACT-1
P-1
SB-1
CPT-1
ACT-1
P-1
SB-1
CPT-1
ACT-1
P-1
SB-1
CPT-1
ACT-1
P-1
SB-1
CPT-1
ACT-1
P-1
SB-1
CPT-1
ACT-1
P-1
SB-2
VFC-1
ACT-1
P-1
SB-1
CPT-1
ACT-1
P-1
SB-1
CPT-1
ACT-1
P-1
SB-1
CPT-1
P-3 P-1
SB-2
SC-1
ACT-1
P-1
SB-2
VFC-1
ACT-1
P-1/GFC-1
SB-1
CPT-1
OPEN OFFICE
203A
I-401
I-401
I-401
P-5 AT RAILS
AND STRINGERS
P-5 AT RAILS
AND STRINGERS
P-1
P-1
CPT-1 CARPET TILE
FLOOR FINISH LEGEND
PT-1 PORCELAIN TILE
MAT-1 FOOT GRILLE
RT-1 RUBBER TILE
RT-2 RUBBER TILE
SC-1 SEALED CONCRETE
VFC-1 VINYL FLOOR COVERING
1. REFER TO SHEET I-601 FOR INTERIOR FINISH MATERIAL KEY AND INTERIOR FINISH MATERIAL SCHEDULE.
REFER TO SHEET A-611 ROOM FINISH SCHEDULE FOR FULL FINISH APPLICATION.
2. REFER TO REFLECTED CEILING PLAN FOR CEILING HEIGHTS AND ADDITIONAL CEILING INFORMATION.
3. REFER TO CID PACKAGE FOR FINISH SAMPLES.
4. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISHES.
GENERAL NOTES
FINISH KEY
CEILING
WALL
BASE
FLOOR
CEILING
ACT ACOUSTICAL CEILING TILE
EXP/P EXPOSED TO STRUCTURE ABOVE - PAINTED
P GYPSUM BOARD - PAINTED
WALLS
GFC GLASS FIBRE CLOTH
PT PORCELAIN TILE
P PAINT
TWP TACKABLE WALL PANEL
MBW MARKER BOARD WALL COVERING
BASE
SB BASE
FLOOR
CPT CARPET TILE
PT PORCELAIN TILE
MAT FOOT GRILLE
RT RUBBER TILE
SC SEALED CONCRETE
VFC VINYL FLOOR COVERING
N
TRUE NORTH
WIND
PLAN NORTH
0 10,000MM 20,000MM
SCALE 1:200 (MILLIMETERS)
UNCLASSIFIED//FOR OFFICIAL USE ONLY
US Army Corps of Engineers New York District
SY
M
BO
L
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
U
.S .A
R M
Y C
O R
PS
O
FE
N
G
IN
EE
R
S N
EW
Y
O R
K D
IS
TR
IC
T ht tp w w w
.n an
.u sa ce .a rm y.
m il
SHEET
REFERENCE
NUMBER:
***SAFETY PAYS***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:
FILE PATH:
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
ED
ER
AL
P
LA
ZA
R O
O M
N
EW
Y
O R
K, N
Y
8-
A N
SI
D
DA
TE
SO
LI
C
IT
A
TI
O N
N O
C O
N
TR
A C
T N
O
FI
LE
N U
M B
ER
FI
LE
N A
M E:
PL
O
T D
A
TE
C K
D B
Y:
D
W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B
M
IT
TE
D
B Y:
PL
O
T
SC
A
LE
SI
ZE
PR
O
JE
CT
S
TA
TU
S:
C:\Users\carterjk\Documents\CE_Shops_Int_Central_bowmanar.rvt
4/25/2016 1:02:00 PM
R ev . 1
A pr
A s in di ca te d
I-102
C O
N
SO
LI
D
AT
ED
C
IV
IL
E
N G
IN
EE
R
IN
G
SH
O
PS
A N
D S
U
PP
LY
F
AC
IL
IT
Y
SE
C
O N
D F
LO
O
R F
IN
IS
H
PL
AN
TH
U
LE
E
EN
LA
N
D
W W
C X1
A
PR
A.
Bo w m an
A.
Bo w m an K
.C ha rb on ea u
0%
S ub m is si on
1 : 200I-102
1 SECOND FLOOR FINISH PLAN
P-1
SB-1
P-1
MBW-1
MARKER TRAY
50 P-1 P-1
SB-1
TWP-1TWP-1 TWP-1 TWP-1 TWP-1 TWP-1
693 1219 1219 1219 1219 1219 1219 695
P-1
P-1
TV3
STN-1
P-5
SB-1
TO
C
EN
TE
R L
IN
E
O F
TV
STN-1P-5
SB-1 SB-1
P-5
P-1 P-1
MBW-1
MARKER TRAY
ART1 ART1
0 1,000MM 2,000MM
SCALE 1:20 (MILLIMETERS)
UNCLASSIFIED//FOR OFFICIAL USE ONLY
US Army Corps of Engineers New York District
SY
M
BO
L
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
U
.S .A
R M
Y C
O R
PS
O
FE
N
G
IN
EE
R
S N
EW
Y
O R
K D
IS
TR
IC
T ht tp w w w
.n an
.u sa ce .a rm y.
m il
SHEET
REFERENCE
NUMBER:
***SAFETY PAYS***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:
FILE PATH:
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
ED
ER
AL
P
LA
ZA
R O
O M
N
EW
Y
O R
K, N
Y
8-
A N
SI
D
DA
TE
SO
LI
C
IT
A
TI
O N
N O
C O
N
TR
A C
T N
O
FI
LE
N U
M B
ER
FI
LE
N A
M E:
PL
O
T D
A
TE
C K
D B
Y:
D
W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B
M
IT
TE
D
B Y:
PL
O
T
SC
A
LE
SI
ZE
PR
O
JE
CT
S
TA
TU
S:
C:\Users\carterjk\Documents\CE_Shops_Int_Central_bowmanar.rvt
4/25/2016 1:02:01 PM
R ev . 1
A pr
A s in di ca te d
I-201
C O
N
SO
LI
D
AT
ED
C
IV
IL
E
N G
IN
EE
R
IN
G
SH
O
PS
A N
D S
U
PP
LY
F
AC
IL
IT
Y
IN
TE
R
IO
R E
LE
VA
TI
O
N S
TH
U
LE
E
EN
LA
N
D
W W
C X1
A
PR
A.
Bo w m an
A.
Bo w m an K
.C ha rb on ea u
0%
S ub m is si on
1 : 20I-201
1 RM 210 - NORTH ELEV
1 : 20I-201
2 RM 210 - EAST ELEV
1 : 20I-201
3 RM 210 - SOUTH ELEV
1 : 20I-201
4 RM 210 - WEST ELEV
PT-2
PT-1
PT-1
P-5
PTB-1
PT-1
PTB-1
P-2
PT-2
PT-1
P-5
STN-1 STN-1 STN-1
PTB-1
PT-1
P-2
PT-2
PTB-1
PT-1
PT-2
PT-1
P-2
PT-2
PT-1
PT-1
PLAM-1 COUNTERTOP
& BACKSPLASH
PTB-1
PT-1
GFC-2
PT-2
PT-1
PT-1
P-2
P-2 AT SINK
ALCOVE WALLS
PLAM-1
COUNTERTOP
& BACKSPLASH
PTB-1
0 1,000MM 2,000MM
SCALE 1:20 (MILLIMETERS)
UNCLASSIFIED//FOR OFFICIAL USE ONLY
US Army Corps of Engineers New York District
SY
M
BO
L
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
U
.S .A
R M
Y C
O R
PS
O
FE
N
G
IN
EE
R
S N
EW
Y
O R
K D
IS
TR
IC
T ht tp w w w
.n an
.u sa ce .a rm y.
m il
SHEET
REFERENCE
NUMBER:
***SAFETY PAYS***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:
FILE PATH:
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
ED
ER
AL
P
LA
ZA
R O
O M
N
EW
Y
O R
K, N
Y
8-
A N
SI
D
DA
TE
SO
LI
C
IT
A
TI
O N
N O
C O
N
TR
A C
T N
O
FI
LE
N U
M B
ER
FI
LE
N A
M E:
PL
O
T D
A
TE
C K
D B
Y:
D
W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B
M
IT
TE
D
B Y:
PL
O
T
SC
A
LE
SI
ZE
PR
O
JE
CT
S
TA
TU
S:
C:\Users\carterjk\Documents\CE_Shops_Int_Central_bowmanar.rvt
4/25/2016 1:02:03 PM
R ev . 1
A pr
A s in di ca te d
I-202
C O
N
SO
LI
D
AT
ED
C
IV
IL
E
N G
IN
EE
R
IN
G
SH
O
PS
A N
D S
U
PP
LY
F
AC
IL
IT
Y
IN
TE
R
IO
R E
LE
VA
TI
O
N S
TH
U
LE
E
EN
LA
N
D
W W
C X1
A
PR
A.
Bo w m an
A.
Bo w m an K
.C ha rb on ea u
0%
S ub m is si on
1 : 20I-202
1 RM 116 - WEST ELEV
1 : 20I-202
2 RM 116 - SOUTH ELEV
1 : 20I-202
3 RM 205 - WEST ELEV - RESTROOM TYPICAL
1 : 20I-202
4 RM 205 - EAST ELEV - RESTROOM TYPICAL
1 : 20I-202
5 RM 205 - WEST ELEV - SINKS
1 : 20I-202
6 RM 208 - EAST ELEV - SINKS
PT-2
P-2
PTB-1
PT-1
P-2
PT-2
60P-5
P-2
LK-1
P-2P-2
LK-1 LK-1
P-2
PT-2
SF-1
PLAM-2 UPPER CABINETS PLAM-2 UPPER CABINETS
PLAM-2 BASE CABINETS
PLAM-1 COUNTER TOP
& BACKSPLASH
PLAM-1 COUNTER TOP
& BACKSPLASH
P-1 AT SOFFIT P-1 AT SOFFIT
P-1
AT COLUMN
P-1
PLAM-2 BASE CABINETS
P-1
RNG1
DWR1
RFG1
MCW1
SB-2SB-2
0 1,000MM 2,000MM
SCALE 1:20 (MILLIMETERS)
PT-1
P-2
PT-2
SF-1
P-5
PT-1
SB-1
UNCLASSIFIED//FOR OFFICIAL USE ONLY
US Army Corps of Engineers New York District
SY
M
BO
L
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
U
.S .A
R M
Y C
O R
PS
O
FE
N
G
IN
EE
R
S N
EW
Y
O R
K D
IS
TR
IC
T ht tp w w w
.n an
.u sa ce .a rm y.
m il
SHEET
REFERENCE
NUMBER:
***SAFETY PAYS***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:
FILE PATH:
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
ED
ER
AL
P
LA
ZA
R O
O M
N
EW
Y
O R
K, N
Y
8-
A N
SI
D
DA
TE
SO
LI
C
IT
A
TI
O N
N O
C O
N
TR
A C
T N
O
FI
LE
N U
M B
ER
FI
LE
N A
M E:
PL
O
T D
A
TE
C K
D B
Y:
D
W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B
M
IT
TE
D
B Y:
PL
O
T
SC
A
LE
SI
ZE
PR
O
JE
CT
S
TA
TU
S:
C:\Users\carterjk\Documents\CE_Shops_Int_Central_bowmanar.rvt
4/25/2016 1:02:05 PM
R ev . 1
A pr
A s in di ca te d
I-203
C O
N
SO
LI
D
AT
ED
C
IV
IL
E
N G
IN
EE
R
IN
G
SH
O
PS
A N
D S
U
PP
LY
F
AC
IL
IT
Y
IN
TE
R
IO
R E
LE
VA
TI
O
N S
TH
U
LE
E
EN
LA
N
D
W W
C X1
A
PR
A.
Bo w m an
A.
Bo w m an K
.C ha rb on ea u
0%
S ub m is si on
1 : 20I-203
RM 205 - EAST ELEV
TOILET TYPICAL
1 : 20I-203
RM 205 - NORTH ELEV
TOILET TYPICAL
1 : 20I-203
3 RM 205 - NORTH ELEV - LOCKERS TYPICAL
1 : 20I-203
RM 205 - WEST ELEV
SHOWER TYPICAL
1 : 20I-203
6 RM 204 - EAST ELEV
1 : 20I-203
RM 205 - NORTH ELEV
SHOWER TYPICAL
FD
FD
EXIT AIR LOCK
P-3 P-1
SB-2
MAT-1/SC-1
SC-1 153MM WIDE AT
PERIMETER OF EXIT
AIR LOCK, TYPICAL. 153
MAT-1 OFFSET 153 MM
FROM WALL, TYPICAL.
PT-1/PT-2
PT-1
I-202
1 P-4
PT-1/PT-2
PTB-1
PT-1
TOILET
PT-1
PT-1
I-203 6
P-3
P-1/GFC-1
SB-2
RT-1/RT-2
BREAK RM
RT-1, TYPICAL
RT-2, TYPICAL
P-1
P-1 AT SOFFIT
RFG1
RNG1
DWR1
P-1 AT SOFFIT
MCW1
GFC-1
I-2025
MEN LOCKERS /
TOILET
WOMEN LOCKERS
/ TOILET
I-202 43
I-2034
I-203 1
I-203
I-202 6
P-4
P-2/PT-1/PT-2/GFC-2
PTB-1
PT-1
P-4
P-2/PT-1/PT-2/GFC-2
PTB-1
PT-1
P-2
P-2
P-2 P-2
P-2
P-2/PT-1/PT-2 AT SHOWER
WALLS, TYPICAL.
P-2/PT-2 AT REAR
SHOWER WALL, TYPICAL.
P-2 P-2
P-2/
PT-1/
PT-2
P-2/PT-1/PT-2 AT TOILET
WALLS, TYPICAL.
P-2/PT-2 AT REAR TOILET
WALL, TYPICAL.
P-2 P-2
P-2
P-2
P-2/
PT-1/
PT-2
P-2
P-2
GFC-2GFC-2GFC-2
P-2/
PT-1/
PT-2
P-2/
PT-1/
PT-2
P-2
P-2/
PT-1/
PT-2
P-2/
PT-1/
PT-2
P-2/
PT-1/
PT-2
P-2/PT-1/PT-2
SF-1 AT SHOWER FLOOR,
TYPICAL.
I-2014
CONF RM
ACT-1
P-1/TWP-1/MBW-1
SB-1
CPT-1
MBW-1
P-1
P-1 P-1 TWP-1
P-1
FINISH KEY
CEILING
WALL
BASE
FLOOR
CEILING
ACT ACOUSTICAL CEILING TILE
EXP/P EXPOSED TO STRUCTURE ABOVE - PAINTED
P GYPSUM BOARD - PAINTED
WALLS
GFC GLASS FIBRE CLOTH
PT PORCELAIN TILE
P PAINT
TWP TACKABLE WALL PANEL
MBW MARKER BOARD WALL COVERING
BASE
SB BASE
FLOOR
CPT CARPET TILE
PT PORCELAIN TILE
MAT FOOT GRILLE
RT RUBBER TILE
SC SEALED CONCRETE
VFC VINYL FLOOR COVERING
CPT-1 CARPET TILE
FLOOR FINISH LEGEND
PT-1 PORCELAIN TILE
MAT-1 FOOT GRILLE
RT-1 RUBBER TILE
RT-2 RUBBER TILE
SC-1 SEALED CONCRETE
VFC-1 VINYL FLOOR COVERING
UNCLASSIFIED//FOR OFFICIAL USE ONLY
US Army Corps of Engineers New York District
SY
M
BO
L
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
U
.S .A
R M
Y C
O R
PS
O
FE
N
G
IN
EE
R
S N
EW
Y
O R
K D
IS
TR
IC
T ht tp w w w
.n an
.u sa ce .a rm y.
m il
SHEET
REFERENCE
NUMBER:
***SAFETY PAYS***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:
FILE PATH:
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
ED
ER
AL
P
LA
ZA
R O
O M
N
EW
Y
O R
K, N
Y
8-
A N
SI
D
DA
TE
SO
LI
C
IT
A
TI
O N
N O
C O
N
TR
A C
T N
O
FI
LE
N U
M B
ER
FI
LE
N A
M E:
PL
O
T D
A
TE
C K
D B
Y:
D
W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B
M
IT
TE
D
B Y:
PL
O
T
SC
A
LE
SI
ZE
PR
O
JE
CT
S
TA
TU
S:
C:\Users\carterjk\Documents\CE_Shops_Int_Central_bowmanar.rvt
4/25/2016 1:02:07 PM
R ev . 1
A pr
A s in di ca te d
I-401
C O
N
SO
LI
D
AT
ED
C
IV
IL
E
N G
IN
EE
R
IN
G
SH
O
PS
A N
D S
U
PP
LY
F
AC
IL
IT
Y
EN
LA
R G
ED
F
IN
IS
H
PL
AN
S
TH
U
LE
E
EN
LA
N
D
W W
C X1
A
PR
A.
Bo w m an
A.
Bo w m an K
.C ha rb on ea u
0%
S ub m is si on 1 : 50I-401
2 EXIT AIR LOCK FINISH PLAN - TYPICAL
1 : 20I-401
1 TOILET RM 116 FINISH PLAN
1 : 50I-401
3 BREAK ROOM RM 204 FINISH PLAN
1 : 50I-401
4 LOCKERS / TOILET ROOMS FINISH PLAN
1 : 50I-401
5 CONFERENCE ROOM FINISH PLAN
0 2,500MM 5,000MM
SCALE 1:50 (MILLIMETERS)
0 1,000MM 2,000MM
SCALE 1:20 (MILLIMETERS)
INTERIOR FINISH MATERIALS KEY
ACT ACOUSTICAL CEILING TILE
CG CORNER GUARD
CPT CARPET TILE
GFC GLASS FIBRE CLOTH
GT GROUT
LK LOCKER
MAT RECSSED ENTRY MAT
LK LOCKER
MBW MARKER BOARD WALL COVERING
P PAINT
PLAM PLASTIC LAMINATE
PT PORCELAIN TILE
PTB PORCELAIN TILE BASE
RT RUBBER TILE
SB SKIRTING BOARD
SC SEALED CONCRETE
SF SHOWER FLOOR
STN WOOD STAIN
TWP TACKABLE WALL PANEL
VFC VINYL FLOOR COVERING
WT WINDOW TREATMENT
GENERAL NOTES
1. ALL FINISHES TO BE INSTALLED AND/OR APPLIED IN ACCORDANCE WITH THE MANUFACTURERS WRITTEN INSTRUCTIONS.
2. ALL FINISHES LISTED ARE BASIS OF DESIGN AND NOT INTENDED TO LIMIT CHOICE OF THE MANUFACTURER FOR EQUAL COLOR/PATTERN.
3. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISHES.
4. ALL FLOOR TRANSITIONS ARE TO OCCUR AT THE CENTERLINE OF THE DOOR, DOORWAY, OR CEILING LINE, UNLESS OTHERWISE NOTED.
5. ALL REDUCER STRIPS SHALL MATCH COLOR OF BASE.
6. ALL GYP BOARD WALLS TO BE PAINTED EGGSHELL FINISH, UNLESS OTHERWISE NOTED. ALL GYP BOARD CEILINGS TO BE PAINTED FLAT FINISH, UNLESS
OTHERWISE NOTED.
7. ALL DOORS AND FRAMES TO BE PAINTED SEMI-GLOSS FINISH, UNLESS OTHERWISE NOTED.
8. PAINT SHALL NOT COVER DOOR HARDWARE, ACCESSORIES, FIRE RATING LABELS OR OTHER CODE REQUIRED LABEL PLATES.
9. REFER TO SHEET A-611 FOR THE ROOM FINISH SCHEDULE.
UNCLASSIFIED//FOR OFFICIAL USE ONLY
US Army Corps of Engineers New York District
SY
M
BO
L
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
U
.S .A
R M
Y C
O R
PS
O
FE
N
G
IN
EE
R
S N
EW
Y
O R
K D
IS
TR
IC
T ht tp w w w
.n an
.u sa ce .a rm y.
m il
SHEET
REFERENCE
NUMBER:
***SAFETY PAYS***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***DATE:
FILE PATH:
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
F
ED
ER
AL
P
LA
ZA
R O
O M
N
EW
Y
O R
K, N
Y
8-
A N
SI
D
DA
TE
SO
LI
C
IT
A
TI
O N
N O
C O
N
TR
A C
T N
O
FI
LE
N U
M B
ER
FI
LE
N A
M E:
PL
O
T D
A
TE
C K
D B
Y:
D
W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B
M
IT
TE
D
B Y:
PL
O
T
SC
A
LE
SI
ZE
PR
O
JE
CT
S
TA
TU
S:
C:\Users\carterjk\Documents\CE_Shops_Int_Central_bowmanar.rvt
4/25/2016 1:02:07 PM
R ev . 1
A pr
I-601
C O
N
SO
LI
D
AT
ED
C
IV
IL
E
N G
IN
EE
R
IN
G
SH
O
PS
A N
D S
U
PP
LY
F
AC
IL
IT
Y
IN
TE
R
IO
R M
AT
ER
IA
LS
FI
N
IS
H
S C
H
ED
U
LE
TH
U
LE
E
EN
LA
N
D
W W
C X1
A
PR
A.
Bo w m an
A.
Bo w m an K
.C ha rb on ea u
0%
S ub m is si on
INTERIOR FINISH MATERIALS SCHEDULE
FINISH
CODE SURFACE MATERIAL MANUFACTURER STYLE COLOR REMARKS
ACT-1 CEILING ACOUSTICAL CEILING TILE ARMSTRONG TILE: 1772 ANGLED TEGULAR 24" X 24" X 5/8” WHITE 15/16" GRID CG-1 WALL CORNER GUARD WALL PROTECTION C/S GROUP C/S ACROVYN CO-8 CORNER GUARD STAINLESS STEEL
CPT-1 FLOOR MODULAR CARPET TILE TANDUS INFINITY 18" X 18" MOONSTONE 55022
GFC-1 WALL GLASS FIBRE CLOTH FLüGGER GLASS FIBRE CLOTH MEDIUM WALL WITH GLUE 378 EXTRA - PRODUCT ID 44135, PRODUCT 33448 GFC-2 WALL GLASS FIBRE CLOTH - WET AREAS FLüGGER GLASS FIBRE CLOTH MEDIUM WALL WITH GLUE 380 WETSAFE - PRODUCT ID 44135, PRODUCT 23850
GT-1 WALL, FLOOR GROUT QUARTZLOCK URETHANE GROUT 240 LINEN -
LK-1 LOCKERS POWDER COATED STEEL LOCKERS HADRIAN, INC. EMPEROR, SINGLE TIER, 12"W X 72"H (305 X 1829 MM) 535 LIGHT GREY MAT-1 FLOOR RECESSED ENTRY MAT MATS INC. FOOT GRILLS - ADVANCED TRACK GRILL: ALUMINUM WITH BOSTON KENMORE GRAY MBW-1 MARKER BOARD WALL COVERING DRY ERASE PROTECTION COVERING WOLF GORDON/EGAN WALL EWP54, 100% WHITE POLYESTER , BACKING NON WOVEN
POLYCARBONATE LEXON, 54"H X 144"W (1372 X 3658 MM)
WHITE APPLY TO NORTH WALL OF CONFERENCE ROOM
P-1 WALL GENERAL WALL PAINT FLüGGER FLUTEX 5 RAW WHITE PRODUCT ID 38105 P-2 WALL WALL PAINT - WET AREAS FLüGGER FLUTEX 205 RAW WHITE PRODUCT ID 76656 P-3 CEILING GENERAL CEILING PAINT FLüGGER FLUTEX 5 RAW WHITE PRODUCT ID 38105 P-4 CEILING CEILING PAINT - WET AREAS FLüGGER FLUTEX 205 RAW WHITE PRODUCT ID 76656 P-5 STAIR RAILINGS, DOOR TRIM STAIR RAILING PAINT AND DOOR TRIM FLüGGER HIGH FINISH GRAY - PLAM-1 COUNTERTOPS PLASTIC LAMINATE, HORIZONTAL SURFACES HTH LAVA DUST 249 - COUNTERTOPS PLAM-2 MILLWORK PLASTIC LAMINATE, VERTICAL SURFACES FORMICA 5882-58 MATTE CITADEL WARP MILLWORK AT BREAK ROOM & COUNTER AREA PT-1 WALL, FLOOR PORCELAIN TILE DALTILE FLORENZA OLIVIA FZ02 12" X 12", 3" X 12" FLOORS AND WALLS
PT-2 WALL PORCELAIN TILE DALTILE FLORENZA SABBIA FZ01 3" X 12" ON WALLS
PTB-1 WALL, ACCENT PORCELAIN TILE, ACCENT DALTILE FLORENZA OLIVIA FZ02 S-36C9T
RT-1 FLOOR RUBBER TILE NORA NORAPLAN SENTICA ED, 24" X 24" (610 X 610 MM) TILE 6521 SUNDAY PAPER STATIC DISSAPATIVE TILE RT-2 FLOOR RUBBER TILE NORA NORAPLAN SENTICA ED, 24" X 24" (610 X 610 MM) TILE 6530 WATERFALL STATIC DISSAPATIVE TILE
SB-1 BASE SKIRTING BOARD - MDF 14 X 65 MM WHITE PRIMED AT CARPET
SB-2 BASE SKIRTING BOARD ARMSTRONG-DK HPR 2525 - PRODUCT ID 220095, AT RESILIENT FLOORING
SC-1 FLOOR SEALED CONCRETE - - - -
SF-1 FLOOR TERRAZZO FIAT MONTEREY SHOWER FLOOR 081 BLACK & WHITE SHOWER PAN AT 2ND FLOOR RESTROOM SHOWERS STN-1 DOOR SOLID CORE WOOD DOOR - BEECH WOOD STAINED TO MATCH STEELCASE 3614 WARM OAK REFER TO A-601 TWP-1 WALL TACKABLE…