Appendix_U_-_Shipping_Rates_Gov_Furnished_Transport.pdf

PDF 13 KB Posted

Attached to
Thule Consolidation 1 (Base Shops & Base Supply Facility)
Solicitation number
W912DS-16-B-0002
Issued by

About this file

Appendix U

View the file

Other files

File Type Posted
Bid_Abstract_-_W912DS-16-B-0002.pdf PDF
C-104.pdf PDF
C-304.pdf PDF
C-303.pdf PDF
C-106.pdf PDF
C-103.pdf PDF
W912DS-16-B-0002_-_Amendment_0005.pdf PDF
Greenland_-_DBA_Waiver_-_Greenland.pdf PDF
C-107.pdf PDF
Thule_Consol_1_CE_shop_-_100__ELECT_SPEC_27_10_00_(Rev_1)_25_April_2016.pdf PDF
Thule_Consol_1_CE_shop_-_100__ELECT_SPEC_(REGISTER)_27_10_00_(Rev_1)_25_April_2016.pdf PDF
C-105.pdf PDF
Consoliation_1_Revised_Drwgs_Amd_0004.pdf PDF
W912DS-16-B-0002_Amendment_0004.pdf PDF
Thule_Consol_1_CE_Shop_-_Updated_100__CID_Package_25_April_2016.pdf PDF
Thule_Consol_1_CE_shop_-_100__ELECT_SPEC_(REGISTER)_27_10_00_(Rev_1)_25_April_2016.pdf PDF
Thule_Consol_1_CE_shop_-_100__ELECT_SPEC_27_10_00_(Rev_1)_25_April_2016.pdf PDF
ES-601_-_SITE_ELEC_REVISED_(25_APR_2016).pdf PDF
ES-601A_-_FEEDER_SCHEDULE(4-25-2016).pdf PDF
W912DS-16-B-0002_Amendment_0003.pdf PDF
ES-102A_-_NEW_REVISED_SITE_FOR_CE_SHOP(4-25-2016).pdf PDF
W912DS-16-B-0002_Amendment_0002.pdf PDF
W912DS-16-B-0002_-_Amendment_0001.pdf PDF
Appendix_S_-_FY14_-_FY17_Sealift_Rates.pdf PDF
Appendix_X_-_Pacer_Goose_Shipping_Instructions.pdf PDF
Appendix_F_-_PPM_Plan.pdf PDF
Appendix_I_-_Slug_Mgmt_Plan.pdf PDF
Package_2_-_Thule_Consolidation_1_-_Specifications_100.pdf PDF
Appendix_L_-_Affirmative_Proc_Plan.pdf PDF
Package_3_-_Thule_Consolidation_1_-_SID_ _CID.pdf PDF
Appendix_R_-_Demo_(Lead_ _Asbestos_Survey _As-Builts).pdf PDF
Package_1_-_Thule_Consolidation_1_-_Plans_100.pdf PDF
Appendix_H_-_Storm_Water_Mgmt_Plan.pdf PDF
W912DS-16-B-0002.pdf PDF
Appendix_C_-_Conservation_Mgmt_Plan.pdf PDF
Appendix_A_-_Active_Landfills.pdf PDF
Appendix_M_-_PCB_Repl_Plan.pdf PDF
Appendix_G_-_Solid_Waste_Mgmt_Plan.pdf PDF
Appendix_K_-_FGS-GL_(Environmental_Protection).pdf PDF
Appendix_D_-_HWM_Plan.pdf PDF
Appendix_E_-_Spill_Prevention-Response_Plan.pdf PDF
Appendix_Q_-_Thule_Site_Topo_Survey.dwg DWG drawing
Appendix_W_-_Natural_Resources_Management_Plan.pdf PDF
Appendix_N_-_Asbestos_Mgmt_Plan.pdf PDF
Appendix_T_-_Fuel_Pricing_and_DLA_info.pdf PDF
Appendix_O_-_Lead_Paint_Mgmt_Plan.pdf PDF
Appendix_J_-_Installation_HAZMAT_Management_Plan.pdf PDF
Appendix_B_-_NFS_Material_Borrow_Sites.pdf PDF
Appendix_V_-_Geotechnical_Investigation.pdf PDF
Appendix_P_-_DBA_Waiver.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHIPPING CHARACTERISTICS

UNITED STATES (Norfolk) – THULE AIR BASE The Guaranteed Maximum Shipping Weights and Dimensions between Norfolk (United States) and the Base shall be stipulated in Measurement Ton (MT) only. One Measurement Ton equals 40 cubic feet that in turn equals 1.12 cubic meter (Note: Prices are for evaluation purposes only. Actual funds will not be incorporated in the contract, only volume):

GUARANTEED MAXIMUM SHIPPING WEIGHTS AND DIMENSIONS (to be completed by Offeror)

From Norfolk, Virginia to From Thule Air Base, Greenland Thule Air Base, Greenland to Norfolk, Virginia Quantity Quantity x Quantity Quantity x Description Unit Price (MT) Price $ (MT) Price $

(A) General Cargo $40.00 __________ __________ __________ __________

(B) Special Cargo:

(i) Lumber $40.00 __________ __________ __________ __________

(ii) Metal Products $40.00 __________ __________ __________ __________

(iii) Vehicles over 10,000 lbs $40.00 __________ __________ __________ __________

(iv) Vehicles under 10,000 lbs $40.00 __________ __________ __________ __________

(v) Explosives $40.00 __________ __________ __________ __________

SUBTOTAL: __________ __________

NOTE: Transfer the SUBTOTAL Quantities to Appropriate CLINS on the Bid Schedule. SUBTOTAL (Quantity x Price) is for evaluation purposes only.

All pallets and containers used for the transportation of contractor’s cargo shall be the contractor’s responsibility and the contractor’s expense.