W912BU-24-B-0019 0001.pdf

PDF 367 KB Posted

Attached to
CELRE Three Deck Barges Federal contract opportunity
Solicitation number
W912BU-24-B-0019
Issued by
Department of the Army Corps of Engineers Engineering District Philadeplhia

About this file

This document is an amendment to a solicitation for the procurement of three welded steel barges to support the civil works maintenance and repair mission of the U.S. Army Corps of Engineers Detroit District. The amendment adds Section F, which provides the required delivery schedule and place of delivery details. The barges must be fabricated and delivered within 465 calendar days after receipt of the notice to proceed, with specific deadlines for the planning and scheduling, engineering, construction and testing, and delivery phases. The delivery locations are the U.S. Army Corps of Engineers Duluth Project Office in Duluth, MN and the U.S. Army Corps of Engineers Detroit District in Sault Sainte Marie, MI. The solicitation number is W912BU-24-B-0019.

View the file

Other files for this federal contract opportunity

Other files attached to CELRE Three Deck Barges, newest first.
File Type Posted
ABS Letter T2455022.pdf PDF
ABS Letter T2483253.pdf PDF
ABS Letter T2483246.pdf PDF
888-B415-01r2 Hatches and Manholes.pdf PDF
888-B301-02r3 Welding Schedule.pdf PDF
888-B215-01r4 General Arrangement.pdf PDF
888-B170-02r1 Dry Docking Calculations (1).pdf PDF
888-B105-01r3 Hull Lines and Offset-Manually.pdf PDF
ABS Letter T2483249.pdf PDF
ABS Letter T2455523.pdf PDF
888-B410-02r2 Rub Rails and Fenders.pdf PDF
888-B170-01r1 Dry Docking Plan.pdf PDF
888-B335-02r3 Removable Cargo Bin.pdf PDF
888-B205-01r4 Outboard Profile.pdf PDF
888-B405-02r1 Cathodic Protection Calculations (1).pdf PDF
888-B140-01r0 Load Line Calculation.pdf PDF
888-B405-01r2 Cathodic Protection.pdf PDF
ABS Letter T2483259.pdf PDF
ABS Letter T2483255.pdf PDF
888-B150-01r2 Damage Stability.pdf PDF
888-B301-01r3 Midship Section.pdf PDF
888-B125-01r1 Hydrostatic Calculations.pdf PDF
888-B307-01r3 Shell Plating.pdf PDF
888-B410-01r2 Tow Knees.pdf PDF
ABS Letter T2455550.pdf PDF
ABS Letter T2483257.pdf PDF
ABS Letter T2455555.pdf PDF
ABS Letter T2481041.pdf PDF
888-B305-01r3 Deck and Bottom Plating.pdf PDF
888-B445-01r1 Lifesaving and Safety Plan.pdf PDF
888-B309-01r3 Transverse Structure.pdf PDF
888-B155-01r2 Intact Stability.pdf PDF
888-B115-01r1 Weight Estimate.pdf PDF
888-B311-01r3 Longitudinal Structure.pdf PDF
888-B427-01r2 Vertical Ladder Details.pdf PDF
888-B420-01r2 Deck Fitting Arrangement.pdf PDF
888-B335-01r3 Permanent Cargo Bin.pdf PDF
888-B160-01r1 Displacement and Deadweight Scales (PE).pdf PDF
888-B460-01r1 Hull Markings.pdf PDF
W912BU-24-B-0019.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to add section F and draw ings.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Jun-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BU24B0019

X 9B. DATED (SEE ITEM 11)

10-Jun-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Jun-2024

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: AMANDA BELLNIER, CONTRACTING DIVISION, 1

TREET, 4TH FLOOR

PHILADELPHIA PA 19103-2004

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BU24B0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been added by full text:

SECTION F

PART I – THE SCHEDULE - SECTION F

DELIVERIES OR PERFORMANCE

F01 PERFORMANCE

FAR 52.211-8 TIME OF DELIVERY (JUN 1997)

(a) The Government requires completion of all work and delivery under this contract to be made within 465 calendar days after receipt of the Notice to Proceed of CLINS 0001, 0002 and 0003 issued by the Contracting Officer. At this time the contractor shall proceed with the PLANNING & SCHEDULING Phase. However, contractor should not proceed with ENGINEERING, CONSTRUCT & TEST and DELIVERY phases until a Phase Start Notification (PSN) is issued by the Contracting Officer Representative. This performance period (465 calendar days) includes review of submittals by the Marine Design Center. All work shall be completed in accordance to the following schedule:

REQUIRED DELIVERY SCHEDULE

ITEM DESCRIPTION QUANTITY WITHIN DAYS AFTER

DATE OF CONTRACT

NOTICE TO PROCEED

0001AA,0002AA,0003AA PLANNING &

SCHEDULING

1 job 30 calendar days

0001AB,0002AB,0003AA ENGINEERING

1 job 75 calendar days

0001AC,0002AC,0003AC CONSTRUCT & TEST

1 job 300 calendar days

0001AD,0002AD,0003AD DELIVERY - Option

1 job 60 calendar days

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered non-responsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an earlier delivery schedule than required above is proposed. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR’S PROPOSED DELIVERY SCHEDULE

ITEM DESCRIPTION QUANTITY WITHIN DAYS AFTER

DATE OF CONTRACT

NOTICE TO PROCEED

0001AA.0002AA,0003AA PLANNING &

SCHEDULING

1 job _______________

0001AB,0002AB,0003AB ENGINEERING

0001AC,0002AC,0003AC CONSTRUCT & TEST

0001AD,0002AD,0003AD DELIVERY - Option

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract.

The Government will mail or otherwise furnish to the offeror an award or notice of award not later than one day after the award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of contract rather than the date the written notice is received from the Contracting Officer through the ordinary mails.

(End of Clause)

F02 PLACE OF DELIVERY

Delivery of the barges to their final locations are optional CLINS under this contract.

CLINS 0001AD, CLIN 0002AD and CLIN 0003AD will be exercised within 150 days after receipt of the notice to proceed issued by the Contracting Officer.

For CLIN 0001AD (Hull #888):

The contractor shall deliver the barge, its components, materials, and spare parts to the following location:

U.S. Army Corps of Engineers Duluth Project Office

600 South Lake Avenue Duluth, MN 55802

For CLIN 0002AD and CLIN 0003AD (Hull #889 and Hull #890):

The contractor shall deliver the barges, their components, materials, and spare parts to the following location:

U.S. Army Corps of Engineers Detroit District

St. Mary’s Falls Canal 119 East Water Street

Sault Sainte Marie, MI 49783

The following have been deleted:

SECTION F

(End of Summary of Changes)

File details come from the government source that posted it. Updated .