About this file

This document is an "Approval in Principle" review letter from the American Bureau of Shipping (ABS) regarding a cathodic protection design for a steel barge. The review was conducted at the request of The Shearer Group, Inc. to establish compliance with the applicable ABS Rules for Building and Classing Steel Barges 2022. The review is limited to the structural attachment and alignment of steel support for anodes. ABS notes that final approval will require verification against the Rules, Regulations and Standards applicable at the time the construction contract is signed or the keel is laid. ABS would be prepared to class the final design once the relevant design drawings, calculations and documents are submitted for review upon completion of detailed engineering, and after ABS surveyors have attended the fabrication survey during construction and installation.

The related federal contract opportunity is for the procurement of three (3) welded steel barges to support the civil works maintenance and repair mission of the Detroit District of the U.S. Army Corps of Engineers. The solicitation is an Invitation for Bid (IFB) with a bid guarantee, payment, and performance bonding requirement. Delivery and final acceptance will be at the U.S. Army Engineer Detroit District locations in Sault Sainte Marie, MI and Duluth, MN. Contractors are required to be registered in the System for Award Management (SAM) prior to award.

View the file

Other files for this federal contract opportunity

Other files attached to CELRE Three Deck Barges, newest first.
File Type Posted
ABS Letter T2455022.pdf PDF
ABS Letter T2483253.pdf PDF
ABS Letter T2483246.pdf PDF
888-B415-01r2 Hatches and Manholes.pdf PDF
888-B301-02r3 Welding Schedule.pdf PDF
888-B215-01r4 General Arrangement.pdf PDF
888-B170-02r1 Dry Docking Calculations (1).pdf PDF
888-B105-01r3 Hull Lines and Offset-Manually.pdf PDF
ABS Letter T2483249.pdf PDF
ABS Letter T2455523.pdf PDF
888-B410-02r2 Rub Rails and Fenders.pdf PDF
888-B170-01r1 Dry Docking Plan.pdf PDF
888-B335-02r3 Removable Cargo Bin.pdf PDF
888-B205-01r4 Outboard Profile.pdf PDF
888-B405-02r1 Cathodic Protection Calculations (1).pdf PDF
888-B140-01r0 Load Line Calculation.pdf PDF
888-B405-01r2 Cathodic Protection.pdf PDF
ABS Letter T2483257.pdf PDF
ABS Letter T2455555.pdf PDF
ABS Letter T2481041.pdf PDF
888-B305-01r3 Deck and Bottom Plating.pdf PDF
888-B445-01r1 Lifesaving and Safety Plan.pdf PDF
888-B309-01r3 Transverse Structure.pdf PDF
888-B155-01r2 Intact Stability.pdf PDF
888-B115-01r1 Weight Estimate.pdf PDF
888-B311-01r3 Longitudinal Structure.pdf PDF
888-B427-01r2 Vertical Ladder Details.pdf PDF
888-B420-01r2 Deck Fitting Arrangement.pdf PDF
888-B335-01r3 Permanent Cargo Bin.pdf PDF
888-B160-01r1 Displacement and Deadweight Scales (PE).pdf PDF
888-B460-01r1 Hull Markings.pdf PDF
W912BU-24-B-0019 0001.pdf PDF
ABS Letter T2483259.pdf PDF
ABS Letter T2483255.pdf PDF
888-B150-01r2 Damage Stability.pdf PDF
888-B301-01r3 Midship Section.pdf PDF
888-B125-01r1 Hydrostatic Calculations.pdf PDF
888-B307-01r3 Shell Plating.pdf PDF
888-B410-01r2 Tow Knees.pdf PDF
W912BU-24-B-0019.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABS Global Engineering 275 Slater Street, Suite 1003 | Ottawa (ON), K1P 5H9 | Canada

Task – T2455550 Class No.: TBD Shipyard: TBD / Hull No.: TBD Flag: United States of America

Attention: Mr. Joshua Sebastian, The Shearer Group, Inc (442598)

The document shown in the attached list is reviewed in accordance with the applicable requirements of the following:

• ABS Rules for Building and Classing Steel Barges 2022

Please note our review is based on the following conditions:

1. At your request, we have carried out an “Approval in Principle” review of the documents in the attached list.

2. The primary objective of this review is to establish compliance in principle with the applicable ABS Rules, insofar as they relate to the details submitted.

3. It is also to be noted that before final approval can be granted, the proposed design will need to be verified against the Rules, Regulations and Standards applicable at the time that the contract for construction is signed or the keel is laid, as applicable.

4. Please note that our review at this time in no way precludes any future amendments which may be deemed necessary due to submittal of additional information, clarification or drawing revisions during detailed engineering review for the subject design.

5. ABS would be prepared to class the final design of this concept when the relevant design drawings, calculations and documents are submitted for review on completion of the detailed engineering, and after ABS surveyors have attended the fabrication survey during the construction and installation. Subsequent maintenance of Class will be subject to satisfactory in-service inspection by ABS Surveyors as required for Classification.

6. Review is limited to structural attachment and alignment of steel support for anodes.

For any clarifications, contact Aldo Martino at (343) 633-1424 or amartino@eagle.org.

Very truly yours, Jihed Boulares Director, Engineering

Electronically Signed by: Aldo Martino

Electronically published by ABS Ottawa.

Reference T2455550, dated 09-OCT-2023.

mailto:amartino@eagle.org

ABS Global Engineering 275 Slater Street, Suite 1003 | Ottawa (ON), K1P 5H9 | Canada

Documents List

Drawing No. Rev. Title Status

888-B405-01 1 Cathodic Protection Reviewed w/Remarks 888-B405-02 1 Cathodic Protection

Calculations Filed by ABS for Reference Only

Electronic copies of the documents, appropriately stamped, are available in the ABS Client Portal.

Electronically published by ABS Ottawa.

Reference T2455550, dated 09-OCT-2023.

File details come from the government source that posted it. Updated .