About this file

This document is an "Approval in Principle" review letter from ABS Global Engineering regarding the structural drawings for a deck cargo barge. The key details are:

The review was conducted for compliance with the ABS Rules for Building and Classing Steel Barges, 2022 and the ABS Rules for Building and Classing Marine Vessels, 2022. ABS performed a statement of compliance review for the hull structure to meet ABS Ice Class C0 requirements per the client's request, though the U.S. Army Corps of Engineers does not require the ice belt design to satisfy low temperature requirements. ABS provided technical comments regarding the deck plating material, connection details, and longitudinal stiffener arrangements, which were addressed through revisions to the drawings. ABS stated they would be prepared to class the final design of the barge once the detailed engineering drawings and documents are submitted for full approval review.

View the file

Other files for this federal contract opportunity

Other files attached to CELRE Three Deck Barges, newest first.
File Type Posted
W912BU-24-B-0019 0001.pdf PDF
ABS Letter T2483259.pdf PDF
ABS Letter T2483255.pdf PDF
888-B150-01r2 Damage Stability.pdf PDF
888-B301-01r3 Midship Section.pdf PDF
888-B125-01r1 Hydrostatic Calculations.pdf PDF
888-B307-01r3 Shell Plating.pdf PDF
888-B410-01r2 Tow Knees.pdf PDF
ABS Letter T2455022.pdf PDF
ABS Letter T2483253.pdf PDF
888-B415-01r2 Hatches and Manholes.pdf PDF
888-B301-02r3 Welding Schedule.pdf PDF
888-B215-01r4 General Arrangement.pdf PDF
888-B170-02r1 Dry Docking Calculations (1).pdf PDF
888-B105-01r3 Hull Lines and Offset-Manually.pdf PDF
ABS Letter T2483249.pdf PDF
ABS Letter T2455523.pdf PDF
888-B410-02r2 Rub Rails and Fenders.pdf PDF
888-B170-01r1 Dry Docking Plan.pdf PDF
888-B335-02r3 Removable Cargo Bin.pdf PDF
888-B205-01r4 Outboard Profile.pdf PDF
888-B405-02r1 Cathodic Protection Calculations (1).pdf PDF
888-B140-01r0 Load Line Calculation.pdf PDF
888-B405-01r2 Cathodic Protection.pdf PDF
ABS Letter T2455550.pdf PDF
ABS Letter T2483257.pdf PDF
ABS Letter T2455555.pdf PDF
ABS Letter T2481041.pdf PDF
888-B305-01r3 Deck and Bottom Plating.pdf PDF
888-B445-01r1 Lifesaving and Safety Plan.pdf PDF
888-B309-01r3 Transverse Structure.pdf PDF
888-B155-01r2 Intact Stability.pdf PDF
888-B115-01r1 Weight Estimate.pdf PDF
888-B311-01r3 Longitudinal Structure.pdf PDF
888-B427-01r2 Vertical Ladder Details.pdf PDF
888-B420-01r2 Deck Fitting Arrangement.pdf PDF
888-B335-01r3 Permanent Cargo Bin.pdf PDF
888-B160-01r1 Displacement and Deadweight Scales (PE).pdf PDF
888-B460-01r1 Hull Markings.pdf PDF
W912BU-24-B-0019.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABS Global Engineering 275 Slater Street, Suite 1003 | Ottawa (ON), K1P 5H9 | Canada

Task – T2483246 Class No.: TBD Shipyard: TBD / Hull No.: TBD Flag: United States of America Subject: Deck Cargo Barge

Attention: Mr. Joshua Sebastian, The Shearer Group, Inc. (442598)

The document shown in the attached list is reviewed in accordance with the applicable requirements of the following:

• ABS Rules for Building and Classing Steel Barges, 2022.

• ABS Rules for Building and Classing Marine Vessels, 2022.

Please note our review is based on the following conditions:

1. At your request, we have carried out an “Approval in Principle” review of the documents in the attached list.

2. The hull structural drawings are also subjected to a Statement of Compliance review for compliance with ABS Ice Class C0 as per your request.

3. The primary objective of this review is to establish compliance in principle with the applicable ABS Rules, insofar as they relate to the details submitted, that when all other requirements have been satisfactorily met, the barge will be eligible for the proposed Class notations: À A1, Barge, Great Lake Service.

4. It is also to be noted that before final approval can be granted, the proposed design will need to be verified against the Rules, Regulations and Standards applicable at the time that the contract for construction is signed or the keel is laid, as applicable.

5. The markups made on the document are to be incorporated in the final design that will be submitted for approval.

6. Please note that our review at this time in no way precludes any future amendments which may be deemed necessary due to submittal of additional information, clarification or drawing revisions during detailed engineering review for the subject design.

7. ABS would be prepared to class the final design of this concept when the relevant design drawings, calculations and documents are submitted for review on completion of the detailed engineering, and after ABS surveyors have attended the fabrication survey during the construction and installation. Subsequent maintenance of Class will be subject to satisfactory in-service inspection by ABS Surveyors as required for Classification.

8. Main Deck structure reviewed for an uniformly distributed deck loading of 3,000 lbf/ft2.

Comments S-013 through S-016 are closed with this review.

Electronically published by ABS Ottawa.

Reference T2483246, dated 19-DEC-2023.

275 Slater Street, Suite 1003 | Ottawa (ON), K1P 5H9 | Canada

For any clarifications, contact Aldo Martino at (343) 633-1424 or amartino@eagle.org.

Very truly yours, Jihed Boulares Director, Engineering

Electronically Signed by: Aldo Martino

Electronically published by ABS Ottawa.

mailto:amartino@eagle.org

275 Slater Street, Suite 1003 | Ottawa (ON), K1P 5H9 | Canada

Documents List

Drawing No. Rev. Title Status

888-B301-01 3 Midship Section Reviewed 888-B301-02 3 Welding Schedule Reviewed 888-B305-01 3 Deck & Bottom Plating Reviewed 888-B307-01 3 Shell Plating Reviewed 888-B309-01 3 Transverse Structure Reviewed with remarks 888-B311-01 3 Longitudinal Structure Reviewed

Electronic copies of the documents, appropriately stamped, are available in the ABS Client Portal.

Comments List:

Thread No. Comment Text Facilities Action

S-013 888-B305-01 - Deck & Bottom Plating , 888-B301-

01 - Midship Section , 888-B307-01 - Shell Plating

, 888-B309-01 - Transverse Structure , 888-B311-

01 - Longitudinal Structure

TBD

[Closed]

Technical

ABS

Comment

We note your request for a Statement of Compliance review of the structural drawings in accordance with applicable requirements for the Ice

Class C0. In this regard, the following items require further design change

(or) clarification.

1. The material and material grade are to comply with ABS MVR 6-1-

5/33. Grade of material for the deck plating and gunwale, sheer strake and deck stringer are to be revised.

2. Connection details in way of the upper turn of the bilge, which is within the ice belt zone, is to be made flush so as to avoid any damage during operations in first year ice.

3. Side shell longitudinals' collar plates in way of transverse webs are to be either shifted close to side shell, or a full collar plate is to be provided as to avoid soft patch within the ice belt region.

4. End connections in way of the webs and stiffeners within ice belt region are to be well developed. These members are to be attached and bracketed such that the Rule required net shear area in way of these end connections are satisfied. Refer to ABS MVR 6-

1-5/13.5 & 15.

Customer Reply

Comment 1: Per US Army Corps of Engineers MDC, the Government does not require the ice belt design, or material selected, to satisfy the low temperature requirements as stated in the ABS Rules. Request the material requirements, as specified in ABS MVR 6-1-5/33, to be except from the Statement of Compliance of Ice Class C0. Comments 2 & 3: We

275 Slater Street, Suite 1003 | Ottawa (ON), K1P 5H9 | Canada respectfully disagree. This detail is in accordance with standard barge design. This detail is the same as another Ice Classed barge designed through MDC, the CELRE Crane Barge Harvey Replacement.”

ABS Reply We have received your confirmation of a statement of compliance review, and we have no objection to the proposed material grade. Rest of the comment remains open pending submission and review of revised drawings as per email communication.

ABS Reply ABS has received updated drawing and notes statement of compliance regarding material grade. Comment closed.

S-014 888-B309-01 - Transverse Structure TBD [Closed]

Technical

ABS

Comment

The intermediate bottom shell longitudinal stiffeners in way of the bow region noted to terminate at Fr. 4 as per the bottom plan (888-B305-01, Sheet 2). The typical section does not show relevant end connection details for the intermediate stiffeners. In this regard, additional details for the bottom structure in way of Fr. 4 are to be included in the drawing for review.

Customer Reply

Please see revision 3 of 888-B309-01 Transverse Structure, submitted

11/21/2023.

ABS Reply ABS has received the updated revision detailing bottom structure at frame

4. Comment closed.

S-015 888-B311-01 - Longitudinal Structure TBD [Closed]

Technical

ABS

Comment

It is noted that there is no shear connection provided between the deck transverse and the centerline longitudinal bulkhead for the bulkhead to be considered as an effective support for the considered span and provided section modulus (ABS SBR 5-1-1/7). In this regard, a collar plate is to be provided as shown in the Detail 3-23C (on Page 3) of the drawing.

Customer Reply

Per clients request the CL long'l BHD deck and bottom cutouts have been removed. Please see revision 3 of 888-B311-01 Longitudinal Structure, submitted 11/21/2023.

ABS Reply ABS Has received updated drawing showing that cutouts have been removed. comment closed.

S-016 888-B307-01 - Shell Plating TBD [Closed]

Technical

ABS

Comment

We note your request for a Statement of Compliance review of the structural drawings in accordance with applicable requirements for the Ice

Class C0. Bow arrangement does not include deep or intercostal stringers as required by ABS MVR 6-1-5/13.9. Please revise.

275 Slater Street, Suite 1003 | Ottawa (ON), K1P 5H9 | Canada

Customer Reply

Section of rules sited is applicable to Transversely Framed vessels. As our vessel is longitudinally framed we have complied with rules as specified in

ABS MVR 6-1-5/15 for Longitudinally Framed vessels. Section 15 does not require deep or intercostal stringers.

ABS Reply Comment remains open pending submission and review of revised drawing for the bow area as per email communication.

ABS Reply Updated bow arrangement has been received. Comment closed