888-B301-01r3 Midship Section.pdf

PDF 630 KB Posted

Attached to
CELRE Three Deck Barges Federal contract opportunity
Solicitation number
W912BU-24-B-0019
Issued by
Department of the Army Corps of Engineers Engineering District Philadeplhia

About this file

This document appears to be an Approval in Principle Statement of Compliance Review for an Ice Class C0 vessel. It references an ABS Ottawa letter dated 19-DEC-2023 related to compliance.

The related federal contract opportunity is for the procurement of three (3) welded steel barges to support the civil works maintenance and repair mission of the USACE Detroit District. The barges have specific principal dimensions, with a length of 150'-0", beam of 38'-0", and depth of 10'-4" at centerline and 10'-0" at side. The contractor will be required to fabricate and deliver the barges to the government locations in Sault Sainte Marie, MI and Duluth, MN. Liquidated damages, bid guarantee, payment, and performance bonds will apply. Contractors must be registered in SAM and submit VETS employment reports. Questions on the solicitation should be submitted by 21 June 2024. The contracting agency is the U.S. Army Corps of Engineers, Philadelphia District.

View the file

Other files for this federal contract opportunity

Other files attached to CELRE Three Deck Barges, newest first.
File Type Posted
ABS Letter T2455022.pdf PDF
ABS Letter T2483253.pdf PDF
ABS Letter T2483246.pdf PDF
888-B415-01r2 Hatches and Manholes.pdf PDF
888-B301-02r3 Welding Schedule.pdf PDF
888-B215-01r4 General Arrangement.pdf PDF
888-B170-02r1 Dry Docking Calculations (1).pdf PDF
888-B105-01r3 Hull Lines and Offset-Manually.pdf PDF
W912BU-24-B-0019 0001.pdf PDF
ABS Letter T2483259.pdf PDF
ABS Letter T2483255.pdf PDF
888-B150-01r2 Damage Stability.pdf PDF
888-B125-01r1 Hydrostatic Calculations.pdf PDF
888-B307-01r3 Shell Plating.pdf PDF
888-B410-01r2 Tow Knees.pdf PDF
ABS Letter T2455550.pdf PDF
ABS Letter T2483257.pdf PDF
ABS Letter T2455555.pdf PDF
ABS Letter T2481041.pdf PDF
888-B305-01r3 Deck and Bottom Plating.pdf PDF
888-B445-01r1 Lifesaving and Safety Plan.pdf PDF
888-B309-01r3 Transverse Structure.pdf PDF
888-B155-01r2 Intact Stability.pdf PDF
888-B115-01r1 Weight Estimate.pdf PDF
888-B311-01r3 Longitudinal Structure.pdf PDF
888-B427-01r2 Vertical Ladder Details.pdf PDF
888-B420-01r2 Deck Fitting Arrangement.pdf PDF
888-B335-01r3 Permanent Cargo Bin.pdf PDF
888-B160-01r1 Displacement and Deadweight Scales (PE).pdf PDF
888-B460-01r1 Hull Markings.pdf PDF
ABS Letter T2483249.pdf PDF
ABS Letter T2455523.pdf PDF
888-B410-02r2 Rub Rails and Fenders.pdf PDF
888-B170-01r1 Dry Docking Plan.pdf PDF
888-B335-02r3 Removable Cargo Bin.pdf PDF
888-B205-01r4 Outboard Profile.pdf PDF
888-B405-02r1 Cathodic Protection Calculations (1).pdf PDF
888-B140-01r0 Load Line Calculation.pdf PDF
888-B405-01r2 Cathodic Protection.pdf PDF
W912BU-24-B-0019.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Approval in Principle

Statement of Compliance Review Ice Class C0

See A

BS O

tta w a L ette r R ef T

2483246 D ate d 1 9-D

EC

-2

See A

BS O

tta w a L ette r R ef T

2483246 D ate d 1 9-D

EC

See A

BS O

tta w a L ette r R ef T

2483246 D ate d 1 9-D

EC

File details come from the government source that posted it. Updated .