ABS Letter T2455022.pdf

PDF 57 KB Posted

Attached to
CELRE Three Deck Barges Federal contract opportunity
Solicitation number
W912BU-24-B-0019
Issued by
Department of the Army Corps of Engineers Engineering District Philadeplhia

About this file

This document is a letter from ABS Global Engineering reviewing the submitted drawings and calculations for a 150'x38'x10' deck barge (Task T2455022 and T2455024) for the CELRE contract. The letter indicates that ABS has reviewed the submitted documents, which include intact and damage stability calculations, weight estimate, and hydrostatic calculations, in accordance with the applicable ABS Rules and federal regulations. However, the review is preliminary, and a stability test is required upon completion of the vessel to establish final lightship values. The letter also notes that ABS is not responsible for the operation of the vessel, and it is the owner's responsibility to provide training, supervision, and guidance.

The related federal contract opportunity is for the procurement of three (3) 150'x38'x10' welded steel barges to support the civil works maintenance and repair mission of the Detroit District of the U.S. Army Corps of Engineers. The contract will require the successful bidder to fabricate and deliver the barges to the U.S. Army Engineer Detroit District in Sault Sainte Marie, MI and Duluth, MN. Bid guarantee, payment, and performance bonding will be required, and there will be liquidated damages associated with this procurement.

View the file

Other files for this federal contract opportunity

Other files attached to CELRE Three Deck Barges, newest first.
File Type Posted
ABS Letter T2483253.pdf PDF
ABS Letter T2483246.pdf PDF
888-B415-01r2 Hatches and Manholes.pdf PDF
888-B301-02r3 Welding Schedule.pdf PDF
888-B215-01r4 General Arrangement.pdf PDF
888-B170-02r1 Dry Docking Calculations (1).pdf PDF
888-B105-01r3 Hull Lines and Offset-Manually.pdf PDF
ABS Letter T2483249.pdf PDF
ABS Letter T2455523.pdf PDF
888-B410-02r2 Rub Rails and Fenders.pdf PDF
888-B170-01r1 Dry Docking Plan.pdf PDF
888-B335-02r3 Removable Cargo Bin.pdf PDF
888-B205-01r4 Outboard Profile.pdf PDF
888-B405-02r1 Cathodic Protection Calculations (1).pdf PDF
888-B140-01r0 Load Line Calculation.pdf PDF
888-B405-01r2 Cathodic Protection.pdf PDF
ABS Letter T2455550.pdf PDF
ABS Letter T2483257.pdf PDF
ABS Letter T2455555.pdf PDF
ABS Letter T2481041.pdf PDF
888-B305-01r3 Deck and Bottom Plating.pdf PDF
888-B445-01r1 Lifesaving and Safety Plan.pdf PDF
888-B309-01r3 Transverse Structure.pdf PDF
888-B155-01r2 Intact Stability.pdf PDF
888-B115-01r1 Weight Estimate.pdf PDF
888-B311-01r3 Longitudinal Structure.pdf PDF
888-B427-01r2 Vertical Ladder Details.pdf PDF
888-B420-01r2 Deck Fitting Arrangement.pdf PDF
888-B335-01r3 Permanent Cargo Bin.pdf PDF
888-B160-01r1 Displacement and Deadweight Scales (PE).pdf PDF
888-B460-01r1 Hull Markings.pdf PDF
W912BU-24-B-0019 0001.pdf PDF
ABS Letter T2483259.pdf PDF
ABS Letter T2483255.pdf PDF
888-B150-01r2 Damage Stability.pdf PDF
888-B301-01r3 Midship Section.pdf PDF
888-B125-01r1 Hydrostatic Calculations.pdf PDF
888-B307-01r3 Shell Plating.pdf PDF
888-B410-01r2 Tow Knees.pdf PDF
W912BU-24-B-0019.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABS Global Engineering 1701 City Plaza Drive | Spring, TX 77389 USA

Task – T2455022 and T2455024 CELRE 150'x38'x10' Deck Barge Flag: United States of America

Attention: Mr. Harrison Brann, The Shearer Group, Inc. (WCN: 442598)

The documents shown in the attached list have been reviewed in accordance with the applicable requirements of the following:

ABS Rules for Building and Classing Steel Barges, 2023

46 CFR Subchapter S (170.170, 174.015) USACE Modified Single Compartment Damage Requirements 46 CFR Part 45 – 1973 Great Lakes Load Lines

Please note our review is based on the following conditions:

1. Our review is preliminary and the submitted calculations were based on estimated lightship values. Upon completion of the vessel, a stability test shall be performed to establish the final lightship values.

2. The review was performed as an approval in principle for the submitted data only and should not be misconstrued as being performed on behalf of the administration.

3. ABS is not responsible for the operation of the vessel. It is the Owner’s responsibility to provide training, supervision, and guidance to ensure that the vessel is operated within the limits of Classifications and applicable Regulations.

For any clarifications, contact Mr. Alex Taber at +1-281-877-6479 or (ataber@eagle.org).

Very truly yours, Leile Froufe Vice President of Engineering

Electronically Signed by: Carly McCormick

Documents List

Drawing No. Rev. No. Title Status

888-B155-01 2 Intact Stability Calculations Reviewed

888-B150-01 2 Damage Stability Calculations

Reviewed

888-B115-01 1 Weight Estimate Reviewed

888-B125-01 1 Hydrostatic Calculations Reviewed

Electronic copies of the documents, appropriately stamped, are available in the ABS Client Portal.

Electronically published by ABS Houston.

Reference T2455024, dated 13-OCT-2023.

File details come from the government source that posted it. Updated .