W912BU-24-B-0019.pdf

PDF 1 MB Posted

Attached to
CELRE Three Deck Barges Federal contract opportunity
Solicitation number
W912BU-24-B-0019
Issued by
Department of the Army Corps of Engineers Engineering District Philadeplhia

About this file

This document is a solicitation for an Invitation for Bid (IFB) issued by the U.S. Army Corps of Engineers (USACE) Marine Design Center to procure three new steel deck cargo barges. The principal dimensions of each barge are 150 feet long, 38 feet wide, and 10 feet, 4 inches deep. One barge will have permanent cargo bin walls, while the other two will have removable cargo bin walls. The barges will primarily support the Detroit District's civil works maintenance and repair mission in the Great Lakes region. The contractor will be responsible for the final engineering, fabrication, testing, and delivery of the barges. The barges are to be delivered to the Sault Sainte Marie, Michigan and Duluth, Minnesota locations. Bids are due by July 10, 2024 at 1:00 PM. The solicitation includes specific requirements for ABS classification, load line certification, stability analysis, and testing and inspection.

View the file

Other files for this federal contract opportunity

Other files attached to CELRE Three Deck Barges, newest first.
File Type Posted
ABS Letter T2455022.pdf PDF
ABS Letter T2483253.pdf PDF
ABS Letter T2483246.pdf PDF
888-B415-01r2 Hatches and Manholes.pdf PDF
888-B301-02r3 Welding Schedule.pdf PDF
888-B215-01r4 General Arrangement.pdf PDF
888-B170-02r1 Dry Docking Calculations (1).pdf PDF
888-B105-01r3 Hull Lines and Offset-Manually.pdf PDF
ABS Letter T2455550.pdf PDF
ABS Letter T2483257.pdf PDF
ABS Letter T2455555.pdf PDF
ABS Letter T2481041.pdf PDF
888-B305-01r3 Deck and Bottom Plating.pdf PDF
888-B445-01r1 Lifesaving and Safety Plan.pdf PDF
888-B309-01r3 Transverse Structure.pdf PDF
888-B155-01r2 Intact Stability.pdf PDF
888-B115-01r1 Weight Estimate.pdf PDF
888-B311-01r3 Longitudinal Structure.pdf PDF
888-B427-01r2 Vertical Ladder Details.pdf PDF
888-B420-01r2 Deck Fitting Arrangement.pdf PDF
888-B335-01r3 Permanent Cargo Bin.pdf PDF
888-B160-01r1 Displacement and Deadweight Scales (PE).pdf PDF
888-B460-01r1 Hull Markings.pdf PDF
W912BU-24-B-0019 0001.pdf PDF
ABS Letter T2483259.pdf PDF
ABS Letter T2483255.pdf PDF
888-B150-01r2 Damage Stability.pdf PDF
888-B301-01r3 Midship Section.pdf PDF
888-B125-01r1 Hydrostatic Calculations.pdf PDF
888-B307-01r3 Shell Plating.pdf PDF
888-B410-01r2 Tow Knees.pdf PDF
ABS Letter T2483249.pdf PDF
ABS Letter T2455523.pdf PDF
888-B410-02r2 Rub Rails and Fenders.pdf PDF
888-B170-01r1 Dry Docking Plan.pdf PDF
888-B335-02r3 Removable Cargo Bin.pdf PDF
888-B205-01r4 Outboard Profile.pdf PDF
888-B405-02r1 Cathodic Protection Calculations (1).pdf PDF
888-B140-01r0 Load Line Calculation.pdf PDF
888-B405-01r2 Cathodic Protection.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912BU24B0019 10-Jun-2024

b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME

01:00 PM 10 Jul 2024

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912BU9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

AMANDA BELLNIER

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W25PHS 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

MDC-DESIGN BR

WALTER CZOP

MARINE DESIGN CENTER 1650 ARCH STREET 5TH FLO

PHILADELPHIA PA 19103-2004

TEL: 215-656-6850 FAX:

US ARMY ENGINEER DISTRICT, PHILADELPHIA POC:

AMANDA BELLNIER, CONTRACTING DIVISION

1650 ARCH TREET, 4TH FLOOR

PHILADELPHIA PA 19103-2004

TEL:

FAX:

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,300

NAICS:

336611

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF86

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912BU24B0019

Section SF 1449 - CONTINUATION SHEET

SECTION B

Section B – Supplies or Services and Prices

Design, construct, test, and deliver three (3) new steel deck cargo barges for the Corps of Engineers, Detroit District for use in support of its various missions in accordance with the attached specifications.

ITEM

NUMBER ITEM QTY UNIT

UNIT

PRICE

TOTAL

PRICE

CLIN

0001 CELRE DECK CARGO BARGE #1

0001AA PLANNING & SCHEDULING 1 JOB XXXX $_______

0001AB ENGINEERING 1 JOB XXXX $_______

0001AC CONSTRUCT & TEST 1 JOB XXXX $_______

0001AD DELIVERY - OPTION 1 JOB XXXX $_______

TOTAL BASE BID (ITEMS 0001AA, 0001AB & 0001AC) 1 JOB XXXX $_______

TOTAL BASE BID WITH ALL OPTIONS (ITEMS 0001AA –

0001AD)

1 JOB XXXX $_______

CLIN

0002 CELRE DECK CARGO BARGE #2

0002AA PLANNING & SCHEDULING 1 JOB XXXX $_______

0002AB ENGINEERING 1 JOB XXXX $_______

0002AC CONSTRUCT & TEST 1 JOB XXXX $_______

0002AD DELIVERY - OPTION 1 JOB XXXX $_______

TOTAL BASE BID (ITEMS 0002AA, 0002AB & 0002AC) 1 JOB XXXX $_______

TOTAL BASE BID WITH ALL OPTIONS (ITEMS 0002AA –

0002AD)

1 JOB XXXX $_______

CLIN

0003 CELRE DECK CARGO BARGE #3

0003AA PLANNING & SCHEDULING 1 JOB XXXX $_______

0003AB ENGINEERING 1 JOB XXXX $_______

0003AC

CONSTRUCT & TEST

JOB

XXXX

0003AD

DELIVERY - OPTION

JOB

XXXX

TOTAL BASE BID (ITEMS 0003AA, 0003AB & 0003AC) 1 JOB XXXX $_______

TOTAL BASE BID WITH ALL OPTIONS (ITEMS 0003AA –

0003AD)

1 JOB XXXX $_______

TOTAL BASE BID WITH ALL OPTIONS (CLINS 0001 - 0003) 1 JOB XXXX $_______

The submittals required for each of the Item Numbers listed above are identified in Contract Clause H02. Each Item Number listed above is initiated only by a Notice To Proceed (NTP) issued by the Contracting Officer or the Phase Start Notification by the Contracting Officer’s Representative. See Contract Clause H01 for additional details concerning Contract Organization.

INSERT LOCATION OF THE FACILITY WHERE THE WORK WILL BE PERFORMED:

The Government may reject an offer as non-responsive if it is materially and mathematically unbalanced as to price for any offered item or combination of offered items. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.

SECTION C

PART – I – THE SCHEDULE - SECTION C

DESCRIPTION/SPECIFICATION/WORK STATEMENT

C000 GENERAL

C001 PROJECT OVERVIEW

A. SCOPE

The Marine Design Center (MDC) of the U.S. Army Corps of Engineers (USACE) has issued this Invitation for Bid (IFB) to acquire three new, nearly identical, steel deck cargo barges. The vessel’s primary mission will be to support the Detroit District’s areas of responsibility with transportation of materials, equipment, and lock gates/components to support the routine maintenance and construction activities for the navigable channels, navigation locks, and breakwaters within the Great Lakes Region. Two of the barges shall have removable cargo bin walls installed on main deck, while the third barge shall have permanent cargo bin walls installed on the main deck.

B. PRINCIPAL CHARACTERISTICS

The principal dimensions of each barge shall be as follows:

Length (Molded) 150'- 0" Beam (Molded) 38'- 0"

Depth (Molded at Centerline) 10’-4” Design Deck Loading o Structure/Plating 3,000 PSF o Impact Loading 5,000 PSF

Bow Raked Stern Square Sheer Forward 15 feet Camber 4” sloped from centerline to side.

C002 SCOPE OF WORK

For this contract, the Government has developed a contract design of the barges that have been reviewed by the American Bureau of Shipping (ABS). Those drawings are provided as part of the solicitation. The contractor shall include all costs to provide and deliver the following:

Coordinate with ABS to incorporate the ABS review comments for the drawings and update the drawings.

Using the revised drawings, contractor shall develop his drawings for the production and fabrication of the barges.

Complete the design of the rotating deck winch foundations per contract Clause C456.

Fabricate the three barges in accordance with the drawings and specifications of this contract.

Test all barge related equipment.

Obtain ABS Class and Great Lakes Load Line for the barges as stated in contract Clause C004.

Deliver the completed barges to the designated locations:

o Two of the barges shall be delivered to the St. Mary’s Falls Canal (Soo Locks, St. Mary’s River), Sault Sainte Marie, Michigan.

o One of the barges shall be delivered to Duluth, Minnesota to the Duluth Project Office.

Final acceptance will be issued after inspection of each barge at the designated delivery points for each barge.

C003 DESIGN STANDARDS

Each barge was designed and shall be constructed in accordance with the contract drawings, and the latest edition and interpretations of the rules, regulations, requirements and standards of the Legislation, Regulatory Agencies and technical organizations listed below. The contractor is required to incorporate into the barges any revisions to the rules and regulations listed below as well as those stipulated in the respective specification clauses.

American Bureau of Shipping (ABS) “Rules for Building and Classing Steel Barges”

American Bureau of Shipping (ABS) “Rules for Building and Class Vessels, Part 6, Specialized Items and Systems, Strengthening for Navigation in Ice, Requirements for Vessels Intended for Navigation in First Year Ice”

American Bureau of Shipping (ABS) “Rules for Survey After Construction - Part 7, Appendix 1, Section 1, Underwater Inspections in Lieu of Drydocking Surveys.”

46 CFR Subchapter E – Part 45 – Great Lakes Load Lines

International Association of Classification Societies (IACS) Guide No. 47 “Shipbuilding and Repair Quality Standard”

U.S. Army Corps of Engineers, Publication No. EM 385-1-1, “Safety and Health Requirements Manual.”

46 CFR Subchapter E, Part 47, Subpart F – International and Great Lakes Service; Stability Limited Deck

Cargo Barges

American Welding Society (AWS) “Guide for Steel Hull Welding”, AWS D3.5

46 CFR, Subchapter G, Part 67 – Documentation of Vessels

46 CFR Subchapter S – Part 170, Subpart E – Weather Criterion

46 CFR Subchapter S – Part 174, Subpart B – Special Rules Pertaining to Deck Cargo Barges

U.S. Coast Guard, Navigation Rules and Regulations - Inland

American Society for Testing and Materials (ASTM) – F1166 - Standard Practice for Human Engineering Design for Marine Systems, Equipment, and Facilities

The National Shipbuilding Research Program (NSRP 0490), January 1998, “Industrial Standards for Hull

Structural Penetration Design Criteria and Details.”

C004 CLASSIFICATION & CERTIFICATION

A. U.S. COAST GUARD (USCG)

The contractor shall also be responsible for obtaining a U.S. Coast Guard Load Line Assignment for Great Lakes Service.

The USCG can authorize ABS review and inspections on their behalf through NVIC 10-82; the contractor shall submit an Application for Inspection and a letter requesting ABS review to USCG OCMI Sault Ste. Marie District.

The contractor shall be responsible for delivering the barges with a USCG Builder’s Certification and First Transfer Title and a USCG Certificate of Documentation (COD).

The Government shall be provided a copy of all correspondences between the contractor and the USCG.

B. ABS CLASSIFICATION

The contractor shall be responsible obtaining necessary regulatory body reviews and approvals, obtaining necessary inspections and surveys during construction and for the certification and classing of the vessel as follows:

ABS classification for Maltese Cross A-1, Steel Barge, Great Lakes Service, Great Lakes Load Line

Underwater Inspections in Lieu of Drydocking (UWILD) notation in accordance with ABS General Rules for Classification, Materials and Welding and Survey After Construction Part 7, Appendix 1, Section 1

ABS Statement of Facts:

1. The vessel ice belt extent and design pressures meet the requirements for ABS Ice Class C0. Note: the barges shall be constructed utilizing ABS Grade A steel with no considerations for service temperature, except as indicated in the contract drawings.

2. The deck structure is adequate for the design uniform deck loading of 3,000 PSF.

3. The barge intact stability satisfies 46 CFR 170.170 and 46 CFR 174.015 in all loading conditions.

4. The barge damage stability satisfies the USACE one compartment standard.

All expenses associated with the acquisition of the required reviews, inspections, construction support, classing and certification shall be borne by the contractor.

The recommended ABS point of contact is Mr. Rich Delpizzo, who can be reached by phone, email, or mail, at: (703) 519-9233, RDelpizzo@eagle.org, or 80 M Street SE, Suite 480, Washington, DC 20003.

The contractor shall contract for and be directly responsible for obtaining necessary inspections, surveys, testing, vessel, and material certificates, during construction, as required by ABS for the barges’ certification and classification as stated above. All costs for construction related support by ABS shall be to the contractor’s account.

The contractor shall be financially responsible for any additional ABS review costs incurred due to contractor request for deviation from approved drawings, where the Government allows the deviation.

If the contractor intends to launch, test, operate or tow the barges “out of class”, the contractor must specifically advise ABS of such intent and incorporate any and all modifications required by that agency for such operation at no additional cost to the Government and at no additional contract time. Any such modifications which, in the opinion of the COR, affects the arrangements, operability, or suitability of the barges shall be removed from the barges by the contractor at no additional cost or time and the barges returned to new condition prior to Final Acceptance.

C. ABS ONSITE INSPECTION

When steel construction commences, the contractor shall coordinate with ABS to ensure the frequency of onsite inspections are not less than once every two weeks. The contractor shall provide a schedule for the ABS Onsite Inspections. The schedule shall include the scheduled inspection date(s), actual inspection date(s), and signature blocks for the ABS Inspector and contractor, and notes for what inspection(s) were conducted. This report shall be kept current and upon request be made available to the COR.

D. VESSEL OWNER & ADDRESS

For the ABS certificates of classification, the owner shall be listed as “U.S. Army Corps of Engineers, Detroit District”.

The owner’s address for record for hull 888 (permanent cargo bin) shall be listed as:

U.S. Army Corps of Engineers Duluth Project Office 600 South Lake Avenue Duluth, MN 55802

PHONE: (218) 788-6413

EMAIL: DANIEL.K.CARLSON@USACE.ARMY.MIL

The owner’s address for record for hulls 889 and 890 (removable cargo bin) shall be listed as:

U.S. Army Corps of Engineers Detroit District St. Mary’s Falls Canal 119 East Water Street Sault Sainte Marie, MI 49783

PHONE: (906) 635-3477

EMAIL: JUSTIN.T.PROULX@USACE.ARMY.MIL

E. ABS ENGINEERING MANAGER ACCESS & DISCLOSURE

The Marine Design Center (CEMDC) will be the “Owner’s Representative” on this project. All correspondence with ABS shall be made available to the COR. In order to facilitate the communication process and reduce the paperwork burden on all parties, the contractor and all sub-contractors shall utilize the ABS Eagle Construct Engineering Manager Portal (02E) for all drawing submittals and correspondence.

The contractor and all sub-contractors shall make the necessary arrangements with ABS to ensure that the Marine Design Center is granted the following Oversight Permissions for this contract:

View project and drawing status View comments View transmittals Download approved drawings and review letters E-Mail notification of approval E-Mail notification of transmittal Status Disclaimer

The Marine Design Center’s ID/WCN number is 615255 and the point of contact with respect to the ABS Coordination/Engineering Manager Portal (02E) is Mr. Tim Keyser, Timothy.J.Keyser@usace.army.mil, phone: (215) 656-6171.

The contractor shall ensure that, as a part of its contract with ABS, the contractor authorizes ABS to disclose to and discuss with the Army Corps of Engineers any Rule or certification criteria issues, design assumptions and their impact on classification and certification, and any other technical considerations on which classification is to be based or which may affect future classification or certification of the vessel.

The contractor shall authorize ABS to provide the Army Corps of Engineers at its request with a copy of all correspondence related to classification, statutory certification, or other compliance verification for which ABS is responsible as it is promulgated and initially distributed. This is to include drawings and other engineering work requiring ABS approval as well as correspondence generated which relates to such approvals, including all such correspondence dealing with vendors.

In addition, the contractor shall copy the Army Corps of Engineers with correspondence regarding classification, statutory certification, and other compliance verification for which ABS is responsible. The contractor shall also authorize ABS to establish and maintain contact with other certification, verification, and compliance agents involved on the vessel being built.

Upon request by the COR, the contractor shall request ABS to furnish the Government with the project comment list.

The list shall include open and closed technical and surveyor comments. The surveyor comments shall not only include comments generated during the drawing review process, but also comments generated by the ABS Surveyor during construction inspections. The comment list shall be sent directly from ABS to the COR via email as a .pdf file.

At the completion of the ABS review process, the contractor shall download all ABS “Eagle Stamped” drawings and provide them on a CD or DVD to the Government in .pdf format.

C005 VESSEL IDENTIFICATION

The vessels to be acquired through this solicitation have been assigned the following names and Marine Design Center hull and project numbers:

MDC Project Number 3383 MDC Hull Numbers 888, 889, 890 Vessel Names TBD

For the purposes of document and drawing preparation, the title “CELRE DECK CARGO BARGES” and the MDC hull numbers 888, 889, and 890 shall be used on all documents and drawings.

Hull 888 shall have permanent cargo bin walls. Hulls 889 and 890 shall have the removable cargo bin walls.

Upon selection of the official name for the vessels by the Government, the contractor shall incorporate the names into all “As-Built” documents and the construction drawings of the required hull markings. The MDC hull numbers shall be used in lieu of an “Official Number”.

C006 SCOPE OF WORK

A. CONTRACTOR’S RESPONSIBILITY

The contract consists of four phases:

Phase I Planning & Scheduling Phase II Engineering Phase III Construct & Test Phase IV Delivery

In accordance with the four phases, the contractor assumes complete responsibility for completing the final engineering, building, and testing each barge to meet the requirements of the contract. Should the contractor determine at any time that he is unable to fulfill those responsibilities, he shall notify the COR immediately of the problem experienced and his proposed manner of correction.

B. CONTRACT INTENT

It is intended that the contractor will be able to bid using the contract drawings provided in the solicitation. The contractor is expected to perform limited design development with the exception of the deck winch foundations (see contract Clause C456).

C. DRAWING CHANGES

The plans and specifications of this contract have been prepared in accordance with the referenced design standards.

All members, plating, and welds have been defined. The contractor shall not deviate from the hull principal characteristics, subdivision and general arrangements, scantlings, and welds as shown on these plans.

Aside from the design effort required to design the deck winch foundation (see contract Clause C456 Deck Winches), it is expected that a contractor could bid and build the barges with only such engineering and additional design effort as is necessary to modify the design to incorporate the required design change and to suit the individual construction and business practices of the shipyard.

Any contractor-driven design changes require advanced notification and approval from CEMDC before additional engineering effort can begin. The contractor is permitted to request modifications to the contract design in order to suit the individual construction and business practices of the shipyard.

D. DRAWINGS PROVIDED & REQUIRED

1. Contract Drawings

The contract drawings are listed in Section J, contract Clause J01, Contract Drawings & Documents. The contract drawings are provided with these specifications for bid and construction purposes.

2. Final Design Drawings Required

Per Section H, contract Clause H12, Engineering and Drawings, contains a list with the minimum drawings/calculations required to be finalized and/or developed by the contractor for the final design.

For clarification purposes, the list in contract Section H12 details the drawings by action groups. The action groups distinguish between separate categories based upon the engineering requirements to be completed by the barge contractor. The following is a description/definition of these categories:

Drawings To Be Finalized: as part of the scope of work for this effort, the contractor shall be required to finalize a certain number of contract drawings to achieve a final design. These drawings have been included as contract drawings. The scope and extent of the necessary finalization has been explained in detail in each respective contract clause. These drawings shall be updated and submitted to the Government and, if required for class, ABS for review and approval.

Drawings To Be Developed: the barge contractor shall also be required to develop a certain number of drawings to achieve a final design to conform to the requirements of this solicitation. These drawings have been identified but do not currently exist. These drawings shall be developed and submitted to the Government and, if required for class, ABS for review and approval.

As-Built Drawings: the barge contractor shall be required to provide a complete “As- Built” record of the vessel. The requirements for the “As-Built” drawings are further defined in contract Clause H14. As stated above, ABS may require some drawings to be submitted for review and approval in order to obtain class. It is the barge contractor’s responsibility to coordinate and contract with ABS for any such reviews.

E. DEVIATIONS FROM THE CONTRACT DESIGN

Should the contractor desire to deviate from this specification and/or the contract drawings, he shall submit his request in writing to the COR. Each proposed deviation requested shall be accompanied with a detailed analysis and comparison of the equipment, material or arrangement specified, and the equipment, material or arrangement proposed, including features, dimensions, performance characteristics, benefit to the Government, and compelling reason(s) why the deviation should be made. The request shall include, but is not limited to:

Desired deviation Reason(s) for the deviation Detailed analysis (as stated above) Impact on schedule Impact on cost Impact on weight, draft, and trim Impact of regulatory review and classification Supporting documentation (i.e., cut sheets, engineering drawings, photos, etc.)

In the absence of compelling reasons for making the deviation, the contractor’s proposal may be denied.

The Government will review the request and render a decision within 21 calendar days of receipt of a complete request for deviation. Requests that do not provide all the information identified above may not be reviewed within 21 calendar days, or may be returned as incomplete, with no review action.

If approved, the contractor shall be responsible for any cascading effects on the design, drawings or scientific reports as determined by the Government. The contractor shall be responsible for integrating the deviation into the design at no increase in contract cost or no extension of contract completion.

No work deviation shall commence without a written approval from the KO.

If a deviation is approved by the COR, it is the sole responsibility of the barge contractor to coordinate with ABS and provide any additional engineering effort to meet the conditions of classifications and this specification.

The barge contractor shall bear all costs associated with any requested and/or approved deviations, including engineering, estimating, administrative and overhead, regulatory review and approval, construction and test and trials.

F. CONTRACT DESIGN PERFORMANCE RISK

The Government assumes the performance risk for the design as shown on the contract drawings and described in this specification. The contract drawings have been developed to the ABS standards and have been reviewed and approved by ABS.

The barge contractor shall provide and install all the systems as they are shown on the contract drawings. All major pieces of equipment have performance characteristics shown on the contract drawings or described in the specifications.

If the barge contractor selects equipment that is not as shown on the contract drawings or described in this specification, he shall be responsible for ensuring the overall system(s) performance is maintained, submitting cut sheets and details to the Government for review and approval, and if necessary, re-engineering of the system(s) and revising of the drawings, and coordinating with ABS for class review and approval. For further details see contract Clause H15.

C010 DEFINITIONS

The following definitions are applicable to phrases and acronyms used throughout this contract:

ABS - American Bureau of Shipping

CELRE – USACE - Detroit District

CEMDC – USACE - Marine Design Center

COR - Contracting Officer’s Representative - A member of the contract management and quality assurance team authorized by the Contracting Officer to perform certain administrative and managerial duties.

KO - Contracting Officer - A person with the authority to enter into, administer and/or terminate contracts and make related determinations and findings.

NTP – Acronym for Notice to Proceed – is issued by a Contracting Officer or COR to commence work on a specific contract line item.

SNAME – Society of Naval Architects and Marine Engineers

QC - Quality Control. Quality Control is a function of the contractor. Quality Assurance (QA) is a function of the Government.

USACE - United States Army Corps of Engineers

USCG – United States Coast Guard

C025 CONTRACTOR QUALITY STANDARDS

A. GENERAL

The contractor shall be responsible for the construction of complete and functioning barges. The contractor shall utilize the contract drawings to meet specification requirements utilizing construction and testing methods to ensure that the completed barges conform to the intended design.

Inspection by the Marine Design Center is for the purpose of verifying the proper function of the contractor’s quality control measures and is not to be used as a substitute for control of quality by the contractor.

Every effort shall be made during production planning to construct the vessel in an efficient sequence minimizing rework and repair. Care shall be taken to assure the latest revisions of the Final Design plans are being used.

B. STRUCTURAL MATERIALS

Unless otherwise specified or noted on the drawings, all structural hull material shall be in accordance with the following specifications:

American Bureau of Shipping (ABS), “Rules for Building and Classing Marine Vessels” and “Rules for Building and Classing Steel Barges”

Welding Materials - ABS “Approved Welding Electrodes, Wire-Flux and Wire Gas Combination”

Bolts, nuts, and screws – ASTM A307-82, Specification for Carbon Steel Externally and Internally Threaded

Standard Fasteners

C. STANDARD PARTS AND MATERIALS

All articles, fittings, equipment, machinery, supplies, and materials used in the construction and outfitting of the vessel shall be new, of the highest grade, free from defects and imperfections, and be the standard product of reputable manufacturers, to the maximum extent practicable. Any material not specified shall be the best of their kind for the purpose intended. All items shall be suitable for steel barge application and meet the latest requirements of standard specifications published by National Agencies. No salvaged materials shall be used in the works. Spare parts and service shall be readily obtainable.

D. WORKMANSHIP

All labor shall be especially skilled for each kind of work and under competent direction.

Where work of one trade joins, passes through, or is on other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damage of previously acceptable construction shall be cause for rejection. All parts of the vessel intended to join or bear upon other parts shall have complete and solid contact and shall fit together without excessive cold work during erection. All faying surfaces shall be painted and be clean and smooth before bolting up. Shims or liners shall not be used for the purpose of overcoming a bad fit.

All frames and longitudinal members, where applicable, shall be provided with limber holes and/or snipes of adequate size to allow water in bilges to flow to the lowest point of each compartment. Limber holes shall also be provided to allow for the passage of air in tanks. Limber holes shall be located at the plate edge.

Ends of outstanding flanges shall be cropped. Lighting holes may be punched, or flame-cut and all edges shall have burrs removed.

All holes for machinery mounting bolts shall be drilled or punched; burning is not acceptable. Holes in members having sharp curvature shall be avoided.

All hull casting shall be machined or ground to bear solidly against the connecting structure.

E. WELDERS

All welding under this contract shall be done only by welders who have successfully passed qualification tests accepted by the American Bureau of Shipping or other regulatory agency acceptable to ABS. The contractor shall bear the expense of conducting these tests and shall certify, by name to the Contracting Officer, welders who have successfully passed the prescribed tests and hold current, valid certifications.

The contractor shall require any welder to repeat these tests when in the opinion of the Contracting Officer’s Representative, the work of the welder indicates a reasonable doubt of his proficiency. In such cases the welder shall be re-certified as above if he successfully passed the retest; otherwise, he shall be disqualified until he has successfully passed the retest.

The listed of certified welders shall be submitted during Phase I of the contract. The list shall include the employee’s name, certification(s), and date(s) of the most recent tests for each certification(s). This list shall be named and numbered 888-C025-01 LIST OF CERTIFIED WELDERS.

The contractor shall maintain records of the individual welder’s certification during the course of the contract. The records are to be available for examination upon request of the Contracting Officer or his representative.

F. WELDING

All welding shall be in accordance with the current rules of the American Bureau of Shipping, except where stated otherwise. All welding equipment used on the work shall be of a modern type subject to close control. The electrodes used throughout the work shall be suitable for use with the parent metal at each weld, and be approved by ABS.

Welding procedures, as to direction, length, numbers and sequence of beads, shall be carefully planned to minimize lock-up stresses. Care shall be exercised to produce smooth even beads, especially on all exposed plating and fittings.

Beads shall be ground where directed by the Contracting Officer or his authorized representative.

The contractor shall employ appropriate welding procedures and grounding connections to preclude the possibility of anodic erosion of the hull after launching.

A detailed description of all welding procedures being employed in the construction shall be available to the Contracting Officer or his authorized representative.

G. INSTALLATION

Materials and equipment shall be installed in accordance with the approved recommendations of the manufacturer, and in compliance with this specification and the contract documents. The installation shall be accomplished by workmen especially skilled for each kind of work and under competent direction.

H. PLATE FAIRNESS

Steel plating shall be installed using proper welding procedures and sequences to insure fair, undistorted plating panels. The use of filler materials to surface unfair areas is not acceptable.

Maximum allowable plating distortion is depicted in the IACS. Guide No. 47. Distortion shall not exceed the amounts in this guide.

I. CONSTRUCTION STANDARDS

All material, machinery and equipment shall be new, of current manufacture and suitable for the marine service intended. Spare parts and service shall be readily obtainable.

All material, unless otherwise specified in these specifications or in the drawings, shall be of commercial quality to

ASTM, ANSI, or SAE specifications.

During construction and before delivery, the contractor shall be responsible for protection of all material, equipment, etc., intended for the vessel.

The overweight tolerance of members shall be within the limits defined by the specifications of the American Society for Testing and Materials.

All materials shall be free of imperfections due to manufacturing processes and from defects which adversely affect appearance or serviceability.

All plating shall be neatly cut, fitted, and welded. All sharp edges or projections which constitute a personnel hazard shall be removed or ground smooth. All notches shall have a radius to prevent stress concentrations.

Where aluminum must be attached to dissimilar metals or between dissimilar alloys of aluminum, fasteners shall be of stainless steel of an approved design with insulation as required to eliminate metal to metal contact.

All galvanizing shall be done after fabrication by the hot dip process, and the zinc shall be not less than 98% pure. In instances where some types of metals cannot be hot dip galvanized, zinc silicate coating may then be substituted.

C100 SCIENTIFIC

All scientific data shall be provided in United States Customary System units of measurement (pounds, long tons, and feet). Data provided in other units will not be evaluated or considered.

C105 HULL GEOMETRY

A. CONTRACT DRAWING

888-B105-01 HULL LINES & OFFSETS

B. GENERAL

The hull geometry for each barge shall be as shown on the contract drawing.

C115 INCLINING & DEADWEIGHT SURVEY

A. CONTRACT DRAWINGS

888-B125-01 HYDROSTATIC CALCULATIONS

888-B160-01 DISPLACEMENT & DEADWEIGHT SCALES

B. DRAWING FOR CONTRACTOR INFORMATIONAL PURPOSES ONLY

888-B115-01 WEIGHT ESTIMATE

C. USE OF WEIGHT ESTIMATE FOR BIDDING

The weight estimate has been developed commensurate with the contract level design and uses margins for the purposes of vessel performance. The Government does not consider the weight estimate to be suitable for detailed bidding purposes. The Government is not responsible for contractor use of the weight estimate in bid preparation.

D. WEIGHT & CENTER OF GRAVITY ESTIMATES & MONITORING

The contractor shall implement a careful independent weight estimating and monitoring program.

During the Engineering Phase (Phase II), the contractor shall prepare a detailed weight estimate for the vessel based on the final equipment selected as well as take-offs of materials. Weights and centers of gravity shall be documented in a spreadsheet type format using a system similar to the MDC Work Breakdown Structure (WBS), which will be provided at contract award. The document shall be numbered 888-C115-01 and titled WEIGHT ESTIMATE.

The detailed weight estimate shall be complete with the longitudinal, transverse, and vertical location of the center of gravity of all items included in the estimate.

The contractor shall update the weight estimate each month with details on the equipment selected and purchased, and outfitting design developments. The weight estimate shall be submitted monthly for Government quality assurance review.

During the Construct and Test Phase (Phase III), the contractor shall continue to update and submit the weight and CG estimate each month. The update shall reflect actual equipment location, actual quantity and location of outfitting items, and any changes to the structural weight.

The Government will review the monthly weight estimate to ensure the anticipated draft, and trim and stability conditions of the barge are satisfactory. If weight growth that adversely impacts the vessel’s trim and stability is found, the Government will contact the contractor to determine the cause and develop a remedial action plan.

E. INCLINING & DEADWEIGHT SURVEY

Upon completion of all work, the contractor shall conduct an inclining experiment on the barge with permanent cargo bins (hull #888). Additionally, the contractor shall also conduct deadweight surveys on the two barges with removable cargo bins (hulls #889 and #890).

The contractor shall conduct an incline experiment on the barge with permanent cargo bins (Hull 888). The inclining test shall be carried out in accordance with ASTM F 1321-21 and Section E, contract Clause E05. The contractor shall be responsible for developing the inclining test procedure/plan, providing all certified inclining weights, pendulum setups, support equipment and personnel, directing the experiment, recording all data, and completing the inclining test report. The inclining experiment shall be conducted by a Registered Professional Engineer in the field of Naval Architecture.

The incline experiment plan shall be numbered 888-C115-02 and titled: INCLINE EXPERIMENT PLAN. For the Government’s review and approval, the plan shall be submitted at least 45 calendar days prior to the scheduled inclining. Following the completion of the inclining experiment, the contractor shall complete the incline test report and determine the lightship displacements, centers of gravity and hydrostatic properties of the barge. The report shall be numbered 888-D115-03 and titled INCLINE EXPERIMENT RESULTS. The report shall be submitted to the Government and ABS for review and approval. For additional requirements on drawing development and submission for review, see Clause H12 of this contract.

The contractor shall perform deadweight surveys for hulls 889 and 890 (the barges with removable cargo bins). The contractor shall develop deadweight survey reports for each of the two barges and submit to the Government and ABS for review and approval. These reports shall be 889-D115-03 REPORT DEADWEIGHT SURVEY and 890-D115-03

DEADWEIGHT SURVEY REPORT.

The Government has developed preliminary hydrostatics and curves of form and preliminary displacement and deadweight scales. Using the results of the inclining experiment, stability analyses, and deadweight surveys, the contractor shall update 888-D125-01 HYDROSTATIC CALCULATIONS. The final submittals shall be reviewed and stamped by a Registered Professional Engineer in the field of Naval Architecture. These documents shall be submitted to the Government and ABS for review and approval.

C140 LOAD LINE CALCULATION

888-B115-01 WEIGHT ESTIMATE

888-B140-01 GREAT LAKES LOAD LINE CALCULATIONS

B. DESCRIPTION OF WORK

The Government has completed preliminary load line calculations based on the contract hull form, and weight and centers of gravity estimate.

Using the results of the inclining experiment, the contractor shall update the contract drawing to be the “As-Built” Load Line Calculation (888-D140-01). The final submittal shall be reviewed and stamped by a Registered Professional Engineer in the field of Naval Architecture

The report shall be submitted to the Government and ABS for review and approval in accordance with the requirements for the Great Lakes Load Line certification prior to delivery. Following approval of the load line assignment, the contractor shall weld the required load line markings on each barge.

C150 DAMAGE STABILITY

888-B150-01 DAMAGE STABILITY CALCULATIONS

B. DESCRIPTION OF WORK

The Government has completed preliminary damage stability calculations based on the contract hull form, and weight and centers of gravity estimate.

Using the results of the inclining experiment, the contractor shall update the contract drawing to be the “As-Built” Damage Stability (888-D150-01). This report shall utilize the criteria contained in the preliminary analysis provided by the Government. The final submittals shall be reviewed and stamped by a Registered Professional Engineer in the field of Naval Architecture. Prior to final acceptance, the updated report shall be submitted to the Government and ABS for review and approval in accordance with ABS rules and the criteria described in this contract clause.

In the analysis, the contractor shall determine the maximum allowable deck cargo while satisfying the damage stability criteria. The maximum allowable deck cargo shall be incorporated into the Displacement & Deadweight Scales (see Clause C115)

In the full load condition (maximum deck cargo), each barge will meet a one compartment damaged stability standard where:

After breaching any one compartment, the deck edge will have at least 3 inches of margin above the waterline.

The definition of compartment permeability will be as contained in 46 CFR, Subchapter S.

The vessel may be damaged from the side or bottom.

The Government understands that the maximum allowable deck cargo/maximum draft to meet the single compartment damage criteria will be less than the assigned Load Line.

C155 INTACT STABILITY

888-B155-01 INTACT STABILITY CALCULATIONS

B. DESCRIPTION OF WORK

The Government has completed preliminary intact stability calculations based on the contract hull form, and weight and centers of gravity estimate.

Using the results of the inclining experiment, the contractor shall update the contract drawing to be the “As-Built” Intact Stability (888-D155-01). This report shall utilize the criteria similar to the preliminary analysis provided by the Government. The final submittals shall be reviewed and stamped by a Registered Professional Engineer in the field of Naval Architecture. The report shall be submitted to the COR and ABS for review and approval in accordance with ABS rules and the criteria described in this section and the contract drawing prior to delivery.

Each barge will meet the intact stability criteria in 46 CFR Subchapter S, part 174, Subpart B – Deck Cargo Barge and 46 CFR Subchapter S, part 170, Subpart E – Intact Stability Criteria.

C160 DISPLACEMENT & DEADWEIGHT SCALES

888-B160-01 DISPLACEMENT & DEADWEIGHT SCALES

B. DESCRIPTION OF WORK

The Government has completed preliminary displacement and deadweight scales based on the contract hull form, and weight and centers of gravity estimate.

Using the results of the inclining experiment, stability analyses, and deadweight surveys, the contractor shall update 888-D160-01 DISPLACEMENT & DEADWEIGHT SCALES for the barge with the permanent cargo bins.

Additionally, the contractor shall develop 889-D160-01 DISPLACEMENT & DEADWEIGHT SCALES and 890- D160-01 DISPLACEMENT & DEADWEIGHT SCALES for each barge with removable cargo bins.

The final submittals shall be reviewed and stamped by a Registered Professional Engineer in the field of Naval Architecture. These documents shall be submitted to the Government and ABS for review and approval in accordance with ABS rules.

C170 DOCKING PLAN

888-B170-01 DRY DOCK PLAN

888-B170-02 DRY DOCKING CALCULATIONS

B. DESCRIPTION OF WORK

The Government has completed preliminary dry docking calculations and a dry dock plan for the barge.

Following the completion and approval of incline results for hull #888, as well as the completion of the deadweight surveys for barges with hull #889 and #890, the contractor shall update the dry docking calculations and dry docking plans to reflect the as-built conditions of each barge. The updated calculations and plans shall be titled:

888-D170-01 DRY DOCK PLAN

888-D170-02 DRY DOCKING CALCULATIONS

889-D170-01 DRY DOCK PLAN

889-D170-02 DRY DOCKING CALCULATIONS

890-D170-01 DRY DOCK PLAN

890-D170-02 DRY DOCKING CALCULATIONS

For additional requirements on drawing development and submission for review, see Clause H12 of this contract.

Each drydock blocking plan shall show the blocking for drydocking the barge. It shall show all major hull structure on the bottom, all transverse and longitudinal bulkheads connected to the bottom shell, anodes, and any other features which could interfere with the setting and shifting of the docking blocks.

Each drydock blocking plan shall include an alternate blocking arrangement to allow for the servicing of all areas of the bottom of the vessels.

The drydock blocking plan shall note the actual weight and centers of gravity for each of the three barges.

The final submittals shall be reviewed and stamped by a Registered Professional Engineer in the field of Naval Architecture. These documents shall be submitted to the Government and ABS for review and approval in accordance with ABS rules.

C185 TEST & TRIALS

Each barge and its component parts shall undergo tests and trials in accordance with Section E, contract Clause E05, Tests, Trials, & Demonstrations.

C200 ARRANGEMENTS

C205 OUTBOARD PROFILE

888-B205-01 OUTBOARD PROFILE

Isometric and Elevation views of the hull shall be as shown on the contract drawing.

C215 GENERAL ARRANGEMENT

888-B215-01 GENERAL ARRANGEMENT

The configuration of the deck arrangement, and the bulkheads and subdivisions within the hull shall be as shown on the contract drawing.

C300 STRUCTURE

The hull steel plate shall be ABS Grade A, with the exception of a portion of the deck plating as identified on the contract drawings, which shall be ABS Grade D steel. The steel structural shapes, stiffeners, and angles shall be ABS Grade A steel or ASTM A36 steel, as shown on the contract drawings.

C305 HULL STRUCTURE

888-B301-01 MIDSHIP SECTION

888-B301-02 WELD SCHEDULE

888-B305-01 DECK & BOTTOM PLATING

888-B307-01 SHELL PLATING

888-B309-01 TRANSVERSE STRUCTURE

888-B311-01 LONGITUDINAL STRUCTURE

B. DESCRIPTION OF WORK

The hull shall be of all welded steel construction and divided into watertight compartments with transverse and longitudinal bulkheads as shown on the contract drawings. The contractor shall construct the hull as shown on the contract drawings. The Government does not require additional review for the hull structural drawings.

The principal hull structure has been developed in accordance with the criteria of contract Clause C003. No structure defined by the contract drawings shall be altered, particularly lightened, in any manner without the approval of the

COR.

The contractor shall obtain Statements of Fact from ABS as a part of this contract as defined in contract Clause C004, Paragraph A and Paragraph B.

All welding and weld sizes shall be in accordance with the contract drawings and the applicable standards of the American Bureau of Shipping. Any area of welding not defined in the contract drawings shall be developed by the barge contractor and approved by ABS as required. All welding shall be performed in accordance with AWS and ABS specifications and procedures.

The shell and main deck plating shall be constructed of longitudinal strakes of lengths consistent with accepted practice for hulls. All seams shall be connected with full penetration welds. Hull plating seams may not fall within 12 inches forward or aft of flat-of-bottom transverse tangent line (bottom rake), nor within 2 inches of a girder or plate stiffener.

Seams shall not be aligned directly over bulkhead plating or over the webs of stiffeners and transverses.

When penetrations are made in watertight bulkheads, shell or deck, the plating shall be restored to watertight condition in accordance with the ABS Rules referenced in contract Clause C003. All such penetrations and deck openings shall be suitably designed and reinforced in accordance with NSRP 0490 (referenced in contract Clause C003).

All structural drawings submitted by the contractor to the COR for approval shall be submitted with supporting calculations.

C335 CARGO BIN WALLS

888-B335-01 PERMANENT CARGO BIN – HULL #888

888-B335-02 REMOVABLE CARGO BIN – HULL #889 & #890

B. DESCRIPTION OF WORK

The contractor shall fabricate and install the cargo bin walls as shown in the contract drawings. One barge shall have permanent bin walls (hull #888) and two barges shall have the removable cargo bin walls (hulls #889 and #890). The barge with permanent cargo bin walls shall have removable wall sections on the forward and aft ends of the bin as shown on the contract drawing. All removable sections shall be fitted with lifting eyes as shown on the contract drawings. The safe working load (SWL) of each lifting eye shall be stenciled in yellow paint on (or near) the lifting eye. The contractor shall obtain the certified weight of each removable section. The weight of each section shall be painted in yellow stenciling on the outside of the section.

The cargo bin walls shall be fabricated with scuppers as shown in the contract drawings. The contractor shall provide all scupper plugs.

The contractor shall fabricate 32 deck socket plugs as shown in the contract drawings for each barge with removable cargo bin walls. The swivel hoist rings (x32) shall be provided with the deck socket plugs for each barge.

After construction and fit-up of the removable cargo bin walls, the contractor shall provide oak timber shims to obtain a snug fit between pipe bollards and deck sockets and to ensure that the collar plates are in contact with the deck plating all around. The contractor shall determine the shim size and quantity. The contractor shall record the number of shims, sizes, and locations required for a snug fit and provide the record to the Government for future use.

C399 STRUCTURAL CALCULATIONS

888-B399-01 PRIMARY ABS SCANTLING CALCULATIONS

888-B399-03 LONGITUDINAL STRENGTH ANALYSIS

B. GENERAL

The Government has developed support…