ABS Letter T2481041.pdf

PDF 70 KB Posted

Attached to
CELRE Three Deck Barges Federal contract opportunity
Solicitation number
W912BU-24-B-0019
Issued by
Department of the Army Corps of Engineers Engineering District Philadeplhia

About this file

This document is an approval letter from ABS Global Engineering regarding a preliminary review of the design and calculations for a 150'x38'x10' deck barge to be constructed for the U.S. Army Corps of Engineers (USACE) Detroit District. The review was performed in accordance with applicable ABS Rules and U.S. regulations. The letter outlines the conditions of the review, noting it is preliminary and that a final stability test will be required upon completion of the vessel. The letter also states that ABS is not responsible for the vessel's operation, which is the owner's responsibility.

The related federal contract opportunity is for the procurement of three (3) of these 150'x38'x10' welded steel deck barges to support the USACE Detroit District's civil works maintenance and repair mission. The Invitation for Bid (IFB) solicitation number is W912BU-24-B-0019. Key details include the requirement for bid guarantee, payment, and performance bonding, as well as the need for contractors to be registered in the System for Award Management (SAM). The solicitation also notes that there will be liquidated damages associated with this procurement, and that requests for information (RFIs) should be submitted by June 21, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to CELRE Three Deck Barges, newest first.
File Type Posted
ABS Letter T2455022.pdf PDF
ABS Letter T2483253.pdf PDF
ABS Letter T2483246.pdf PDF
888-B415-01r2 Hatches and Manholes.pdf PDF
888-B301-02r3 Welding Schedule.pdf PDF
888-B215-01r4 General Arrangement.pdf PDF
888-B170-02r1 Dry Docking Calculations (1).pdf PDF
888-B105-01r3 Hull Lines and Offset-Manually.pdf PDF
ABS Letter T2483249.pdf PDF
ABS Letter T2455523.pdf PDF
888-B410-02r2 Rub Rails and Fenders.pdf PDF
888-B170-01r1 Dry Docking Plan.pdf PDF
888-B335-02r3 Removable Cargo Bin.pdf PDF
888-B205-01r4 Outboard Profile.pdf PDF
888-B405-02r1 Cathodic Protection Calculations (1).pdf PDF
888-B140-01r0 Load Line Calculation.pdf PDF
888-B405-01r2 Cathodic Protection.pdf PDF
ABS Letter T2455550.pdf PDF
ABS Letter T2483257.pdf PDF
ABS Letter T2455555.pdf PDF
888-B305-01r3 Deck and Bottom Plating.pdf PDF
888-B445-01r1 Lifesaving and Safety Plan.pdf PDF
888-B309-01r3 Transverse Structure.pdf PDF
888-B155-01r2 Intact Stability.pdf PDF
888-B115-01r1 Weight Estimate.pdf PDF
888-B311-01r3 Longitudinal Structure.pdf PDF
888-B427-01r2 Vertical Ladder Details.pdf PDF
888-B420-01r2 Deck Fitting Arrangement.pdf PDF
888-B335-01r3 Permanent Cargo Bin.pdf PDF
888-B160-01r1 Displacement and Deadweight Scales (PE).pdf PDF
888-B460-01r1 Hull Markings.pdf PDF
W912BU-24-B-0019 0001.pdf PDF
ABS Letter T2483259.pdf PDF
ABS Letter T2483255.pdf PDF
888-B150-01r2 Damage Stability.pdf PDF
888-B301-01r3 Midship Section.pdf PDF
888-B125-01r1 Hydrostatic Calculations.pdf PDF
888-B307-01r3 Shell Plating.pdf PDF
888-B410-01r2 Tow Knees.pdf PDF
W912BU-24-B-0019.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABS Global Engineering 1701 City Plaza Drive | Spring, TX 77389 USA

Task – T2481041 CELRE 150'x38'x10' Deck Barge Flag: United States of America

Attention: Mr. Harrison Brann, The Shearer Group, Inc. (WCN: 442598)

The documents shown in the attached list have been reviewed in accordance with the applicable requirements of the following:

• ABS Rules for Building and Classing Steel Barges, 2023

• 46 CFR Subchapter S (170.170, 174.015)

• USACE Modified Single Compartment Damage Requirements

• 46 CFR Part 45 – 1973 Great Lakes Load Lines

Please note our review is based on the following conditions:

1. Our review is preliminary and the submitted calculations were based on estimated lightship values. Upon completion of the vessel, a stability test shall be performed to establish the final lightship values.

2. The review was performed as an approval in principle for the submitted data only and should not be misconstrued as being performed on behalf of the administration.

3. ABS is not responsible for the operation of the vessel. It is the Owner’s responsibility to provide training, supervision, and guidance to ensure that the vessel is operated within the limits of Classifications and applicable Regulations.

For any clarifications, contact Mr. Alex Taber at +1-281-877-6479 or (ataber@eagle.org).

Very truly yours, Leile Froufe Vice President of Engineering

Electronically Signed by: Carly McCormick

Documents List

Drawing No. Rev. No. Title Status

888-B105-01 3 Hull Lines and Offsets Filed by ABS for Reference Only

Electronic copies of the documents, appropriately stamped, are available in the ABS Client Portal.

Electronically published by ABS Houston.

Reference T2481041, dated 22-NOV-2023.

mailto:ataber@eagle.org

File details come from the government source that posted it. Updated .