TE-11-9_MAIN DRAIN TEST.pdf
PDF 160 KB Posted
- Attached to
- FACILITIES INVESTMENT SERVICES_REGION 6 FOR THE 63d READINESS DIVISION (RD) US ARMY RESERVES
- Solicitation number
- W9127S21Q0056
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
63rd Readiness Division Fire Protection Systems
Main Drain Test
Report of Annual Testing
ONE REPORT SHALL BE COMPLETED FOR EACH RUN-IN TO THE BUILDING
FACID
Building Number
Date of Inspection
Main Drain Test Location
Size of Test Pipe
Test Results:
Static Pressure before test psi Residual Pressure during full flow psi Static Pressure after test psi Time for supply pressure to return to normal sec
Evaluation:
Y N/A N
Current Test Results Compared to previous results
Comparison between the results is satisfactory
Comments:
Inspector Name
Inspector Signature
Witness Name
Witness Signature
File details come from the government source that posted it. Updated .