TE-11-8_KITCHEN HOOD SYSTEM ANNUAL INSPECTION.pdf

PDF 151 KB Posted

Attached to
FACILITIES INVESTMENT SERVICES_REGION 6 FOR THE 63d READINESS DIVISION (RD) US ARMY RESERVES
Solicitation number
W9127S21Q0056
Issued by

View the file

Other files

File Type Posted
Region 6 Site Visit Minutes.pdf PDF
63d RD_REGION 6_FIS_PWS_Final Rev 2_20211031.pdf PDF
FIS_PWS_Section J_TE-09_Acronyms_and_ Definitions_20211028.pdf PDF
TE-10-4_GSA_FORM_55_07-2002.pdf PDF
Region6_FIS_PWS_Section J_TE-06_Quality Assurance Surveillance Plan_20211031.pdf PDF
TE-10-6_SPILL RESPONSE INCIDENT REPORT FORM.pdf PDF
TE-11-13_WET PIPE FIRE SPRINKLER SYSTEMS.pdf PDF
Region6_FIS_PWS_Section J_TE-01_Facilities Site Index and Maps_20211031.pdf PDF
TE-11-6_FIRE ALARM ANNUAL INSP TESTING REPORT.pdf PDF
DA_Fm5477_MAR2008.pdf PDF
FIS_PWS_Section J_TE-08_HVAC-Refrigeration Temp Standards_20211030.pdf PDF
TE-10-1_Certification of Work.pdf PDF
TE-11-2_DIESEL FIRE PUMP ASSEMBLIES.pdf PDF
TE-10-5_ENG_FORM_3394_2021Aug.pdf PDF
Region 6 Projnet Responses1.pdf PDF
FIS_PWS_Section J_TE-05_Deliverables_20211030.pdf PDF
TE-11-12_PORTABLE FIRE EXTINGUISHER ANNUAL INSPECTION.pdf PDF
TE-11-15_FIRE HYDRANT ANNUAL INSPECTION.pdf.pdf PDF
TE-11-4_ELECTRIC FIRE PUMP ASSEMBLIES.pdf PDF
TE-11-5_EMERGENCY LIGHT ANNUAL INSPECTION.pdf PDF
TE-10-2_Work Request Estimate and Completion Form.pdf PDF
TE-10-3_GSA_FORM_376_11-1967.pdf PDF
Contactor guidance doc_20210922 (002).pdf PDF
TE-11-11_NOTIFICATION AND INITIATING APPLIANCE SUPPLEMENT.pdf PDF
DA_Fm5479_MAR2008.pdf PDF
Region6_FIS_PWS_Section J_TE-03_Detailed Equipment Inventory_20211031.pdf PDF
TE-11-14_WATER STORAGE TANKS.pdf PDF
Amendment_0002_21Q0056.pdf PDF
TE-11-10_MASS NOTIFICATION SYSTEM SUPP RECORD OF INSP AND TEST.pdf PDF
A.07.20_Site_Visit_Attendance_Sheet_21Q0056.pdf PDF
Region 6 Briefing Slides.pdf PDF
Region6_FIS_PWS_Section J_TE-04_Government Points of Contact_20211030.pdf PDF
TE-11-3_DRY PIPE FIRE SPRINKLER SYSTEMS.pdf PDF
FIS_PWS_Sect J_ATCH-05_ELINs_FIS_Region 6_20211031.xlsx XLSX spreadsheet
TE-11-9_MAIN DRAIN TEST.pdf PDF
Region6_FIS_PWS_Section J_TE-02_Summary Equipment Inventory_20211031.pdf PDF
FIS_PWS_Section J_TE-07_2018_GSA_PM Guide_FINAL.pdf PDF
FIS_PWS_Sect J_ATCH-05_ELINs_FIS-ENV_Region 6_20211031.xlsx XLSX spreadsheet
TE-11-1_DELUGE FIRE SPRINKLER SYSTEMS.pdf PDF
TE-11-7_FIRE DEPARTMENT CONNECTIONS.pdf PDF
W9127S21Q0056_AMENDMENT 0001_07-Oct-2021.pdf PDF
2018_GSA_PM_Guide_FINAL.pdf PDF
W9127S21Q0056_AMENDMENT 0001_20211007.pdf PDF
63d RD_REGION 6_FIS_PWS_Final REV 1_20210827.pdf PDF
W9127S21Q0056_R6 FIS Synopsis_Solicitation_20211006.pdf PDF
FIS_PWS_Sect J_ATCH-05_ELINs_FIS_Region 6_20210826.xlsx XLSX spreadsheet
TE-02_Region 6_Summary Equipment Inventory_26 August 2021.xlsx XLSX spreadsheet
63d RD DPW Operations Area Map FY20_20200909.pdf PDF
TE-03_Region 6_Detailed Equipment Inventory_26 August 2021.xlsx XLSX spreadsheet
FIS_PWS_Sect J_ATCH-05_ELINs_FIS-ENV_Region 6_20210826.xlsx XLSX spreadsheet
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

63rd Readiness Division Fire Protection Systems

Kitchen Hood System Annual Inspection

FACID

Building Number

Date of Inspection

System Manufacturer Date Installed

Type of extinguishing agent

Equipment Protected:

(check all that apply)

Complete the remainder of this page once inspection is complete.

IV. Annual Kitchen Hood System Inspection Summary:

Y N

Kitchen Hood System considered acceptable based on inspection and performance tests Form is attached listing the deficiencies and corrections needed

Comments:

Potassium carbonate Potassium acetate

Combination potassium carbonate/potassium acetate

Deep fat fryer(s) Upright broiler(s)

Griddle(s) Grill(s) Range Top Other

63rd Readiness Division Kitchen Hood System Inspection

I. Inspection Tasks:

Wet chemical cylinder Normal pressure: psi Manufacturer’s minimum pressure: psi Normal weight: lbs Manufacturer’s minimum weight: lbs

Y N/A N

Connected to fire alarm system?

Automatic shutdown of cooking equipment?

If yes, is it Gas or Electric?

Nozzle caps are in place.

System components have no obvious physical damage.

Nozzles aim at cooking surfaces they protect.

Manual actuators are not obstructed.

Tamper indicators and seals are intact.

Maintenance tag or certificate is in place.

Pressure gauges are in operable range.

Expellant Gas Cartridge (if applicable) Pressure of nitrogen: psi Weight of carbon dioxide: lbs Fusible Link(s) (if applicable) Number of Fusible Links Temperature of Fusible Link(s) Deg F

II. Maintenance & Testing:

Y N/A N

Actuating Test:

Actuating test conducted Actuating test results satisfactory Cooking equipment shutdown satisfactory Fire Alarm activated Grease Fan continues to activate Fusible Link Replaced Hydrostatic Testing:

Date of Last Hydrostatic Test Last Hydrostatic Test (or installed) within 12 years

III. Completion:

Wet system restored and left in service Date Time

Inspector Name

Inspector Signature

Witness Name

Witness Signature

File details come from the government source that posted it. Updated .