FIS_PWS_Sect J_ATCH-05_ELINs_FIS-ENV_Region 6_20210826.xlsx
XLSX spreadsheet 115 KB Posted
- Attached to
- FACILITIES INVESTMENT SERVICES_REGION 6 FOR THE 63d READINESS DIVISION (RD) US ARMY RESERVES
- Solicitation number
- W9127S21Q0056
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELINS SUMMARY
| ATTACHMENT 05 - FIS ENVIRONMENTAL |
| (ATCH-05) |
| EXHIBIT LINE ITEM NUMBERS |
THIS SHEET POPULATES AUTOMATICALLY AS SHADED CELLS ON SUBSEQUENT SHEETS ARE FILLED OUT
| Environmental Services Summary |
| Service Code: 411 |
| CLIN | CLIN DESCRIPTION | Total |
| 0006 | Base Period Firm Fixed-Price | $ - 0 |
| 0007 | Base Period - Firm Fixed-Price, OPTIONAL | $ - 0 |
| 0008 | Base Period Indefinite Quantity | $ - 0 |
| 1006 | First Option Period Firm Fixed-Price | $ - 0 |
| 1007 | First Option Period Firm Fixed-Price, OPTIONAL | $ - 0 |
| 1008 | First Option Period Indefinite Quantity | $ - 0 |
| 2006 | Second Option Period Firm Fixed-Price | $ - 0 |
| 2007 | Second Option Period Firm Fixed-Price, OPTIONAL | $ - 0 |
| 2008 | Second Option Period Indefinite Quantity | $ - 0 |
$ - 0
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELINS BASE PERIOD FFP
| ATTACHMENT 05 - FIS ENVIRONMENTAL |
| (ATCH-05) |
| EXHIBIT LINE ITEM NUMBERS |
PROVIDE UNIT PRICES IN SHADED CELLS FOR ENVIRONMENTAL SERVICES - FIRM FIXED-PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM A4-3
CLIN 0006 - Base Period - Firm Fixed-Price Work (CLINS 0006AA - 0006AE)
| FACID | SITE NAME | SITE CODE | |||
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| CA001 | Wilkson Hall ARC | 06835 | |||
| Firm Fixed-Price Work | |||||
| 0006AA | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 2 | Each | $ - 0 | $ - 0 |
| CA012 | Marina ARC/OMS/AMSA 12 | 06628 | |||
| Firm Fixed-Price Work | |||||
| 0006AB | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 1 | Each | $ - 0 | $ - 0 |
| CA062 | BT Collins ARC/AMSA 98 (G) | 06767 | |||
| Firm Fixed-Price Work | |||||
| 0006AC | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 1 | Each | $ - 0 | $ - 0 |
| CA150 | Mare Island ARC/AMSA (M) | 06991 | |||
| Firm Fixed-Price Work | |||||
| 0006AD | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 1 | Each | $ - 0 | $ - 0 |
| CA187 | SGT James Wilkowski AFRC | 06287 | |||
| Firm Fixed-Price Work | |||||
| 0006AE | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 1 | Each | $ - 0 | $ - 0 |
Total CLIN 0006 - Base Period - Firm Fixed-Price $ - 0
ELINS BASE PERIOD FFP (OPTNL)
| ATTACHMENT 05 - FIS ENVIRONMENTAL |
| (ATCH-05) |
| EXHIBIT LINE ITEM NUMBERS |
PROVIDE UNIT PRICES IN SHADED CELLS FOR ENVIRONMENTAL SERVICES - FIRM FIXED-PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM A4-3
CLIN 0007 - Base Period - Firm Fixed-Price Work (CLIN 0007AA), OPTIONAL
| FACID | SITE NAME | SITE CODE | |||
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| CA207 | Concord MOTCO ARC | 0696A | |||
| Firm Fixed-Price Work | |||||
| 0007AA | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 1 | Each | $ - 0 | $ - 0 |
Total CLIN 0007 - Base Period - Firm Fixed-Price, OPTIONAL $ - 0
ELINS BASE PERIOD IQ
| ATTACHMENT 05 - FIS ENVIRONMENTAL |
| (ATCH-05) |
| EXHIBIT LINE ITEM NUMBERS |
PROVIDE UNIT PRICE AND EFFICIENCY FACTOR (%) IN SHADED CELLS FOR ENVIRONMENTAL SERVICES INDEFINITE DELIVERY INDEFINITE QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM A4-4
CLIN 0008 - Base Period - Indefinite Quantity Work (ELINs A700 Through A702)
| Unit Priced Tasks (See Section C, Annex 2, Spec Item A2-2.14.1) | ||||||
| ELIN | ACTIVITY | FULL DESCRIPTION | UNIT | |||
| PRICE | UNIT OF | |||||
| ISSUE | EST. QUANTITY | |||||
| A700 | Used Oil Collection and Recycling or Disposal | The Contractor shall collect and dispose of or recycle used oil within 10 calendar days of order. | $ - 0 | Gallon | 10,000 |
| Unit Priced Labor, Materials and Equipment (See Section C, Annex 2) | ||||||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | EFFICIENCY FACTOR (%) | EST. QUANTITY | TOTAL AMOUNT | |
| A701 | Contractor Efficiency for Normal Working Hours (Negotiated) | The offeror's price prior to applying the Contractor Efficiency Factor must contain the Prime Contractor's and any subcontractor's overhead and profit for the items listed in the TOTAL INCL O&P columns from the latest edition of the RSMeans Complete Tier cost data and indirect labor with social security contributions, workers' compensation insurance, federal unemployment insurance, incidental engineering services, estimating, and planning, and all contingencies in connection therewith, since no allowance will be made at a later time for anything other than pre-priced or non-prepriced item unit prices. Ref: Spec Item A2-2.14 and sub-paragraphs. | (The Contractor enters Efficiency Factor in Cell E16) | $90,000.00 | $ - 0 |
A702 Contractor Efficiency for Other Than Normal Working Hours (Negotiated) The offeror's price prior to applying the Contractor Efficiency Factor must contain the Prime Contractor's and any subcontractor's overhead and profit for the items listed in the TOTAL INCL O&P columns from the latest edition of the RSMeans Complete Tier cost data and indirect labor with social security contributions, workers' compensation insurance, federal unemployment insurance, incidental engineering services, estimating, and planning, and all contingencies in connection therewith, since no allowance will be made at a later time for anything other than pre-priced or non-prepriced item unit prices. Ref: Spec Item A2-2.14 and sub-paragraphs. (The Contractor enters Efficiency Factor in Cell E18) $5,000.00 $ - 0
* The offer, once the Contractor Efficiency Factor is applied, shall be "net" (e.g., 100%) or a percentage "decrease from" (e.g., 95%) or "increase to" (e.g., 105%) the unit prices specified in the RSMeans Complete Tier Cost Data, latest edition, using the TOTAL INCL O&P column times the applicable city index and/or other coefficients as defined in RSMeans. See the attached sample sheet for an explanation of how the factor will be applied.
TOTAL IQ LINE ITEMS - ELINs A700 Through A702 $ - 0
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
SECTION J
EXHIBIT A - CLIN 9001
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN B011 through B211 (NOTE: Revise to match ELIN Structure) Line Item 0003 Option Year One - Firm Fixed Price Work ELIN B001 through B211 Line Item 0004 Option Year One- Indefinite Quantity Work ELIN B1001 through B1004
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN B1001 through B1004
ELINS FIRST OPTION FFP
| ATTACHMENT 05 - FIS ENVIRONMENTAL |
| (ATCH-05) |
| EXHIBIT LINE ITEM NUMBERS |
PROVIDE UNIT PRICES IN SHADED CELLS FOR ENVIRONMENTAL SERVICES - FIRM FIXED-PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM A4-3
CLIN 1006 - First Option Period - Firm Fixed-Price Work (CLINS 1006AA - 1006AE)
| FACID | SITE NAME | SITE CODE | |||
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| CA001 | Wilkson Hall ARC | 06835 | |||
| Firm Fixed-Price Work | |||||
| 1006AA | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 2 | Each | $ - 0 | $ - 0 |
| CA012 | Marina ARC/OMS/AMSA 12 | 06628 | |||
| Firm Fixed-Price Work | |||||
| 1006AB | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 1 | Each | $ - 0 | $ - 0 |
| CA062 | BT Collins ARC/AMSA 98 (G) | 06767 | |||
| Firm Fixed-Price Work | |||||
| 1006AC | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 1 | Each | $ - 0 | $ - 0 |
| CA150 | Mare Island ARC/AMSA (M) | 06991 | |||
| Firm Fixed-Price Work | |||||
| 1006AD | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 1 | Each | $ - 0 | $ - 0 |
| CA187 | SGT James Wilkowski AFRC | 06287 | |||
| Firm Fixed-Price Work | |||||
| 1006AE | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 1 | Each | $ - 0 | $ - 0 |
Total CLIN 1006 - Base Period - Firm Fixed-Price $ - 0
ELINS FIRST OPTION FFP (OPTNL)
| ATTACHMENT 05 - FIS ENVIRONMENTAL |
| (ATCH-05) |
| EXHIBIT LINE ITEM NUMBERS |
PROVIDE UNIT PRICES IN SHADED CELLS FOR ENVIRONMENTAL SERVICES - FIRM FIXED-PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM A4-3
CLIN 1007 - First Option Period - Firm Fixed-Price Work (CLIN 1007AA), OPTIONAL
| FACID | SITE NAME | SITE CODE | |||
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| CA207 | Concord MOTCO ARC | 0696A | |||
| Firm Fixed-Price Work | |||||
| 1007AA | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 1 | Each | $ - 0 | $ - 0 |
Total CLIN 0007 - Base Period - Firm Fixed-Price, OPTIONAL $ - 0
ELINS FIRST OPTION IQ
| ATTACHMENT 05 - FIS ENVIRONMENTAL |
| (ATCH-05) |
| EXHIBIT LINE ITEM NUMBERS |
PROVIDE UNIT PRICE AND EFFICIENCY FACTOR (%) IN SHADED CELLS FOR ENVIRONMENTAL SERVICES INDEFINITE DELIVERY INDEFINITE QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM A4-4
CLIN 1008 - First Option Period - Indefinite Quantity Work (ELINs B700 Through B702)
| Unit Priced Tasks (See Section C, Annex 2, Spec Item A2-2.14.1) | ||||||
| ELIN | ACTIVITY | FULL DESCRIPTION | UNIT | |||
| PRICE | UNIT OF | |||||
| ISSUE | EST. QUANTITY | |||||
| B700 | Used Oil Collection and Recycling or Disposal | The Contractor shall collect and dispose of or recycle used oil within 10 calendar days of order. | $ - 0 | Gallon | 10,000 |
| Unit Priced Labor, Materials and Equipment (See Section C, Annex 2) | ||||||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | EFFICIENCY FACTOR (%) | EST. QUANTITY | TOTAL AMOUNT | |
| B701 | Contractor Efficiency for Normal Working Hours (Negotiated) | The offeror's price prior to applying the Contractor Efficiency Factor must contain the Prime Contractor's and any subcontractor's overhead and profit for the items listed in the TOTAL INCL O&P columns from the latest edition of the RSMeans Complete Tier cost data and indirect labor with social security contributions, workers' compensation insurance, federal unemployment insurance, incidental engineering services, estimating, and planning, and all contingencies in connection therewith, since no allowance will be made at a later time for anything other than pre-priced or non-prepriced item unit prices. Ref: Spec Item A2-2.14 and sub-paragraphs. | (The Contractor enters Efficiency Factor in Cell E16) | $90,000.00 | $ - 0 |
B702 Contractor Efficiency for Other Than Normal Working Hours (Negotiated) The offeror's price prior to applying the Contractor Efficiency Factor must contain the Prime Contractor's and any subcontractor's overhead and profit for the items listed in the TOTAL INCL O&P columns from the latest edition of the RSMeans Complete Tier cost data and indirect labor with social security contributions, workers' compensation insurance, federal unemployment insurance, incidental engineering services, estimating, and planning, and all contingencies in connection therewith, since no allowance will be made at a later time for anything other than pre-priced or non-prepriced item unit prices. Ref: Spec Item A2-2.14 and sub-paragraphs. (The Contractor enters Efficiency Factor in Cell E18) $5,000.00 $ - 0
* The offer, once the Contractor Efficiency Factor is applied, shall be "net" (e.g., 100%) or a percentage "decrease from" (e.g., 95%) or "increase to" (e.g., 105%) the unit prices specified in the RSMeans Complete Tier Cost Data, latest edition, using the TOTAL INCL O&P column times the applicable city index and/or other coefficients as defined in RSMeans. See the attached sample sheet for an explanation of how the factor will be applied.
TOTAL IQ LINE ITEMS - ELINs B700 Through B702 $ - 0
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
SECTION J
EXHIBIT A - CLIN 9001
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN B011 through B211 (NOTE: Revise to match ELIN Structure) Line Item 0003 Option Year One - Firm Fixed Price Work ELIN B001 through B211 Line Item 0004 Option Year One- Indefinite Quantity Work ELIN B1001 through B1004
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN B1001 through B1004
ELINS SECOND OPTION FFP
| ATTACHMENT 05 - FIS ENVIRONMENTAL |
| (ATCH-05) |
| EXHIBIT LINE ITEM NUMBERS |
PROVIDE UNIT PRICES IN SHADED CELLS FOR ENVIRONMENTAL SERVICES - FIRM FIXED-PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM A4-3
CLIN 2006 - Second Option Period - Firm Fixed-Price Work (CLINS 2006AA - 2006AE)
| FACID | SITE NAME | SITE CODE | |||
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| CA001 | Wilkson Hall ARC | 06835 | |||
| Firm Fixed-Price Work | |||||
| 2006AA | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 2 | Each | $ - 0 | $ - 0 |
| CA012 | Marina ARC/OMS/AMSA 12 | 06628 | |||
| Firm Fixed-Price Work | |||||
| 2006AB | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 1 | Each | $ - 0 | $ - 0 |
| CA062 | BT Collins ARC/AMSA 98 (G) | 06767 | |||
| Firm Fixed-Price Work | |||||
| 2006AC | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 1 | Each | $ - 0 | $ - 0 |
| CA150 | Mare Island ARC/AMSA (M) | 06991 | |||
| Firm Fixed-Price Work | |||||
| 2006AD | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 1 | Each | $ - 0 | $ - 0 |
| CA187 | SGT James Wilkowski AFRC | 06287 | |||
| Firm Fixed-Price Work | |||||
| 2006AE | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 1 | Each | $ - 0 | $ - 0 |
Total CLIN 2006 - Base Period - Firm Fixed-Price $ - 0
ELINS SECOND OPTION FFP (OPTNL)
| ATTACHMENT 05 - FIS ENVIRONMENTAL |
| (ATCH-05) |
| EXHIBIT LINE ITEM NUMBERS |
PROVIDE UNIT PRICES IN SHADED CELLS FOR ENVIRONMENTAL SERVICES - FIRM FIXED-PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM A4-3
CLIN 2007 - Second Option Period - Firm Fixed-Price Work (CLIN 2007AA), OPTIONAL
| FACID | SITE NAME | SITE CODE | |||
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| CA207 | Concord MOTCO ARC | 0696A | |||
| Firm Fixed-Price Work | |||||
| 2007AA | Cleaning of Oil/Water Separators (Spec Item A4-3.1) | 1 | Each | $ - 0 | $ - 0 |
Total CLIN 0007 - Base Period - Firm Fixed-Price, OPTIONAL $ - 0
ELINS SECOND OPTION IQ
| ATTACHMENT 05 - FIS ENVIRONMENTAL |
| (ATCH-05) |
| EXHIBIT LINE ITEM NUMBERS |
PROVIDE UNIT PRICE AND EFFICIENCY FACTOR (%) IN SHADED CELLS FOR ENVIRONMENTAL SERVICES INDEFINITE DELIVERY INDEFINITE QUANTITY WORK IN ACCORDANCE WITH SECTION C, SPEC ITEM A4-4 ELINS C700 - C702
CLIN 2008 - Second Option Period - Indefinite Quantity Work (ELINs C700 Through C702)
| Unit Priced Tasks (See Section C, Annex 2, Spec Item A2-2.14.1) | ||||||
| ELIN | ACTIVITY | FULL DESCRIPTION | UNIT | |||
| PRICE | UNIT OF | |||||
| ISSUE | EST. QUANTITY | |||||
| C700 | Used Oil Collection and Recycling or Disposal | The Contractor shall collect and dispose of or recycle used oil within 10 calendar days of order. | $ - 0 | Gallon | 10,000 |
| Unit Priced Labor, Materials and Equipment (See Section C, Annex 2) | ||||||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | EFFICIENCY FACTOR (%) | EST. QUANTITY | TOTAL AMOUNT | |
| C701 | Contractor Efficiency for Normal Working Hours (Negotiated) | The offeror's price prior to applying the Contractor Efficiency Factor must contain the Prime Contractor's and any subcontractor's overhead and profit for the items listed in the TOTAL INCL O&P columns from the latest edition of the RSMeans Complete Tier cost data and indirect labor with social security contributions, workers' compensation insurance, federal unemployment insurance, incidental engineering services, estimating, and planning, and all contingencies in connection therewith, since no allowance will be made at a later time for anything other than pre-priced or non-prepriced item unit prices. Ref: Spec Item A2-2.14 and sub-paragraphs. | (The Contractor enters Efficiency Factor in Cell E16) | $90,000.00 | $ - 0 |
C702 Contractor Efficiency for Other Than Normal Working Hours (Negotiated) The offeror's price prior to applying the Contractor Efficiency Factor must contain the Prime Contractor's and any subcontractor's overhead and profit for the items listed in the TOTAL INCL O&P columns from the latest edition of the RSMeans Complete Tier cost data and indirect labor with social security contributions, workers' compensation insurance, federal unemployment insurance, incidental engineering services, estimating, and planning, and all contingencies in connection therewith, since no allowance will be made at a later time for anything other than pre-priced or non-prepriced item unit prices. Ref: Spec Item A2-2.14 and sub-paragraphs. (The Contractor enters Efficiency Factor in Cell E18) $5,000.00 $ - 0
* The offer, once the Contractor Efficiency Factor is applied, shall be "net" (e.g., 100%) or a percentage "decrease from" (e.g., 95%) or "increase to" (e.g., 105%) the unit prices specified in the RSMeans Complete Tier Cost Data, latest edition, using the TOTAL INCL O&P column times the applicable city index and/or other coefficients as defined in RSMeans. See the attached sample sheet for an explanation of how the factor will be applied.
TOTAL IQ LINE ITEMS - ELINs C700 Through C702 $ - 0
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
SECTION J
EXHIBIT A - CLIN 9001
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN B011 through B211 (NOTE: Revise to match ELIN Structure) Line Item 0003 Option Year One - Firm Fixed Price Work ELIN B001 through B211 Line Item 0004 Option Year One- Indefinite Quantity Work ELIN B1001 through B1004
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN B1001 through B1004
Sample Calculations
| ATTACHMENT 05 - FIS ENVIRONMENTAL |
| (ATCH-05) |
| SAMPLE CALCULATIONS |
CALCULATION GUIDANCE - FULLY SUPPORTED BY RSMEANS
| TYPE: | SERVICE CALL IDIQ {Fully supported by RSMeans} | |
| Date Prepared: | ||
| IDIQ PROJECT TITLE: | REPLACE 3 ENTRANCE DOORS ON QUARTERS A, B and C |
| LOCATION - SITE: | CA002: BELL, SC | |||||
| TOTAL | CONTRACTOR'S | |||||
| MEANS | QUANTITY | TOTAL | CITY | EFFICIENCY | CONTRACT | |
| LINE # | DESCRIPTION | OF UNITS | INCL O&P | INDEX | FACTOR | COST |
| 82009301020 | ENTRANCE DOOR, COLONIAL, | 3 | $ 500.00 | 0.824 | 110% | $ 1,359.60 |
| 1 3/4" X 6'-8", 6 PANEL, 3'-0" WIDE |
(This is a very simple sample calculation to ensure the prospective offerors understand where each number comes from.)
| MEANS LINE # is the distinctive 12 digit # in the Means Book in the extreme left column. |
| DESCRIPTION is just that - a description of the item being proposed with sufficient detail to trace in RSMeans. |
| QUANTITY OF UNITS is the estimated quantity to complete the project. |
| TOTAL INCL O&P column is the far right column from the Means Estimating Book. |
| TOTAL CITY INDEX is the City Cost Index from the back of the Means Estimating Book using the last column. |
| CONTRACTOR'S EFFICIENCY FACTOR (REGULAR TIME) is the contractor's proposed efficiency compared to RSMeans. |
| CONTRACT COST is (QUANTITY OF UNITS) times (TOTAL INCL O&P) times (TOTAL CITY INDEX) times (EFFICIENCY FACTOR) |
IDIQ CALCULATION GUIDANCE
This is for IDIQs that cannot be fully supported by RSMeans or exceed $150,000.
FOR WORK NOT FULLY COVERED BY RS MEANS (I.E., NON-PRE-PRICED ITEMS), SEE ANNEX 2, SPEC ITEM 2.14.1.1.2
Note: Contractor's Efficiency Factor as bid for Service Calls & IDIQ work is always applied to TOTAL INCL O&P for RSMeans costs. For an IDIQ that is not fully supported by RSMeans, the Efficiency Factor is applied to both the RSMeans component and the non-RSMeans based costs.
File details come from the government source that posted it. Updated .