TE-11-15_FIRE HYDRANT ANNUAL INSPECTION.pdf.pdf
PDF 137 KB Posted
- Attached to
- FACILITIES INVESTMENT SERVICES_REGION 6 FOR THE 63d READINESS DIVISION (RD) US ARMY RESERVES
- Solicitation number
- W9127S21Q0056
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
63rd Readiness Division Fire Protection Systems
Fire Hydrant Annual Inspection
FACID
Hydrant Location
Date of Inspection
1. Are the hydrants accessible?
2. Does the hydrant appear to be in good condition?
3. Is the hydrant free of cracks or other damage?
4. Are the barrels dry and free of water or ice?
5. Are the barrels of the hydrant draining properly?
6. Do the outlet caps seal when the caps are tightened?
7. Do the gaskets & O-rings appear to be in good condition?
8. Are the nozzle connection threads in good condition and not worn?
9. Are the hydrants operating nuts in good condition and not damaged or worn?
10. Are there operating wrenches readily accessible?
11. Do the fire hydrant threads match the local fire department threads?
12. Do the threads appear to be in good condition?
13. Have the fire hydrants been opened fully and flowed for at least one minute until all foreign material has cleared?
Residual psi 14. Static psi_
15. Make, Model # & Year
16. Number of turns to open __________________
17. Has the hydrant been lubricated?
18. If applicable, is the oil resovoir full?
Comments:
Yes No N/A
Yes No N/A
Yes No N/A
Yes No N/A
Yes No N/A
Yes No N/A
Yes No N/A
Yes No N/A
Yes No N/A
Yes No N/A
Yes No N/A
Yes No N/A
Yes No N/A
Yes No N/A
Yes No N/A
Inspector Name
Inspector Signature
Witness Name
Witness Signature
File details come from the government source that posted it. Updated .