63d RD_REGION 6_FIS_PWS_Final REV 1_20210827.pdf

PDF 12 MB Posted

Attached to
FACILITIES INVESTMENT SERVICES_REGION 6 FOR THE 63d READINESS DIVISION (RD) US ARMY RESERVES
Solicitation number
W9127S21Q0056
Issued by

View the file

Other files

File Type Posted
Region 6 Site Visit Minutes.pdf PDF
63d RD_REGION 6_FIS_PWS_Final Rev 2_20211031.pdf PDF
FIS_PWS_Section J_TE-09_Acronyms_and_ Definitions_20211028.pdf PDF
TE-10-4_GSA_FORM_55_07-2002.pdf PDF
Region6_FIS_PWS_Section J_TE-06_Quality Assurance Surveillance Plan_20211031.pdf PDF
TE-10-6_SPILL RESPONSE INCIDENT REPORT FORM.pdf PDF
TE-11-13_WET PIPE FIRE SPRINKLER SYSTEMS.pdf PDF
Region6_FIS_PWS_Section J_TE-01_Facilities Site Index and Maps_20211031.pdf PDF
TE-11-6_FIRE ALARM ANNUAL INSP TESTING REPORT.pdf PDF
DA_Fm5477_MAR2008.pdf PDF
FIS_PWS_Section J_TE-08_HVAC-Refrigeration Temp Standards_20211030.pdf PDF
TE-10-1_Certification of Work.pdf PDF
TE-11-2_DIESEL FIRE PUMP ASSEMBLIES.pdf PDF
TE-10-5_ENG_FORM_3394_2021Aug.pdf PDF
Region 6 Projnet Responses1.pdf PDF
FIS_PWS_Section J_TE-05_Deliverables_20211030.pdf PDF
TE-11-12_PORTABLE FIRE EXTINGUISHER ANNUAL INSPECTION.pdf PDF
TE-11-15_FIRE HYDRANT ANNUAL INSPECTION.pdf.pdf PDF
TE-11-4_ELECTRIC FIRE PUMP ASSEMBLIES.pdf PDF
TE-11-5_EMERGENCY LIGHT ANNUAL INSPECTION.pdf PDF
TE-10-2_Work Request Estimate and Completion Form.pdf PDF
TE-10-3_GSA_FORM_376_11-1967.pdf PDF
Contactor guidance doc_20210922 (002).pdf PDF
TE-11-11_NOTIFICATION AND INITIATING APPLIANCE SUPPLEMENT.pdf PDF
DA_Fm5479_MAR2008.pdf PDF
Region6_FIS_PWS_Section J_TE-03_Detailed Equipment Inventory_20211031.pdf PDF
TE-11-14_WATER STORAGE TANKS.pdf PDF
TE-11-8_KITCHEN HOOD SYSTEM ANNUAL INSPECTION.pdf PDF
Amendment_0002_21Q0056.pdf PDF
TE-11-10_MASS NOTIFICATION SYSTEM SUPP RECORD OF INSP AND TEST.pdf PDF
A.07.20_Site_Visit_Attendance_Sheet_21Q0056.pdf PDF
Region 6 Briefing Slides.pdf PDF
Region6_FIS_PWS_Section J_TE-04_Government Points of Contact_20211030.pdf PDF
TE-11-3_DRY PIPE FIRE SPRINKLER SYSTEMS.pdf PDF
FIS_PWS_Sect J_ATCH-05_ELINs_FIS_Region 6_20211031.xlsx XLSX spreadsheet
TE-11-9_MAIN DRAIN TEST.pdf PDF
Region6_FIS_PWS_Section J_TE-02_Summary Equipment Inventory_20211031.pdf PDF
FIS_PWS_Section J_TE-07_2018_GSA_PM Guide_FINAL.pdf PDF
FIS_PWS_Sect J_ATCH-05_ELINs_FIS-ENV_Region 6_20211031.xlsx XLSX spreadsheet
TE-11-1_DELUGE FIRE SPRINKLER SYSTEMS.pdf PDF
TE-11-7_FIRE DEPARTMENT CONNECTIONS.pdf PDF
W9127S21Q0056_AMENDMENT 0001_07-Oct-2021.pdf PDF
2018_GSA_PM_Guide_FINAL.pdf PDF
W9127S21Q0056_AMENDMENT 0001_20211007.pdf PDF
W9127S21Q0056_R6 FIS Synopsis_Solicitation_20211006.pdf PDF
FIS_PWS_Sect J_ATCH-05_ELINs_FIS_Region 6_20210826.xlsx XLSX spreadsheet
TE-02_Region 6_Summary Equipment Inventory_26 August 2021.xlsx XLSX spreadsheet
63d RD DPW Operations Area Map FY20_20200909.pdf PDF
TE-03_Region 6_Detailed Equipment Inventory_26 August 2021.xlsx XLSX spreadsheet
FIS_PWS_Sect J_ATCH-05_ELINs_FIS-ENV_Region 6_20210826.xlsx XLSX spreadsheet
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: W9127S-21-Q-0056

FACILITY INVESTMENT SERVICES FOR

63D READINESS DIVISION

REGION 6

PERFORMANCE WORK STATEMENT/RFP

FINAL Rev 1

August 27, 2021

U.S. Army Engineer District, Little Rock Corps of Engineers 700 West Capital, Room 7315, Little Rock, AR 72201

TABLE OF CONTENTS

SECTION A – SOLICITATION FORM – SEE SF1449

SECTION B – SUPPLIES OR SERVICES AND PRICES – SEE SF1449

SECTION C – DESCRIPTIONS AND SPECIFICATIONS – PERFORMANCE WORK STATEMENT

SECTION D – NOT USED

SECTION E – INSPECTION AND ACCEPTANCE – SEE SF1449

SECTION F – NOT USED

SECTION G – CONTRACT ADMINISTRATION DATA – SEE SF1449

SECTION H – SPECIAL CONTRACT REQUIREMENTS – SEE SF1449

SECTION I – CONTRACT CLAUSES – SEE SF1449

SECTION J – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS – SEE SF1449

SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICE TO BIDDERS – SEE SF1449

SECTION M – EVALUATION FACTORS FOR AWARD - SEE SF1449

63d RD_REGION 6_FIS_PWS_Final REV 1_20210827.pdf

SECTION A – SOLICITATION FORM – SEE SF1449

SECTION B – SUPPLIES OR SERVICES AND PRICES – SEE SF1449

SECTION C – DESCRIPTIONS AND SPECIFICATIONS – PERFORMANCE WORK STATEMENT

SECTION C: DESCRIPTIONS AND SPECIFICATIONS

Annex-1 – GENERAL INFORMATION

Annex-1 – General Information Spec Item Title Description

A1-1 General Information The PWS is organized into annexes. Annex-1 is "General Information." Annex-2 contains “Management and Administration” requirements. Annex-3 “Facility Investment” and Annex-4 “Environmental Services” contain the technical requirements.

A1-1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide Facility Investment services for the Region’s locations as specified in Section J, TE-01, Facilities Site Index and Maps, and described in this Performance Work Statement (PWS).

Real Property Installed Equipment (RPIE) inventory requirements will be outlined in later sections of this PWS.

Additional sites may be added to the scope of this PWS through future contract modification.

A1-1.2 Project Location

The work shall be performed at various locations as listed in Section J, TE-01, Facilities Site Index and Maps, and will vary from location to location. Service locations may be added or deleted, and the services required at each location may be changed during the term of the contract via contract modification, at the discretion of the Government. The following is an example of the dispersion of work at the various locations.

(1) Service Calls, including emergency, urgent, and routine: various locations

(2) Preventive Maintenance (PM) for a wide variety of equipment and systems: various locations

(3) Inspection, Testing, and Certification for various types of equipment: various locations

(4) Other Recurring Services for the inspection and repair of equipment and systems: various locations

(5) IDIQ (Individual Task Order) repair, restoration, and modernization requirements which are beyond the scope of service calls, as well as related tasks such as preparation for and restoration from accidents and natural disasters: various locations

(6) Environmental Services: various locations

A1-1.3 Background Information Most, if not all, sites outlined in this PWS are currently being maintained by contractors. These buildings host many different Army Reserve units who are tenants in the buildings, which are operated by the 63d Readiness

Annex-1 – General Information Spec Item Title Description

Division (63d RD). The Army Corps of Engineers serves as the contracting agency for these contracts as a Federal Partner with the 63d RD.

A1-1.4 Verification of Workload and Conditions

Throughout the PWS, the workload data is generally referred to as being located in Section J. Section J provides data such as maps, floor plans, and tables to represent the type, quantity and location of services to be provided. These records are not always exact and as such, offerors are encouraged to attend the site visit as part of their due diligence to assess the nature of work and conditions under which work is to be performed.

A1-1.5 Climate Patterns The total project is at multiple locations so the climate will vary. The contractor must take into consideration the potential for significant weather pattern changes similar to those observed in recent years.

A1-1.6 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 4 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

A1-1.7 Army Approach to Service Contracting

The Department of Army (DoA) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support (OBOS) services. The Head of the Contracting Activity (HCA) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations.

A1-1.7.1 Partnering Philosophy The Army embraces the philosophy of Partnering. The Army views its contractors as partners and not just abstract service providers. The Army wants its contractors to succeed because partners' success drives the Army's successful mission accomplishment. Within the bounds of acquisition policy the Army intends to work to find solutions that will be beneficial to both the Government and its partners.

A1-1.7.2 Contractor's Knowledge The second principle is that the Army will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Army clients’ strategic and operational goals and objectives. The Army's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Army wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

A1-1.7.3 Industry Best Practices The third principle is that the Army will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Army's and contractor's responsibility as partners to reach this goal. To that end, the Army's emphasis will be in evaluating performance objectives (end results).

A1-1.8 Document Structure Offerors should develop an understanding of the structure of this document as part of performing due diligence in reaching an understanding of the Army’s requirements and expectations.

Annex-1 will always contain information that is relevant to the entire scope of the contract. Annex-2 contains project management and administration requirements that are relevant to the entire scope of the contract.

Annexes 3 and 4 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification Item (Spec Item) Section 1 will always contain General Information. Spec Item Section 2 will always contain the management and administration requirements. Spec Item Section 3 will always contain the Firm Fixed-Price (FFP) requirements. Spec Item Section 4 will always contain the Indefinite Delivery-Indefinite Quantity (IDIQ) requirements.

Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Spec Item 3 standards apply to all FFP specification items. Spec Item A3-3.1 is applicable to all A3-3.1 subordinate specification items. Spec Item A3-3.2 and A3-3.3 are not considered subordinate to A3-3.1.

All costs associated with Annex-1 and Annex-2, and costs associated with Annex-3 Spec Item A3-1 and A3-2 must be priced and distributed within Annex-3 Spec Item 3 requirements, unless otherwise specifically priced.

Additionally, all costs associated with Annex-1 and Annex-2 in relation to Environmental Services requirements, and Annex-4 Spec Items A4-1 and A4-2 must be priced and distributed within Annex-4 Spec Item 3, unless otherwise specifically priced.

A1-1.9 Army PBSC Approach The Army’s approach to performance-based service contracting (PBSC) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) quality assurance surveillance plan.

A1-1.10 Technical Proposal Certification

The contractor warrants that its proposal, incorporated herein by reference, including, but not limited to, proposed approaches, staffing, methodology, or work plans, will meet the performance objectives set forth in this contract during execution thereof. The contractor is not excused from meeting such performance objectives in the event such proposal proves inadequate as conceived or executed to meet such performance objectives. The contractor understands that it bears all of the cost and performance risk associated with adopting acceptable additional (and/or alternative) means or methods of meeting the performance objective.

SECTION C: DESCRIPTIONS AND SPECIFICATIONS

Annex-2 – Management and Administration

Annex-2 – Management and Administration Spec Item Title Description

A2-2 Management and Administration

A2-2.1 Acronyms and Definitions See Section J, Technical Exhibit TE-09 for Acronyms and Definitions.

A2-2.2 General Information

A2-2.2.1 Government Regular Working Hours

The Government's regular working hours include times in which facilities are used to support the military mission and vary from site to site. Regular working hours are typically 0800-1600, five days per week, Monday through Friday, except observed Federal Holidays, and Saturdays and Sundays up to two weekends per month.

Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.

A2-2.2.1.1 Observed Federal Holidays The Government observes the following holidays:

New Year’s Day, January 1st

Martin Luther King Jr.’s Birthday, 3rd Monday in January

President’s Day, 3rd Monday in February

Memorial Day, last Monday in May

Juneteenth, June 19th

Independence Day, July 4th

Labor Day, 1st Monday in September

Columbus Day, 2nd Monday in October

Veterans’ Day, November 11th

Thanksgiving Day, 4th Thursday in November

Christmas Day, December 25th.

A2-2.2.2 Wage Determinations Refer to Contract Clauses for information on wage determinations.

A2-2.2.3 Requirements Hierarchy Requirements or definitions specified in each Spec Item of this contract apply to subordinate paragraphs. For example, requirements shown in Spec Item A3-3.1 would apply to Spec Item A3-3.1.1, A3-3.1.2, A3-3.1.2.1 and so on.

A2-2.3 General Administrative Requirements

The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall ensure that subcontractors comply with the provision of this contract. The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives, standards, and other requirements of the contract. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records and drawings, and quality control. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met. The Contractor shall provide contract management consistent with the Management Plan submitted in the Contractor’s quote. The Contractor shall conduct operations with a clear focus on safety, security, energy conservation and environmental stewardship of all resources. The Contractor shall designate a minimum of one individual for this contract, hereafter referred to as the Project Manager (PM), to serve as the central Contractor point of contact with the Government. The PM shall be authorized to act on behalf of the Contractor for all matters relating to this contract to include the authority to bind the Contractor for matters pertaining to this contract. The PM shall be hands-on and hold collateral duties in the performance of the PWS, however PM duties will be their primary focus. The Contractor shall confirm the designated PM in writing to the Government Program Managers no later than five (5) calendar days after contract award. The PM shall be the individual designated in the offeror’s quote unless written approval is obtained from the Government Program Managers. Any successor PM shall meet or exceed the qualifications of the original designee and this PWS. The Contractor shall submit the qualifications of any successor to the Government Program Managers for evaluation and approval prior to his/her assumption of duties. The Contractor shall have the PM available on the phase-in start date and throughout the term of the contract. The Contractor shall designate an individual(s) with the authority to act for the PM in his/her temporary absence.

A2-2.3.1 Management Plan The Contractor shall provide contract management consistent with the Management Plan submitted in the Contractor’s quote.

The Contractor shall submit a Management Plan as part of its proposal. This plan will be incorporated into the contract at the time of award and forms the basis for management performance during the entire period of performance of the contract. The Contractor shall review and submit updates to the Management Plan annually.

A2-2.3.1.1 Required Conferences and Meetings

The Contractor may be required to attend administrative and coordination meetings.

A2-2.3.2 Permits and Licenses Within 15 calendar days after award of this contract, the Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable federal, state and local laws and regulations. Provide evidence of such permits and licenses to the KO before work commences and at other times as requested by the KO.

A2-2.3.3 Insurance Within 15 calendar days after award of this contract, the Contractor shall obtain insurance coverage in amounts not less than the amounts specified in Spec Item A2-2.3.3.2 below in accordance with the FAR Clause 52.228-05, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.

A2-2.3.3.1 Certificate of Insurance Within 15 calendar days after award of this contract, the Contractor shall furnish the KO a certificate of insurance as evidence of the existence of the required insurance coverage. The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the FAR Clause 52.228-05.

A2-2.3.3.2 Minimum Insurance Amounts

The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

Comprehensive General Liability: $500,000 per occurrence

Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage

Workmen's Compensation: As required by Federal and State worker's compensation and occupational disease statutes

Employer's Liability coverage: $100,000, except where worker's compensation may not be written by private carriers

Other as required by State Law

A2-2.3.4 Protection of Government Property

During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged, as a result of negligence under this contract, to their original condition at no cost to the Government.

A2-2.3.5 Access to Work Areas The Contractor shall make all arrangements through the appropriate office necessary to obtain access to buildings, facilities and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority. The Government will not issue keys to the Contractor. The Contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from its action or inaction.

A2-2.3.6 Directives, Instructions, and References

Applicable Department of Defense (DoD) and other directives, instructions, and references are listed in Section J

ATCH-01.

A2-2.3.7 Invoicing Procedures See FAR 52.212-4(g), CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS, Section I. A consolidated package with all sites individually invoiced will be accepted no more frequently than monthly. See invoicing procedures in Section J, ATCH-02.

At this time the Army Corps of Engineers is NOT using Wide Area Work Flow (WAWF) for invoice submission.

Until further notice is provided, any invoices submitted via WAWF will not be processed.

A2-2.3.7.1 MAXIMO Invoice Support The contractor shall update ALL status, completed IDIQ (Individual Task Order) work, completed service tickets, and other information required for reporting into MAXIMO for the invoice period prior to invoice submission to the Government. MAXIMO will be used to generate invoices in accordance with the sample invoice provided in Section J, ATCH-02. Status in MAXIMO, along with other means of surveillance, will be used to verify completed work. Any work completed and not properly entered into MAXIMO will not be expensed.

A2-2.3.8 Forms See Section J, TE-10, for forms to be used in the performance of this contract to include certification of work;

work requests, estimates, and completion; elevator inspection and certificates; accident investigation and reporting, damage reporting, spill response. Note: NFPA Inspection report templates are found at Section J, TE- 11.

A2-2.3.9 Training for Maintenance and Operation of New and Replacement Systems and Equipment

When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.

A2-2.3.10 RSMeans Cost Data The Contractor shall use the latest edition of the RSMeans Complete Tier cost data. An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as "Means". See Section J, TE-09 for further definition.

A2-2.3.11 Direct Material Costs Direct material costs shall include shipping charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor. Pre-expended bin materials and supplies, as defined herein, adding up to a total of $10.00 or less may be invoiced as a single line item for service calls.

A2-2.4 Government-Furnished Property, Materials and Services

The Government will not furnish/make available any facilities, materials, or equipment for use in connection with this contract.

A2-2.4.1 Government-Furnished Facilities (GFF)

None. The Government will not furnish any facilities in connection with this contract.

A2-2.4.2 Government-Furnished Utilities

All normally available utilities will be free to the Contractor at existing outlets for completion of this contract, to include water, sewer, and electricity. No phone, fax, copying, computer services, or office space will be available.

A2-2.4.3 Government-Furnished Materials (GFM)

None. The Government will not furnish any materials in connection with this contract.

A2-2.4.4 Government-Furnished Equipment (GFE)

None. The Government will not furnish any equipment in performance of this contract. If replacement of Refrigerators, Freezers, Ice Machines, and/or kitchen equipment is required, new equipment shall be government furnished and replaced via service call or IDIQ work.

A2-2.5 Contractor-Furnished Items Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Contractor shall comply with all Federal, State and local laws and regulations in the defined contract region regarding any banned materials or items on any facility location. The KO may at any time require samples, Safety Data Sheets (SDS), manufacturer’s data cut sheets of materials used in this contract.

A2-2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality control. The Contractor shall provide staff with the necessary management expertise to assure performance objectives and standards are met.

A2-2.6.1 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status reports shall be provided when requested by the KO. A written work status report of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0900 the following work day for inquiries after regular working hours.

A2-2.6.2 Work Schedule The Contractor's work shall not interfere with normal Government business. In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.

A2-2.6.3 Service Interruptions If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers a minimum of 10 calendar days in advance. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable.

A2-2.6.4 Contractor’s Computerized Maintenance Management Systems (CMMS)

The contractor shall populate, utilize, and maintain Maximo {IBM Maximo Asset Management} as the formal CMMS system of record for this contract. The contractor is expected to keep track of all aspects of the contract, and contract administration in an instance of the MAXIMO system. This system is required to have web access and at least 10 licenses for government personnel access to the system. The government shall be able to change who has access to the system each month if required. The contractor shall be responsible for providing the government a copy of the data base, and all records tracked inside of MAXIMO. This information shall be delivered to the government through CDs, approved electronic transfer, or by other means as determined by the KO.

The contractor shall use the MAXIMO system for asset tracking and management. The contractor shall utilize the work order function within the MAXIMO system to manage and track all preventative maintenance activities and service requests, including but not limited to, scheduling, estimated costs, and actual costs. The contractor shall maintain complete and accurate records of all services provided and make these records available for the Government’s use in managing the effort required under this contract. The contractor shall ensure all data collected is entered into MAXIMO. The contractor shall submit any information/data that cannot to be uploaded into MAXIMO to the government, in electronic format, at the end of each base and option year.

The contractor is also expected to utilize the CMMS for managing invoicing activities for the duration of the contract in addition to the requirements of Spec Item A2-2.3.7, Invoicing Procedures.

A2-2.6.4.1 Work Authorization Forms The Contractor shall initiate a record for all Exhibit Line Item Number (ELIN) designated services, to include a description of the problem or requested work, date and time received, location, and other appropriate information into MAXIMO. For services other than service calls (e.g. preventive maintenance), the record number shall be coded to differentiate that work from service call work.

1) Immediately upon receipt of a service call, the Contractor shall record the following information in MAXIMO:

- Customer Support System (CSS) work authorization number

- Service call priority (emergency, urgent, or routine)

- Name, office and command of requester

- Type of funding (DES, DOL, DPW)

- Paying Activity Code (PAC) (as required)

- Date and time call received

- Specific craft designation(s)

- Caller's description of the problem or requirement

- Associated Asset ID number -Description of equipment or system (e.g. type of equipment, size, serial number, model number)

Upon completion of the requested service, the Contractor shall enter the following actions into MAXIMO no later than 0900 the following working day after completion of the service:

- Description of problem or requirement as found by craftsman

- Description of work performed

- Labor hours expended and direct material costs

- Date and time work was commenced and completed

- Authorizing signature indicating work was performed (Use “Certification of Work” Form, provided in Section

J, TE-10-1)

2) The Contractor’s records system shall include complete records of all other Facilities Maintenance Services provided, including but not limited to the following:

- Date service scheduled to be performed document)

- Date(s) of actual performance of service

- Location of service (e.g., site code, FACID, building number, and room number)

- Description of equipment or system (e.g., type of equipment, size, serial number, model number)

- Description of maintenance provided or service performed

- List of parts replaced or equipment replaced in kind

- Other information as needed to completely describe the work performed

- Associated ELIN

- Labor hours expended and direct labor and direct material costs

- Authorizing signature indicating work was performed (Use “Certification of Work” Form, provided in Section

J, TE-10-1)

- Before and after photographs of repairs, taken with enough detail to demonstrate the work is complete

3) The Contractor’s records system shall be updated to included missing and updated equipment information in the Section J, TE-03, Detailed Equipment Inventories, such as description for the piece of equipment, location (site code + 5 digit IFS Building Number), manufacturer, model number, capacity, date last serviced, date last certified, service frequency, time spent, material spent, equipment used, quantity, etc. Inventory updates shall be provided with the monthly invoice in Microsoft Excel format.

4) The contractor shall maintain these records for the life of the contract and prepare them in electronic format for transfer to the Government at the end of the contract. The records shall be catalogued & organized by performance year and facility identification code (FACID). The file format shall be fundamentally compatible with a Microsoft Windows operating system, Microsoft Office, and Adobe Acrobat.

A2-2.6.5 Quality Management The Contractor shall manage all aspects of quality to ensure deliverables, services performed, and assigned workforce fully satisfy the requirements of the contract.

A2-2.6.5.1 Quality Control Manager

(QCM)

The Contractor shall provide the overall Quality Control Manager function for all aspects of the contract. See further definition under A2-2.7 Personnel Requirements.

A2-2.6.5.2 Quality Management System

(QMS)

The Contractor shall establish and maintain a complete QC program in accordance with the provisions specified herein. The Contractor’s QC Program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QC program shall address:

• Accurate documentation of work processes, procedures, and output measures.

• A systematic procedure for assessing compliance with performance objectives and standards.

• Accurate documentation of quality inspections conducted throughout the execution of work.

• Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.

A2-2.6.5.2.1 Quality Management (QM) Plan

The Contractor shall develop and submit a QM Plan within 15 calendar days after award. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.

A2-2.6.5.2.2 Quality Inspection and Surveillance

The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be turned over to the KO within five calendar days of termination of the contract.

A2-2.6.5.2.3 Quality Inspection and Surveillance Report

The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report monthly with the monthly invoice. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.

A2-2.6.6 System and Equipment Replacement

The Contractor shall maintain the integrity and performance of existing energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work. Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced. Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment.

A2-2.6.7 Quality Control & Quality Assurance

The Contractor shall take all measures necessary to control the quality of goods and services produced for both management and technical aspects of contract execution.

A2-2.6.7.1 Quality Control (QC) Plan The Contractor shall develop and submit a QC Plan within 30 calendar days after award and as changes are made over the period of performance. The QC Plan shall describe the processes and procedures to be used to ensure and maintain the quality of products and services (including management, administrative, and technical products/services) is sustained for the duration of the contract. In addition, the plan shall establish procedures for identifying and documenting process escapements affecting quality of products/services as well as implementing corrective action to prevent recurrence.

A2-2.6.7.2 Additional Quality Control & Quality Assurance Information

Quality Control is the responsibility of the contractor. The contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.212-4, Contractor Inspection Requirements). The contractor shall maintain an inspection system commensurate with commercial practices to ensure the Contractor only tenders for acceptance those items or services that conform to the requirements of this contract.

Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is a Government only document primarily focused on what the Government must do to assure that the contractor has performed in accordance with the requirements of the contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. Non-conforming services shall be re-performed at no increase in contract price. If non-conforming services are recurring, cannot be re-performed, or the services fail to achieve the performance standards in the PWS, the Government may reject the nonconforming service(s) and document the contractor’s performance record accordingly.

The Government may also issue a Contract Discrepancy Report (CDR) in which the contractor will be required to respond with the development of a Corrective Action Plan (CAP) which identifies the root cause, corrective action for the root cause, corrective action for the specific nonconformance, and the date the corrective action(s) will be complete. The Government may also reduce payment to reflect the value of the services performed, or may perform the services and charge the Contractor for any related cost incurred, or may terminate this contract for default.

Government will require rework for any services found not performed to the stated PWS standard. Reoccurring performance issues can lead to contract termination.

If rework cannot be completed, or is not completed to standard, an equitable price reduction and/or adequate consideration will be assessed by the KO for acceptance of nonconforming services when the contractor compliance is below the stated performance threshold.

Results will be recorded and may be reported in CPARS.

A2-2.7 Personnel Requirements The Contractor shall comply with the personnel requirements stated below.

A2-2.7.1 Key Personnel The Project Manager shall be considered key personnel as defined in Section L.

A2-2.7.1.1 Project Manager (PM) The PM must have relevant experience at a comparable level of responsibility in projects of similar size, scope and complexity. The PM or alternate shall have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be available by phone within one hour both during and after the Government's regular working hours.

A2-2.7.1.1.1 PM Qualifications The PM shall be technically qualified in the field Facilities Maintenance Management and shall have a Bachelor of Science Degree from a U.S. accredited institution of higher learning in either an engineering discipline or management; and, a minimum of five (5) years’ experience in facility operations and maintenance, including the supervision of a diversified work force responsible for operations, maintenance and repair of facility systems.

The PM shall currently have or be able to obtain a Certified Professional Maintenance Manager (CPMM) from the Association for Facilities Engineering within the first 180 days. The PM should also have working experience with NFPA, EPA, TJC, OSHA codes and standards.

A2-2.7.1.1.2 Project Manager Annual Reporting

The PM shall develop and present, when requested, comprehensive quarterly and annual program performance reports including documentation and metrics on program successes, challenges, key performance indicators, risks and opportunities, and all aspects of the requirements. The Quarterly Reports shall be delivered to the KO and RFOS/COR within 30 days following the 1st, 2nd, and 3rd Quarterly periods of the contract. The Annual Report shall be suitable for presentation to Senior Leadership (i.e., General Officer) and delivered to the KO and RFOS/COR within 30 days following the 4th Quarterly period of the contract. The Contractor shall be prepared for presentation to Senior Leadership not later than 45 days following the contract period of performance.

A2-2.7.1.2 Quality Control Manager

(QCM)

The QCM shall be appointed in writing and empowered to operate independent of Contractor’s Program Manager. The QCM shall be responsible for implementing and assuring that both contractor and subcontractor personnel follow the requirements of the Contractors approved Quality Control Plan (QCP). The QCM shall monitor the performance of the Quality Control activities in all facilities covered by the contract and shall provide remedial training as necessary to the responsible personnel at all locations. The QCM shall conduct not only administrative quality control, but also schedule on-site inspections as part of the quality control process.

A2-2.7.1.2.1 QCM Qualifications The QCM shall possess, at a minimum, working computer knowledge, have the skills to utilize and navigate the Internet and utilize Microsoft Office products. The QCM shall be able to write memos, use email and develop/use spreadsheets. The QCM must be familiar with multi-function printer capabilities. In order to successfully meet the performance objective of each task order, the QCM shall possess the following knowledge / skills:

1. Minimum of three (3) years documented experience in quality control management.

2. Trained in and experience with ISO 9001 (2015 or later).

3. Ability to operate independently and make timely decisions to effectively manage an effective Quality

Control Program.

4. Ability to analyze organizational and operational problems and develop timely and economical solutions.

5. Highly skilled in verbal and written communications in order to conduct professional meetings, execute plans, and generate memorandums of instruction.

A2-2.7.1.3 Site Safety and Health Officer (SSHO)

A Contractor employee whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract. The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract:

For contracts greater than $100,000/year but less than $2M/year – “The SSHO shall have completed 3 years of satisfactory experience in preparing and enforcing the Contractor’s safety program on contracts of similar size and complexity in the past, and shall have completed 30-hour OSHA safety class or equivalent within the last three years.” The SSHO may be the same person as the project manager; however, the pre-requisite qualification and experience for the SSHO position remains.

A2-2.7.2 Employee Requirements The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract.

Personnel shall be fully knowledgeable of all safety and environmental requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can read and understand printed regulations, detailed written orders, operating procedures, training instructions and materials.

The Contractor shall ensure that all Contractor personnel have received proper safety training, appropriate to their respective jobs. At a minimum, all Contractor personnel shall have attended the OSHA 10 hour safety course, or equivalent.

The Contractor shall implement an ongoing training program that refreshes the safety skills, qualifications and awareness of the Contractor workforce on a regular, periodic basis. The details of the Contractor’s safety training program shall be included as part of the Contractor’s Accident Prevention Plan, as required in Spec Item A2-2.9.1.

The contractor shall maintain a centrally-located (within the region) presence to ensure the QCM and/or PM can visit any location within an 8 hour timeframe (standard work day). This is not a requirement of response time, simply proximity.

A2-2.7.2.1 Employee Appearance The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.

A2-2.7.2.2 Employee Conduct Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.

Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel. All Contractor employees shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.

A2-2.7.2.3 Removal of Employees The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security.

A2-2.7.2.4 Proof of Citizenship No employee or representative of the Contractor will be admitted to the site of work unless satisfactory proof of citizenship is furnished, or, if an alien, legal residency within the United States is confirmed.

A2-2.7.2.5 Anti-Terrorism (AT)

Level 1 Training

All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training and submit certificates of completion to the COR, or KO, within fifteen (15) days of award at the following website:

http://jko.jten.mil/courses/atl1/launch.html

A2-2.7.6 Operational Security

(OPSEC) Training

Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC training is available at the following website: http://cdsetrain.dtic.mil/opsec/

A2-2.7.7 iWATCH Training This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). The local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 45 calendar days after contract award.

A2-2.8 Security Requirements The Contractor shall comply with all federal, state, and local security statutes, regulations, and requirements.

The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. The Contractor shall ensure that all security/entrance clearances are obtained. The Contractor shall establish and maintain a Security/Entrance Clearance List to be provided to the COR prior to performing on-site work and as updates are made.

63d RD_REGION 6_FIS_PWS_Final REV 1_20210827.pdf http://jko.jten.mil/courses/atl1/launch.html

A2-2.8.1 Employee Roster The Contractor shall establish and maintain a current roster of employees (to include Sub-contractor Employees). The roster shall include employee’s name, social security number, address, copy of valid driver’s license and proof of insurance (if ever driving on Government property) and level of security clearance. The Contractor shall furnish the KO/COR a current Employee Roster prior to initially commencing work at a Government facility and upon update.

A2-2.8.2 Vehicles The company name shall be displayed on each of the Contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid state license plate that complies with State Vehicle Code. Vehicles shall meet all other requirement of the State Vehicle Code, such as safety standards, and shall carry proof of insurance and state registration, if applicable.

A2-2.8.3 Passes and Badges All Contractor employees shall obtain the required employee and vehicle passes. When an employee leaves the Contractor's service, the employee's Passes and Badges shall be returned within 10 calendar days. CAC and government issued badge are only required at selected locations. If not required at a location the contractor will not be required to wear. If required, the Contractor employees must be able to obtain CAC in accordance with security requirements. Each employee shall wear the Government issued badge over the front of the outer clothing.

For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

A2-2.8.4 Access to Buildings The Contractor shall monitor and control access into restricted areas under their responsibility, allowing only those individuals who have been properly cleared into restricted areas or other controlled access areas. The Contractor shall comply with security requirements, plus those imposed by the installation Commander at all times. Personnel with access to special areas will have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas will wear special badges authorizing access for those areas. Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties. The Contractor shall secure all buildings and facilities entered during non-duty hours and will secure all building and facilities under the Contractor’s cognizance at the end of each work day or shift period.

A2-2.8.5 Access Arrangements The Contractor shall make all arrangements necessary to obtain access to buildings, facilities and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority.

A2-2.8.6 Security Clearances The Contractor shall obtain all required corporate and personnel security clearances prior to commencement of work. The Contractor shall ensure that a Security/Entrance Clearance List of all personnel with security clearances is maintained current, including clearances that are pending.

A2-2.9 Contractor Safety Program The Contractor shall develop and implement a Safety Program detailing how the Contractor plans, staffs, performs, and controls all safety practices while delivering best value services to the Government without any accidents or mishaps. The Contractor’s safety program shall comply with all safety standards identified in the U.S.