TE-10-2_Work Request Estimate and Completion Form.pdf

PDF 1 MB Posted

Attached to
FACILITIES INVESTMENT SERVICES_REGION 6 FOR THE 63d READINESS DIVISION (RD) US ARMY RESERVES
Solicitation number
W9127S21Q0056
Issued by

View the file

Other files

File Type Posted
Region 6 Site Visit Minutes.pdf PDF
63d RD_REGION 6_FIS_PWS_Final Rev 2_20211031.pdf PDF
FIS_PWS_Section J_TE-09_Acronyms_and_ Definitions_20211028.pdf PDF
TE-10-4_GSA_FORM_55_07-2002.pdf PDF
Region6_FIS_PWS_Section J_TE-06_Quality Assurance Surveillance Plan_20211031.pdf PDF
TE-10-6_SPILL RESPONSE INCIDENT REPORT FORM.pdf PDF
TE-11-13_WET PIPE FIRE SPRINKLER SYSTEMS.pdf PDF
Region6_FIS_PWS_Section J_TE-01_Facilities Site Index and Maps_20211031.pdf PDF
TE-11-6_FIRE ALARM ANNUAL INSP TESTING REPORT.pdf PDF
DA_Fm5477_MAR2008.pdf PDF
FIS_PWS_Section J_TE-08_HVAC-Refrigeration Temp Standards_20211030.pdf PDF
TE-10-1_Certification of Work.pdf PDF
TE-11-2_DIESEL FIRE PUMP ASSEMBLIES.pdf PDF
TE-10-5_ENG_FORM_3394_2021Aug.pdf PDF
Region 6 Projnet Responses1.pdf PDF
FIS_PWS_Section J_TE-05_Deliverables_20211030.pdf PDF
TE-11-12_PORTABLE FIRE EXTINGUISHER ANNUAL INSPECTION.pdf PDF
TE-11-15_FIRE HYDRANT ANNUAL INSPECTION.pdf.pdf PDF
TE-11-4_ELECTRIC FIRE PUMP ASSEMBLIES.pdf PDF
TE-11-5_EMERGENCY LIGHT ANNUAL INSPECTION.pdf PDF
TE-10-3_GSA_FORM_376_11-1967.pdf PDF
Contactor guidance doc_20210922 (002).pdf PDF
TE-11-11_NOTIFICATION AND INITIATING APPLIANCE SUPPLEMENT.pdf PDF
DA_Fm5479_MAR2008.pdf PDF
Region6_FIS_PWS_Section J_TE-03_Detailed Equipment Inventory_20211031.pdf PDF
TE-11-14_WATER STORAGE TANKS.pdf PDF
TE-11-8_KITCHEN HOOD SYSTEM ANNUAL INSPECTION.pdf PDF
Amendment_0002_21Q0056.pdf PDF
TE-11-10_MASS NOTIFICATION SYSTEM SUPP RECORD OF INSP AND TEST.pdf PDF
A.07.20_Site_Visit_Attendance_Sheet_21Q0056.pdf PDF
Region 6 Briefing Slides.pdf PDF
Region6_FIS_PWS_Section J_TE-04_Government Points of Contact_20211030.pdf PDF
TE-11-3_DRY PIPE FIRE SPRINKLER SYSTEMS.pdf PDF
FIS_PWS_Sect J_ATCH-05_ELINs_FIS_Region 6_20211031.xlsx XLSX spreadsheet
TE-11-9_MAIN DRAIN TEST.pdf PDF
Region6_FIS_PWS_Section J_TE-02_Summary Equipment Inventory_20211031.pdf PDF
FIS_PWS_Section J_TE-07_2018_GSA_PM Guide_FINAL.pdf PDF
FIS_PWS_Sect J_ATCH-05_ELINs_FIS-ENV_Region 6_20211031.xlsx XLSX spreadsheet
TE-11-1_DELUGE FIRE SPRINKLER SYSTEMS.pdf PDF
TE-11-7_FIRE DEPARTMENT CONNECTIONS.pdf PDF
W9127S21Q0056_AMENDMENT 0001_07-Oct-2021.pdf PDF
2018_GSA_PM_Guide_FINAL.pdf PDF
W9127S21Q0056_AMENDMENT 0001_20211007.pdf PDF
63d RD_REGION 6_FIS_PWS_Final REV 1_20210827.pdf PDF
W9127S21Q0056_R6 FIS Synopsis_Solicitation_20211006.pdf PDF
FIS_PWS_Sect J_ATCH-05_ELINs_FIS_Region 6_20210826.xlsx XLSX spreadsheet
TE-02_Region 6_Summary Equipment Inventory_26 August 2021.xlsx XLSX spreadsheet
63d RD DPW Operations Area Map FY20_20200909.pdf PDF
TE-03_Region 6_Detailed Equipment Inventory_26 August 2021.xlsx XLSX spreadsheet
FIS_PWS_Sect J_ATCH-05_ELINs_FIS-ENV_Region 6_20210826.xlsx XLSX spreadsheet
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Region: Order Date:

Contract: Order Value:

CSS W/O: Estimate Date:

FACID: Priority:

Building: Funding Source:

D

Sections A, B C, and D required for ALL estimates

** Repair Requests under $2,500.00 require labor hours, material description and all costs involved.

** Repair Requests over $2,500.00 require RS Means lines that relate to the description/SOW and associated costs.

** Contractor required to provide manufacturer, model and serial number for all components being serviced, repaired and/or replaced.

A

CSS Description:

Work Request, Estimate and Completion Form

Diagnosis:

B

C

Scope of Work/Repair Requirement:

CSS W/O: Estimate Date:

FACID: Priority:

Building: Funding Source:

** Repair Requests under $2,500.00 require labor hours, material description and all costs involved.

** Repair Requests over $2,500.00 require RS Means lines that relate to the description/SOW and associated costs.

** Contractor required to provide manufacturer, model and serial number for all components being serviced, repaired and/or replaced.

A

Work Request, Estimate and Completion Form

Hours

Total Hours Labor Rate

Cost

Total Labor Grand Total

New Total:

This section required for all estimates less than $2,500.00

Repair over $2,500.00 new WO Required

Repair Less than $2,500.00

E

F

Material:

Labor:

Total Material

This section required to be submitted when additional funding is required.

G

Additional Funding Description:

Original Total:

Additional funds required:

CSS W/O: Estimate Date:

FACID: Priority:

Building: Funding Source:

** Repair Requests under $2,500.00 require labor hours, material description and all costs involved.

** Repair Requests over $2,500.00 require RS Means lines that relate to the description/SOW and associated costs.

** Contractor required to provide manufacturer, model and serial number for all components being serviced, repaired and/or replaced.

A

Work Request, Estimate and Completion Form

1 Repair Order Date:

2 Repair Control Number:

3 Additional Funding Request (Yes/No):

4 Additional Funding Authorized (Date):

Repair Completion Date:

H

This section required to be submitted when repair is complete.

Repair Completion

Prime Contractor Signature Government Signature

Data Release: Year_______ Quarter ______

A B C D E F G H I J K

Quantity Line Number Description Unit Total O&P

Ext. Mat.

O&P

Ext. Labor O&P

Ext. Equip.

O&P

Data Release

CCI

Location Notes

Work Request, Estimate and Completion Form ** Repair Requests under $2,500.00 require labor hours, material description and all costs involved.

** Repair Requests over $2,500.00 require RS Means lines that relate to the description/SOW and associated costs.

** Contractor required to provide manufacturer, model and serial number for all components being serviced, repaired and/or replaced.

This page required on all repairs estimated over $2,500.00.

RS Means - No Cost Estimate

Estimate Date:

Priority:

Funding Source:

Contractor Logo

Building:

Region:

CSS W/O:

FACID:

Contract:

II

Section G is required when additional funds are requested Section H is completed as follows:

Work Request, Estimate and Completion Form ** Repair Requests under $2,500.00 require labor hours, material description and all costs involved.

** Repair Requests over $2,500.00 require RS Means lines that relate to the description/SOW and associated costs.

** Contractor required to provide manufacturer, model and serial number for all components being serviced, repaired and/or replaced.

Document Instructions Sections A, B, C, and D required on ALL estimate submissions Sections E and F required on ALL estimates less than $2,500.00

Section I required on ALL estimates over $2,500.00 (DO NOT INCLUDE ANY COST DATA)

H1 - Upon submission H2 - When estimate submitted H3 - If additional funds are required above original order amount H4 - If additional funds are requried above original order amount H5 - When repair has been completed and proper operation has been verified.

TABLE OF CONTENTS
SECTION A – SEE SF1449
SECTION B – SEE SF1449
SECTION C – DESCRIPTIONS AND SPECIFICATIONS – PERFORMANCEWORK STATEMENT
Section C 0100000 FIS General Information Region 5
Section C 0200000 Management and Administration Region 5
Section C 1502000 Facility Investment Services Region 5
Section C 1800000 Environmental Services Region 5
SECTION D – NOT USED
SECTION E – SEE SF1449
SECTION F – DELIVERIES OR PERFORMANCE
SECTION G – SEE SF1449
SECTION H – SEE SF1449
SECTION I – SEE SF1449
SECTION J – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
Section J Consolidated Index
Section J 0200000 Management and Administration
J-0200000-01 ACRONYMS
J-0200000-02 Index of Wage Determinations
J-0200000-03 References, Instructions, Directives
J-0200000-04 INVOICING PROCEDURES
J-0200000-05 FORMS
Work Request, Est & Completion Form
Spill Report Form
J-0200000-06 Gov't furnished property, Materials, & Services
J-0200000-07 & J-1800000 ELINS Region 5
J-0200000-08 Site Index
Section J 1502000
J-1502000-02 Site Map Index
J-1502000-03
J-1502000-04
J-1502000-05
J-1502000-06
J-1502000-07
J-1502000-08
J-1502000-09
J-1502000-10
J-1502000-11
J-1502000-12
J-1502000-13
J-1502000-14
J-1502000-15
J-1502000-16
J-1502000-17
J-1502000-18
J-1502000-19
J-1502000-20
J-1502000-21
J-1502000-22
J-1502000-23
J-1502000-24
J-1502000-25
J-1502000-26
J-1502000-27
J-1502000-28
J-1502000-29
J-1502000-30
J-1502000-31
J-1502000-32
J-1502000-33
J-1502000-34
J-1502000-35
J-1502000-36
J-1502000-37
J-1502000-38
J-1502000-39
J-1502000-40
J-1502000-41
J-1502000-42
J-1502000-43
J-1502000-44
J-1502000-45
J-1502000-46
J-1502000-47
J-1502000-48
J-1502000-49
J-1502000-50
J-1502000-51
J-1502000-52
J-1502000-53
J-1502000-54
J-1502000-55
J-1502000-56
J-1502000-57
J-1502000-58
J-1502000-59
J-1502000-60
J-1502000-61
J-1502000-63
J-1502000-64
J-1502000-65
J-1502000-66
J-1502000-68
J-1502000-69
J-1502000-70
J-1502000-71
J-1502000-72
J-1502000-73
J-1502000-74
J-1502000-75
SECTION K - SEE SF1449
SECTION L - SEE SF1449
SECTION M - SEE SF1449
Region:
Order Date:
Contract:
Order Value:
CSS WO:
Estimate Date:
FACID:
Priority:
Building:
Funding Source:
CSS DescriptionB:
CSS DescriptionB_2:
CSS DescriptionB_3:
CSS DescriptionB_4:
CSS DescriptionB_5:
CSS DescriptionB_6:
CSS DescriptionB_7:
DiagnosisC:
DiagnosisC_2:
DiagnosisC_3:
DiagnosisC_4:
DiagnosisC_5:
DiagnosisC_6:
DiagnosisC_7:
DiagnosisC_8:
Scope of WorkRepair RequirementD:
Scope of WorkRepair RequirementD_2:
Scope of WorkRepair RequirementD_3:
Scope of WorkRepair RequirementD_4:
Scope of WorkRepair RequirementD_5:
Scope of WorkRepair RequirementD_6:
Scope of WorkRepair RequirementD_7:
Scope of WorkRepair RequirementD_8:
Scope of WorkRepair RequirementD_9:
Scope of WorkRepair RequirementD_10:
Scope of WorkRepair RequirementRow11:
Region_2:
Order Date_2:
Contract_2:
Order Value_2:
CSS WO_2:
Estimate Date_2:
FACID_2:
Priority_2:
Building_2:
Funding Source_2:
LaborE:
HoursE:
LaborE_2:
HoursE_2:
LaborE_3:
HoursE_3:
LaborE_4:
HoursE_4:
LaborE_5:
HoursE_5:
LaborE_6:
HoursE_6:
HoursRow7:
HoursRow8:
MaterialF:
CostF:
MaterialF_2:
CostF_2:
MaterialF_3:
CostF_3:
MaterialF_4:
CostF_4:
MaterialF_5:
CostF_5:
MaterialF_6:
CostF_6:
MaterialF_7:
CostF_7:
CostRow8:
CostRow9:
CostRow10:
Repair Less than 250000:
G:
G_2:
G_3:
Repair over 250000 new WO Required:
Original Total:
Addt funds:
New Total:
Region_3:
Order Date_3:
Contract_3:
Order Value_3:
CSS WO_3:
Estimate Date_3:
FACID_3:
Priority_3:
Building_3:
Funding Source_3:
Repair Order Date:
Repair Control Number:
Additional Funding Request YesNo:
Additional Funding Authorized Date:
Repair Completion Date:
Region_4:
Estimate Date_4:
Contract_4:
Priority_4:
CSS WO_4:
Funding Source_4:
FACID_4:
Building_4:
Data Release Year:
Quarter:
QuantityII:
Line NumberII:
DescriptionII:
UnitII:
Data ReleaseII:
CCI LocationII:
NotesII:
QuantityII_2:
Line NumberII_2:
DescriptionII_2:
UnitII_2:
Data ReleaseII_2:
CCI LocationII_2:
NotesII_2:
QuantityII_3:
Line NumberII_3:
DescriptionII_3:
UnitII_3:
Data ReleaseII_3:
CCI LocationII_3:
NotesII_3:
QuantityII_4:
Line NumberII_4:
DescriptionII_4:
UnitII_4:
Data ReleaseII_4:
CCI LocationII_4:
NotesII_4:
QuantityII_5:
Line NumberII_5:
DescriptionII_5:
UnitII_5:
Data ReleaseII_5:
CCI LocationII_5:
NotesII_5:
QuantityII_6:
Line NumberII_6:
DescriptionII_6:
UnitII_6:
Data ReleaseII_6:
CCI LocationII_6:
NotesII_6:
QuantityII_7:
Line NumberII_7:
DescriptionII_7:
UnitII_7:
Data ReleaseII_7:
CCI LocationII_7:
NotesII_7:
QuantityII_8:
Line NumberII_8:
DescriptionII_8:
UnitII_8:
Data ReleaseII_8:
CCI LocationII_8:
NotesII_8:
QuantityII_9:
Line NumberII_9:
DescriptionII_9:
UnitII_9:
Data ReleaseII_9:
CCI LocationII_9:
NotesII_9:
QuantityII_10:
Line NumberII_10:
DescriptionII_10:
UnitII_10:
Data ReleaseII_10:
CCI LocationII_10:
NotesII_10:
QuantityII_11:
Line NumberII_11:
DescriptionII_11:
UnitII_11:
Data ReleaseII_11:
CCI LocationII_11:
NotesII_11:
QuantityII_12:
Line NumberII_12:
DescriptionII_12:
UnitII_12:
Data ReleaseII_12:
CCI LocationII_12:
NotesII_12:
QuantityII_13:
Line NumberII_13:
DescriptionII_13:
UnitII_13:
Data ReleaseII_13:
CCI LocationII_13:
NotesII_13:
QuantityII_14:
Line NumberII_14:
DescriptionII_14:
UnitII_14:
Data ReleaseII_14:
CCI LocationII_14:
NotesII_14:
QuantityII_15:
Line NumberII_15:
DescriptionII_15:
UnitII_15:
Data ReleaseII_15:
CCI LocationII_15:
NotesII_15:
QuantityII_16:
Line NumberII_16:
DescriptionII_16:
UnitII_16:
Data ReleaseII_16:
CCI LocationII_16:
NotesII_16:
QuantityII_17:
Line NumberII_17:
DescriptionII_17:
UnitII_17:
Data ReleaseII_17:
CCI LocationII_17:
NotesII_17:
QuantityII_18:
Line NumberII_18:
DescriptionII_18:
UnitII_18:
Data ReleaseII_18:
CCI LocationII_18:
NotesII_18:
QuantityII_19:
Line NumberII_19:
DescriptionII_19:
UnitII_19:
Data ReleaseII_19:
CCI LocationII_19:
NotesII_19:
QuantityII_20:
Line NumberII_20:
DescriptionII_20:
UnitII_20:
Data ReleaseII_20:
CCI LocationII_20:
NotesII_20:
QuantityII_21:
Line NumberII_21:
DescriptionII_21:
UnitII_21:
Data ReleaseII_21:
CCI LocationII_21:
NotesII_21:

File details come from the government source that posted it. Updated .