This document outlines a forthcoming solicitation for a Design-Build Multiple Award Task Order Contract to support the U.S. Army Medical Command Medical Sustainment, Restoration and Modernization program from 2020 to 2024. The contract will have a total value of $240 million to be awarded across multiple indefinite-delivery/indefinite-quantity task orders ranging from $250,000 to $15 million for the design and construction of hospitals, clinics, medical facilities and associated buildings. The U.S. Army Corps of Engineers seeks to make awards to up to five contractors through a two-phase selection process. Phase one will evaluate experience and past performance, with the top five contractors advancing to phase two to submit technical and price proposals for an initial seed task order. The anticipated solicitation release date is June 14, 2019 with proposals due on July 23, 2019. The scope of work includes design, renovation, repair and construction services to sustain, restore and modernize medical facilities across the continental U.S., Alaska and Hawaii.

Templates

View the file

Other files

File Type Posted
ProjNetQuestionsAnswers.pdf PDF
Amendment02.pdf PDF
AttachmentF.pdf PDF
Phase1Factor3.pdf PDF
Amedment_01_Attachment.pdf PDF
Amendment01.pdf PDF
000_Div_00_TOC_DB_MATOC_2.pdf PDF
01_PWS_MEDCOM_DB_MATOC_2.pdf PDF
10_Attach_J_Installation_Reqs.pdf PDF
08_Attach_G_Submittals.pdf PDF
Solicitation.pdf PDF
09_Attach_H1_Project_Delivery_Team.pdf PDF
07_Attach_F2_Div_01_Listing.pdf PDF
07_Attach_F1_Code_Crit_Stand.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D-C WEEKLY REPORT

TAB 1 - PROJECT OVERVIEW

REV 1.2 (No IO)

REPORT DATE

SCOPE PROPOSED SCHEDULED ACTUAL

FY D-B BASE BID D-B AWARD

PRIMARY PROJ # D-B OPTIONS NTP

PROJECT TITLE D-B SUB-TOTAL

PRIMARY BLDG # IO-T OPTION PERIOD OF PERF

INSTALLATION

DESIGN

COMPLETE

PRIMARY FAC

TYPE

IO SUB-TOTAL

CONSTRUCT

COMPLETE

NEAREST CITY OP OPTION

DELIVERY

METHOD

PROPOSAL

TOTAL

OFB

CONTRACT # MODS COST RATE PERCENT

COMPLETE % placed

TASK ORDER # D-B MODS $0 #DIV/0! SCOPE SUMMARY

AWARD DATE IO-T MODS $0 #DIV/0! PROPOSED GSF

REVISED GSF-

TOTAL

PRIME KTR OP MODS $0 #DIV/0!

DESIGNER OF

RECORD (DOR)

SUB-TOTAL $0 #DIV/0!

CONTRACT

TOTAL:

CHANGE

REQUESTS (CR)

EST COST

PRIMARY AGENT D-B CR $0

FIELD AGENT IO-T CR $0

CUSTOMER

OP CR $0

SUB-TOTAL $0

POTENTIAL

CHANGES (PC)

EST COST

D-B PC $0

FUNDING

SOURCE

IO-T PC $0

20 $0

##/##/20## COST SUMMARY SCHEDULE SUMMARY

PROJECT INFORMATION COST

$0 Repair Med Admn, B9913A, MAMC $0

9913A $0

PROJECT MANAGEMENT

MAMC, JBLM

$0

Tacoma $0

Design-Build $0

MEDCOM

$0

USACE-SWL

D-C WEEKLY REPORT

TAB 1 - PROJECT OVERVIEW

REV 1.2 (No IO)

OP PC $0

SUB-TOTAL $0

CONTRACT

TOTAL +

CHANGES =

$0 #DIV/0!

MONTHLY REPORT

TAB 2-COSTS

REV 1.2 (No IO)

AWARD AMOUNT CLIN #

AWARD

DATE

PERF

PERIOD

D-B ($)

IO-T ($)

Option

OP ($)

Option

DESCRIPTION (DB/IO/OP)

BASE BID 0001 $0 $0

SUBCLIN 0002 $0 IO-T

ADD/OPT 1 0003

ADD/OPT 2 0004 $0

ADD/OPT 3 0005 $0

ADD/OPT 4 0006 $0

TOTALS: $0 $0 $0

IO RATE (%) #DIV/0!

MODS #

AWARD

DATE

ADJ

PERF

PERIOD

D-B ($)

IO-T ($)

Option

OP ($)

Option

DESCRIPTION (DB/IO/OP)

MOD 1 0001 $0 $0

MOD 2 0002 $0 $0

MOD 3 0003

MOD TOTAL: $0 $0 $0

MOD RATE (%) #DIV/0! #DIV/0! #DIV/0!

PENDING CHANGE

REQUESTS

RFP

RECV’D

DATE

EST ADJ

PERF

PERIOD

D-B ($)

IO-T ($)

Option

OP ($)

Option

DESCRIPTION (DB/IO/OP)

CR 1 0001

CR 2 0002

CR TOTAL: $0 $0 $0

EXPOSURE RATE

#DIV/0! #DIV/0! #DIV/0!

POTENTIAL

CHANGES

RISK # ID DATE

EST ADJ

PERF

PERIOD

D-B ($)

IO-T ($)

Option

OP ($)

Option

DESCRIPTION (DB/IO/OP)

PC 1 0001

PC 2 0002

PC TOTAL: $0 $0 $0

EXPOSURE RATE

#DIV/0! #DIV/0! #DIV/0!

$0 $0 $0 $0 $0 $0 $0 $0 $0

CURRENT AWARDED TOTAL ($) (include base PENDING AWARDED TOTAL ($) (unawarded

CURRENT & PENDING TOTAL

Activity # Proposed Schedule

(preaward) Master Schedule (post award submission) Actual (Revised)

Contract Award 1 Notice-to-Proceed (Design) 2 Project Kick-off (Telecon) 3 Charette/Site Investigation 4 Preliminary Meetings 5 FFE-LVS User Interviews 35% FFE Inventory (on site) 6 Design/FFE-LVS Submittal 35% - Review Conference (on site) 7 Design/FFE-LVS Submittal 35% – Resolution Conference (telecon) 8 Change/Mod Reconcilation Meeting (if required) 9 Prefinal Meetings 10 FFE-LVS User Interviews 65% & FFE Inventory (on site) 11 Design/FFE-LVS Submittal 65% - Review Conference (on site) 12 Design/FFE-LVS Submittal 65% – Resolution Conference (telecon) 13 Change/Mod Reconcilation Meeting (if required) 14 Final Meetings 15 FFE-LVS User Interviews 100% & FFE Inventory (on site) 16 Design/FFE-LVS Submittal 100% - Review Conference (on site) 17 Design/FFE-LVS Submittal 100% – Resolution Conference (telecon) 18 Change/Mod Reconcilation Meeting (if required) 19 Corrected Final Meetings 20 FFE-LVS User Interviews 100% corrected 21 Design/FFE-LVS Submittal 100% corrected - Review Conference (on site) 22 Design/FFE-LVS Submittal 100% corrected – Resolution Conference (telecon) 23 Change/Mod Reconcilation Meeting (if required) 24 Pre-Construction Meeting. 25 Pre-Construction Submittal Review Meeting 26 Notice-to-Proceed (Demo & TPF Const.) 29 Notice-to-Proceed (Construction - Main Project) 30 Move/Prep Departments Complete 31 Phase 1-Precon 32 Phase 1-Demo Start 33 Phase 1- Construction End 34 Phase 1-Commissioning Start 35 Phase 1-Preliminary Inspections (LS, MEP, LVS, FFE) 36

TAB 3-SCHEDULE-KEY MILESTONES

REV 1.2 (No IO)

Activity # Proposed Schedule

(preaward) Master Schedule (post award submission) Actual (Revised)

Phase 1-Gov't Inspections (MEP-Arch) 37 Phase 1-Gov't Inspections (LVS) 38 Phase 1-Gov't Inspections (FFE) 39 Phase 1-FFE-LVS Testing/Certification/Training 40 Phase 1-Final Cleaning 41 Phase 1-Final Acceptance 42 Phase 1-As-Built Docs & Closeout 43 Phase 1- Open for Business 44 Phase 2-[all items same as above] 45 Phase X (to be continued all items as above) 49 Total Project -Commissioning 50 Total Project-Inspection/Warranty 51 Total Project-Final Acceptance 52 Final FFE-LVS Acceptance 53

Beneficial Occupancy Date (BOD)

Early Access

Open for Business (OFB)

The date the Using Agency accepts and occupies the area.

When the government must access select rooms/departments prior to OFB in order to install select systems or equipment (i.e. communication systems or radiology equipment).

The date medical staff starts seeing patients/practicing medicine.

DEFINITIONS

# Date Entered Risk

Plan to Minimize

Risk

Current Status

Planned Resolution

Date

Actual Date Resolved

Est Impact to Critical

Path (Days)

Est Impact to

Cost

Risk Type (Owner/Con tractor)

"Level of Risk” (R/G/Y)

1 $10.00 R 2 -$5.00 G 3 Y

Total $ 5.00

Chronicle each risk on a weekly basis

Note: Formal time/cost notification must be accomplished via FAR Clause

TAB 6-PDT DISTRO

REV 1.2 (No IO)

CONTRACT #: (Construction)

AGENCY NAME OFFICE ROLE/

POSITION ADDRESS E-MAIL PHONE Invites/Minutes/

Corres

Construction Submittals/Shop

Drawings

# # Elect Elect Hard Copy Elect Hard

Copy Elect Hard Copy Elect Hard

Copy Elect Hard Copy

SEE ATTACHED

SUBMITTAL

REGISTER

1 USACE TBD USACE-

SWL

Project Manager

Medical Support Branch - Little Rock District, CESWL-PM-S 700W Capitol St., Little Rock, AR 72207

1 1 1 0 1 0 1 0 1 1 1 1

2 USACE TBD USACE-

SWL

Technical Manager

See above 2 1 1 0 1 0 1 0 1 1 0 0

3 USACE TBD USACE-

SWL

ACO See above 3 1 1 0 1 0 1 0 1 0 0 0

4 USACE TBD USACE-

TBD

COR/Project Engineer

TBD (on-site) [If team member from MEDCOM/HFPA change "Agency"]

4 1 1 0 1 0 1 0 1 1 1 0

5 USACE TBD USACE-

TBD

QAR/Quality Assurance Representative

TBD (on-site) [If team member from MEDCOM/HFPA change "Agency"]

5 1 1 1 1 1 1 1 1 1 1 1

6 MEDCOM TBD TBD Director Restoration & Modernization

TBD 6 1 1 0 1 0 1 0 1 1 1 0

7 MEDCOM TBD TBD Project Integrator

TBD 7 1 1 0 1 0 1 0 1 0 0 0

8 MEDCOM TBD TBD Medical Programs Manager

TBD 8 1 1 0 1 0 1 0 1 0 0 0

9 MEDDAC TBD TBD Facility Manager

TBD

10 HFPA TBD TBD TBD US Army Health Facility Planning Agency 7700 Arlington Blvd, Suite 5147 Falls Church, VA 22042-5147

10 1 1 0 1 0 1 0 1 1 1 1

11 DPW TBD TBD TBD TBD (on-site) 11 1 1 0 1 0 1 0 1 0 1 0

12 GOVT RMS All submittals and official communication MUST be submitted to RMS. Design Submittal Material may go through AMRDEC, but a copy of the cover letter will be submitted to RMS for project documentation

12 1 1 0 1 0 1 0 1 0 1 0

13 USACE Greg Yada USACE-

SWL

Program Manager

See above 13 0 0 0 0 0 0 0 0 0 0 0

14 USACE USACE-

SWL

Construction Branch

See above 14 0 0 0 0 0 0 0 0 0 0 0

15 USACE TBD USACE-

SWL

Contracting Officer

See above 15 0 0 0 0 0 0 0 0 0 0 0

16 USACE TBD USACE-

SWL

Contract Specialist

See above 16 0 0 0 0 0 0 0 0 0 0 0

17 MEDCOM MEDCOM

/ G-9

17 0 0 0 0 0 0 0 0 0 0 0

18 MEDCOM MEDCOM/

G-9

18 0 0 0 0 0 0 0 0 0 0 0

EXTENDED PROJECT DELIVERY TEAM SUPPORT

CORE PROJECT DELIVERY TEAM & DISTRIBUTION LIST NOTE: all hard copy drawings are half-sized

SUBMITTALS (Design, FFE-LVS, Precon, Closeout)PROJECT:

Submittal #1 Submittal #2 Submittal #3 SID/CID Boards Corrected

/Quantified Final Submittal

CONTRACT #: (Construction)

AGENCY NAME OFFICE ROLE/

POSITION ADDRESS E-MAIL PHONE Invites/Minutes/

Corres

Construction Submittals/Shop

Drawings

# # Elect Elect Hard Copy Elect Hard

Copy Elect Hard Copy Elect Hard

Copy Elect Hard Copy

SEE ATTACHED

SUBMITTAL

REGISTER

CORE PROJECT DELIVERY TEAM & DISTRIBUTION LIST NOTE: all hard copy drawings are half-sized

SUBMITTALS (Design, FFE-LVS, Precon, Closeout)PROJECT:

Submittal #1 Submittal #2 Submittal #3 SID/CID Boards Corrected

/Quantified Final Submittal

19 MEDCOM MEDCOM/

G-9

19 0 0 0 0 0 0 0 0 0 0 0

20 MEDCOM MEDCOM/

G-9

0 0 0 0 0 0 0 0 0 0 0

21 HFPA HFPA 21 0 0 0 0 0 0 0 0 0 0 0

22 HFPA HFPA 22 0 0 0 0 0 0 0 0 0 0 0

23 HFPA HFPA 23 0 0 0 0 0 0 0 0 0 0 0

24 NEC DPW NEC TBD (on-site) 24 0 0 0 0 0 0 0 0 0 0 0

25 DPW DPW Fire Department

(AHJ)

TBD (on-site) 25 0 0 0 0 0 0 0 0 0 0 0

26 DPW DPW Environmental see DPW representative in Core PDT 26 0 0 0 0 0 0 0 0 0 0 0

27 DPW DPW Engineering see DPW representative in Core PDT 27 0 0 0 0 0 0 0 0 0 0 0

28 DPW DPW see DPW representative in Core PDT 28

29 A-E 3 (Peer review)

TBD TBD Project Manager (Field)

TBD 29 1 1 1 1 1 1 1 1 1 1 1

30 A-E 3 (Peer review)

TBD TBD Project Manager (Office)

TBD 30 0 0 0 0 0 0 0 0 0 0 0

31 A-E 3 (Peer review)

TBD TBD Mechanical see above 31 0 0 0 0 0 0 0 0 0 0 0

32 A-E 3 (Peer review)

TBD TBD Electrical see above 32 0 0 0 0 0 0 0 0 0 0 0

33 A-E 3 (Peer review)

TBD TBD Life Safety see above 33 0 0 0 0 0 0 0 0 0 0 0

34 A-E 3 (Peer review)

TBD TBD Structural see above 34 0 0 0 0 0 0 0 0 0 0 0

TOTALS: 12 12 2 12 2 12 2 12 7 8 4

1-PROJECT OVERVIEW
2-COSTS
3-SCHEDULE&REPORTS
4-RISKS
5-PDT-DISTRO

File details come from the government source that posted it. Updated .