000_Div_00_TOC_DB_MATOC_2.pdf

PDF 244 KB Posted

Attached to
Army MEDCOM DB MATOC 2. 0
Solicitation number
W9127S19R6002
Issued by

About this file

This document outlines a federal contract opportunity for design-build services for the U.S. Army Medical Command's Medical Sustainment, Restoration and Modernization program. The multiple award task order contract has an estimated value of $250 million to $500 million and will be awarded to up to five contractors for a five-year base period. Services will include design, construction, repair, and alteration of active medical facilities such as hospitals, clinics, administrative buildings, and warehouses across the continental U.S., Alaska, and Hawaii. Offerors must register in the System for Award Management and submit capability statements and past performance information by July 23, 2019 for evaluation and selection of the most qualified firms to participate in the two-phase selection process. The U.S. Army Corps of Engineers and U.S. Army Medical Command will award up to five indefinite delivery, indefinite quantity contracts for design-build services to support the Medical Sustainment, Restoration and Modernization program through 2024.

Div 00 TOC DB MATOC 2

View the file

Other files

File Type Posted
ProjNetQuestionsAnswers.pdf PDF
Amendment02.pdf PDF
AttachmentF.pdf PDF
Phase1Factor3.pdf PDF
Amedment_01_Attachment.pdf PDF
Amendment01.pdf PDF
01_PWS_MEDCOM_DB_MATOC_2.pdf PDF
10_Attach_J_Installation_Reqs.pdf PDF
08_Attach_G_Submittals.pdf PDF
Solicitation.pdf PDF
09_Attach_H1_Project_Delivery_Team.pdf PDF
07_Attach_F2_Div_01_Listing.pdf PDF
07_Attach_F1_Code_Crit_Stand.pdf PDF
09_Attach_H2_Templates.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEDCOM Design Build MATOC 2.0 Phase I Division 00 – Bidding Requirements

U.S. Army Corps of Engineers

BUILDING STRONG

Division 00 - Bidding Requirements for:

Phase I

DESIGN – BUILD MEDICAL MATOC 2.0

R E V I S E D : Spring FY19

REV: Spring 2019

Division 00 Table of Content

1.1 - RFP Table of Content

1.2 - Bidding Requirements

1.3 - Bid Schedule (TASK ORDER ONLY)

1.4 - Design Construct Cost Data (TASK ORDER ONLY)

RFP – Table of Content

DB MATOC – Task Order Name

RFP TABLE OF CONTENT

SECTION TITLE SUBTITLE/SECTIONS

Division 00 Bidding Requirements

00.1 RFP Package Table of Content

00.2 Bidding Requirements –

Solicitation/Contract Form (SF 1442) Section 00 11 00 – CLIN Schedule

Section 00 22 11 – Proposal Sub. Requirements, Eval.

Crit., Basis of Award

Section 00 72 00 – Contract Section 00 73 00 – Special Contract Requirements

Section 00 73 46 – Wage Determination Schedule

NOT REQUIRED PHASE I

00.3 Bid Schedule – NOT REQUIRED PHASE I

00.4 Design-Construction Cost Data - NOT REQUIRED

PHASE I

PWS Performance Work Statement I. Project Requirements II. Project Team Qualifications III. Administrative Requirements IV. Design & Preconstruction V. Construction VI. Closeout & Warranty VII. Attachments List VIII. Acronyms

Attachments PWS-Attachments Technical Provisions (Attachments A – J) Attach A Project Objectives - PROVIDED WITH TASK ORDER

Attach B Drawings - PROVIDED WITH TASK ORDER

Attach C Program for Design - PROVIDED WITH TASK ORDER

Attach D Power, Furnishings, and Equipment - Low Voltage Systems

- PROVIDED WITH TASK ORDER

DB MATOC – Task Order Name

Attach E Existing Condition Information - PROVIDED WITH TASK ORDER

Attach F Codes, Criteria & Standards F.1 Codes, Criteria, and Standards List

F.2 Division 01 Listing (LISTING NOT INCLUDED

WITH TASK ORDERS)

F.3

Task Order Division 01 Requirements- PROVIDED

WITH TASK ORDER

Attach G Submittal Requirements - EXAMPLE PROVIDED WITH PHASE 1

Attach H Weekly Report Template /Project Delivery Team

H.1 Project Delivery Team H.2 Templates Project Overview Costs Schedule Risk PDT Distributions

Attach J Installation Requirements - TASK ORDER SPECIFIC, TEMPLATE

PROVIDED WITH PHASE 1 AS EXAMPLE

1.2 ‐ Bidding Requirements

1.3 ‐ Bidding Schedule

00.4 – Design Construct Cost Data

1.1 - RFP Table of Content
RFP – Table of Content
1.2 ‐ Bidding Requirements

File details come from the government source that posted it. Updated .