AM05 DRAWINGS.pdf
PDF 13 MB Posted
- Solicitation number
- W9127820R0104
About this file
This document provides details for a federal contract solicitation to construct a new aircraft maintenance hangar at Hurlburt Field, Florida. The solicitation seeks to award a contract for construction of a 105,041 square foot maintenance hangar, aircraft maintenance unit with shops, and weapons shop with reinforced concrete foundation and floor slab, steel structure, masonry walls and standing seam metal roof. Supporting facilities will include utilities, pavements, site improvements, communications and demolition of seven existing buildings to provide a complete and usable facility. Roadway and parking will include associated primary utilities and communications as well as realignment of existing infrastructure as required. Airfield pavements are also required to provide access to the hangar. Special site conditions require excavation, fill and stabilization. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Mobile.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AM05.pdf | ||
| AM04.pdf | ||
| AM04 DRAWINGS.pdf | ||
| AM03.pdf | ||
| Minutes-Pre-Bid site visit.pdf | ||
| Minutes-Pre-Bid demo site visit.pdf | ||
| AM03 DRAWINGS.pdf | ||
| AM02.pdf | ||
| APPENDIX F- As Builts of Demo Buildings- 1 of 3.zip | ZIP file | |
| APPENDIX F- As Builts of Demo Buildings- 2 of 3.zip | ZIP file | |
| APPENDIX F- As Builts of Demo Buildings- 3 of 3.zip | ZIP file | |
| AM01 Drawings.pdf | ||
| AM01.pdf | ||
| RTA DRAWINGS VOL 2.pdf | ||
| VOL3.PDF | ||
| VOL2.PDF | ||
| VOL4.PDF | ||
| RTA DRAWINGS VOL 1.pdf | ||
| VOL6.PDF | ||
| VOL1.PDF | ||
| VOL5.PDF | ||
| EM 385-1-1.pdf | ||
| RTA DRAWINGS VOL 3.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
MOBILE DISTRICT
109 SAINT JOSEPH STREET
MOBILE AL 36602
FTEV153009 SOF AMU &
WEAPONS HANGAR FACILITY
HURLBURT FIELD, FLORIDA
OKALOOSA COUNTY
AUGUST 2020
MOBILE DISTRICT PROJECT CODE: MEF20004
SOLICITATION NUMBER: W9127820R0104
AMENDMENT NO. 0005
GENERAL PROJECT NOTES:
1. CONSTRUCTION ACCESS FOR COMMERCIAL VEHICLES TO THE PROJECT
SITE SHALL BE THROUGH THE COMMERCIAL VEHICLE GATE ON DOWNS
ROAD. POV ACCESS THROUGH THE MAIN GATE OR BACK GATE. SEE
DRAWING GC003 AND GC004.
2. CONTRACTORS SHALL KEEP ALL ROADS AND STREETS CLEAN OF
CONSTRUCTION DEBRIS, MUD, ETC. AT ALL TIMES. CONTRACTOR SHALL
PROVIDE EQUIPMENT AND PERSONNEL TO CLEAN ANY STREETS AS
REQUESTED BY THE CONTRACTING OFFICER. CONTRACTOR IS
RESPONSIBLE FOR ALL REPAIRS TO STREETS, PARKING AREAS, AND BASE
OR GOVERNMENT PROPERTY, DUE TO DAMAGE BY THEIR CONSTRUCTION
ACTIVITIES. CONTRACTOR SHALL PROVIDE PHOTOGRAPHS AND/OR VIDEO
RECORDING OF THE EXISTING CONDITIONS. CONTRACTOR SHALL
COORDINATE WITH THE CONTRACTING OFFICER FOR A PRE-CONSTRUCTION
VIDEO DETAILING THE EXISTING CONDITION OF ACCESS POINTS, HAUL
ROUTES, AND LAYDOWN AREAS TO BE PERFORMED. SEE SPEC SECTION 01
00 00.
3. CONTRACTOR SHALL CONNECT TO EXISTING OR NEW FIRE HYDRANTS FOR
TEMPORARY CONSTRUCTION WATER. INSTALL QUICK DISCONNECT, BACK
FLOW PREVENTOR, AND SHUT OFF VALVE WITH METER ON 2
" HOSE
CONNECTION ONLY.
4. CONTRACTOR SHALL OBTAIN A DIG PERMIT FROM 1 SOCES WHOM SHALL
MARK ALL ACTUAL LOCATIONS OF ALL UNDERGROUND CABLE AND UTILITIES
(COMM, WATER, ETC.) BEFORE THE START OF CONSTRUCTION. CAUTION
SHALL BE TAKEN BY THE CONTRACTOR AROUND ANY U.G. CABLE OR
UTILITY. ANY DAMAGE SHALL BE REPAIRED OR REPLACED TO THE
SATISFACTION OF C.O.R. AT NO ADDITIONAL COST TO THE GOVERNMENT.
5. CONTRACTOR IS REQUIRED TO FILE FAA FORM 7460 IN REFERENCE TO THE
CONTRACTOR'S SITE CONSTRUCTION EQUIPMENT. SEE EQUIPMENT AND
STOCKPILE HEIGHT NOTES.
6. CONTRACTOR SHALL COMPLETE THE STORMWATER POLLUTION
PREVENTION PLAN (SWPPP). REFER TO THE SPECIFICATIONS FOR DETAILS
ON STORMWATER POLLUTION PREVENTION MEASURES FOR THIS PROJECT.
CONTRACTOR IS RESPONSIBLE FOR FOLLOWING ALL FLORIDA DEP
REQUIREMENTS FOR EROSION CONTROL. THIS PROJECT SHALL BE
CONSTRUCTED IN COMPLIANCE WITH PART 91 OF ACT 451 OF 1994, AS
AMENDED, THE SOIL EROSION AND SEDIMENT CONTROL ACT. CONTRACTOR
IS RESPONSIBLE FOR COORDINATING ALL REQUIREMENTS WITH STATE AND
LOCAL AUTHORITIES AND DOCUMENTS TO BE SUBMITTED FOR PERMITTING.
SEE ENVIRONMENTAL AND RESOURCE NOTES - NOTE 4 ON GC008.
7. THE STABILIZED CONSTRUCTION ENTRANCE LOCATION, AS SHOWN SHALL
BE INSTALLED BY THE CONTRACTOR AND COORDINATED AND APPROVED
BY THE CONTRACTING OFFICER.
8. CONTRACTOR SHALL STOP WORK IMMEDIATELY AND CONTACT THE
CONTRACTING OFFICER IF A UTILITY LINE IS DISTURBED.
9. ALL WORK SHALL BE SUBJECT TO INSPECTION BY AUTHORIZED PERSONNEL
OF STATE, LOCAL, AND GOVERNMENT REGULATORY AGENCIES AND THE
CONTRACTING OFFICER.
10. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE PLANS AND
SPECIFICATIONS, STATE, LOCAL, AND GOVERNMENT CODES, ORDINANCES,
AND REGULATIONS. IN CASE OF CONTRADICTION OR DISCREPANCY
BETWEEN REQUIREMENTS, CONTRACTOR SHALL INCORPORATE
WHICHEVER IS MOST STRINGENT. WHERE A QUESTION REMAINS ON WHICH
REQUIREMENT IS MOST STRINGENT, CONTRACTOR SHALL SUBMIT ISSUE TO
THE CONTRACTING OFFICER IN WRITING. THE DECISION OF THE
CONTRACTING OFFICER SHALL BE CONSIDERED FINAL.
11. INSTALL A TEMPORARY FENCE AROUND THE CONSTRUCTION ZONE
STAGING AREA AND LAYDOWN AREAS AS NEEDED FOR SECURITY OF
EQUIPMENT AND MATERIALS AS DIRECTED BY CONTRACTING OFFICER. SEE
DRAWING GC004.
12. COORDINATE THE DISCONNECTION OF UTILITIES THROUGH THE
CONTRACTING OFFICER. DEMOLITION SHALL NOT BEGIN UNTIL WRITTEN
BASE APPROVAL IS RECEIVED. ALL EXISTING UTILITIES ARE TO BE
TERMINATED AT THEIR POINT OF CONNECTION TO THE MAINS. WHERE
CONNECTIONS OF NEW UTILITIES TO EXISTING UTILITIES ARE SHOWN ON
THE PLANS, THE CONTRACTOR SHALL EXPOSE THE EXISTING LINES AT THE
PROPOSED CONNECTIONS TO VERIFY THE LOCATIONS AND DEPTHS PRIOR
TO EXCAVATION FOR THE NEW LINES.
13. THE CONTRACTOR SHALL EXPOSE, VERIFY AND BACKFILL ALL EXISTING
UNDERGROUND UTILITIES AND STRUCTURES AT UTILITY CROSSINGS PRIOR
TO EXCAVATION OF PIPELINE TRENCH. UTILITY CROSSINGS AT A DEPTH
GREATER THAN 12-INCHES BELOW TRENCH BOTTOM DO NOT NEED TO BE
EXPOSED. UTILITY ALIGNMENT AND GRADE MAY BE CHANGED IF THERE ARE
CONFLICTS WITH ANY EXISTING UNDERGROUND UTILITIES AND
STRUCTURES, WHETHER SHOWN ON THE PLANS OR NOT. COORDINATE
WITH THE CONTRACTING OFFICER AND DESIGN ENGINEER.
14. FACILITIES IN THE UTILITY CORRIDOR SHALL BE RESTORED UPON
COMPLETION OF CONSTRUCTION. PAVEMENTS, FENCES, VEGETATION, AND
OTHER LANDSCAPING SHALL BE REPLACED IN LIKE KIND TO THE ORIGINAL
FEATURES AND TO THE APPROVAL OF THE CONTRACTING OFFICER.
COORDINATE WITH CONTRACTING OFFICER.
15. CONTRACTOR IS RESPONSIBLE FOR MOWING AND MAINTAINING ALL AREAS
WITHIN THE PROJECT LIMITS. FROM NOTICE-TO-PROCEED DATE THROUGH
THE DURATION OF THE PROJECT. MOW TO A MAXIMUM AVERAGE HEIGHT
OF 3-INCHES FOR SPRING/SUMMER MAINTENANCE AND 6-INCHES FOR
FALL/WINTER MAINTENANCE.
16. EROSION CONTROL DEVICES SHALL BE USED FOR THE STAGING AREA AND
ANY MATERIAL STOCK PILES WHEN NECESSARY TO CONTROL EROSION AND
STORM WATER RUNOFF, IN ACCORDANCE WITH ALL FEDERAL, STATE, AND
LOCAL REGULATIONS.
17. THE CONTRACTOR SHALL TAKE THE STEPS TO ENSURE THAT PROJECT
CONSTRUCTION ACTIVITY DOES NOT INTERFERE WITH REGULAR BASE
OPERATIONS. REGULAR BRIEFINGS SHALL BE CONDUCTED BY THE
CONTRACTOR WITH THE RESPONSIBLE BASE OFFICIALS FOR THE PURPOSE
OF COORDINATING CONSTRUCTION ACTIVITIES AND SCHEDULED BASE
OPERATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING THE INTERVAL (WEEKLY, BIWEEKLY, ETC.) FOR THE
REQUIRED BRIEFINGS PRIOR TO COMMENCEMENTS OF SITE
CONSTRUCTION ACTIVITY. THE BASE COMMANDER AND/OR THE
CONTRACTING OFFICER'S REPRESENTATIVE SHALL HAVE THE AUTHORITY
TO IMMEDIATELY SUSPEND AUTHORIZATION TO WORK IN A PARTICULAR
AREA OF THE SITE DURING MILITARY EMERGENCIES OR FOR BASE
SECURITY REASONS.
ACCESS AND SAFETY NOTES:
1. THE GENERAL CONTRACTOR'S WORKING HOURS, AND ACCESS TO THE SITE
ARE DEFINED AS DAYLIGHT HOURS, MONDAY THRU FRIDAY, EXCEPT ON
FEDERAL HOLIDAYS OR ASSOCIATED MILITARY DOWN DAYS, UNLESS
APPROVED OTHERWISE. WORK SCHEDULED AFTER NORMAL WORKING
HOURS SHALL BE SUBMITTED IN WRITING TO THE COR 30 DAYS IN ADVANCE
OF THE WORK TO BE PERFORMED SO THAT BASE OPERATIONS CAN
COORDINATE. SUBMITTAL DOES NOT GUARANTEE APPROVAL
2. ACCESS TO THE PROJECT FOR ALL CONTRACTOR PERSONNEL, VEHICLES,
AND EQUIPMENT IS ILLUSTRATED ON GC003. ACCESS ROUTES MAY BE
SUBJECT TO CHANGE BASED ON OPERATIONAL REQUIREMENTS ON BASE.
POTENTIAL SCHEDULE IMPACTS SHALL BE COORDINATED WITH THE
CONTRACTING OFFICER.
3. THE EXISTING BASE ROAD SPEED LIMITS AND LOAD LIMITS ARE STRICTLY
ENFORCED. ALL CONCRETE TRUCKS SHALL PUT DOWN EXTRA AXLES
WHEN TRAVELING ON HURLBURT AIRFIELD PROPERTY.
4. CONTRACTOR SHALL PROVIDE AND INSTALL A PROFESSIONALLY PAINTED
SIGN, MEETING CONTRACTING OFFICER APPROVAL, AT THE CONSTRUCTION
ENTRANCE TO DIRECT MATERIAL SUPPLIERS AND EMPLOYEES TO THE
CONSTRUCTION SITE. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE
OF 48 HOURS TO THE CONTRACTING OFFICER REGARDING OVERSIZED OR
CONSTRUCTION DELIVERIES TO THE HURLBURT AIRFIELD COMMERCIAL
TRUCK GATE PRIOR TO THOSE DELIVERIES. DELIVERIES SHALL BE
SCHEDULED MONDAY - FRIDAY, 0400 TO 1600. CONTRACTOR SHALL
COORDINATE DELIVERIES WITH BASE SECURITY FORCES BY SUBMISSION
OF THE CORRECT ENTRY PASS PAPERWORK VIA THE CONTRACTING
OFFICER.
5. EXISTING BASE ROADS USED AS HAUL ROADS SHALL BE MAINTAINED SUCH
THAT UNOBSTRUCTED ACCESS WILL BE PROVIDED AT ALL TIMES FROM THE
ROAD TO THE STAGING AREA AND FROM THE STAGING AREA TO THE WORK
SITE AND FACILITATE GOVERNMENT ACCESS TO THE BASE AT ALL TIMES.
THE MAINTENANCE OF HAUL ROADS SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT. THE HAUL
ROAD LOCATIONS SHALL BE AS INDICATED ON THE DRAWINGS AND
APPROVED BY THE CONTRACTING OFFICER. CONTRACTOR IS REQUIRED TO
IMMEDIATELY CLEAN ANY DEBRIS DEPOSITED ONTO THE SITE, ROADS, ETC
FROM CONTRACTOR'S EQUIPMENT OR OPERATIONS. MATERIAL DROPPED
WITHIN THESE AREAS SHALL BE CONTINUOUSLY REMOVED BY SURFACE
SWEEPERS OR OTHER APPROVED METHODS DURING WORKING HOURS.
CONTRACTOR TO MAINTAIN ONE FULLY OPERATIONAL STREET
SWEEPER/VAC TRUCK ON SITE AT ALL TIMES.
6. CONTRACTOR SHALL COORDINATE ACTIVITIES THROUGHOUT THE PROJECT
IN A MANNER THAT ALLOWS EMERGENCY ACCESS TO ALL EXISTING
ROADWAYS AT ALL TIMES WITHOUT DELAYS TO EMERGENCY VEHICLE'S
RESPONSE TIME. CONTRACTOR SHALL MAINTAIN AT ALL TIMES ONE FIRE
LANE FREE FROM OBSTRUCTION AND MAINTAIN ACCESS TO AND THROUGH
THE SITE, AND SURROUNDING ROADS AND STREETS.
7. NOT USED.
8. CONTRACTOR SHALL COORDINATE WITH CONTRACTING OFFICER'S
REPRESENTATIVE CONCERNING ANY GOVERNMENT-OWNED EQUIPMENT
REQUIRING RELOCATION TO COMPLETE PROJECT WORK.
9. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, THE CONTRACTOR'S
CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE PARKED WITHIN THE
STAGING AREA OR FENCED CONSTRUCTION AREA.
10. ALL AREAS DISTURBED BY ANY CONSTRUCTION ACTIVITIES INCLUDING
STOCKPILE AREAS, MATERIAL LAYDOWN , EQUIPMENT PARKING,
CONTRACTOR PARKING, EARTHWORK ACTIVITIES, UTILITY TRENCHING,
OVERHEAD UTILITY WORK, ETC SHALL BE RESTORED TO EXISTING
CONDITIONS. ALL AREAS NOT DESIGNATED FOR PAVEMENT OR GRAVEL
SURFACING SHALL BE COVERED WITH A MINIMUM 4-INCHES OF TOPSOIL,
SODDED, AND IRRIGATED/MAINTAINED FOR A MINIMUM OF 12 MONTHS OR
UNTIL 95% COVERAGE OF GROUND COVER PER THE SPECIFICATIONS.
11. CONTRACTOR SHALL PROVIDE ALL NECESSARY WATER AND TOILET
FACILITIES FOR HIS WORKERS WITHIN THE CONSTRUCTION ZONE.
CONTRACTOR WORKERS SHALL NOT USE GOVERNMENT FACILITIES UNLESS
SPECIFICALLY INDICATED OTHERWISE. LOCATIONS OF FACILITIES SHALL BE
COORDINATED WITH CONTRACTING OFFICER.
12. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO CONSTRUCTION
ACTIVITIES, CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER,
POLICE, LOCAL FIRE AUTHORITY, AND ALL OTHER EMERGENCY SERVICES
OF THE CLOSURE AT LEAST 21 DAYS IN ADVANCE FOR APPROVAL. SEE
NOTE 6 UNDER TRAFFIC CONTROL.
13. NO WORK WITHIN THE QD SAFETY DISTANCES SHOWN ON THE SHEET
GC005 WILL BE ALLOWED WHEN MUNITIONS ARE PRESENT.
COORDINATION AND COMMUNICATION DURING
CONSTRUCTION:
1. CONTRACTOR SHALL APPOINT A PROJECT MANAGER AND CONSTRUCTION
SUPERINTENDENT, SUBJECT TO THE APPROVAL OF THE CONTRACTING
OFFICER, WHO SHALL BE PRESENT ON THE CONSTRUCTION SITE AT ALL
TIMES DURING WORKING HOURS WHILE JOB IS IN PROGRESS. THE
PROJECT MANAGER SHALL BE DESIGNATED THE RESPONSIBLE
CONTRACTOR'S REPRESENTATIVE WHO SHALL BE AVAILABLE ON A 24-HOUR
BASIS. WHEN THE CONTRACTOR'S REPRESENTATIVE IS NOT AVAILABLE ON
THE CONSTRUCTION SITE, AN ALTERNATE REPRESENTATIVE SHALL BE
PROVIDED. CONTRACTOR SHALL PROVIDE NAMES AND CONTACT
INFORMATION OF REPRESENTATIVES TO THE COR PRIOR TO THE START OF
CONSTRUCTION ACTIVITIES.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONSTANT
COORDINATION BETWEEN ANY SUBCONTRACTORS AND THE COR. ALL
CONSTRUCTION ACTIVITIES PLANNED BY THE CONTRACTOR SHALL BE
REVIEWED AND APPROVED BY THE COR.
TRAFFIC CONTROL:
1. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL CORDON OFF THE
WORK AREAS AND STREET CROSSINGS BY USING BARRICADES APPROVED
BY THE CONTRACTING OFFICER.
2. ALL CONSTRUCTION EQUIPMENT AND CONTRACTOR CONSTRUCTION
VEHICLES SHALL BE MARKED WITH COMPANY PAINTED DESIGNS, INSIGNIAS
OR OTHER COMPANY MARKINGS, WHICH ARE CLEARLY VISIBLE.
3. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING DEVICES
TO SOUND AN ALARM WHEN MOVING IN REVERSE.
4. ONLY RUBBER-TIRED VEHICLES SHALL BE ALLOWED ON EXISTING
PAVEMENT THAT IS TO REMAIN.
5. NON-CONSTRUCTION PEDESTRIAN TRAFFIC SHALL NOT BE ALLOWED INSIDE
THE CONSTRUCTION FENCE LIMITS.
6. CONTRACTOR SHALL PROVIDE A MINIMUM 21 DAY NOTICE TO HURLBURT
AIRFIELD CE OFFICE AND THE CONTRACTING OFFICER PRIOR TO ANY
REQUESTED ROAD CLOSURE. THE 21 DAY ADVANCE NOTICE DOES NOT
MEAN THE REQUEST WILL BE AUTOMATICALLY APPROVED. THE 21 DAYS
PROVIDES NECESSARY TIME FOR BASE CE TO COORDINATE AND VERIFY IF
CLOSURE IS ACCEPTABLE. CONTRACTOR SHALL WORK WITH THE BASE CE
AND CONTRACTING OFFICER TO FINALIZE DATES IF THE BASE HAS
CONFLICTS WITH OTHER ACTIVITIES.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING AND SUBMITTING
OUTAGE REQUEST WITH BASE CE OFFICE FOR ANY WORK BLOCKING TEN
OR MORE EXISTING PARKING SPACES.
8. PRIOR TO THE REMOVAL OF BARRICADES AND TRAFFIC CONTROL DEVICES,
THE CONTRACTOR SHALL REQUEST THE COR TO SCHEDULE AN
INSPECTION. NO ROADWAY OR PORTION OF THE AIRFIELD SHALL BE
RE-OPENED UNTIL THE COR HAS COMPLETED INSPECTION AND APPROVED
THE RE-OPENING OF THE ACTIVE AREAS INCLUDING AIRFIELD FOD SWEEPS.
9. CONTRACTOR SHALL ATTEND ANY SPONSOR-MANDATED VEHICLE
OPERATOR OR FOREIGN OBJECT DEBRIS/DAMAGE (FOD) CONTROL
TRAINING COURSE, INCLUDING THE AIRFIELD DRIVING COURSE AS
REQUIRED BY AIRFIELD MANAGEMENT AND BASE OPERATIONS.
EQUIPMENT AND STOCKPILE HEIGHT:
1. TEMPORARY OBSTRUCTIONS, SUCH AS CRANES, MUST BE MARKED AND
LIGHTED IN ACCORDANCE WITH FAA AC 70/7460. ALL HAZARDOUS AREAS
(SUCH AS EXCAVATIONS OR STOCKPILED MATERIALS) MUST BE DELINEATED
WITH LIGHTED BARRICADES ON ALL EXPOSED (VISIBLE OR ACCESSIBLE)
SIDES. CONTRACTOR SHALL PROVIDE ALL NECESSARY INFORMATION TO
THE BASE CE FOR CONSTRUCTION CRANES, EQUIPMENT, AND RELATED
EQUIPMENT, AND RELATED ACTIVITIES. ALL FORMS SHALL BE APPROVED
PRIOR TO USING OR BRINGING EQUIPMENT ON SITE. BASE CE TO SUBMIT
7460 FORMS TO FAA FOR PERMANENT BUILDING. CONTRACTOR TO SUBMIT
7460 FORMS TO FAA FOR ALL TEMPORARY CONSTRUCTION.
2. THE MAXIMUM ALLOWABLE HEIGHT OF CONSTRUCTION EQUIPMENT
OPERATING IN AN AIRCRAFT OPERATIONS AREA IS GOVERNED BY FAA AC
150/5370-2F AND AC 150/5300-13A (CURRENT EDITIONS). TEMPORARY
OBSTRUCTIONS, SUCH AS CRANES AND EQUIPMENT LESS THAN 150'-0" IN
HEIGHT REQUIRE ADDITIONAL LOCAL APPROVAL AS WELL AS FAA 7460
APPROVAL. COORDINATE WITH CONTRACTING OFFICER AND BASE CE
OFFICE FOR LOCAL OBSTRUCTION APPROVAL. WHEN EQUIPMENT IS
EXPECTED TO PENETRATE THE AIRFIELD APPROACH SURFACES OR WHEN
CRANES WILL BE USED ON-SITE, CONTRACTOR SHALL PROVIDE A MINIMUM
NOTICE OF 60 DAYS TO THE CONTRACTING OFFICER AND BASE AIRFIELD
OPERATIONS PRIOR TO THE START OF CONSTRUCTION TO COORDINATE
THE SUBMITTAL OF FAA FORM 7460 TO THE FAA REGIONAL OFFICE.
PERMISSION TO USE CRANES SHALL BE ISSUED BY BASE AIRFIELD
OPERATIONS AND THE CONTRACTING OFFICER AFTER APPROVAL BY THE
FAA. SEE SPEC SECTION 01 00 00.
3. OBSTRUCTION LIGHT FIXTURES SHALL BE AVIATION RED INCANDESCENT
STEADY BURNING FAA AC 150/5345-43, TYPE L-810. AIR FORCE POLICY DOES
NOT ALLOW USE OF LED FIXTURES FOR OBSTRUCTION LIGHTING.
4. WHEN NOT IN OPERATION, ALL EQUIPMENT AND CRANES SHALL HAVE
BOOMS OR ARMS LOWERED TO THEIR LOWEST ELEVATION.
5. CONTRACTOR SHALL ENSURE THAT STOCKPILES ARE MANAGED AND
DISPOSED OF IN ACCORDANCE WITH THE ENVIRON MENTAL GENERAL
REQUIREMENTS. CONTRACTOR SHALL NOT STOCKPILE CONSTRUCTION
MATERIALS, SPOILS, OR DEBRIS IN ANY AREA WHERE SUCH STOCKPILES
WOULD PENETRATE AVIATION SURFACES. ALL STOCKPILES ADJACENT TO
AIRCRAFT OPERATIONS AREA SHALL BE IDENTIFIED WITH A 360-DEGREE
RED OBSTRUCTION LIGHT PLACED AT THE HIGHEST POINT OF THE
STOCKPILE. STOCKPILING OF MATERIAL WITHIN THE AIRFIELD SAFETY
AREAS IS PROHIBITED.
EXCAVATION AND TRENCHES:
1. CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT EDITION OF OSHA
REGULATIONS, THE STATE OF FLORIDA LAWS CONCERNING EXCAVATION,
AND USACE EM 385-1-1 SAFETY AND HEALTH REQUIREMENT MANUAL.
2. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE SHALL BE
PROMINENTLY MARKED WITH ORANGE BARRICADES WITH FLASHING RED
LIGHTS ACCEPTABLE TO THE CONTRACTING OFFICER.
3. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 72 HOURS TO THE
CONTRACTING OFFICER AND ASSOCIATED UTILITY COMPANIES AND
AGENCIES BEFORE PROCEEDING WITH ANY EXCAVATION.
4. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS ON-HAND AND
READY FOR PLACING THEREIN. AS SOON AS POSSIBLE AFTER THE
MATERIAL HAS BEEN PLACED AND WORK APPROVED, BACKFILL AND
COMPACT TRENCHES AS SPECIFIED.
5. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS MAY BE
REQUIRED, SEE GEOTECHNICAL BORING LOGS.
6. STRUCTURES AND UTILITIES TO BE REMOVED SHALL BE BACKFILLED IN
ACCORDANCE WITH THE SPECIFICATIONS.
7. ALL TOPSOIL SHALL BE STRIPPED FROM ALL AREAS WITHIN THE LIMITS OF
CONSTRUCTION AND STOCKPILED FOR LATER USE IN THE UPPER 4 INCHES
OF FINISHED GRADE TO PROVIDE A SUITABLE SOD BED. THE CONTRACTOR
SHALL RECEIVE APPROVAL FROM THE CONTRACTING OFFICERS
REPRESENTATIVE FOR TOPSOIL STOCKPILE LOCATIONS.
8. ALL WORK ADJACENT TO OR ON EXISTING ROADWAY SHALL COMPLY WITH
CURRENT FLORIDA DEPARTMENT OF TRANSPORTATION STANDARDS FOR
TRAFFIC CONTROL AND SAFETY. ALL WORK IN AND ADJACENT TO STREETS
OR ROADS SHALL BE COORDINATES WITH CONTRACTING OFFICER'S
REPRESENTATIVE. THE CONTRACTOR SHALL PROVIDE THE CONTRACTING
OFFICER'S REPRESENTATIVE WITH A ONE-WEEK ADVANCE NOTICE PRIOR
TO BEGINNING OF WORK ADJACENT TO BASE ROADWAYS. NO WORK
ADJACENT TO OR ON EXISTING ROADS SHALL BE INITIATED WITHOUT PRIOR
APPROVAL FROM THE CONTRACTING OFFICER'S REPRESENTATIVE.
9. BE ADVISED THAT THE CONTRACTOR'S WORK SHALL BE
SUSPENDED WHEN LIGHTNING IS WITHIN 5 MILES PER
HURLBURT FIELD STANDARDS.
H U
R L
B U
R T
F
I E
L D
F
L O
R I D
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
U S
A
M
Y
C
O R
P
O
E N
G I N
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
H O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
C
T
Y
M
O
B U
R N
M c D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
B
Y
P L O
T
S
C A
L E
S I Z
E x
F I L E
N
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
D
E
J U
L Y
W R
F T
E V
M E
F
J U
L Y
H A
N G
U
P R
O J E
F
T E
V
Z:\CLIENTS\ANF\USCOE\SAM\107669_SOFCHARRETTES\HANGARAMU\DESIGN\CIVIL\SHEETS\107669_GC006.DWG 12/17/2020 1:39 PM BLEIKER
M
A S
H E
K
G
C
D
W G
K
R
O B
E R
T S
C
F
R A
N Z
E N
R
B
A R
U T
H
G E
N E
R A
L
C
O N
S T
R U
C T
I O
N
N
O T
E S
GC006
A M
E N
D
N
O T
E
M
O D
I F
I C
A T
I O
N S
STEADY BURNING FAA AC 150/5345-43, TYPE L-810. AIR FORCE POLICY DOES
CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT EDITION OF OSHA
OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE SHALL BE
ADJACENT TO OR ON EXISTING ROADS SHALL BE INITIATED WITHOUT PRIOR
OTHER SAFETY REQUIREMENTS:
1. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
REGULATIONS AND USACE SAFETY MANUAL EM 385-1-1.
2. BE ADVICES THAT THE CONTRACTOR'S WORK SHALL BE SUSPENDED WHEN
LIGHTNING IS WITHIN 5 MILES PER HURLBURT FIELD STANDARDS.
3. CONTRACTOR SHALL OBTAIN A BURN PERMIT FROM THE FIRE DEPARTMENT
PRIOR TO PERFORMING ANY WELDING ON SITE
4. THE CONTRACTOR SHALL PERFORM ON-SITE INSPECTIONS DAILY AND
PRIOR TO LEAVING THE SITE EACH DAY TO REMEDY ANY SAFETY
CONCERNS IMMEDIATELY.
5. THERE SHALL BE NO PERMANENT WASTE SITES ON BASE PROPERTY. ANY
TEMPORARY WASTE AREA (10 DAYS OR LESS) SHALL BE APPROVED BY THE
CONTRACTING OFFICER AND SHALL BE KEPT IN AN ORDERLY CONDITION.
REMOVAL OF WASTE THAT IS NOT PROPERLY MAINTAINED IS SUBJECT TO
THE DIRECTION OF THE CONTRACTING OFFICER.
6. NOT USED.
7. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO
CONTROL/PREVENT DUST CAUSED BY CONSTRUCTION ACTIVITIES TO A
LIMIT ACCEPTABLE TO BASE OPERATIONS. THE CONTRACTOR SHALL
CONTROL/PREVENT BLOWING DUST ON THE PROJECT SITE FROM ANY HAUL
ROUTE OR WORK AREA REGARDLESS OF SOURCE.
8. GASOLINE, DIESEL FUEL, OIL, AND HAZARDOUS WASTE RESULTING FROM
CONTRACTOR'S OPERATIONS OR ACTIVITIES SHALL BE PROPERLY
DISPOSED OF IN ACCORDANCE WITH THE SPECIFICATIONS AND LOCAL
REGULATORY REQUIREMENTS AND PROPERLY REMOVED FROM THE
PROJECT PROPERTY. IF HAZARDOUS MATERIALS ARE ENCOUNTERED OR
UNCOVERED DURING CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL
IMMEDIATELY NOTIFY THE CONTRACTING OFFICER.
9. FAILURE TO COMPLY WITH BASE OPERATIONS AND THE CONTRACTING
OFFICER SAFETY REQUIREMENTS SHALL RESULT IN THE SUSPENSION OF
CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY CONCERNS ARE ADDRESSED
BY THE CONTRACTOR TO THE SATISFACTION OF THE CONTRACTING
OFFICER.
10. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH SAFETY PLAN
OR BASE OPERATIONS SHALL IMMEDIATELY BE REMOVED FROM THE WORK
AREA AND SHALL NOT BE PERMITTED TO RETURN THROUGHOUT THE
REMAINDER OF THE PROJECT.
11. ALL TEMPORARY CONSTRUCTION LIGHTING SHALL BE COORDINATED WITH
HURLBURT FIELD SECURITY FOR APPROVAL OF LOCATIONS, HEIGHT, AND
DIRECTION.
12. CONTRACTOR SHALL PROVIDE KEY ACCESS TO ALL CONSTRUCTION GATES
TO THE BASE FIRE DEPARTMENT DURING CONSTRUCTION. COORDINATE
ACCESS PADLOCKS AND KEYS WITH THE CONTRACTING OFFICER.
CONTRACTOR SAFETY PLAN SUBMITTALS:
1. CONTRACTOR SHALL FURNISH A CONSTRUCTION SAFETY
PLAN IN ACCORDANCE WITH THE SPECIFICATIONS AND USACE
SAFETY MANUAL EM 385-1-1 WITH HIS/HER PROJECT
SCHEDULE. THE SAFETY PLAN SHALL IDENTIFY THE
FOLLOWING ITEMS:
A. PROPOSED ACCESS POINTS, STAGING AREA AND HAUL ROUTES.
B. TEMPORARY MARKINGS AND SIGNAGE TO BE USED.
C. LOCATION AND TYPE OF BARRICADES OR OTHER TRAFFIC CONTROL
DEVICES.
D. METHODS BY WHICH THE CONTRACTOR WILL COMMUNICATE WITH THE
CONTRACTING OFFICER.
E. CONTRACTING SUPERINTENDENT
F. SITE SAFETY MANAGER
NIGHT WORK:
1. WORK LIGHTS FOR NIGHT WORK ON THE BASE SHALL BE POSITIONED SUCH
THAT THE LIGHT WILL NOT BE DIRECTED TOWARD THE CONTROL TOWER OR
AIRCRAFT UTILIZING THE RUNWAY AND AIRFIELD INCLUDING APPROACHES.
COORDINATE WITH BASE OPERATIONS AND REQUEST ACTIVITY 5 DAYS IN
ADVANCE.
SECURITY REQUIREMENTS:
1. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS AND
PROCEDURES OF “IAW AFFAR 5353.242-9000, CONTRACTOR ACCESS TO AIR
FORCE INSTALLATIONS”, IN ACCORDANCE WITH THE SITE ACCESS AS
INDICATED FOR CONSTRUCTION ACCESS.
2. ALL CONTRACTOR EMPLOYEES SHALL CARRY CONTRACTOR PHOTO
IDENTIFICATION AT ALL TIMES WHILE WORKING INSIDE THE BASE SECURE
PERIMETER.
3. CONTRACTOR EMPLOYEES SHALL COMPLY WITH ANY INTEGRATED
DEFENSE MEASURES THAT MAY BE NECESSARY DURING CONTINGENCY
OPERATIONS. THIS INCLUDES, BUT IS NOT LIMITED TO, VEHICLE
INSPECTIONS, IDENTIFICATION CHECKS, ETC.
4. CONTRACTOR AND EMPLOYEE IDENTIFICATION CREDENTIALS: DUE TO THE
NATURE OF THE MILITARY MISSION AT HURLBURT AIRFIELD, STRINGENT
SECURITY PROCEDURES ARE ESTABLISHED TO ENSURE MISSION SUCCESS.
PART OF THE MISSION ASSURANCE PIECE IS TO CONDUCT IDENTITY
PROOFING AND VETTING OF ALL CONTRACTORS WHO ENTER THE
INSTALLATION. THE VETTING PROCESS INCLUDES AN EXTENSIVE CRIMINAL
HISTORY CHECK TO DETERMINE THE INDIVIDUAL'S FITNESS FOR
AUTHORIZATION TO ENTER THE INSTALLATION. THE PRIMARY
CONTRACTOR WILL ENSURE ALL EMPLOYEES WORKING INSIDE THE BASE
SECURITY PERIMETER POSSESS PROPER CREDENTIALS ALLOWING THEM
TO WORK IN THE UNITED STATES. EXECUTIVE ORDER 12989 REQUIRES
CONTRACTORS TO USE THE DEPARTMENT OF HOMELAND SECURITY'S
E-VERIFY SYSTEM FOR ALL EMPLOYEES WORKING ON FEDERAL
CONTRACTS. SEE PROJECT SPECIFICATIONS AND BASE SECURITY FOR FULL
LISTING OF ALL REQUIREMENTS.
5. EMPLOYEES WILL BE IDENTITY-PROOFED AND VETTED EACH TIME A PASS
AND/OR CREDENTIAL IS ISSUED. SECURITY FORCES PERSONNEL MAY ALSO
CONDUCT RANDOM SCREENING AT ANY TIME. IF DISQUALIFYING
INFORMATION IS FOUND, EMPLOYEES MAY BE DENIED ACCESS TO THE
INSTALLATION AND THE CONTRACTING OFFICER OR CONTRACT
ADMINISTRATOR WILL BE NOTIFIED OF THE DENIAL. DUE TO MANDATES OF
USC 552A (B) (3) AS RELATED TO PRIVACY ACT 1974 AS AMENDED, THE
INFORMATION CAN ONLY BE DISCUSSED WITH THE EMPLOYEE AND WILL
NOT BE EXPRESSED OUTSIDE OF LAW ENFORCEMENT.
6. BASE ACCESS CREDENTIALS: THE CONTRACTOR SHALL SUBMIT ALL
HURLBURT AIRFIELD FORMS AT LEAST 7 DAYS PRIOR TO, IF THE EMPLOYEE
WILL BE REQUIRED TO DRIVE ON THE INSTALLATION, HE/SHE MUST
PRESENT A VALID DRIVER'S LICENSE, STATE VEHICLE REGISTRATION AND
PROOF OF INSURANCE. FURTHER, THE VEHICLES AND EQUIPMENT MAY BE
ESCORTED DURING EXERCISE OPERATIONS AND MAY BE RENDERED
IMMOBILE WHEN NOT IN OPERATION BY THE REMOVAL OF IGNITION KEYS
OR BY OTHER READILY REVERSIBLE MEANS. CONTRACTOR VEHICLES ARE
SUBJECT TO SEARCH PRIOR TO ENTERING, WHILE TRANSITING AND/OR
WHILE EXITING THE INSTALLATION.
7. IF THE CONTRACT REQUIRES WORK TO BE DONE IN CONTROLLED OR
RESTRICTED AREAS ON THE INSTALLATION, ACCESS TO THOSE AREAS WILL
REQUIRE COORDINATION WITH AND APPROVAL BY ORGANIZATIONS
CONTROLLING THOSE AREAS. MORE DETAILED INFORMATION MAY BE
REQUESTED FROM THE CONTRACTING OFFICER UPON AWARD OF THE
CONTRACT.
CONTRACTOR PERMITTING REQUIREMENTS:
1. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS TO COMPLY
WITH ALL FEDERAL, STATE, AND LOCAL REGULATORY REQUIREMENTS. THE
PERMITTING PROCESS MAY INCLUDE THE SUBMISSION OF THE FOLLOWING
TYPES OF PERMITS:
A. EROSION AND SEDIMENT CONTROL.
B. STORMWATER MANAGEMENT. (SWPPP)
C. MONITORING WELLS.
D. SOLID AND HAZARDOUS WASTE.
E. DIG PERMIT AF103.
F. TRAFFIC CONTROL PLAN.
G. WELDING PERMIT FOR ANY WELDING OR CUTTING OPERATIONS CAN BE
OBTAINED AT THE HURLBURT FIRE STATION.
H. FAA FORM 7460
I. AIR PERMIT
J. FDEP ERP (BORROW PIT)
K. DEWATERING PERMIT
EROSION CONTROL NOTES:
1. EROSION CONTROL MEASURES MUST BE IN PLACE PRIOR TO ANY
DISTURBANCE.
2. EROSION CONTROL DEVICES SHALL BE USED FOR THE STAGING AREA AND
ANY MATERIAL STOCK PILES WHEN NECESSARY TO CONTROL EROSION AND
STORM WATER RUNOFF.
3. CONTRACTOR SHALL FLAG EXISTING WETLANDS AS SHOWN IN THE PLANS.
CONTRACTOR IS ALLOWED TO ENTER AND DISTURB ONLY THOSE WETLAND
AREAS SHOWN AS PERMANENT AND TEMPORARY IMPACTS IN THE PLANS.
4. LIMITS OF CONSTRUCTION IS DEFINES AS THOSE AREAS AFFECTED BY THE
CONTRACTOR'S OPERATIONS INVOLVING EXCAVATION, EMBANKMENT, AND
FINAL GRADING REQUIRED TO COMPLETE THE WORK IN ACCORDANCE WITH
THE ELEVATIONS, GRADES, AND SECTIONS SHOWN IN THESE DRAWINGS.
5. CONTRACTOR SHALL SOD AND FERTILIZE AREAS DISTURBED DURING
CONSTRUCTION OUTSIDE THE LIMITS OF PAVED AREAS IN ACCORDANCE
WITH THE CONTRACT SPECIFICATIONS AFTER COMPLETION OF ALL PAVING
AND TOPSOIL FINISH GRADING WORK FOR EACH PHASE OF THE PROJECT.
NO SEED OR MULCH SHALL BE USED ON THE AIRFIELD.
6. THE CONTRACTOR SHALL SOD ALL DISTURBED AREAS WITHIN THE SITE
LIMITS, INCLUDING ALL CUT AND FILL SECTIONS IN ACCORDANCE WITH THE
PLANS AND SPECIFICATIONS. SOD SHALL BE AS SPECIFIED. CONTRACTOR
SHALL MAINTAIN GRASS UNTIL A PERMANENT VEGETATION COVER HAS
BEEN ESTABLISHED PRIOR TO FINAL ACCEPTANCE OF THE PROJECT.
ESTABLISHMENT OF A PERMANENT VEGETATION COVER SHALL INCLUDE:
PLACEMENT OF TOPSOIL, APPLICATION OF FERTILIZER, PLANTING OF
GRASS SPECIES SELECTED, IRRIGATIONS AS REQUIRED, AND RAKING OR
HAND FINISHING.
7. CONTRACTOR SHALL UTILIZE BEST MANAGEMENT PRACTICES PLAN
DETAILS SHOWN HEREIN.
8. CONTRACTORS STAGING AREA SHALL BE RETURNED TO ORIGINAL
CONDITIONS AS APPROVED BY THE CONTRACTING OFFICERS
REPRESENTATIVE (COR) AT COMPLETION OF CONSTRUCTION.
EXISTING CONDITION NOTES:
1. THE LOCATIONS OF STRUCTURES AND UNDERGROUND UTILITIES AS
INDICATED HAVE BEEN OBTAINED FROM EXISTING RECORDS AND FIELD
SURVEYS. UNDERGROUND STRUCTURES AND UTILITIES MAY BE PRESENT
WHICH ARE NOT DOCUMENTED OR LOCATED.
2. THE CONTRACTOR SHALL FIELD-CHECK ALL EXISTING CONDITIONS AND BE
THOROUGHLY FAMILIAR WITH THE SITE BEFORE ANY WORK COMMENCES.
ANY DISCREPANCIES IN THE DRAWINGS SHALL BE IMMEDIATELY REPORTED
TO THE COR BEFORE ANY FURTHER WORK COMMENCES.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD-VERIFY
EXISTING STRUCTURES, UTILITIES, AND SURVEY INFORMATION, AND TO
TAKE NECESSARY PRECAUTIONS DURING DEMOLITION AND
CONSTRUCTION. CONTRACTOR SHALL VERIFY EXISTENCE AND MARK
LOCATIONS OF ALL UTILITIES, INCLUDING SERVICE CONNECTIONS TO
UNDERGROUND UTILITIES PRIOR TO BEGINNING WORK. CONTRACTOR
SHALL CONTACT THE COR AND ALL ASSOCIATED UTILITY COMPANIES AND
AGENCIES TO IDENTIFY THE LOCATION OF UTILITIES. THERE IS NO
GUARANTEE, EITHER EXPRESSED OR IMPLIED, THAT THE LOCATIONS, SIZE
AND TYPE OF MATERIAL OF EXISTING UNDERGROUND UTILITIES INDICATED
ARE REPRESENTATIVE OF THOSE TO BE ENCOUNTERED DURING
CONSTRUCTION.
4. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE COR OF
OPERATIONAL PLANS. IN THE EVENT AN UNEXPECTED UTILITY OR
STRUCTURE INTERFERENCE OR CONFLICT IS ENCOUNTERED DURING
CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COR.
ANY UTILITY SERVICES OR STRUCTURES DISTURBED BY THE
CONTRACTOR'S OPERATIONS SHALL BE RESTORED IMMEDIATELY AT
CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE COR.
5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS NOT TO BE
DAMAGED DURING DEMOLITION AND CONSTRUCTION. THE CONTRACTOR
SHALL REPAIR OR REPLACE DAMAGED OR DISTURBED ITEMS TO THE
SATISFACTION OF THE COR.
6. SITE AND UTILITY WORK WILL BE OCCURRING IN AN AREA POTENTIALLY
CONTAMINATED. ANY CONTAMINATED SOILS ENCOUNTERED SHALL BE
COLLECTED ALONG WITH ANY EXCESS SPOILS AND SHALL BE DISPOSED OF
OFF SITE IN A LOCATION PER LOCAL, STATE, AND FEDERAL LAWS. ANY
CONTAMINATED SUBSURFACE WATER ENCOUNTERED IN THIS
CONSTRUCTION AREA SHALL BE COLLECTED AND DISPOSED OF OFF SITE
PER LOCAL, STATE, AND FEDERAL LAWS. CONTAMINATED MATERIALS SHALL
BE MANAGED IN ACCORDANCE WITH SPECIFICATION SECTIONS 02 61 13
EXCAVATION AND HANDLING OF CONTAMINATED MATERIALS AND 02 81 00
TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS.
7. SPECIAL HANDLING AND CONSIDERATION SHALL BE REQUIRED FOR
EXCAVATED SOILS THOUGHT TO CONTAIN CONTAMINATED SUBSTANCES.
CONTRACTOR SHALL PERIODICALLY MONITOR EXCAVATED SOILS. SOILS
SHALL BE TREATED ON SITE OR DISPOSED OF PROPERLY IN ACCORDANCE
WITH ALL FEDERAL, STATE, AND LOCAL REQUIREMENTS AND THE PROJECT
SPECIFICATIONS. ANY CONTAMINATED SOILS ENCOUNTERED SHALL BE
COLLECTED ALONG WITH ANY EXCESS SPOILS AND SHALL BE DISPOSED OF
OFF SITE IN A LOCATION PER LOCAL, STATE, AND FEDERAL LAWS. ANY
CONTAMINATED SOILS ENCOUNTERED SHALL BE COLLECTED ALONG WITH
ANY EXCESS SPOILS AND SHALL BE DISPOSED OF OFF SITE IN A LOCATION
PER LOCAL, STATE, AND FEDERAL LAWS. CONTRACTOR SHALL COORDINATE
REMOVAL OF CONTAMINATED MATERIALS WITH THE COR.
8. MONITORING WELLS IN THE VICINITY OF BUILDINGS 90731, 90825 AND 90811
ARE TO BE AVOIDED AND PROTECTED DURING DEMOLITION ACTIVITIES.
9. NOT USED.
10. SPILL RESPONSE PLAN: A SPILL IS DEFINED AS AN UNINTENTIONAL
RELEASE OF A CHEMICAL TO THE ENVIRONMENT. THE SPILL
RESPONSE PLAN SHALL BE DEVELOPED BY THE CONTRACTOR AND
SHALL IDENTIFY THE EQUIPMENT, PROCEDURES, NOTIFICATION AND
MANPOWER THAT WILL BE USED TO PREVENT OR MITIGATE A SPILL
EVENT. THE CONTRACTOR MUST DEMONSTRATE THE ABILITY TO
PERFORM EMERGENCY DUTIES INCLUDING PROVIDING A DETAILED
LIST OF EQUIPMENT THAT WILL BE STORED ON SITE DURING
CONSTRUCTION AND A LIST AND CORRESPONDING QUALIFICATION
FOR THE PERSONNEL THAT WILL BE ASSIGNED THE DUTY. THIS
PLAN MUST BE SUBMITTED AND APPROVED BY THE GOVERNMENT
AND HURLBURT FIELD PRIOR TO BEGINNING ANY CONSTRUCTION
OR SITE DISTURBANCE ACTIVITIES.
GENERAL SITE NOTES:
1. BUILDING COORDINATES ARE INDICATED TO OR MEASURED AT THE CENTER
OF BUILDING COLUMNS. CONTRACTOR SHALL COORDINATE BEARINGS OF
BUILDING GRID LINES WITH STRUCTURAL DRAWINGS.
2. CONTRACTOR SHALL COORDINATE BUILDING ENTRANCES, EGRESSES,
WALKWAYS, AND DOORWAY LOCATIONS WITH ARCHITECTURAL AND
STRUCTURAL SHEETS. STOOPS AND SIDEWALKS SHALL BE CENTERED ON
DOORS.
3. SEE MECHANICAL AND ELECTRICAL SHEETS FOR MISCELLANEOUS SITE
EQUIPMENT DETAILS. SEE STRUCTURAL SHEETS FOR EQUIPMENT PAD
DETAILS.
H U
R L
B U
E
L D
F
L O
R I D
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
M
Y
C
O R
E N
G I N
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
J U
L Y
W R
F T
E V
M E
F
J U
L Y
H A
N G
U
P R
O J E
F
T E
V
Z:\CLIENTS\ANF\USCOE\SAM\107669_SOFCHARRETTES\HANGARAMU\DESIGN\CIVIL\SHEETS\107669_GC006.DWG 12/17/2020 10:57 AM BLEIKER
M
A S
H E
K
G
C
D
W G
K
R
O B
E R
T S
C
F
R A
N Z
E N
R
B
A R
U T
H
G E
N E
R A
L
C
O N
S T
R U
C T
I O
N
N
O T
E S
GC007
A M
E N
D
N
O T
E
M
O D
I F
I C
A T
I O
N S
AIRFIELD OPERATIONS COORDINATION NOTES:
1. CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS INDICATED IN
FEDERAL AVIATION ADMINISTRATION (FAA) ADVISORY CIRCULAR (AC)
150/5370-2F, OPERATIONAL SAFETY ON AIRPORTS DURING
CONSTRUCTION (CURRENT EDITION).
2. CONTRACTOR SHALL NOT ACCESS THE AIRCRAFT OPERATIONS AREA
WITHOUT CLEARANCE FROM BASE AIRFIELD OPERATIONS AND THE COR,
AND SHALL CONDUCT WORK IN SUCH A MANNER TO ENSURE A MINIMUM
HINDRANCE TO AVIATION OPERATIONS. CONTRACTOR SHALL PROVIDE A
MINIMUM NOTICE OF 30 DAYS TO BASE AIRFIELD OPERATIONS FOR
ACCESS TO AN AIRCRAFT OPERATIONS AREA. PEDESTRIAN TRAFFIC AND
PRIVATELY OWNED VEHICLES SHALL NOT BE ALLOWED IN THE AIRCRAFT
OPERATIONS AREA. CONSTRUCTION ACTIVITY AFFECTING AIRCRAFT
MOVEMENT AREAS AND AIRFIELD SAFETY REQUIREMENTS SHALL BE
COORDINATED WITH BASE AIRFIELD OPERATIONS AND THE COR. NO
AIRCRAFT OPERATIONS AREA SHALL BE CLOSED WITHOUT APPROVAL
FROM BASE OPERATIONS.
3. DURING PERIODS OF LOW VISIBILITY, VEHICLES AND EQUIPMENT SHALL
BE IDENTIFIED BY AN APPROPRIATELY SIZED FLASHING OR STEADY
BURNING AMBER BEACON MOUNTED ON THE UPPER MOST PART OF THE
VEHICLE OR EQUIPMENT SUCH THAT IT IS CONSPICUOUS FROM ANY
DIRECTION INCLUDING FROM THE AIR. IF A VEHICLE OR PIECE OF
EQUIPMENT IS NOT FURNISHED WITH SUCH A BEACON, IT MUST BE
ESCORTED AT ALL TIMES INTO THE AIRCRAFT OPERATIONS AREA BY A
PROPERLY LIT VEHICLE.
4. SEE EQUIPMENT AND STOCKPILE HEIGHT NOTES ON GC006.
5. NOTICES TO AIRMEN (NOTAMS) SHALL BE ISSUED IN ACCORDANCE WITH
AC 150/5370-2F OPERATIONAL SAFETY ON AIRPORTS DURING
CONSTRUCTION, AND AC 150/5200-28D NOTICES TO AIRMEN FOR AIRPORT
OPERATORS. ALL NOTAMS SHALL BE COORDINATED WITH BASE AIRFIELD
OPERATIONS AND THE COR. THE NOTAM INFORMATION SHALL INCLUDE
PORTIONS OF THE AIRFIELD THAT ARE CLOSED OR DISPLACED, THE DATE
AND TIME OF THE BEGINNING AND ENDING OF WORK, AND THE DURATION
OF THE WORK.
6. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 30 DAYS TO BASE
AIRFIELD OPERATIONS REGARDING THE NEED FOR NOTICES TO AIRMEN
(NOTAMS). CONTRACTOR SHALL NOT COMMENCE WORK ACTIVITIES ON
AIRFIELD AREAS UNTIL APPROPRIATE NOTAMS HAVE BEEN ISSUED TO
IDENTIFY WORK ACTIVITIES.
7. CONTRACTOR SHALL PROTECT FROM DAMAGE ALL EXISTING PAVEMENTS
TO REMAIN, AIRFIELD LIGHTING, NAVIGATIONAL AID (NAVAID) EQUIPMENT
AND ALL ASSOCIATED STRUCTURES AND UTILITIES. CONTRACTOR SHALL
IMMEDIATELY NOTIFY THE COR IF CONSTRUCTION ACTIVITY DAMAGES
ITEMS OR DISRUPTS NAVAID EQUIPMENT. THE CONTRACTOR SHALL
REPAIR AND/OR REPLACE ANY DAMAGED NAVAID EQUIPMENT WITH
QUALIFIED TRADESMEN TO THE SATISFACTION OF THE COR AND AT NO
ADDITIONAL COST TO THE GOVERNMENT.
8. APRON CLEARANCE AREAS SHALL BE MARKED IN THE FIELD BY THE
CONTRACTOR, WITH APPROVAL FROM THE COR, TO SERVE AS AN AID TO
KEEP EQUIPMENT AND PERSONNEL FROM INADVERTENTLY ENTERING
THESE AREAS. CONTRACTOR SHALL REFER TO UFC 3-260-01 AND AFI
32-1042.
9. DEBRIS, WASTE, AND LOOSE MATERIALS CAPABLE OF CAUSING DAMAGE
TO AIRCRAFT SHALL NOT BE LEFT WITHIN ACTIVE AIRCRAFT
OPERATIONAL AREAS. CONTRACTOR IS REQUIRED TO IMMEDIATELY
CLEAN ANY DEBRIS CARRIED ONTO AIRFIELD FROM CONTRACTOR'S
EQUIPMENT OR OPERATIONS TO PREVENT FOREIGN OBJECT DAMAGE
(FOD). MATERIAL DROPPED WITHIN THESE AREAS SHALL BE
CONTINUOUSLY REMOVED BY APPROVED METHODS DURING WORKING
HOURS. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER
TO PREVENT MOVEMENT RESULTING FROM AIRCRAFT PROPWASH OR JET
BLAST. CONTRACTOR SHALL HAVE A FULLY OPERATIONAL VACUUM
TRUCK ON SITE AT ALL TIMES TO CLEAN ADJACENT AIRFIELD PAVEMENTS
ON A DAILY BASIS AND AS REQUIRED BY THE COR AND AIRFIELD
OPERATIONS.
10. NOT USED.
11. CONTRACTOR IS TO MAINTAIN PAVEMENT AND MARKINGS FOR AIRFIELD
ROADS, OVERRUN, AND TAXIWAY ALONG THE HAUL ROUTE.
MAINTENANCE OF PAVEMENT AND MARKINGS WILL BE AT THE EXPENSE
OF THE CONTRACTOR.
12. CONTRACTOR SHALL HAVE TWO WAY COMMUNICATIONS WITH TOWER AT
ALL TIME DURING CONSTRUCTION ACTIVITY CONTRACTOR'S SUPERVISOR
SHALL HAVE TWO WAY COMMUNICATIONS WITH ALL DRIVERS USING
NORTH HAUL ROAD ROUTE.
13. CONTRACTOR SHALL MAN THE EAST AIRFIELD GATE DURING
CONSTRUCTION ACTIVITIES. THE CONTRACTOR WILL BE ALLOWED TO
SECURE THE GATE IN A MEANS CONVENIENT, PROVIDED IT IS FULLY
LOCKABLE AND SECURITY FORCES HAVE ACCESS.
14. CONTRACTOR IS TO MOVE EQUIPMENT OUT THE CLEAR ZONE WHEN
OPERATION IS NOT PRESENT. EQUIPMENT SHALL BE STORED IN THE
PROJECT SITE OR LAYDOWN / STAGING AREA IF EQUIPMENT IS TO BE IDLE
FOR MORE THAN 48 HOURS.
15. CONTRACTORS SHALL SUBMIT IN WRITING, THROUGH THE COR, THE
TAXIWAY AND RUNWAY CLOSURE PLAN AND SCHEDULE 30 DAYS IN
ADVANCE OF THE WORK TO BE PERFORMED SO THAT BASE AND FLIGHT
OPERATION CAN COORDINATE. SUBMITTAL DOES NOT GUARANTEE
APPROVAL.
16. CONTRACTOR IS TO MOVE OUT OF THE QD ARCS SHOWN ON GC005 AS
MUNITIONS BECOME PRESENT. CONTRACTOR IS TO COORDINATE WITH
COR & FLIGHT OPS ON WHEN MUNITIONS SHALL BE PRESENT AS PART OF
WEEKLY MEETING.
17. CONTRACTOR TO COORDINATE WITH COR, BASE, CE OFFICER, AND
AIRFIELD OPERATIONS RELATED TO VIOLATIONS REQUIRING WAIVERS
FOR CONSTRUCTION: (WAIVERS TO BE OBTAINED BY HURLBURT FIELD
PRIOR TO NOTICE TO PROCEED EXCEPT FOR FAA 7460 RELAYED TO
CONTRACTOR'S CONSTRUCTION EQUIPMENT/CRANES/ETC IMPACTING
ITEM 1 BELOW.)
17.1. VERTICAL CONSTRUCTION UTILIZING CRANES TO ERECT LIGHT
POLES AND HANGAR, LIGHTING PROTECTION WILL VIOLATE 7H:1V
TRANSITIONAL SURFACE.
17.2. CONSTRUCTION VEHICLES UTILIZING HAUL ROUTES WILL VIOLATE
7H:1V TRANSITIONAL SURFACE.
17.3. CONSTRUCTION VEHICLES UTILIZING HAUL ROUTE WILL VIOLATE
PRIMARY SURFACE.
17.4. CONSTRUCTION VEHICLES UTILIZING HAUL ROUTE WILL VIOLATE
40H:1V APPROACH DEPARTURE CLEARANCE SURFACE.
17.5. CONSTRUCTION VEHICLES UTILIZING HAUL ROUTE WILL VIOLATE APZ.
17.6. CONSTRUCTION VEHICLES UTILIZING HAUL ROUTE WILL VIOLATE
MANDATORY FRANGIBLE ZONE.
17.7. CONSTRUCTION VEHICLES UTILIZING HAUL ROUTE WILL VIOLATE
TAXIWAY CLEARANCE DISTANCE.
ENVIRONMENTAL AND RESOURCE NOTES:
1. APPLICABLE PERMITTING REQUIREMENTS MUST BE SATISFIED IN
ACCORDANCE WITH 62-346 OF THE FLORIDA ADMINISTRATIVE CODE (FAC)
(ENVIRONMENTAL RESOURCE PERMITTING) AND THE NATIONAL
POLLUTANT DISCHARGE ELIMINATION SYSTEM (FAC 62-621).
COORDINATION WITH 96 CEG/CEVCE IS REQUIRED TO OBTAIN
STORMWATER AND UTILITY EXTENSION PERMITS, INCLUDING
CONSULTATION WITH THE NORTHWEST FLORIDA WATER MANAGEMENT
DISTRICT (NWFWMD) AND OTHER STATE, FEDERAL, AND LOCAL
REGULATING AGENCIES.
2. WATER PERMITS TO BE OBTAINED BY THE GOVERNMENT TO COMPLY
WITH SAFE DRINKING WATER ACT REGULATIONS: FLORIDA DEPARTMENT
OF ENVIRONMENTAL PROTECTION (FDEP) FORM 62-555.900(1)
APPLICATION FOR A SPECIFIC PERMIT TO CONSTRUCT PWS
COMPONENTS; AND 62-555.900(9) CERTIFICATION OF CONSTRUCTION
COMPLETION AND REQUEST FOR CLEARANCE TO PLACE PERMITTED PWS
COMPONENTS INTO OPERATION.
3. WASTEWATER PERMITS TO BE OBTAINED BY THE GOVERNMENT:
WASTEWATER, FDEP FORM 62-604.300(8)(A) NOTIFICATION/APPLICATION
FOR CONSTRUCTING A DOMESTIC WASTEWATER
COLLECTION/TRANSMISSION SYSTEM (DEPENDENT ON DESIGN), AND
FDEP FORM 62-604.300(8)(B) REQUEST FOR APPROVAL TO PLACE
WASTEWASTER SYSTEM INTO OPERATION.
4. NOT USED.
5. A STORMWATER POLLUTION PREVENTION PLAN IS REQUIRED UNDER THE
NPDES PERMIT BEFORE BEGINNING CONSTRUCTION ACTIVITIES.
HURLBURT FIELD WILL SUBMIT A NOTICE OF INTENT TO USE THE GENERIC
PERMIT FOR STORMWATER DISCHARGE UNDER THE NPDES PROGRAM
PRIOR TO PROJECT INITIATION ACCORDING TO SECTION 403.0885,
FLORIDA STATUTES. BEST MANAGEMENT PRACTICES (BMPS) SUCH AS
EROSION AND SEDIMENT CONTROLS AND STORMWATER MANAGEMENT
MEASURES WILL BE REQUIRED TO MINIMIZE EROSION AND STORMWATER
RUNOFF, AND TO REGULATE SEDIMENT CONTROL. THE PROPONENT WILL
ENSURE THAT THE DESIGN ENGINEER COORDINATES WITH BASE CE
COMPLIANCE ENGINEERING FOR FINAL STORMWATER DESIGN AND
PERMITTING. THERE ARE NO MITIGATION REQUIREMENTS FOR THE
WETLAND IMPACTS FOR THIS PROJECT AS THESE REQUIREMENTS WERE
PERMITTED AS PART OF THE FY18 CAPA PROJECT. THE WETLAND
CREDITS WERE INCLUDED IN THE ENVIRONMENTAL RESOURCE PERMIT
FOR THAT PROJECT. THE ERP FOR THE HANGAR PROJECT WILL BE
INCLUDED IN THIS PROJECT'S STORMWATER PERMITTING DOCUMENTS
FOR REFERENCE. WETLAND IMPACT MITIGATION REQUIREMENTS FOR
THIS PROJECT ARE SPECIFIED IN STATE OF FLORIDA ADMINISTRATIVE
CODE (F.A.C.) RULE 62-330 ENVIRONMENTAL RESOURCE PERMIT
0318613-004-EM/46 (MODIFIED 12 MAR 2019) AND U.S. ARMY CORPS OF
ENGINEERS CLEAN WATER ACT SECTION 404 PERMIT
AJ-3016-02855-SP-EPS (ISSUED 7 JAN 2019). THESE PERMITS WERE
OBTAINED BY THE MILCON CAPA PROJECT, INCLUDING THE SOF HANGAR.
BOTH PERMITS REQUIRE SPECIFIC CONDITIONS THAT MUST BE
FOLLOWED BY ALL CONTRACTORS OR SUB-CONTRACTORS PERFORMING
ANY ON-SITE WORK THROUGHOUT THE DURATION OF ALL COVERED
PROJECTS UNTIL COMPLETE. BOTH PERMITS REQUIRE
ENGINEERING CERTIFICATION AND AS-BUILT SUBMITTALS. THIS PROJECT
CAN NOT AFFECT ANY AREAS OUTSIDE THOSE DELINEATED AS PART OF
STATE PERMIT 0318613-004-EM/46 AND U.S. ARMY CORPS OF ENGINEERS
PERMIT SAJ-2016-02855-SP-EPS.SEE APPENDIX A OF THE SPECIFICATION
FOR THE DRAFT SWPPP.
6. WETLAND IMPACT MITIGATION REQUIREMENTS FOR THIS PROJECT ARE
SPECIFIED IN STATE OF FLORIDA ADMINISTRATIVE CODE (F.A.C.) RULE
62-330 ENVIRONMENTAL RESOURCE PERMIT 0318613-004-EM/46 (MODIFIED
12 MAR 2019) AND U.S. ARMY CORPS OF ENGINEERS CLEAN WATER ACT
SECTION 404 PERMIT SAJ-2016-02855-SP-EPS (ISSUED 7 JAN 2019). THESE
PERMITS WERE OBTAINED BY THE MILCON CONSTRUCTION SECTION OF
THE U.S. ARMY CORPS OF ENGINEERS AND COVER MULTIPLE PROJECTS
ASSOCIATED WITH THE FY18 MILCON CAPA PROJECT. BOTH PERMITS
REQUIRE THAT 48.52 MITIGATION CREDITS BE PURCHASED FROM THE
PENSACOLA BAY MITIGATION BANK TO OFFSET THE WETLAND IMPACTS
FOR THE MULTIPLE PROJECT GROUPING WHICH INCLUDES FTEV153009.
BOTH PERMITS REQUIRE SUBMITTAL OF THE MITIGATION CREDIT
DOCUMENTATION AND COMMENCEMENT NOTICES IN ADDITION TO MANY
OTHER SPECIFIC CONDITIONS THAT MUST BE FOLLOWED BY ALL
CONTRACTORS OR SUB-CONTRACTORS PERFORMING ANY ON-SITE
WORK THROUGHOUT THE DURATION OF ALL COVERED PROJECTS UNTIL
COMPLETE. BOTH PERMITS REQUIRE ENGINEERING CERTIFICATION AND
AS-BUILT SUBMITTALS. THIS DESIGN IS NOT EXPECTED TO AFFECT ANY
AREAS OUTSIDE THOSE DELINEATED AS PART OF STATE PERMIT
0318613-004-EM/46 AND U.S. ARMY CORPS OF ENGINEERS PERMIT
SAJ-2016-02855-SP-EPS."
7. RESIDUAL SOIL AND GROUND WATER CONTAMINATION MAY BE
ENCOUNTERED. SEE NOTES 8, 9, 10, AND 11. THE CONTRACTOR WILL BE
REQUIRED TO COMPLY WITH THE FOLLOWING REQUIREMENTS
THROUGHOUT CONSTRUCTION:
· THE CONTRACTOR WILL ADHERE TO APPLICABLE OSHA, STATE,
FEDERAL AND BASE REQUIREMENTS IF ANY UNKNOWN MATERIALS OR
CONTAMINANTS ARE UNCOVERED DURING THE SITE EXCAVATION
WORK. THIS INCLUDES PROTECTING ALL WORKERS AND SURROUNDING
POPULATIONS.
· THE CONTRACTOR WILL CONDUCT ALL TASKS IN A MANNER THAT DOES
NOT: CAUSE OR PROMOTE THE SPREAD OF CONTAMINATION AT THE
SITE; ALLOW FOR FUTURE RELEASE OF CONTAMINATION OR WASTE TO
OCCUR; OR CREATE CONDUITS FOR GROUNDWATER MIGRATION
BETWEEN CONTAMINATED AND UNCONTAMINATED AQUIFERS, OR
PORTIONS OF THEREOF.
· CONTRACTOR SHALL VERIFY THAT SOIL STOCKPILES ARE MANAGED
AND DISPOSED OF IN ACCORDANCE WITH THE SPECIFICATIONS AND
ERP. THE CONTRACTOR WILL IDENTIFY MEANS AND METHODS FOR
STOCKPILING, CHARACTERIZING, MANAGING, AND DISPOSING OF
CONTAMINATED SOIL, GROUNDWATER, AND OTHER WASTES
GENERATED DURING CONSTRUCTION.
· EXCESS SATISFACTORY SOIL GENERATED DURING CONSTRUCTION
ACTIVITIES SHALL BE USED ONSITE AS MUCH AS PRACTICALLY
POSSIBLE, AND WHEN NOT POSSIBLE, THE SOIL SHALL BE PROPERLY
STOCKPILED, PROPERLY CHARACTERIZED, AND PROPERLY DISPOSED
OF OFF-SITE.
8. THE AMU HANGAR AREA IS LOCATED WITHIN A CLOSED ENVIRONMENTAL
SITE (NO FURTHER ACTION), INSTALLATION RESTORATION SITES SS-130,
SS-132, AND AOC-131. NOTE THAT THERE IS A POSSIBILITY OF
ENCOUNTERING RESIDUAL GROUNDWATER AND SOIL CONTAMINATION.
DEWATERING IS NOT AUTHORIZED WITHOUT AN APPROVED DEWATERING
PLAN. IF DISCOVERED, SUSPICIOUS ODORS, ODD SOIL COLOR,
UNFAMILIAR LIQUIDS, BURIED MATERIALS, ETC. SHOULD BE REPORTED
TO JOE GOOTEE,OF HURLBURT FIELD ENVIRONMENTAL OFFICE AT
850-883-3351.
9. SAMPLES FROM BUILDINGS 90825 AND 99065 WERE FOUND TO CONTAIN
LEAD, AND SAMPLES FROM BUILDINGS 90731, 90825, AND 90809 WERE
FOUND TO CONTAIN ASBESTOS. ADDITIONAL HAZARDOUS MATERIALS
SUCH AS PCB-CONTAINING BALLASTS, MERCURY-CONTAINING
FLUORESCENT BULBS OR THERMOSTATS, AND/OR RADIOACTIVE SMOKE
DETECTORS MAY BE PRESENT IN ALL BUILDINGS TO BE DEMOLISHED AND
MUST BE REMOVED PRIOR TO DEMOLITION. REMOVAL, TRANSPORT, AND
DISPOSAL SHALL BE IN ACCORDANCE WITH ALL FEDERAL, STATE, AND
LOCAL REGULATIONS AND REQUIREMENTS AS WELL AS THE PROJECT
SPECIFICATIONS. SEE SECTIONS 02 82 00 ASBESTOS REMEDIATION, 02 83
00 LEAD REMEDIATION IMPACT THE PROJECT AREA. BUILDING 90809 TO
BE DEMOLISHED IS LOCATED IN THE EXISTING PROPULSION AREA.
BUILDING 90811 IS THE LARGE GUN ABUTMENT STRUCTURE AND, PER
THE EA NOTES, HAS BEEN REMEDIATED AND CLOSED, AND AVAILABLE
FOR UNRESTRICTED USE; HOWEVER, CONTRACTOR SHALL VERIFY THAT
ALL HAZARDOUS MATERIALS HAVE BEEN REMOVED. BUILDING 99104
AND 99065, ARE SMALL BUILDINGS IN THE PROPULSION AREA.
10. BUILDING 90731, TO BE DEMOLISHED, IS LOCATED WITHIN A REGULATED
INSTALLATION RESTORATION PROGRAM (IRP) SITE, SITE SS-125. WITH
SOIL AND/OR GROUNDWATER CONTAMINATION. MONITORING WELLS ARE
IN THE AREA (WITHIN SEVERAL FEET OF THE BUILDING) AND MUST BE
PROTECTED. IF WELLS ARE DAMAGED OR DESTROYED, THE
CONTRACTOR WILL BE RESPONSIBLE FOR FILING AN ABANDONMENT
PERMIT WITH THE STATE, AND REINSTALLING REPLACEMENT WELLS AT
THE CONTRACTOR'S EXPENSE. AN APPROVED ENVIRONMENTAL PLAN IS
REQUIRED PRIOR TO STARTING THE BUILDING DEMOLITION. CONTACT
JOE GOOTEE, 850-883-3351, FOR ASSISTANCE IN DEVELOPING A PLAN TO
ADDRESS ENVIRONMENTAL COMPLIANCE ISSUES.
11. BUILDING 90825, TO BE DEMOLISHED, IS LOCATED NORTHEAST OF AN
ACTIVE INSTALLATION RESTORATION PROGRAM (IRP) SITE (SS-216).
THERE IS A POSSIBILITY OF ENCOUNTERING CONTAMINATED
SOIL/GROUNDWATER. DEWATERING IS NOT AUTHORIZED WITHOUT AN
APPROVED DEWATERING PLAN. AVOID AND PROTECT ALL EXISTING
MONITORING WELLS DURING DEMOLITION AND OTHER ACTIVITIES AND
REPORT SUSPICIOUS ODORS, ODD SOIL COLOR, SHEENS, UNFAMILIAR
LIQUIDS, BURIED MATERIALS ETC. TO MR. JOE GOOTEE, 850-883-3351, IF
THEY ARE DISCOVERED.
12. CONTRACTOR TO NOTIFY STATE OF FLORIDA 10 DAYS IN ADVANCE OF
DEMOLITION ACTIVITIES INCLUDING LEAD BASED PAINT AND ASBESTOS.
SEE SPECIFICATION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS -
HURLBURT STANDARD.
13. EASTERN INDIGO SNAKE PROTECTION MEASURES AND
INSPECTION: CONTRACTOR SHALL COMPLY WITH U.S. FISH AND WILDLIFE
SERVICE'S “STANDARD PROTECTION MEASURES FOR THE EASTERN
INDIGO SNAKE” DATED AUGUST 12, 2013, AS REQUIRED IN THE APPROVED
WETLAND PERMIT. ALL GOPHER TORTOISE BURROWS, ACTIVE OR
INACTIVE, SHALL BE EVACUATED PRIOR TO SITE MANIPULATION IN THE
VICINITY OF THE BURROW. IF EXCAVATING POTENTIALLY OCCUPIED
BURROWS, ACTIVE OR INACTIVE, INDIVIDUALS MUST FIRST OBTAIN STATE
AUTHORIZATION VIA A FLORIDA FISH AND WILDLIFE CONSERVATION
COMMISSION (FWC) AUTHORIZED GOPHER TORTOISE AGENT PERMIT.
THE EXCAVATION METHOD SELECTED SHALL MINIMIZE THE POTENTIAL
FOR INJURY OF AN INDIGO SNAKE. THE PERMITTEE SHALL FOLLOW THE
EXCAVATION GUIDANCE PROVIDED IN THE MOST CURRENT FWC GOPHER
TORTOISE PERMITTING GUIDELINES FOUND AT
HTTP://MYFWC.COM/GOPHERTORTOISE. IF AN INDIGO SNAKE IS
ENCOUNTERED, THE SNAKE MUST BE ALLOWED TO VACATE THE AREA
PRIOR TO ADDITIONAL SITE MANIPULATION IN THE VICINITY. HOLES,
CAVITIES, AND SNAKE REFUGIA OTHER THAN GOPHER TORTOISE
BURROWS SHALL BE INSPECTED EACH MORNING BEFORE PLANNED SITE
MANIPULATION OF A PARTICULAR AREA, AND IF OCCUPIED BY AN INDIGO
SNAKE, NO WORK SHALL COMMENCE UNTIL THE SNAKE HAS VACATED
THE VICINITY OF THE PROPOSED WORK.
14. EXISTING SUBSURFACE PIPING MAY BE ENCOUNTERED IN THE VICINITY
OF ENVIRONMENTAL SITE AOC-131. SEE DRAWINGS V-100 AND CD100 FOR
LOCATION OF AOC-131.
CONSTRUCTION SEQUENCE NOTES:
1. INSTALL REQUIRED TRAFFIC CONTROL DEVICES. PLACE BARRICADES
DAILY AS REQUIRED FOR ROAD CLOSURES. TAXIWAY CLOSURES AND
BARRICADES SHALL BE REMOVED PRIOR TO THE OPENING OF THE
AIRFIELD, UNLESS APPROVED BY THE COR.
2. CLEAR SITE, INSTALL EROSION CONTROL MEASURES ACCORDING TO THE
APPROVED EROSION CONTROL PLAN, GRUB THE CONSTRUCTION SITE
WITHIN THE LIMITS SHOWN. SEE CIVIL DEMOLITION SHEETS FOR
CLEARING LIMITS.
3. CONSTRUCT BERM ALONG THE NORTH AND WEST LIMITS OF THE
CONSTRUCTION AREA, SEE CG301.
4. SEE GEOTECHNICAL SHEETS AND SPECIFICATION 31 00 00 EARTHWORK
FOR ADDITIONAL DETAILS FOR THE CONSTRUCTION BERM.
5. REMOVE MUCK MATERIAL IN ACCORDANCE WITH SECTION 31 00 00
EARTHWORK AND DRAWING CG305.
6. BEGIN STRUCTURAL FILL PLACEMENT FOR HANGAR AND AMU SITE WORK
AS SHOWN ON CG301 - CG306. SEE GEOTECHNICAL SHEETS AND
SPECIFICATION 31 00 00 EARTHWORK FOR SETTLEMENT AND
COMPACTION REQUIREMENTS.
7. COMPLETE EARTHWORK AND GRADING FOR PROPOSED HANGAR AND
AMU BUILDING, APRON, AND POV PARKING AREAS AS ONE MASS GRADING
ELEMENT. SCHEDULE TO INCLUDE 30 DAY HOLD PERIOD AFTER
COMPLETION OF FILL/SUBGRADE MATERIALS TO MONITOR SITE
SETTLEMENT. EXCAVATION FOR FOUNDATIONS MAY OCCUR DURING
HOLD PERIOD BUT NO PLACEMENT OF CONCRETE FOUNDATIONS MAY
OCCUR WITHOUT APPROVAL OF COR BASED ON SETTLEMENT
MONITORING DATA AND APPROVAL OF CONTRACTORS GEOTECHNICAL
ENGINEER.
8. INSTALL UNDERGROUND UTILITIES. SEE ELECTRICAL AND UTILITY
SHEETS FOR ADDITIONAL DETAILS ON INSTALLATION OF UTILITIES.
9. CONSTRUCT PROPOSED BUILDING AFTER FOUNDATIONS HAVE BEEN
COMPLETED, SEE ARCHITECTURAL AND STRUCTURAL PLANS FOR
ADDITIONAL DETAILS.
10. INSTALL ASPHALT AND PCC PAVEMENT ASSOCIATED WITH THE
PROPOSED GSE PAVEMENT AND POV PAVEMENTS.
11. COORDINATE PHASING OF ACCESS APRON AND BID OPTION AIRCRAFT
APRON WITH FY18 CAPA PROJECT CONSTRUCTION. IF CAPA IS COMPLETE
AND OPERATIONAL, COORDINATE INSTALLATION OF LOW PROFILE
BARRICADES ON THE CAPA SHOULDER AREA AND REDUCED OPERATIONS
TO ALLOW CONSTRUCTION WITHIN 125 FEET OF THE CAPA TAXILANE
CENTERLINE, SEE DRAWING GC005. WORK INCLUDES GRADING, WATER
AND SEWER FORCE MAIN DEMOLITION, CONCRETE AND ASPHALT PAVING,
JOINT SEALING AND PAVEMENT STRIPING.
12. INSTALL FINAL PAVEMENT MARKING ASSOCIATED WITH ALL SITE
PAVEMENTS.
13. SOD ALL DISTURBED AREAS AND INSTALL TEMPORARY IRRIGATION.
14. REMOVE TEMPORARY TRAFFIC CONTROL SIGNAGE.
15. REMOVE TEMPORARY IRRIGATION AT THE END OF THE
ESTABLISHMENT PERIOD.
H U
R L
B U
E
L D
F
L O
R I D
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of
Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
M
Y
C
O R
E N
G I N
E E
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K W
A Y
K A
N S
T
Y
M
O
B U
R N
D
O N
N E
L L
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
S B
P L O
T
S
C A
L E
S I Z
E x
F I
M
E
C K
D
B
Y
P L O
T
D
A T
E
D A
T E
S O
L I C
I T
A T
I O
N
N
U M
B E
R
P R
O J E
M
B E
R
C A
D
E
J U
L Y
W R
F T
E V
M E
F
J U
L Y
H A
N G
U
P R
O J E
F
T E
V
Z:\CLIENTS\ANF\USCOE\SAM\107669_SOFCHARRETTES\HANGARAMU\DESIGN\CIVIL\SHEETS\107669_GC006.DWG 12/17/2020 1:39 PM BLEIKER
M
A S
H E
K
G
C
D
W G
K
R
O B
E R
T S
C
F
R A
N Z
E N
R
B
A R
U T
H
G E
N E
R A
L
C
O N
S T
R U
C T
I O
N
N
O T
E S
GC008
A M
E N
D
N
O T
E
M
O D
I F
I C
A T
I O
N S e d
H o r s e
R o a d
R e d
H o r s e
R o a d
R e d
H o r s e
R o a d
C O
C O
D
B U
IL
D
IN
G
F.
F.
E L
.7
B U
IL
D
IN
G
D
W
W
F
F
S
D
C
C
C O
C
F
W
S T
O P
P O
D C
H E
C K
P
F
F
O P
E N
H A
N G
A R
F F
E .3
A S
P H
A L T
R E
D
H
O R
I V
E
D E
B R
IS
P
IL
E
TYPE "F" CURB & GUTTER
TYPE "F" CURB
& GUTTER
TYPE "F" CURB & GUTTER
TYPE "F" CURB & GUTTER
TYPE "F" CURB
& GUTTER
TYPE "F
" C
URB
& G
UTTER
4' S
ID
E W
A
LK
A C
J
A C
J
A C
J
A C
J
A C
J
A C
J
X X
X
X X
X X
X
X
X
X X
X
X X
X
X
X
X
X
STOP FOD
CHECK
STOP FOD
CHECK
STOP FOD
CHECK
H U
R
LB
U R
T
FI
EL
D
, F
LO
R
ID
A
M O
B I L
E
D
I S
T R
I C
T
M O
B I L
E
A
L A
B A
M A
Mobile District
US Army Corps of Engineers ®
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
O
W N
W
A R
D
P
A R
K…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .