AM05.pdf
PDF 1 MB Posted
- Solicitation number
- W9127820R0104
About this file
This solicitation is for the construction of an aircraft maintenance hangar, aircraft maintenance unit, weapons shop, and supporting facilities at Hurlburt Field, Florida. The scope of work includes construction of a 105,041 square-foot maintenance hangar with reinforced concrete foundation and floor slab, steel structure, masonry walls and standing seam metal roof. Supporting environmental control, fire detection, and mass notification systems will be provided. Additional requirements consist of utilities, pavements, site improvements, communications, demolition of seven existing buildings, and all necessary support to provide a complete and usable facility. Special site conditions require excavation, fill, stabilization and airfield pavements to provide hangar access. Offers are due by the date specified, and the contract will be awarded thereafter. The work will be performed for the Department of the Army Corps of Engineers Engineering District Mobile.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AM05 DRAWINGS.pdf | ||
| AM04.pdf | ||
| AM04 DRAWINGS.pdf | ||
| AM03.pdf | ||
| Minutes-Pre-Bid site visit.pdf | ||
| Minutes-Pre-Bid demo site visit.pdf | ||
| AM03 DRAWINGS.pdf | ||
| AM02.pdf | ||
| APPENDIX F- As Builts of Demo Buildings- 1 of 3.zip | ZIP file | |
| APPENDIX F- As Builts of Demo Buildings- 2 of 3.zip | ZIP file | |
| APPENDIX F- As Builts of Demo Buildings- 3 of 3.zip | ZIP file | |
| AM01 Drawings.pdf | ||
| AM01.pdf | ||
| RTA DRAWINGS VOL 2.pdf | ||
| VOL3.PDF | ||
| VOL2.PDF | ||
| VOL4.PDF | ||
| RTA DRAWINGS VOL 1.pdf | ||
| VOL6.PDF | ||
| VOL1.PDF | ||
| VOL5.PDF | ||
| EM 385-1-1.pdf | ||
| RTA DRAWINGS VOL 3.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)
W9127820R0104-0005 21 DEC 2020 MEF20004
6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)
CODE
Corps of Engineers 109 St. Joseph St.
Mobile, AL 36602
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION
NO.
W9127820R0104
9B. DATED (SEE ITEM 11)
6 NOV 2020
10A. MODIFICATION OF
CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE
FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
The subject solicitation for: FTEV153009 SOF AMU AND WEAPONS HANGAR FACILITY, HURLBURT FIELD, FLORIDA Is modified in the following: REFER TO THE ENCLOSED REVISED SPECIFICATIONS/DRAWING REVISIONS FOR AMENDMENT NO. 0005
Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of contracting officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FTEV153009 SOF AMU AND WEAPONS HANGAR FACILITY W9127820R0104
HURLBURT FIELD, FLORIDA MEF20004
SF 30 Page 2
W9127820R0104-0004
PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS
The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.
Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.
Corresponding Added or Revised Paragraph SECTION Page, and/or Section
VOLUME 1
Table of Contents Revised as indicated herein.
03 35 00.00 10 Revised Paragraph 3.3
VOLUME 4
31 00 00 Revised Paragraphs 1.3.10, 1.3.11, 2.1, 3.2, 3.3, 3.3.4, 3.7, 3.11, 3.16.1.1, 3.16.1.2, 3.16.1.3 and 3.16.1.4
Added Paragraphs 3.11.1, 3.11.2, 3.11.3 and 3.11.4
32 13 14.13 Revised Paragraph 2.11.1.1
PART II - REVISIONS MADE BY DELETED PAGES/SECTIONS
The pages and/or sections listed below are to be deleted from the specifications by the bidders and marked "DELETED":
Page/Section
01 33 00 Deleted Submittal Register associated with Section 32 01 16.71
32 01 16.71 Deleted in its entirety.
SF 30 Page 3
W9127820R0104-0004
PART III - NOTE: Revised drawings are listed below. These revised drawings are to be inserted into the folio in the proper numerical sequence. Drawings that have been revised by this amendment shall be deleted from the folio. All drawings listed below are revised unless indicated otherwise.
Sheet Reference Number Title
COVER SHEET
GC006 GENERAL CONSTRUCTION NOTES
GC007 GENERAL CONSTRUCTION NOTES
GC008 GENERAL CONSTRUCTION NOTES
GC010 OVERALL TRAFFIC PLAN
GC011 BORROW PIT LOCATION
GC012 BORROW PIT B-40
CD101 DEMOLITION PLAN GRID 1
CD104 DEMOLITION PLAN GRID 4
CD120 BUILDING 90731 DEMOLITION PLAN
CD121 BUILDING 90825 DEMOLITION PLAN
CG301 CONSTRUCTION BERM PLAN
CG305 EMBANKMENT AND BERM SECTIONS
CG306 EMBANKMENT AND BERM SECTIONS
CS121 BUILDING 90825 SITE PLAN
CS509 SITE DETAILS 9
CU108 UTILITY PLAN GRID 8
I-104 FURNITURE PLAN AREA - D
E-001 ELECTRICAL SYMBOLS LEGEND
EP101 POWER PLAN - AREA A
EP102 POWER PLAN - AREA B
EP103 POWER PLAN - AREA C
EP104 POWER PLAN - AREA D
EP105 POWER PLAN - AREA E
EP106 POWER PLAN - AREA F
EP601 ELECTRICAL ONE-LINE DIAGRAM
ES101 SITE PLAN
ES501 SITE DETAILS
ES502 SITE DETAILS
TS102 COMMUNICATIONS SITE PLAN
Encl as stated:
Revised page of the specifications as indicated in Part I.
30 Revised drawings as indicated in Part III.
This page was intentionally left blank for duplex printing.
Table of Contents Page 1 Amendment No. W9127820R0104-0005
TABLE OF CONTENTS
VOLUME 1 OF 6
CHECKLIST FOR PREPARATION OF OFFERS
BIDDING REQUIREMENTS
STANDARD FORM 1442 - SOLICITATION, OFFER, AND AWARD
BIDDING SCHEDULE
EXPLANATION OF BID ITEMS
STANDARD FORM 24 - BID BOND
STANDARD FORM 28 - AFFIDAVIT OF INDIVIDUAL SURETY
STANDARD FORM LLL - DISCLOSURE OF LOBBYING ACTIVITIES
SMALL BUSINESS SUBCONTRACTING PLAN TEMPLATE
00 11 00 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
00 12 00 EVALUATION CRITERIA AND BASIS OF AWARD
00 21 16 INSTRUCTIONS TO PROPOSERS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 70 00 CONDITIONS OF THE CONTRACT
SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 ADDITIONAL SPECIAL CONTRACT REQUIREMENTS
PROJECT SIGNS
DD FORM 1354
DD FORM 1354 CHECKLIST
WAGE RATES (BUILDING)
WAGE RATES (HEAVY)
01 00 01 GENERAL CONTRACT REQUIREMENTS
CESAM FORM 1151
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
SUBMITTAL REGISTER
FORM 4025
01 33 29 SUSTAINABILITY REPORTING
AIR FORCE SUSTAINABILITY REQUIREMENTS SCORESHEET
GUIDING PRINCIPLES ASSESSMENT
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
SAM FORM 696
01 45 35 SPECIAL INSPECTIONS
STATEMENT OF SPECIAL INSPECTIONS
SCHEDULE OF SPECIAL INSPECTIONS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS – HURLBURT STANDARD
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
Table of Contents Page 2
DIVISION 02 - EXISTING CONDITIONS (CONTINUED)
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE CONSTRUCTION
DIVISION 04 – MASONRY
04 20 00 UNIT MASONRY
VOLUME 2 OF 6
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 11 13 BITUMINOUS DAMPPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 42 13 METAL WALL PANELS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
Table of Contents Page 3
DIVISION 07 - THERMAL AND MOISTURE PROTECTION (CONTINUED)
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 13 COILING COUNTER DOORS
08 34 16.10 STEEL SLIDING HANGAR DOORS
08 34 19.10 20 ROLLING SERVICE DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 51 23 STEEL WINDOWS
08 60 45 TRANSLUCENT PANELS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23.15 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM
09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 13 WIRE MESH PARTITIONS
10 22 19 DEMOUNTABLE AND MOVABLE PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 51 13 METAL LOCKERS
DIVISION 11 - EQUIPMENT
11 01 50 FALL PROTECTION SYSTEMS
Table of Contents Page 4
VOLUME 3 OF 6
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION
FFE ATTACHMENT
12 59 00 SYSTEMS FURNITURE
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00 BRACING FOR MISCELLANEOUS EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 25.00 10 HIGH EXPANSION FOAM (HI EX HEF) FIRE PROTECTION SYSTEM
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 48.19 BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 54 16.00 10 HEATING SYSTEM; GAS-FIRED HEATERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 82 46.00 40 ELECTRIC UNIT HEATERS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS ENERGY
MANAGEMENT CONTROL SYSTEM (EMCS) BUILDING LEVEL ONLY
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FIRE
ALARM REPORTING SYSTEM/MASS NOTIFICATION SYSTEM BUILDING
LEVEL ONLY
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND
INTEGRATION
Table of Contents Page 5
VOLUME 4 OF 6
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16 PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.71 COLD MILLING ASPHALT PAVING
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 11 23 GRADED CRUSHED AGGREGATE AND AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 15.13 ASPHALT PAVING FOR AIRFIELDS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS
32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATIONS
33 34 00 FORCE MAINS AND INVERTED SIPHONS; SEWER
33 40 00 STORM DRAINAGE UTILITIES
33 51 15 NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION
Table of Contents Page 6
DIVISION 33 – UTILITIES (CONTINUED)
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 34 – TRANSPORTATION
34 73 13 MOORING AND GROUNDING POINTS FOR AIRCRAFT
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING
41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING
VOLUME 5 OF 6
APPENDICES
APPENDIX A DRAFT SWPPP
APPENDIX B HAZARDOUS MATERIALS REPORTS
APPENDIX C EGLIN BORROW PIT GEOTECHNICAL DATA
VOLUME 6 OF 6
APPENDICES (CONTINUED)
APPENDIX D HAZARDOUS WASTE MANAGEMENT PLAN
APPENDIX E CAPA ERP
APPENDIX F AS-BUILTS OF DEMO BUILDINGS (PROVIDED ELECTRONICALLY ONLY)
APPENDIX G GEOTECHNICAL BORING LOGS
APPENDIX H HURLBURT ACM REPORT
APPENIDX I HURLBURT FIELD LEAD XRF AND CHIP SAMPLE REPORT
--End of Project Table of Contents--
03 35 00.00 10 Revised by Amendment No. W9127820R0104-0005
03 35 00.00 10
3.3 FINISHING UNFORMED SURFACES
The finish of all unformed surfaces must meet the requirements of Paragraph "Tolerances" in Section 03 30 00.00 10 CAST-IN-PLACE CONCRETE, when tested as specified herein.
Finish unformed surfaces (floors) as indicated below:
a. Admin/Shop: Trowel finish.
b. Hangar slab: Float finish, coordinate with coating requirements.
c. Exterior: Broomed finish.
(Note: The remainder of the section is unchanged by this amendment.)
31 00 00
1.3.10 Initial Fill Initial Working Platform Fill
Fill material placed below the groundwater elevation (approximate elevation 26.00). Inorganic, non-plastic material Fill placed at the bottom of the demucking excavation and subsequent fill placed below the groundwater elevation (approximate elevation 26.00) may consist of structural fill or inorganic, non-plastic material, free of any man-made construction material or debris, with ASTM classification (USCS) of GP or GW. Contractor may substitute FDOT 57 Stone with less than 5 percent material finer than the No. 200 sieve and a maximum particle size of 3 inches. The FDOT 57 stone, spread in 12 inch plus or minus layers, shall should not be placed more than one foot above the water level and should shall include a filter fabric wrap (envelope; around top, bottom and sides of the full GP, GW or FDOT 57 stone thickness).
1.3.11 Structural Fill
All locations and elevations up to 24 inches below sub-floor and pavement section subgrade (except where special pavement section layers are required or the Contractor chooses to use FDOT 57 stone, GW or GP below the water table [approximate elevation 26.00]) shall be SP, SP-SM or GP, GP-GM (fines content < 12 percent; maximum particle size < 3 inches; organic content < 2 percent).
The bottom of the demucking excavation, even with a dewatering system in place, could exhibit persistent wetness and/or looseness (softness) which could impede densification of the lower lifts of fill. Therefore, if "Initial Working Platform" material is not used, the initial lift of Structural Fill may be placed in a 24-inch loose thickness with a minimum compaction requirement of 90 percent of the maximum dry density per the Modified Proctor Test (ASTM D1557). Subsequent lifts should meet the requirements stated in Paragraph "Embankments". further below.
Alternatively, a self-compacting material, such as FDOT No. 57 stone or equivalent, could be spread in a 12-inch plus or minus thickness across the bottom of the excavation to create a stable work pad for placement of overlying Structural Fill. Use of a stone work pad would require a filter fabric (geotextile) envelope.
Structural fill should consist of approved materials free of organic matter and debris. A sample of each material type should be submitted to the Geotechnical Engineer for evaluation prior to use on this Site.
2.1 REQUIREMENTS FOR OFF-SITE SOILS
Test off-site soils brought in for use as backfill for Total Petroleum Hydrocarbons (TPH), Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and full Toxicity Characteristic Leaching Procedure (TCLP) including ignitability, corrosivity and reactivity. Backfill shall contain a maximum of 100 parts per million (ppm) of total petroleum hydrocarbons (TPH) and a maximum of 10 ppm of the sum of Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and shall pass the TCPL test. Determine TPH concentrations by using EPA 600/4-79/020 Method
418.1. Determine BTEX concentrations by using EPA SW-846.3-3 Method 5030/8020.
Perform TCLP in accordance with EPA SW-846.3-3 Method 1311. Provide Borrow Site Testing for TPH, BTEX, and TCLP from a composite sample of material from the borrow site, with at least one test from each borrow site. Muck material to be tested once per 5,000 cy unless suspected contamination is encountered.
Then test per Federal, State, or local requirements to categorize materials.
Do not bring material on-site until tests have been approved by the Contracting Officer.
3.2 STRIPPING OF MUCK/ORGANICS
Where indicated or directed, strip topsoil, muck, and organic materials in their entirety (a minimum of 4 feet) as indicated on the Drawings and soil borings, and completely remove stumps to a minimum depth of 54 inches. The limits of demucking should extend a lateral distance of at least 10 feet beyond the toe of slope for stability reasons but not beyond the indicated wetland disturbance limit. All tap roots of stumps should be completely removed to avoid sinkholes due to decayed organic matter in the future. Spread topsoil on areas already graded and prepared for topsoil, or transported and deposited in stockpiles convenient to areas that are to receive application of the topsoil later, or at locations indicated or specified. Keep topsoil separate from other excavated materials, brush, litter, objectionable weeds, roots, stones larger than 2 inches in diameter, and other materials that would interfere with planting and maintenance operations. Remove from the Site any surplus of topsoil from excavations and gradings. Excess topsoils and all muck materials may be delivered to the Eglin Range borrow pits or to an offsite commercial location. All materials taken to Eglin Range borrow pits must be tested as noted in Paragraph "Requirements for Off-Site Topsoils Soils".
3.3 GENERAL EXCAVATION
Perform excavation of every type of material encountered within the limits of the Project to the lines, grades, and elevations indicated and as specified.
Perform the grading in accordance with the typical sections shown and the tolerances specified in Paragraph "Finishing". Transport satisfactory excavated materials and place in fill or embankment within the limits of the
Work. Excavate unsatisfactory materials encountered within the limits of the Work below grade and replace with satisfactory materials as directed. Include such excavated material and the satisfactory material ordered as replacement in excavation. Dispose surplus satisfactory excavated material not required for fill or embankment off Government property or at Eglin Range borrow pits as indicated on Drawings. All materials taken to Eglin Range borrow pits must be tested as noted in Paragraph "Requirements for Off-Site Topsoils Soils".
Dispose of unsatisfactory excavated material. During construction, perform excavation and fill in a manner and sequence that will provide proper drainage at all times. Excavate material required for fill or embankment in excess of that produced by excavation within the grading limits from the Eglin Range borrow pits as indicated on Drawings or from other approved areas selected by the Contractor as specified.
3.3.4 Dewatering
Control groundwater flowing toward or into excavations to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction. Do not permit French drains, sumps, ditches or trenches within 3 feet of the foundation of any structure, except with specific written approval, and after specific contractual provisions for restoration of the foundation area have been made. Take control measures by the time the excavation reaches the water level in order to maintain the integrity of the in situ material. Considering the relatively large area to be demucked, the required dewatering effort will likely consist of pumping from well points, sumps, deep wells, rim ditches or combinations of these methods.
Well points should be effective for dewatering around the perimeter of the area to be excavated but will have limited effect in lowering the groundwater levels within the interior of the demucked excavation which is large in plan area.
Pumping from appropriately designed deep wells will be more effective in lowering groundwater levels within the central portions of the excavation.
Dewatering to lower the groundwater level not less than 2 feet below the excavation bottom level to allow for engineering inspection of the thoroughness of organic soil removal, and to allow for placement and compaction of engineered backfill in a dry condition. While the excavation is open, maintain the water level continuously, at least 2 feet below the working level. This system should be designed by an engineer licensed in the State of Florida. Operate the dewatering system continuously until construction work below existing water levels is complete. Submit performance records weekly. Measure and record performance of dewatering system at same time each day by use of observation wells or piezometers installed in conjunction with the dewatering system.
Relieve hydrostatic head in previous zones below subgrade elevation in layered soils to prevent uplift.
Contractor is responsible for obtaining a dewatering permit in accordance with Florida Administrative Code Rule 62-621 Construction Activity Permit. In Florida, a generic The permit covers the discharge of non-contaminated ground water associated with dewatering activities. Generic Permit for the Discharge of Produced Ground Water.
The requirements stated in the Generic Permit permit must be met before the commencement of any discharge of produced groundwater from a non-contaminated Site activity. Any reportable documents associated with the compliance of this regulation shall be sent to 1 SOCES/CEAN (Attention: Jonathon Colmer, Air/Water Program Manager, 415 Independence Road, Hurlburt Field, Florida 32544, (850) 884-5192, jonathon.colmer.ctr@hurlburt.af.mil) for review PRIOR to the submittal to the FDEP.
3.7 GEOTECHNICAL ENGINEER
Hire a professional geotechnical engineer to provide inspection of excavations and soil/groundwater conditions throughout construction. Geotechnical Engineer shall have a professional engineering license in the State of Florida to install, monitor, and report the instrumentation results from the surcharge program. Geotechnical Engineer shall submit stamped installation and monitoring reports on a weekly basis throughout the initial construction of the fill and as instructed after the final lift is installed. Reports shall include all measurements and elevations necessary for accurate determinations of settlement data during the completion of embankment and placing of fill, as well as any pertinent information relating to construction of the embankment.
The geotechnical engineer is responsible for performing pre-construction and periodic Site visits throughout construction to assess Site Conditions. The geotechnical engineer is responsible for updating the excavation, sheeting and dewatering plans as construction progresses to reflect changing conditions and submit an updated plan if necessary. Submit a monthly written report, informing the Contractor and Contracting Officer of the status of the plan and an accounting of the Contractor's adherence to the plan addressing any present or potential problems. The Contracting Officer is responsible for arranging meetings with the geotechnical engineer at any time throughout the Contract Duration.
3.11 SETTLEMENT PLATE MONITORING
The excavation and replacement of the top four feet of existing soil muck and the placement of 12 additional feet of soil fill material to meet the indicated site grades will induce settlement in the underlying natural soils. Given the variability of the deeper silty sand with organics encountered beneath the site, the rate at which this zone will compress cannot be determined without monitoring the settlement during the filling process and after the filling is complete.
The weight of the site grading fill is estimated to result in approximately 5 inches of areal ground subsidence which should be mostly (about 60% or 3 inches) an elastic, or immediate, response as the fill is being placed. The two inches of estimated consolidation settlement should also occur relatively quickly.
A 30 day “hold time” will be required, after completion of the site grading fill, for gathering of sufficient settlement plate data to determine that movement has stopped. During that time, foundation and/or utility excavations could be made but no substructures should be installed without approval of the Contracting Officer based on settlement data and approval of the Contractor's geotechnical Engineer.
Implement a settlement monitoring program in the building and apron area to monitor the rate of settlement to confirm its expected completion coinciding with topping off of the site grading fill.
Settlement monitoring involves the use of settlement plates connected to vertical rods placed in strategic locations within and around the footprint of the building before fill is added. The plates settle with the soil mass and the top rods are surveyed periodically to record the vertical movement.
Space plates at one per 10,000 square feet of plan area which results in a minimum of 15 plates with 12 in the building (hangar) footprint and the other 3 in the exterior apron area as indicated on the Drawings.
Settlement plates should be installed at the base of the demucked excavation and include a vertical extension to above the surface of the completed fill as shown on the details.
Establish survey (vertical control) reference hubs or pins at the surface of immediate adjacent construction to monitor potential impact (i.e., settlement) due to placement of the adjoining site grading fill.
3.11.1 Settlement Plate
Bottom of the settlement plates shall be placed directly on top of the exposed subgrade after muck removal. The settlement plates shall be positioned in accordance to the Settlement Plate Test Details shown in drawing CG302.
Settlement plates shall be read from the bottom plate; not at the top of the casing. Level rods shall be extended through the 3-inch diameter steel pipe casing to rest on the settlement plate base. Care shall be made to prevent foreign objects from falling down the casing resulting in erroneous readings.
The top of the threaded steel pipe shall be covered between readings with a threaded or socket type cap with the settlement plate location identification and the installation date. Before installation of the fill, the initial elevation of the top of the settlement plate base shall be determined and recorded. Settlement Plate elevation measurements shall be recorded to the nearest 0.01 foot accuracy.
After instrumentation installation is completed and initial readings are taken additional fill can be placed. With settlement plates centered with respect to each other and maintained in vertical position, the backfill around the settlement plates shall be placed by hand using lightweight walk-behind compaction equipment in order not to disturb settlement plate and riser.
Settlement plates are surveyed for elevation changes at periodic time intervals to allow for the computation of the amount and rate of settlement.
These plates will be spaced across the embankment to coincide with the completion of each stage.
Typical earthen filling over soft, weak soils have a tendency to develop mud waves as the new fill thickness squeezes/laterally displaces the underlying soils. This is usually an indication that instead of the soil compressing in place it is being forced laterally. Too large of a mudwave can cause disturbance and weakening of the soils outside of the fill area.
3.11.2 Embankment Monitoring And Placement
a. Monitoring of the instrumentation shall begin as soon as possible after the instruments have been installed. A repeatable benchmark of three readings spaced at a minimum one day apart will be obtained prior to releasing the area for additional fill placement.
b. Benchmarks for elevation control will not be within 50 feet of the embankment or surcharge perimeter to avoid being effected by the embankment settlement.
c. Each reading of the instrumentation shall be compared to the prior reading to assure the quality of the new reading. All field data shall be reported to the Geotechnical Engineer of Record (GER) within 48 hours of obtaining the data.
d. Settlement Plate readings shall be taken a minimum of every 4 days.
After each stage of fill is placed, the instrumentation will be read and the results from these new readings will be the determining factor in allowing continuation of fill placement. The thickness of the next stage of fill placement will also be governed by the instrumentation readings. It is anticipated that the maximum stage thickness will be 36 inches and a minimum stage thickness 24 inches. The Contractor shall notify the COR of any movement (horizontal or vertical), or cracking in the embankment, or signs of foundation failure (bulges at or near the embankment toe) during the surcharge program.
The Contractor shall notify the COR of any movement (horizontal or vertical), or cracking in the embankment, or signs of foundation failure (bulges at or near the embankment toe) during the surcharge program.
3.11.3 Replacement of Damaged or Inoperable Instrumentation
The Contractor shall replace any instrumentation that becomes damaged or inoperable during the embankment construction. All replaced instruments shall be resurveyed and incorporated into the Instrument Monitoring Program. The cost of the replacement shall not be reimbursed by the Government.
3.11.4 Abandonment of Settlement Plates
After authorized release of the required “holding time” for settlement monitoring, the tops of the settlement plate installations (casing and pipe) should be cut off a minimum of 3 feet below bottoms of foundations (footings) or slabs depending on location. The lowered tops should be securely re-sealed with pvc or steel caps matching the casing type. Any resulting excavation of embankment materials, should be backfilled with Structural Fill placed to meet specified compaction requirements.
3.16.1.1 Construction Berm / Haul Road
Structural Initial fill which meets the Specifications will be placed on the cleared and grubbed surface and filled to a minimum elevation of plus 26 feet where a single layer of geogrid is recommended for the compacted surface of the dozer-graded berm and shall be placed on the compacted surface of the dozer-graded haul road. Structural fill shall be placed to a minimum elevation of plus 28 feet where a single layer of geogrid is recommended for the compacted surface of the dozer-graded berm and shall be placed on the compacted surface of the dozer-graded haul road. Refer to Paragraph Satisfactory "Structural Fill" below for fill requirements above initial fill. Refer to plans for location and geometry of the berm.
3.16.1.2 Geogrid
Refer to Drawings for geogrid installation locations and elevations on the Haul Road/Berm. Geogrid shall only be placed on surfaces that are at the grade and compacted as stated in Paragraph Satisfactory "Structural Fill". Geogrid shall be installed per manufacturer's instruction with a minimum of 2 feet overlap between adjacent rolls in the horizontal direction and 6 feet overlap in the long direction. Geogrid shall be protected from construction traffic. Any damaged or defective geogrid areas shall be replaced per manufacturer's instruction. Geogrid shall be covered within 7 days of installation. Any geogrid installed and exposed for more than 7 days shall not be covered without approval of Contracting Officer's Representative (COR). The Contractor shall replace prolonged exposed geogrid as instructed by COR. A minimum of 12 inches of cover is required prior to any traffic over the geogrid.
3.16.1.3 Structural Fill
Structural fill which meets the Specifications shall be placed in an initial 12-inch loose lift on top of the initial fill and shall be compacted to 95 percent maximum dry density as determined by modified proctor per ASTM D1557 within plus or minus 2 percent of optimum moisture content.
3.16.1.4 Subgrade Fill
A minimum thickness of 2 foot of subgrade fill shall be placed over the structural fill (and beneath the base of the base course pavement section course layer of all pavement sections unless indicated otherwise) and shall be placed in maximum 8-inch loose lifts for roller compactors and/or 4-inch loose lifts for hand-operated compactors, each being thoroughly compacted as required to 95 percent maximum density as determined by modified proctor per ASTM D1557.
32 13 14.13
32 13 14.13
2.11.1.1 Location
Locate the batching and mixing plant on Project Site as indicated on the Drawings or off Government premises no more than 15 minute haul time from the placing site. Water and electrical power are available on the Project Site.
Provide operable telephonic or radio communication between the plant and the placing site at all times concreting is taking place.
File details come from the government source that posted it. Updated .