This solicitation is for the construction of an aircraft maintenance unit and weapons hangar at Hurlburt Field, Florida. The scope of work includes construction of a 105,041 square-foot maintenance hangar with aircraft maintenance unit shops and a weapons shop, along with a reinforced concrete foundation and floor slab, steel structure, masonry walls, standing seam metal roof, environmental control systems, fire detection and protection, mass notification system, supporting utilities, pavements, site improvements, communications, and all necessary support to create a complete and usable facility. Additional requirements comprise roadway and parking areas with primary utilities/communications and realignment of existing infrastructure as needed. Required also are airfield pavements to provide access to the hangar. Special site conditions necessitate excavation, fill, and soil stabilization work plus demolition of seven existing buildings. The response due date is 7 December 2020 with award anticipated thereafter. The soliciting agency is the U.S. Army Corps of Engineers Engineering District in Mobile, Alabama.

View the file

Other files

File Type Posted
AM05 DRAWINGS.pdf PDF
AM05.pdf PDF
AM04.pdf PDF
AM04 DRAWINGS.pdf PDF
Minutes-Pre-Bid site visit.pdf PDF
Minutes-Pre-Bid demo site visit.pdf PDF
AM03 DRAWINGS.pdf PDF
AM02.pdf PDF
APPENDIX F- As Builts of Demo Buildings- 1 of 3.zip ZIP file
APPENDIX F- As Builts of Demo Buildings- 2 of 3.zip ZIP file
APPENDIX F- As Builts of Demo Buildings- 3 of 3.zip ZIP file
AM01 Drawings.pdf PDF
AM01.pdf PDF
RTA DRAWINGS VOL 2.pdf PDF
VOL3.PDF PDF
VOL2.PDF PDF
VOL4.PDF PDF
RTA DRAWINGS VOL 1.pdf PDF
VOL6.PDF PDF
VOL1.PDF PDF
VOL5.PDF PDF
EM 385-1-1.pdf PDF
RTA DRAWINGS VOL 3.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)

W9127820R0104-0003 8 DEC 2020 MEF20004

6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)

CODE

Corps of Engineers 109 St. Joseph St.

Mobile, AL 36602

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION

NO.

W9127820R0104

9B. DATED (SEE ITEM 11)

6 NOV 2020

10A. MODIFICATION OF

CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE

FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

The subject solicitation for: FTEV153009 SOF AMU AND WEAPONS HANGAR FACILITY, HURLBURT FIELD, FLORIDA Is modified in the following: REFER TO THE ENCLOSED REVISED SPECIFICATIONS/DRAWING REVISIONS FOR AMENDMENT NO. 0003

Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of contracting officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FTEV153009 SOF AMU AND WEAPONS HANGAR FACILITY W9127820R0104

HURLBURT FIELD, FLORIDA MEF20004

SF 30 Page 2

W9127820R0104-0002

PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS

The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.

Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.

Corresponding Added or Revised Paragraph SECTION Page, and/or Section

VOLUME 1

00 21 16 Revised “Clauses Incorporated by Reference” as indicated herein.

00 70 00 Revised “Clauses Incorporated by Reference” as indicated herein.

01 00 01 Revised Paragraph 1

VOLUME 2

05 12 00 Revised Paragraphs 2.7.2 and 3.5.1

05 21 00 Revised Paragraphs 2.5 and 3.2.2

09 90 00 Revised Paragraph 1.3.1 Deleted Paragraph 1.3.2

09 97 13.27 Revised Paragraphs 2.2 and 2.2.1

PART II - NOTE: Revised drawings are listed below. These revised drawings are to be inserted into the folio in the proper numerical sequence. Drawings that have been revised by this amendment shall be deleted from the folio. All drawings listed below are revised unless indicated otherwise.

Sheet Reference Number Title

COVER SHEET

CS106 SITE PLAN GRID 6

CS110 SITE PLAN GRID 10

CS132 BASE BID + BIDDING SCHEDULE A WITH GSE PAVEMENT AND BID OPTION

AIRFIELD APRON STRIPING

CS501 SITE DETAILS 1

CP103 BASE BID + BIDDING SCHEDULE A WITH CONCRETE GSE PAVEMENT JOINTING

PLAN 3

SF 30 Page 3

W9127820R0104-0002

Sheet Reference

Number Title

CP110 PAVEMENT JOINTING PLAN 10 - BASE BID + BIDDING SCHEDULE A WITH

CONCRETE GSE PAVEMENT

CP123 PAVEMENT ELEVATION PLAN 3 BASE BID + BIDDING SCHEDULE A WITH

CONCRETE GSE PAVEMENT

CP130 PAVEMENT ELEVATION PLAN 10 - BASE BID + BID OPTION AIRCRAFT

PARKING APRON AND BID SCHEDULE A GSE CONCRETE

Encl as stated:

Revised page of the specifications as indicated in Part I.

9 Revised drawings as indicated in Part II.

This page was intentionally left blank for duplex printing.

00 21 16 Revised by Amendment No. W9127820R0104-0003

00 21 16

CLAUSES INCORPORATED BY REFERENCE

52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors—Competitive Actions JAN 2017 52.215-22 Limitations on Pass-Through Charges--Identification of

Subcontract Effort

OCT 2009

52.217-5 Evaluation of Options JUL 1990 52.222-5 Construction Wage Rate Requirements--Secondary Site of the Work

MAY 2014

52.236-28 Preparation of Proposals--Construction OCT 1997 252.204-7008 Compliance With Safeguarding Covered Defense

Information Controls

OCT 2016

252.204-7019 Notice of NIST SP 800-171 DOD Assessment Requirements

NOV 2020

252.204-7020 NIST SP 800-171 DOD Assessment Requirements NOV 2020 252.215-7008 Only One Offer JUL 2019

252.215-7013 Supplies and Services Provided by Nontraditional

Defense Contractors

JAN 2018

(Note: The remainder of the section is unchanged by this amendment.)

00 70 00

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-13 Contractor Code of Business Ethics and Conduct JUN 2020 52.203-19 Prohibition on Requiring Certain Internal Confidentiality

Agreements or Statements

JAN 2017

52.204-2 Alt II Security Requirements (Aug 1996) - Alternate II APR 1984 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2016

52.204-13 System for Award Management Maintenance OCT 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and

Certifications

DEC 2014

52.204-21 Basic Safeguarding of Covered Contractor Information Systems

JUN 2016

52.204-23 Prohibition on Contracting for Hardware, Software and Services Developed or Provided by Kapersky Lab and Other Covered Entities

JUL 2018

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment

AUG 2020

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

JUL 2013

52.209-10

52.210-1

Prohibition on Contracting With Inverted Domestic Corporations Market Research

NOV 2015

JUN 2020

52.211-13 Time Extensions SEP 2000 52.211-18 Variation in Estimated Quantity APR 1984 52.215-2 Audit and Records--Negotiation OCT 2010 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data-

Modifications

JUN 2020

52.215-13 Subcontractor Certified Cost or Pricing Data-Modifications JUN 2020 52.215-15 Pension Adjustments and Asset Reversions OCT 2010 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits

(PRB) Other than Pensions

JUL 2005

52.215-19 Notification of Ownership Changes OCT 1997 52.215-21 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data-Modifications

JUN 2020

52.219-8 Utilization of Small Business Concerns NOV 2016

52.219-4 (DEV) Notice of Price Evaluation Preference for HUBZone Small

Business Concerns (CD 2020-O0008)

MAR 2020

52.219-9 (DEV) Small Business Subcontracting Plan Alt II (CD 2018-O0018) NOV 2016 52.219-16 Liquidated Damages-Subcontracting Plan JAN 1999 52.222-1 Notice To The Government Of Labor Disputes 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards- Overtime

Compensation

MAY 2014

52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-37 Employment Reports on Veterans FEB 2016 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons MAR 2015 52.222-54 Employment Eligibility Verification OCT 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SEP 2013

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

AUG 2011

52.223-21 Foams JUN 2016 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.227-17 Rights In Data-Special Works DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets JAN 2012 52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014

52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Alt I Disputes Alt I MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 52.236-3

Differing Site Conditions Site Investigation and Conditions Affecting the Work

APR 1984

52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-16 Quantity Surveys APR 1984 52.236-17 52.236-21

Layout of Work Specifications and Drawings for Construction

FEB 1997

52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.244-5 52.244-6

Competition In Subcontracting Subcontracts for Commercial Items

DEC 1996

NOV 2017

52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2015 52.249-2 Alt I Termination for Convenience of the Government (Fixed-

Price) (Apr 2012) - Alternate I

SEP 1996

52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.203-7003 Agency Office of the Inspector General AUG 2019 252.204-7000 Disclosure Of Information OCT 2016 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

OCT 2016

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.204-7021 Cybersecurity Maturity Model Certification Requirements NOV 2020 252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of Terrorism

OCT 2015

252.219-7011 Notification to Delay Performance JUN 1998 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010 252.223-7001 Hazard Warning Labels DEC 1991 252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.223-7008 252.225-7012

Prohibition of Hexavalent Chromium Preference For Certain Domestic Commodities

JUN 2013

DEC 2017

252.225-7048 Export-Controlled Items JUN 2013 252.227-7000 Non-estoppel OCT 1966 252.227-7022 Government Rights (Unlimited) MAR 1979 252.227-7030 Technical Data-Withholding of Payment MAR 2000 252.227-7033 Rights in Shop Drawings APR 1966 252.231-7000 Supplemental Cost Principles DEC 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.236-7005 Airfield Safety Precautions DEC 1991 252.236-7006 Cost Limitation JAN 1997 252.236-7008 Contract Prices-Bidding Schedules DEC 1991 252.236-7013 Requirement for Competition Opportunity for American

Steep Producers, Fabricators, and Manufacturers

JUN 2013

252.242-7005 Contractor Business Systems FEB 2012 252.242-7006 Accounting System Administration 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for

Military Operations

OCT 2010

252.247-7023 Transportation of Supplies by Sea FEB 2019 252.203-7003 Contract Clauses AUG 2019

01 00 01

1. REQUESTS FOR INFORMATION (MAR 2013)

Any questions about this solicitation, including technical questions about plans and specifications, shall be submitted via the Bidder Inquiry Portal in ProjNet at https://www.projnet.org. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet. Questions shall be submitted no later than 7 10 DEC 2020, 2:00 PM Central Time to allow time for a response, and amendment to the solicitation if necessary. On this date and time the portal will be closed. For technical questions, no other means of communication, e-mail, fax, or telephone will be accepted. Oral exchanges between offerors and the government prior to award of the contract will not be binding. In addition to information available to offerors on the Bidder Inquiry Portal, any information concerning this solicitation will be furnished to all offerors as an amendment to the solicitation if the information is necessary to the submittal of.

The Solicitation Number is: W9127820R0104 The Bidder Inquiry Key is: DB9KMH-RF6BEE

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in

ProjNet.

6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

Note: Questions/comments should be entered in the system one at a time. List of questions uploaded into ProjNet, regardless of the format, will not be answered.

Offerors are requested to review the solicitation and amendments in their entirety, as well as to review the Bidder Inquiry Portal for previous questions and responses, prior to submission of a new inquiry on the Portal.

CAUTION: ANY INQUIRY SUBMITTED AND ANSWERED WITHIN THIS SYSTEM, WILL BE

ACCESSIBLE TO VIEW BY ALL INTERESTED OFFERORS ON THIS SOLICITATION.

The call center for the ProjNet operates weekdays from 8 AM to 5 PM U.S.

Central Time Zone. The telephone number is 1-800-428-HELP.

05 12 00

05 12 00

2.7.2 Shop Primer

SSPC Paint 20 (zinc rich primer). Shop prime structural steel in accordance with Section 09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES. 09 90 00 PAINTS AND COATINGS. For exterior storage racks, canopies, and hangar structure, shop prime structural steel in accordance with Section 09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES. Primer must be compatible with finish paint. Do not prime steel surfaces embedded in concrete, galvanized surfaces, surfaces to receive epoxy coatings, or surfaces within 0.5 inch of the toe of the welds prior to welding (except surfaces on which metal decking is to be welded). If flash rusting occurs, re-clean the surface prior to application of primer.

Slip critical surfaces must be primed with a Class B coating in accordance with AISC 325. Submit test report for Class B coating.

Prior to assembly, prime surfaces which will be concealed or inaccessible after assembly. Do not apply primer in foggy or rainy weather; when the ambient temperature is below 45 degrees F or over 95 degrees F; or when the primer may be exposed to temperatures below 40 degrees F within 48 hours after application, unless approved otherwise by the Contracting Officer. Repair damaged primed surfaces with an additional coat of primer.

3.5.1 Field Priming and Finish Painting

Steel exposed to the weather, or located in building areas without HVAC for control of relative humidity must be field primed.After erection, the field bolt heads and nuts, field welds, and any abrasions in the shop coat must be cleaned and primed with paint of the same quality as that used for the shop coat. Finish painting shall comply with Section 09 90 00 PAINTS AND COATINGS.

For exterior storage racks, canopies, and hangar structure, finish paint structural steel in accordance with Section 09 97 13.27 EXTERIOR COATING OF

STEEL STRUCTURES.

05 21 00

05 21 00

2.5 SHOP PAINTING

SSPC Paint 15. Shop prime joists, except as modified herein, in accordance with SSPC PA 1. Clean joists in accordance with SSPC SP 2 before priming. If flash rusting occurs, re-clean the surface prior to application of primer.

For joists which require finish painting under Section 09 90 00 PAINTS AND COATINGS, the primer paint must be compatible with the finish paint. Joists in hangar bay require finish painting under Section 09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES, and primer paint must be compatible with the finish paint.

3.2.2 Field Painting

Paint joists requiring a finish coat in conformance with the requirements of Section 09 90 00 PAINTS AND COATINGS. Joists in hangar bay require finish painting under Section 09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES, and primer paint must be compatible with the finish paint.

09 90 00

09 90 00

1.3 APPLICATOR'S QUALIFICATIONS

1.3.1 Contractor Qualification

Submit the name, address, telephone number, FAX number, and e-mail address of the Contractor that will be performing all surface preparation and coating application. Submit evidence that key personnel have successfully performed surface preparation and application of coatings on air craft training or hangar facilities on a minimum of three five similar projects within the past three five years. List information by individual and include the following:

a. Name of individual and proposed position for this Work.

b. Information about each previous assignment including:

(1) Position or responsibility.

(2) Employer (if other than the Contractor).

(3) Name of facility owner.

(4) Mailing address, telephone number, and telex number (if non-US) of facility owner.

(5) Name of individual in facility owner's organization who can be contacted as a reference.

(6) Location, size and description of structure.

(7) Dates work was carried out.

(8) Description of work carried out on structure.

1.3.2 SSPC QP 1 Certification

All Contractors and Subcontractors that perform surface preparation or coating application must be certified by the Society for Protective Coatings (formerly Steel Structures Painting Council) (SSPC) to the requirements of SSPC QP 1 prior to Contract Award, and must remain certified while accomplishing any surface preparation or coating application. If a Contractor's or Subcontractor's certification expires, the firm will not be allowed to perform any work until the certification is reissued. Requests for extension of time for any delay to the completion of the Project due to an inactive certification will not be considered and liquidated damages will apply. Notify the Contracting Officer of any change in contractor certification status.

09 97 13.27

09 97 13.27

2.2 COATING SYSTEM

Alternate systems or products will not be considered. All primer, intermediate coat and topcoat materials shall be supplied by one supplier. The entire coating system is intended to be applied in the field. Alternatively, surface preparation may be accomplished in the shop, following all temperature, humidity, and testing requirements listed herein, followed by an application of a hold-primer. Remove all shop-applied primer prior to final field surface preparation and coating system application. Adjust all shop preparation to avoid conflicts with final surface preparation requirements.

The Military Specification epoxy and polyurethane products specified in this Section do not require approval for listing on the QPL prior to contract award, as indicated in Paragraph 3.2 of MIL-DTL-24441 and Paragraph 3.1 of MIL-PRF-85285. Testing of products by an independent laboratory to the "Qualification Inspection" requirements of MIL-DTL-24441 and MIL-PRF-85285 prior to Contract Award is required. ee specific submittal requirements in Paragraph "Quality Assurance".

Alternate systems or products can be considered. Contractor proposed alternative coating system must be equal or better than specified coating systems and approved by Government.

2.2.1 Zinc-Rich Epoxy Primer Coat

Epoxy polyamide, MIL-DTL-24441/19 (Formula 159, Type III).

Contractor can propose alternative shop applied primer. Alternative primer must be compatible with intermediate/top coat and approved by Government.

File details come from the government source that posted it. Updated .