DRAFT RFP W9124J-17-R-0006
ATTACHMENT #2a
APPENDIX A
25 February 2016
Performance Requirements Summary
Performance
Objective
Performance
Standards
Performance
Threshold Incentive/Disincentives
Health and Safety: PWS Para 5.1.2.
The Contractor shall maintain Health and Safety Requirements.
Compliant with applicable federal, state, and local laws and regulations
Zero Class C safety violations where the contractor is determined at fault.
Trends of less than acceptable performance could result in termination of task order and/or negative CPARs ratings.
Schedule:
PWS Para
5.1.1. The
Contractor shall meet the schedule requirements of the PMP.
Compliant with this PWS, NMED State Regulators, and all applicable federal, state, and local laws and regulations.
No slippage deemed the fault of the contractor for which the Contractor does not present a viable plan to make up the lost time.
Failure to meet the Performance-Based Milestones/Objectives could result in nonpayment, termination of the task order, and/or negative CPARs ratings.
Approval of Deliverables:
PWS Para
5.1.3. The
Contractor shall obtain Army and Regulatory approval of all project deliverables.
Compliant with this PWS, NMED State Regulators, and all applicable federal, state, and local laws and regulations.
No more than two (2) revisions of deliverables for either Army or Regulator comments.
Failure to complete compliant documents could result in mission failure or schedule delay which would result in nonpayment for work toward the applicable CLINs, termination of the task order, and/or negative CPARs ratings.
DRAFT RFP W9124J-17-R-0006
ATTACHMENT #2a
Performance
Objective
Performance
Standards
Performance
Threshold Incentive/Disincentives
Field Activities:
PWS Para
5.1.4. The
Contractor shall perform all field work and sampling activities required in this PWS in compliance with accepted industry standards, approved site plans, and Army and Regulatory approvals.
Performed in compliance with the Final Work Plans/SAP.
Though field changes are acceptable due to site conditions, these changes must first be approved by the COR, and upon COR’s discretion by Regulators.
100% compliance with the Final Plans and SAP, and the approved variances.
If field work is not completed in accordance with the Final Work Plans, SAP and any approved variances, the contractor may be required to re-work/re-sample at their cost to ensure completion of performance objectives.
Additionally, failure to receive approval of field changes may result in negative CPARs ratings.
Sample Results: PWS Para 5.1.5.
Sample results shall be acceptable to the Army and Regulators.
Sample results shall meet quality assurance goals/requirements to include any applicable SOPs.
100% compliance with QA/QC requirements established in the QAPP and SAP.
Failure to have sample results which fall within QA/QC requirements could result in contractor re-sampling at their cost, schedule delay or mission failure. Failure to meet the Performance-Based Milestones/Objectives could result in nonpayment, termination of the task order, and/or negative CPARs ratings.