ATTACHMENT #2a APPENDIX A WSMR PRS W9124J-17-R-0006_4 JAN 2017

View the file

Other files

File Type Posted
ATTACHMENT__1_Basic_PWS_W9124J-17-R-0006_ERMA_IDIQ_FY18_REVISED_24_FEB_17.pdf PDF
AMENDMENT_0004_W9124J-17-R-0006_EMRA_IDIQ_FY18.pdf PDF
CONFORMED_SECTION_K_W9124J-17-R-0006_ERMA_IDIQ_FY18.pdf PDF
QUESTIONS_in_Response_to_AMENDMENT_0003_16_FEB_17-USG_RESPONSE_24_FEB_17_W9124J-17-R-0006_ERMA_IDIQ_FY18_.pdf PDF
ATTACHMENT__6_WSMR_LIVE_TO_CLIN_Structure_W9124J-17-R-0006_REVISED_15_Feb_2017.pdf PDF
ATTACHMENT__1_Basic_PWS_W9124J-17-R-0006_ERMA_IDIQ_FY18_REVISED_15_FEB_2017.pdf PDF
ATTACHMENT__4_SCA_Wage_Determination_W9124J-17-R-0006_ERMA_IDIQ_FY18_25Jan17_.pdf PDF
QUESTIONS_in_to_Response_AMENDMENT_0002_9_FEB_17-USG_RESPONSE_16_FEB_17_W9124J-17-R-0006_ERMA_IDIQ_FY18.pdf PDF
AMENDMENT_0003_W9124J-17-R-0006_ERMA_IDIQ_FY18.pdf PDF
RFP_5_JAN_2017_QUESTIONS-USG_RESPONSE_8_FEB_17_W9124J-17-R-0006_ERMA_IDIQ_FY18.pdf PDF
ATTACHMENT__6_WSMR_LIVE_TO_CLIN_Structure_W9124J-17-R-0006_REVISED_23_Jan_2017.pdf PDF
AMENDMENT_0002_W9124J-17-R-0006_ERMA_IDIQ_FY18.pdf PDF
ATTACHMENT__6_WSMR_LIVE_TO_CLIN_Structure_W9124J-17-R-0006_REVISED_23_Jan_2017_wTrackChanges.pdf PDF
ATTACHMENT__1_Basic_PWS_W9124J-17-R-0006_ERMA_IDIQ_FY18_REVISED_30_Jan_17.pdf PDF
AMENDMENT_0001_W9124J-17-R-0006_ERMA_IDIQ_FY18.pdf PDF
ATTACHMENT__5_Past_Performance_Questionnaire_W9124J-17-R-0006_4_Jan_2017.doc DOC document
ATTACHMENT__2b_APPENDIX_B_WSMR_ATOPSEC_W9124J-17-R-0006_ERMA_IDIQ_FY18_4_Jan_2017.pdf PDF
ATTACHMENT__4_SCA_Wage_Determination_W9124J-17-R-0006_ERMA_IDIQ_FY18.pdf PDF
ATTACHMENT__2c_APPENDIX_C_WSMR_Site_Summary_W9124J-17-R-0006_EMRA_IDIQ_FY18_4_Jan_2017.pdf PDF
ATTACHMENT__2_WSMR_PWS_W9124J-17-R-0006_ERMA_IDIQ_FY18_4_Jan_2017.pdf PDF
ATTACHMENT__1_Basic_PWS_W9124J-17-R-0006_ERMA_IDIQ_FY18_4_Jan_2017.pdf PDF
RFP_W9124J-17-R-0006_ERMA_IDIQ_FY18_5_JAN_2017.pdf PDF
ATTACHMENT__8_SAMPLE_FORMAT_Questions&Answers_W9124J-17-R-0006_ERMA_IDIQ_FY18.xlsx XLSX spreadsheet
ATTACHMENT__6_WSMR_LIVE_TASK_ORDER_CLIN_Structure_W9124J-17-R-0006_4_Jan_2017.pdf PDF
ATTACHMENT__3_QASP_W9124J-17-R-0006_ERMA_IDIQ_FY18_4_Jan_2017.pdf PDF
ATTACHMENT__7_Financial_Institution_Reference_Sheet_W9124J-17-R-0006_4_Jan_2017.docx DOCX document
WSMR_SITE_VISIT_1_and_2_NOV_2016_QUES_W9124J-17-R-0006_ERMA_IDIQ_FY18_USG_RESP_6_Dec_2016.pdf PDF
REVISED_DRAFT_RFP_W9124J-17-R-0006_ERMA_IDIQ_FY18_6_December_2016.pdf PDF
ATTACHMENT__2_REVISED_DRAFT_WSMR_PWS_W9124J-17-R-0006_ERMA_IDIQ_FY18_6_Dec_2016.pdf PDF
ATTACHMENT__6_REVISED_DRAFT_WSMR_CLIN_Structure_W9124J-17-R-0006_2_Dec_2016.pdf PDF
DRAFT_RFP_dated_4_Oct_2016_QUESTIONS-ANSWERS_16_Nov_2016_W9124J-17-R-0006_ERMA_IDIQ_FY18.pdf PDF
SITE_VISIT_SLIDES_Presented_1_Nov_2016_W9124J-17-R-0006_WSMR _NM_DRAFT_LIVE_TASK_ORDER.pdf PDF
SITE_VISIT_ATTENDEE_LIST_1_Nov_2016_and_2_Nov_2016_W9124J-17-R-0006_ERMA_IDIQ_FY18.pdf PDF
SITE_VISIT_INFORMATION_1_Nov_2016_and_2_Nov_2016_W9124J-17-R-0006_ERMA_IDIQ_FY18.pdf PDF
WSMR_SITE_VISIT_PARKING_AREA_Hwy70_to_Las_Cruces_Gate.pdf PDF
WSMR_SITE_VISIT_Routes_to_WSMR_Main_Post.pdf PDF
ATTACHMENT__2c_DRAFT_APPENDIX_C_WSMR_Site_Summary_W9124J-17-R-0006_ERMA_IDIQ_FY18_3_Oct_2016.pdf PDF
ATTACHMENT__2b_DRAFT_APPENDIX_B_WSMR_ATOPSEC_W9124J-17-R-0006_ERMA_IDIQ_FY18_3_Oct_2016.pdf PDF
DRAFT_RFP_W9124J-17-R-0006_ERMA_IDIQ_FY18_4_OCT_2016.pdf PDF
ATTACHMENT__8_SAMPLE_FORMAT_Questions Answers_W9124J-16-R-0071_ERMA_IDIQ_FY18.xlsx XLSX spreadsheet
ATTACHMENT__7_Financial_Institution_Reference_Sheet_W9124J-17-R-0006_23_Sep_2016.docx DOCX document
ATTACHMENT__4_SCA_Wage_Determination_W9124J-17-R-0006_ERMA_IDIQ_FY18.docx.pdf PDF
ATTACHMENT__5_DRAFT_Past_Performance_Questionnaire_W9124J-17-R-0006_23_Sep_2016.doc DOC document
ATTACHMENT__6_DRAFT_WSMR_CLIN_Structure_W9124J-17-R-0006_11_Apr_2016.pdf PDF
ATTACHMENT__2_DRAFT_WSMR_PWS_LIVE_TO_W9124J-17-R-0006_ERMA_IDIQ_FY18_3_Oct_2016.pdf PDF
ATTACHMENT__2a_DRAFT_APPENDIX_A_WSMR_PRS_W9124J-17-R-0006_ERMA_IDIQ_FY18_25_Feb_2016.pdf PDF
ATTACHMENT__3_DRAFT_QASP_W9124J-16-R-0071_ERMA_IDIQ_FY18_27_Sep_2016.pdf PDF
ATTACHMENT__1_DRAFT_Basic_PWS_W9124J-17-R-0006_ERMA_IDIQ_FY18_1_Sep_2016.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9124J-17-R-0006 ATTACHMENT #2a

Appendix A

4 January 2017

Performance Requirements Summary

Performance

Objective

Performance

Standards

Performance

Threshold Incentive/Disincentives

Health and

Safety: PWS

Para 5.1.2.

The Contractor shall maintain

Health and

Safety

Requirements.

Compliant with applicable federal, state, and local laws and regulations

Zero Class C safety violations where the contractor is determined at fault.

Trends of less than acceptable performance could result in termination of task order and/or negative CPARs ratings.

Schedule:

PWS Para

5.1.1. The

Contractor shall meet the schedule requirements of the PMP.

Compliant with this

PWS, NMED State

Regulators, and all applicable federal, state, and local laws and regulations.

No slippage deemed the fault of the contractor for which the

Contractor does not present a viable plan to make up the lost time.

Failure to meet the

Performance-Based

Milestones/Objectives could result in nonpayment, termination of the task order, and/or negative CPARs ratings.

Approval of

Deliverables:

PWS Para

5.1.3. The

Contractor shall obtain Army and Regulatory approval of all project deliverables.

Compliant with this

PWS, NMED State

Regulators, and all applicable federal, state, and local laws and regulations.

No more than two (2) revisions of deliverables for either

Army or

Regulator comments.

Failure to complete compliant documents could result in mission failure or schedule delay which would result in nonpayment for work toward the applicable

CLINs, termination of the task order, and/or negative CPARs ratings.

W9124J-17-R-0006 ATTACHMENT #2a

Performance

Objective

Performance

Standards

Performance

Threshold Incentive/Disincentives

Field Activities:

PWS Para

5.1.4. The

Contractor shall perform all field work and sampling activities required in this

PWS in compliance with accepted industry standards, approved site plans, and

Army and

Regulatory approvals.

Performed in compliance with the

Final Work Plans/SAP.

Though field changes are acceptable due to site conditions, these changes must first be approved by the COR, and upon COR’s discretion by

Regulators.

100% compliance with the Final

Plans and

SAP, and the approved variances.

If field work is not completed in accordance with the

Final Work Plans, SAP and any approved variances, the contractor may be required to re-work/re-sample at their cost to ensure completion of performance objectives.

Additionally, failure to receive approval of field changes may result in negative CPARs ratings.

Sample

Results: PWS

Para 5.1.5.

Sample results shall be acceptable to the Army and

Regulators.

Sample results shall meet quality assurance goals/requirements to include any applicable

SOPs.

100% compliance with QA/QC requirements established in the QAPP and SAP.

Failure to have sample results which fall within

QA/QC requirements could result in contractor re-sampling at their cost, schedule delay or mission failure. Failure to meet the

Performance-Based

Milestones/Objectives could result in nonpayment, termination of the task order, and/or negative CPARs ratings.