W9124J-17-R-0006 ATTACHMENT #2a
Appendix A
4 January 2017
Performance Requirements Summary
Performance
Objective
Performance
Standards
Performance
Threshold Incentive/Disincentives
Health and
Safety: PWS
Para 5.1.2.
The Contractor shall maintain
Health and
Safety
Requirements.
Compliant with applicable federal, state, and local laws and regulations
Zero Class C safety violations where the contractor is determined at fault.
Trends of less than acceptable performance could result in termination of task order and/or negative CPARs ratings.
Schedule:
PWS Para
5.1.1. The
Contractor shall meet the schedule requirements of the PMP.
Compliant with this
PWS, NMED State
Regulators, and all applicable federal, state, and local laws and regulations.
No slippage deemed the fault of the contractor for which the
Contractor does not present a viable plan to make up the lost time.
Failure to meet the
Performance-Based
Milestones/Objectives could result in nonpayment, termination of the task order, and/or negative CPARs ratings.
Approval of
Deliverables:
PWS Para
5.1.3. The
Contractor shall obtain Army and Regulatory approval of all project deliverables.
Compliant with this
PWS, NMED State
Regulators, and all applicable federal, state, and local laws and regulations.
No more than two (2) revisions of deliverables for either
Army or
Regulator comments.
Failure to complete compliant documents could result in mission failure or schedule delay which would result in nonpayment for work toward the applicable
CLINs, termination of the task order, and/or negative CPARs ratings.
W9124J-17-R-0006 ATTACHMENT #2a
Performance
Objective
Performance
Standards
Performance
Threshold Incentive/Disincentives
Field Activities:
PWS Para
5.1.4. The
Contractor shall perform all field work and sampling activities required in this
PWS in compliance with accepted industry standards, approved site plans, and
Army and
Regulatory approvals.
Performed in compliance with the
Final Work Plans/SAP.
Though field changes are acceptable due to site conditions, these changes must first be approved by the COR, and upon COR’s discretion by
Regulators.
100% compliance with the Final
Plans and
SAP, and the approved variances.
If field work is not completed in accordance with the
Final Work Plans, SAP and any approved variances, the contractor may be required to re-work/re-sample at their cost to ensure completion of performance objectives.
Additionally, failure to receive approval of field changes may result in negative CPARs ratings.
Sample
Results: PWS
Para 5.1.5.
Sample results shall be acceptable to the Army and
Regulators.
Sample results shall meet quality assurance goals/requirements to include any applicable
SOPs.
100% compliance with QA/QC requirements established in the QAPP and SAP.
Failure to have sample results which fall within
QA/QC requirements could result in contractor re-sampling at their cost, schedule delay or mission failure. Failure to meet the
Performance-Based
Milestones/Objectives could result in nonpayment, termination of the task order, and/or negative CPARs ratings.