AMENDMENT 0003 W9124J-17-R-0006 ERMA IDIQ FY18
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reference Summary of Changes.
POC
Joanna B. Cox, Contract Specialist joanna.b.cox.civ@mail.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 23
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Feb-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124J-17-R-0006
X 9B. DATED (SEE ITEM 11)
05-Jan-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Feb-2017
CODE
MICC - FSH
ATTN: MICC - FSH
2205 INFANTRY POST RD
210-466-2145
FORT SAM HOUSTON TX 78234-1361
W9124J 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9124J-17-R-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SUMMARY OF CHANGES (AMENDMENT 0003)
The following Sections of the RFP dated 5 January 2017 are hereby amended:
1) Reference SECTION I, CLAUSES INCORPORATED BY REFERENCE, deleted the following:
52.229-10 State of New Mexico Gross Receipts and Compensating Tax APR 2003
2) Reference Section J, updated the following (via Track Changes):
Attachment #1 Basic Performance Work Statement REVISED 15 February 2017 Attachment #4 SCA Wage Determination REVISED 25 January 2017 Attachment #6 Live Task Order WSMR CLIN Structure 15 February 2017
3) Reference Section L, ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL
ITEMS, INSTRUCTIONS TO OFFERORS (via Track Changes).
4) Reference Section M, ADDENDUM to FAR 52.212-2 EVLUATION--COMMERCIAL ITEMS, EVAUATION
FACTORS FOR AWARD (via Track Changes).
5) The Questions/USG Responses dated 16 February 2017 are hereby incorporated into the Solicitation.
6) All other provisions, clauses, sections and attachments remain unchanged.
The following have been deleted:
SECTION I - CONTRACT CLAUSES
The following have been deleted:
52.229-10 State of New Mexico Gross Receipts and Compensating Tax APR 2003
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
ATTACHMENTS
ATTACHMENT DOCUMENT DATE NUMBER
OF PAGES
Attachment #1 Basic Performance Work Statement 30 JAN 2017
15 FEB 2017
Attachment #2 Live Task Order WSMR PWS 4 JAN 2017 20
Attachment #2a
Appendix A Performance Requirements Summary
4 JAN 2017
Attachment #2b
Appendix B Anti-Terrorism and Operational Security
Attachment #2c Appendix C Cross Reference Site Summary
Attachment #3 Quality Assurance Surveillance Plan 4 JAN 2017 16 Attachment #4 SCA Wage Determination 30 DEC 2016
25 JAN 2017
Attachment #5 Past Performance Questionnaire 4 JAN 2017 4 Attachment #6 Live Task Order WSMR CLIN Structure 23 JAN 2017
15 FEB 2017
Attachment #7 Financial Institution Reference Form 4 JAN 2017 1 Attachment #8 Questions/Answers Sample Format 4 JAN 2017 1
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS
The following provisions are incorporated into 52.212-1 as an addendum to this solicitation:
INSTRUCTIONS TO OFFERORS
A Site Visit at White Sands Missile Range, New Mexico was held on 1 November 2016 and 2 November 2016.
Following completion of presentations by the Government, a Site tour was conducted. Specific date/time and instructions were provided on FedBizOpps.gov.
1. Time and Place for Submission
a. You are invited to submit a proposal in accordance with ADDENDUM to FAR 52.212-1 Instructions to Offerors – Commercial (Section L) to arrive at the location specified in Subparagraph c. below no later than 3:00 PM (CST), 22 February 1 March 2017.
b. All proposals delivered in response to this solicitation shall reflect the following on the address label:
(1) Address indicated in subparagraph c. below
(2) Solicitation Number W9124J-17-R-0006
(3) The legend "TO BE DELIVERED UNOPENED TO VERONICA A. ROMERO”
(4) The Volume and copy number contained in each box
c. Proposals must be submitted by overnight delivery or in person, received no later than 22 February 1 March 2017, by 3:00 PM (CST) time.
It is the duty and responsibility of each Offeror to ensure that its Proposal and any revisions and/or modifications (written or electronic) reaches the designated Government office by the time specified in the FINAL RFP. All properly addressed, identified and delivered Proposals received will be safeguarded in accordance with the applicable Government regulations.
Designated Government Office:
USPS Mail* Couriers/Physical Address (Fed Ex, DHL, UPS) Mission and Installation Contracting Command- Mission and Installation Contracting Command- Environmental Division Environmental Division ATTN: Veronica A. Romero, Contracting Officer ATTN: Veronica A. Romero, Contracting Officer ATTN: Joanna B. Cox, Contract Specialist ATTN: Joanna B. Cox, Contract Specialist
(210) 466-2159 (210) 466-2159 2205 Infantry Post Road 2205 Infantry Post Road JBSA Fort Sam Houston, TX 78234-1361 JBSA Fort Sam Houston, TX 78234-1361
*IMPORTANT: Please be advised that the Mission and Installation Contracting Command receives USPS deliveries at specific/limited times ONLY.
d. Please do not submit a transmittal letter with your bid or proposal. Such a letter is unnecessary and statements therein frequently create conflicts or ambiguities, raising the possibility that your bid is nonresponsive to the invitation or that your proposal takes exception to the terms and conditions of the solicitation.
e. QUESTIONS: ALL questions in response to this RFP must be submitted no later than NOON (CST), on 18 January 2017, via email, to joanna.b.cox.civ@mail.mil. Please utilize Attachment #8 when/if submitting questions in response to this RFP.
FINAL QUESTIONS: All questions in response to this AMENDMENT (0002) must be submitted no later than NOON (CST), on 14 February 2017, via email, to joanna.b.cox.civ@mail.mil. Please utilize Attachment #8 when/if submitting questions in response to this RFP.
FINAL QUESTIONS: All questions in response to this AMENDMENT (0003) must be submitted no later than NOON (CST), on 22 February 2017, via email, to joanna.b.cox.civ@mail.mil. Please utilize Attachment #8 when/if submitting questions in response to this RFP.
f. The Contract Specialist is the sole point of contact for this acquisition. The Contract Specialist will communicate directly with the Contracting Officer. The Offeror shall address any questions or concerns to the Contract Specialist. Written requests may be sent to the Contract Specialist, Joanna B. Cox, via email at joanna.b.cox.civ@mail.mil. Email is the preferred method of communication.
g. Organizational Conflicts of Interest/Disclosure: Offerors must either affirmatively state that they have no
OCI issues or submit a mitigation plan in Volume I, Factor 2, Technical Approach to Live Task Order. Reference Basic PWS, Section C.8.10.
The Contracting Officer for this acquisition is as follows: Ms. Veronica A. Romero
The Offeror’s proposal shall contain all of the requested information specified in the solicitation at or before the time specified. Compliance with these instructions is mandatory and failure to comply may render your proposal ineligible for award.
2. Period for Acceptance of Offers
Unless Offerors insert a different period of time on the Standard Form 33, the entire proposal will remain valid for a period of 300 days from date of receipt specified in the solicitations for the proposals.
3. Proposal Instructions
a. Offerors are cautioned that “parroting” of the Technical requirements or the Basic and/or Live Task Order PWS with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform, therefore will be considered technically unacceptable and will not be considered further. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.
b. All information the Offeror wishes to have considered must be provided with the written proposal. The evaluation will be limited to the information provided and nothing will be assumed.
c. The Solicitation will be a single-phased competition. Awards will be based on evaluation of the factors described in ADDENDUM to 52.212-2 Evaluation – Commercial Items (Section M). Failure to follow the directions put forth in the Solicitation may eliminate the proposal from further consideration. The Government intends to evaluate proposals and award contracts without discussions with Offerors (except clarifications as described in FAR 15.306(a), Clarifications and award without discussions). Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In the event discussions are held, a competitive range determination will be made. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals pursuant to FAR Subpart 15.306(c).
d. Teaming with other Contractors is strongly encouraged, including teaming with Small Businesses; in order to assure maximum market resources are available. Offerors shall describe any teaming arrangements (i.e., teaming agreements, joint venture, partnership, etc.) proposed for performance of the Contract. Offerors shall indicate the portion of work to be performed by each team member and shall state the business size of each member. In addition, Offerors shall include copies of all teaming agreements, and where applicable, the Small Business Administration approval of the teaming arrangement in Volume I, Factor 1, Relevant Corporate Experience and Management Approach.
NOTE: Offeror shall identify its proposed team (prime and all subcontractors/team members) and discuss the role that each member will have in accomplishing the specific functional area requirements of the PWS.
e. North American Industry Classification System (NAICS) Code and Small Business Size Standard: The NAICS Code for this acquisition is 562910 which is 750 employees or less.
f. This Solicitation notice does not commit the U.S. Government to an award for any supply or service or any information or administrative costs incurred in preparation and submission of a proposal in response to this notice.
4. Definitions
a. Subcontracting: In accordance with Federal Acquisition Regulations (FAR) Clause 52.219-14 LIMITATIONS ON SUBCONTRACTING (Nov 2011):
(c) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for --
(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.
(2) Supplies (other than procurement from a nonmanufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.
(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.
(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.
b. Joint Venture: In accordance with FAR Clause 19.101(7)(i) EXPLANATION OF TERMS (15 June 2016):
(i) Definition of a joint venture for size determination purposes. A joint venture for size determination purposes is an association of persons or concerns with interests in any degree or proportion by way of contract, express or implied, consorting to engage in and carry out a single specific business venture for joint profit, for which purpose they combine their efforts, property, money, skill, or knowledge, but not on a continuing or permanent basis for conducting business generally. A joint venture is viewed as a business entity in determining power to control its management.
(B) For other than bundled requirements, apply size standards for the requirement to individual persons or concerns, not to the combined assets, of the joint venture, if—
(1) A revenue-based size standard applies to the requirement and the estimated contract value, including options, exceeds one-half the applicable size standard; or
(2) An employee-based size standard applies to the requirement and the estimated contract value, including options, exceeds $10 million.
Also,
(iii) Joint venture. Concerns submitting offers on a particular acquisition as joint ventures are considered as affiliated and controlling or having the power to control each other with regard to performance of the contract. Moreover, an ostensible subcontractor which is to perform primary or vital requirements of a contract may have a controlling role such to be considered a joint venturer affiliated on the contract with the Prime Contractor. A joint venture affiliation finding is limited to particular contracts unless the SBA size determination finds general affiliation between the parties. The rules governing 8(a) Program joint ventures are described in 13 CFR 124.513.
(iv) Where a concern is not considered as being an affiliate of a concern with which it is participating in a joint venture, it is necessary, nevertheless, in computing annual receipts, etc., for the purpose of applying size standards, to include such concern’s share of the joint venture receipts (as distinguished from its share of the profits of such venture).
For the purposes of this Contract, a Joint Venture must be a separate legal entity.
When proposing as a Joint Venture, all members of the Joint Venture shall sign the SF 33 unless a written agreement by the Joint Venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the Joint Venture. In addition, a copy of the Joint Venture agreement shall be submitted with the proposal in Volume I. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a), HUBZone, or Service-Disabled Veteran-Owned joint venture, the Offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124, 13 CFR Part 125, and 13 CFR Part 126 respectively. The Joint Venture shall include a copy of its SBA approval of the Joint Venture arrangement, if applicable.
c. Teaming Arrangements: In accordance with FAR Clause 19.101(7)(vi) EXPLANATION OF TERMS (15 June 2016) (vi):
Size determination for teaming arrangements. For size determination purposes, apply the size standard tests in paragraphs (7)(i)(A) and (B) of this section when a teaming arrangement of two or more business concerns submits an offer, as appropriate. (Reference 4.b. Joint Venture Definition above.)
d. Mentor-Protégé: In accordance with 13 CFR 124.520 RULES GOVERNING SBA’s MENTOR/PROTÉGÉ
PROGRAM:
(1) A mentor and protégé may joint venture as a Small Business for any Government Prime Contract or Subcontract, including procurements with a dollar value less than half the size standard corresponding to the assigned NAICS code and 8(a) sole source contracts, provided the protégé qualifies as small for the procurement and, for purposes of 8(a) sole source requirements, the protégé has not reached the dollar limit set forth in § 124.519.
(i) SBA must approve the mentor/protégé agreement before the two firms may submit an offer as a joint venture on a particular Government Prime Contract or subcontract in order for the joint venture to receive the exclusion from affiliation.
(ii) In order to receive the exclusion from affiliation for both 8(a) and non-8(a) procurements, the joint venture must meet the requirements set forth in § 124.513(c).
(iii) Once a protégé firm graduates from or otherwise leaves the 8(a) BD program, it will not be eligible for any further benefits from its mentor/protégé relationship (i.e., the receipts and/or employees of the protégé and mentor will generally be aggregated in determining size for any joint venture between the mentor and protégé after the protégé leaves the 8(a) BD program). Leaving the 8(a) BD program, or terminating the mentor/protégé relationship while a protégé firm is still in the program, does not, however, affect contracts previously awarded to a joint venture between the protégé and its mentor. In such a case, the joint venture continues to qualify as small for previously awarded contracts and is obligated to continue performance on those contracts.
(2) Notwithstanding the requirements set forth in §§ 124.105(g) and (h), in order to raise capital for the protégé firm, the mentor may own an equity interest of up to 40% in the protégé firm.
(3) Notwithstanding the mentor/protégé relationship, a protégé firm may qualify for other assistance as a Small Business, including SBA financial assistance.
(4) No determination of affiliation or control may be found between a protégé firm and its mentor based on the mentor/protégé agreement or any assistance provided pursuant to the agreement.
Mentor-Protégé (M-P) is a relationship and not a business entity. M-Ps require formal Teaming Arrangements or Letters of Intent to qualify for consideration as a team member.
e. Offeror: Team submitting the Proposal. Prime shall refer to the entity to which the Contract shall be awarded.
f. Team/Team Member(s)/Teaming Partner(s): The Government will consider the Offeror and all subcontractors a “team” when evidence of a signed Teaming Arrangement or Letter of Intent is provided.
g. Teaming Arrangement (TA) Or Letter Of Intent (LOI): To be valid under this solicitation, all team members shall have a signed TAs or LOI that commits the parties to performance under this contract, should it be awarded to the Prime.
h. SUBCONTRACTORS:
(i)If any subcontractor is projected to perform more than 20% of all work on the EMRA Multiple Award IDIQ then a signed TA or LOI shall be provided for that subcontractor.
(ii) Subcontractors projected to perform less than 20% of all work on the contract may be included as team members at the Offeror’s discretion. If included as a team member, a signed TAs or LOI shall be provided for that subcontractor.
(iii) A subcontractor without a signed TAs or LOI is not considered as part of the “team” and will not be evaluated as such.
(iv) Mission Capability proposal information, Past Performance Information, and Past Performance Questionnaires submitted for subcontractors without a TAs or LOI will not be evaluated.
(v) The Government will consider the Offeror and all subcontractors a “team” when evidence of a signed TAs or LOI is provided in Volume I, General and in Volume II, Mission Capability.
NOTE: Team/Team Member(s)/Teaming Partner(s). The Government will consider the offeror and all subcontractors a “team” when evidence of a signed Teaming Arrangement or Letter of Intent is provided. This RFP will refer to the offeror and all identified teaming subcontractors as a “team.” This RFP will refer to all identified teaming subcontractors as “team members” or “teaming partners.”
5. Proposal Contents
Evaluation Factors and Subfactors
VOLUME I – MISSION CAPABILITY
This section of Volume I shall be clearly marked “VOLUME I- MISSION CAPABILITY, RFP W9124J-17-R- 0006)
Factor 1: Relevant Corporate Experience and Management Approach
Offeror’s corporate experience with projects similar in size, scope, and complexity for continuing effort during the previous five (5) years, by the proposal due date, will be assessed. All Offerors shall describe the depth and breadth of experience in providing services similar to those in Section C of this Solicitation. Through the selected projects and narratives, and management approach, the Offeror shall demonstrate the breadth and depth of its experience in performing the Government’s requirements as identified in Section C of this Solicitation. Breadth of experience reflects the Offeror’s experience in performing the full range/all of the tasks required. Depth of experience reflects the magnitude, significance, and applicability/relevance of the Offeror’s experience in performing each of the tasks required.
Volume Factors Criteria Description I Mission Capability Factor 1 Relevant Corporate Experience and Management Approach
Factor 2 Technical Approach to Live Task Order Subfactor 1 Discussion of Site Subfactor 2 Staffing Plan Subfactor 3 Operational Effort Subfactor 4 Hazards and Safety Identification Subfactor 5 Quality Management/Quality Control Subfactor 6 Project Schedule
II Past Performance Factor 3 Past Performance III Price Factor 4 Live Task Order Price Proposal
Each Offeror shall submit six (6) projects for which they were the Prime Contractor, three (3) of which shall focus on IRP, and three (3) shall focus on MMRP. Projects completed under the Environmental Protection Agency (EPA) Superfund Program at a National Priority List (NPL) site or under the Resource Conservation and Recovery Act (RCRA) Corrective Action Program (CAP) may be substituted for the IRP and MMRP projects provided they are consistent with the definitions for IRP and MMRP defined in the Defense Environmental Restoration Program Manual. Offerors shall submit at least one (1) project of value greater than $7.5 million; the remaining projects shall be of value greater than $500,000 each. The collection of projects submitted will be assessed.
The description shall include, at a minimum, the following information:
a. Customer Techncial Point of Contact name, address, e-mail, and telephone number;
b. Contract number (if Government Contract); Contract type;
c. Awarded price/cost;
d. Final, or projected final, price/cost;
e. Award/Completion Date
f. Extent of subcontracting;
g. Include a narrative explanation on each project cited and how it is similar to the work required by this solicitation, citing objective achieved;
A project is defined as:
Work performed on one specific Task Order of an IDIQ type Contract at one site or multiple sites at a single or multiple Government installations/facilities or equivalent commercial locations; or Work performed on a site-specific Contract (i.e. a non-IDIQ contract) for one site or multiple sites at a single or multiple Government installations/facilities or equivalent commercial locations.
Do not list an IDIQ Contract as an example of a project. Instead, list relevant Task Orders that fit within the definition above. If the Offeror provides a specific Task Order as its "project," it shall provide the Basic Contract number and the Task Order number for reference purposes. If the Offeror provides a site-specific/stand-alone “C- Type” contract as its "project," it shall provide the Contract number for reference purposes.
To qualify as a project, work must be at least 80% complete by the proposal due date. For projects that are not 100% complete, the Offeror shall: 1) explain the metric used to demonstrate 80% complete (e.g., based on cost, schedule, objectives achieved); 2) provide the estimated completion date; and 3) briefly summarize the remaining activities.
Offeror shall provide a description of its proposed management approach to include an organizational chart and narrative identifying roles and responsibilities of all Key Personnel listed in Section C.6 of the Basic PWS and describe how this structure will contribute to a synergistic environment to meet the requirements.
All Offerors shall provide the resumes of the Basic Contract Key Personnel identified in Section C.6 of the Basic PWS. These Key Personnel shall be employees of the Prime Contractor (the entity to which the Contract shall be awarded) and have the experience and education necessary to meet the requirements identified in Section C.6 of the Basic PWS.
The Offeror shall provide a narrative of how they will obtain and retain the necessary personnel required to perform the work described in Section C of this Solicitation.
Offerors shall describe any teaming arrangements (i.e., teaming agreements, joint venture, partnership, etc.)
proposed for performance of the contract. Offerors shall indicate the portion of work to be performed by each team member and shall state the business size of each member. The offeror shall demonstrate its ability to seamlessly manage the teaming arrangements to include how communication will be conducted; what the lines of authority are;
as well as the identification and integration plan for team members, team roles, and what percentage of work will be performed by team members to ensure successful performance under this contract. (Note: Only the Teaming and Joint Venture Agreements will not count toward the page limitation.)
Factor 2: Technical Approach to the Live Task Order
Offerors shall provide a technical approach for the Firm-Fixed Price Live Task Order. Reference Live Task Order PWS, Attachment #2.
Subfactor 1: Discussion of Site, Assumptions, Regulatory Process and Required Submittals - The Offeror shall provide its technical approach for achieving the requirements for the Live Task Order for each site. The Offeror shall provide a brief discussion of the requirement, applicable regulations and regulatory response process;
and submittals, including its content, required to complete the Live Task Order. The Offeror shall clearly state applicable assumptions. The Offeror shall identify any limiting factors/risks and mitigation strategies made when developing its response to the Live Task Order. The mitigation strategies must provide a thorough explanation of the Contractor’s alternate approach.
Subfactor 2: Staffing Plan – The proposal shall include the resumes of the Task Order Key Personnel as defined in Section 1.6.12 of the Live Task Order PWS. These Key Personnel shall be employees of the Offeror and have the experience and education necessary to meet the requirements identified in Section C.6 of the Basic
PWS.
The proposal shall include an organizational chart that shows all positions in the proposed organization for the Live Task Order. All lines of authority/communication including those with the Installation, AEC, MICC-FSH and Regulators shall be included in the organizational chart. The Offeror shall provide a staffing matrix that depicts sufficient labor hours by position by year for the Live Task Order for the technical approach proposed.
Additionally, the Offeror shall identify the required expertise, experience, certifications, licenses, occupational titles, disciplines, and labor categories along with whether the labor categories shall be filled by the Prime Contractor or the Subcontractor. The Offeror shall discuss its ability to identify critical quality and schedule impacts and how the Offeror will manage and control multiple tasks to avoid quality and schedule impacts.
Note: Not having Key Personnel whom have experience working RCRA Corrective Action efforts with NMED Hazardous Waste Bureau and managing projects within the state of New Mexico, will not by itself disqualify the Offeror from Basic Contract and Live Task Order award(s).
Subfactor 3: Operational Effort – The Offeror shall provide a discussion of the operational effort (fieldwork) to complete the requirements of the Live Task Order. This discussion shall include the field methods, the types of equipment, and relevant sampling techniques to be used. The Offeror shall provide a discussion of its approach to anticipate and proactively address reasonable deviations in system operations, physical conditions and regulatory requirements while optimizing system performance and schedule. In addition, the discussion shall include how the Offeror will plan to minimize external project impacts as well as implement proper response actions if planning fails.
Subfactor 4: Hazards and Safety Identification – The Offeror shall provide a discussion of the hazards that may be encountered when performing work required for the Live Task Order. This shall include the hazards that may be found at the site, the potential hazards of the contamination and hazard mitigation. Also, the necessary safety protective equipment shall be identified and discussed.
The Offeror shall provide a narrative to describe its ongoing execution of its Accident Prevention/Safety and Health Program, including training, the number of current Safety and Health professionals and type, and the procedures used in the preparation and implementation of an Accident Prevention Plan (APP)/Site Safety and Health Plan
(SSHP).
Subfactor 5. Quality Management/Quality Control - The Offeror shall provide a narrative of its corporate Quality Management/Quality Control (QM/QC) Program and its business practices that require adherence to the QM/QC Program. The Offeror shall also describe its data management practices and procedures used to maintain quality and accuracy of data from generation to final report. Included with the narrative, the Offeror shall discuss its ability to develop and manage a ProgramProject Management Plan (PMP) throughout the duration of the period of performance.
Subfactor 6: Project Schedule – The Offeror shall provide an activity-based schedule that outlines activities and milestones, defined at the appropriate detail level (submittals, review times, meetings, etc.) and logically sequenced, to support and manage completion of the contract requirements for the Live Task Order corresponding to its proposed technical approach. The schedule must identify the critical path for each of the Live Task Order requirements. The project schedule shall not count against the page count limitation.
Reference Live Task Order PWS, Attachment #2.
VOLUME II - PAST PERFORMANCE
This section of Volume II shall be clearly marked “VOLUME II- PAST PERFORMANCE, RFP W9124J-17-R- 0006)
Factor 3: Past Performance
Past Performance data is required for the Offeror. Contractor shall demonstrate Recent and Relevant past performance in all functions included in the Basic PWS of this Solicitation. Recent performance is defined as projects completed within the past seven (7) years, by the proposal due date. Relevant performance is defined as work completed on projects of similar scope, complexity, and task/contract type as those described in the Basic PWS of this Solicitation, valued at $500,000 or greater for each. Offerors shall submit a minimum of three (3) and a maximum of five (5) projects that are Recent and Relevant as defined above. The Government understands that single projects are not likely to demonstrate Relevant past performance in all functions; therefore, Offerors are encouraged to submit projects with sufficient diversity such that collectively they demonstrate Offeror’s performance capabilities.
Note: Offeror may submit the same projects for Factors 1 and 3, as applicable.
Offeror shall submit the following Past Performance information to include, at a minimum with the Proposal:
a. Contract Title
b. Contract Number, Customer, Contract Type, Contract Value, and Period of Performance
c. Prime (or Subcontractor's) Cage and DUNS number
d. Client, Firm or Government agency for which work was performed, including identification of the office, division or branch, and address, point of contact, telephone number, e-mail address, and facsimile number. Contracting Officer, name, phone, and e-mail.
e. Description of work performed and relevance to this requirement, with a technical description sufficient to permit ready assessment.
f. Original award price, final or projected final price, original delivery schedule, final or projected final delivery schedule, and brief discussion of contract modifications and extensions. For contracts which did not/do not meet original requirements with regard to schedule, or technical performance, a brief explanation of the reason(s) for such factor(s) and any corrective actions taken to avoid recurrence.
Unless a CPARS has been completed/finalized, the Offerors shall send the Past Performance Questionnaire (Attachment #5) to previous clients for assessment of the cited projects above. Completed Past Performance Questionnaires are to be returned directly to the Contracting Office POCs at the following email address:
veronica.a.romero.civ@mail.mil and joanna.b.cox.civ@mail.mil. In order for the inclusion of the questionnaire in the evaluation, the Past Performance Questionnaires must be received by the proposal due date.
Offeror shall provide the above past performance information, to include projects where CPARS will be utilized.
The Government will obtain copies of CPARS, if applicable.
A project is defined as:
Work performed on one specific Task Order of an IDIQ type Contract at one site or multiple sites at a single or multiple Government installations/facilities or equivalent commercial locations; or Work performed on a site-specific Contract (i.e. a non-IDIQ contract) for one site or multiple sites at a single or multiple Government installations/facilities or equivalent commercial locations.
Do not list an IDIQ contract as an example of a project. Instead, list relevant Task Orders that fit within the definition above. If the Offeror provides a specific Task Order as its "project," it shall provide the Basic Contract number and the Task Order number for reference purposes. If the Offeror provides a site-specific/stand-alone “C- Type” contract as its "project," it shall provide the Contract number for reference purposes.
To qualify as a project, work must be at least 80% complete by the proposal due date. For projects that are not 100% complete, the Offeror shall: 1) explain the metric used to demonstrate 80% complete (e.g., based on schedule, objectives achieved); 2) provide the estimated completion date; and 3) briefly summarize the remaining activities.
The Government may also obtain past performance information from established systems such as the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases;
questionnaires tailored to the circumstances of this acquisition, and may be obtained from other sources available to the Government, such as the Defense Contract Management Agency (DCMA); and interviews with Program Managers, Contracting Officers, and Fee Determining Officials.
VOLUME III – LIVE TASK ORDER PRICE PROPOSAL
This section of Volume III shall be clearly marked “VOLUME III- PRICE PROPOSAL, RFP W9124J-17-R- 0006)
Factor 4: Live Task Order Price Proposal
The Offeror’s proposal shall consist of information in response to the Live Task Order. The Offeror shall clearly explain the basis of the price for the Live Task Order.
Price Proposals shall be submitted in accordance with ADDENDUM to FAR 52.212-1 Instructions to Offerors - Commercial (Section L). In submitting its proposal, the Offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception.
The format for the price proposal shall be as follows:
Live Task Order Price Proposal Tab 1 Representations and Certifications and Financial Statements Tab 2
Tab 1: Live Task Order Price Proposal
Offerors shall provide a Firm-Fixed Price proposal for the Live Task Order. The Live Task Order proposal shall be submitted in accordance with the CLIN Structure provided (Attachment #6); based on what is required to achieve the Task Order requirements identified in the Live Task Order PWS.
Tab 2: Representations and Certifications and Financial Statements
a. Offerors shall provide the completed SF33.
b. Representation and Certifications. Provide a completed copy of Section K.
c. Upon request of the Contracting Officer, Offeror shall provide its Financial Institution Reference Form (Attachment #7), certified by its Financial Institution. Such statements will be treated as confidential by the Government. Do not include this with your initial proposal.
6. Limitation on Size of the Proposal
The Offerors shall submit a definitive proposal to achieve the end results that are set forth in Section C of this Solicitation. Elaborate format, binders, special reproduction techniques, etc., are NOT necessary or desired.
All proposals shall be legible, single spaced, in a type size not smaller than 12-point proportional using Arial/Times New Roman Font or equivalent sized font, on paper not larger than 8 1/2" x 11" (except for foldout charts/diagrams described below). A “page” is defined as one side of 8 1/2 x 11” paper. Font size and spacing requirements for, illustrations, charts, graphs, figures and tables may be at the discretion of the Offeror, however, must be easily readable. The page margins shall be no less than 1 inch. Some foldout charts or diagrams may be used within the aforementioned restrictions/page limitations. Any page larger than 8 ½” x 11” will be counted as two pages (i.e., one foldout with two pages will be counted as two 8 1/2" x 11" pages). When both sides of a sheet display printed material, it shall be counted as two (2) pages. No material may be incorporated by reference to circumvent the page limitation. The Offeror shall number each page in order to eliminate any confusion. In the event the Offeror creates an ambiguity in its numbering of pages, the Government may exercise its own discretion in counting pages.
Proposals shall be organized into separate VOLUMES. A cover sheet shall be in each Volume, clearly marked as to Volume Number, Title, Copy Number, the Solicitation Number, the Offeror’s name and CAGE Code(s).
Divider pages are requested to identify and separate sections within the Volumes. Dividers or blank pages will not be counted against the page limitations and should be excluded from the page numbering sequence. All pages of each response shall be appropriately numbered, and identified with the Solicitation Number. Cross-references should be utilized to preclude unnecessary duplication of data between sections.
Volume I:
Factor 1: Relevant Corporate Experience and Management Approach shall not exceed 2528 pages in length. Note:
Although the Resumes will not count toward the page limitation, only one page per resume will be evaluated for each of the Key Personnel position.
Factor 2: Technical Approach to Live Task Order shall not exceed 25 pages in length.
Volume I Page Count INCLUDES: All appendices, charts, graphs, diagrams, tables, figures, photographs, drawings, graphics, etc. within the text. The assumption/exceptions section will count against the page limitation.
Volume I Page Count EXCLUDES: Cover Page, Table of Contents, Tabs, Glossary of Abbreviations and Acronyms, Indices, Title Pages, Cross Reference Indices, Section Dividers/Tables if they are inserted solely to provide ease to the reader in locating parts/sections of the Proposal (they will be counted if they contain any other information, i.e., diagrams, extraneous data, etc.). Pages marked “This page intentionally left blank” will not be counted. Resumes, and Teaming and Joint Venture Agreements, and Organizational Conflicts of Interest/Disclosure will not count toward the page limitation. The Project Schedule will not count towards the page limitation. Note: Although the Resumes will not count toward the page limitation, only one page per resume will be evaluated for each of the Key Personnel position.
Volume II:
Factor 3: Past Performance does not have a page limitation.
Volume III:
Factor 4: Live Task Order Price Proposal does not have a page limitation.
Responses shall not exceed the limits stated above. If the page limits are exceeded, the pages in excess of the limit shall be removed and will not be considered for evaluations.
7. Deviations
Offerors shall comply with all requirements of the above proposal submission. Deviations shall be fully explained.
However, inclusion of price information with any other parts of the proposal is not considered an acceptable deviation.
8. Proposal Submission Summary
Volume Description of Proposal Volumes, and
Sections Page Limit Copies with
Proposal
Volume I
MISSION
CAPABILITY
Factor 1: Relevant Corporate Experience and Management Approach
28 pages
4 paper copies and 2 CDs or DVDs*
Factor 2: Technical Approach to Live Task Order Subfactor 1: Discussion of Site Subfactor 2: Staffing Plan Subfactor 3: Operational Effort Subfactor 4: Hazards and Safety Identification Subfactor 5: Quality Management/ Quality Control Subfactor 6: Project Schedule
25 Pages Live Task Order
Volume II
PAST
PERFORMANCE
Factor 3: Past Performance
No Page Limit
Volume Description of Proposal Volumes, and Sections
Page Limit Copies with Proposal
Volume III
PRICE
PROPOSAL
Factor 4: Live Task Order Price Proposal Tab 1: Live Task Order Price Proposal Tab 2: Representations and Certifications, etc.
No Page Limit
*Each CD or DVD shall contain all three Volumes. Microsoft Office shall be used to prepare files placed on the CD or DVD. Volume I, II and III may be prepared using Adobe Acrobat (.pdf). The Price volume shall also be prepared using MS Excel. Please do not submit Access files.
If files are compressed, they must be self-extracting archives (no software required to decompress). If files contain links, the links must be intact and maintained through all revisions. Additionally, spreadsheets must be easily traceable. None of the files submitted shall have read/write/password protection. Include all formulas in your spreadsheets and please include any notes deemed necessary to add clarity to the spreadsheets.
SECTION M - EVALUATION FACTORS FOR AWARD
ADDENDUM TO FAR 52.212-2 EVALUATION - COMMERCIAL ITEMS
The following is incorporated into 52.212-2 as an addendum to this solicitation:
EVALUATION FACTORS FOR AWARD
1. Basis for Contract Award:
a. This is a best value Source Selection conducted in accordance with the Federal Acquisition Regulation (FAR)
15. The Government will utilize a combination of Source Selection methodologies to obtain best value. A Contract may be awarded to the Offeror(s) who are deemed responsible in accordance with the FAR, whose proposal conforms to the Solicitation’s requirements (to include all stated terms, conditions, representations, certifications, and all other information required by ADDENDUM to FAR 52.212-1 Instructions to Offerors (Section L) of the Solicitation) and is judged, based on the Evaluation Factors to represent the best value to the Government. The Government seeks to award to the Offerors who give the Government the greatest confidence that they will best meet or exceed the requirements affordably. This may result in an award to a higher rated, higher priced Offeror, where the decision is consistent with the Evaluation Factors and the Source Selection Authority reasonably determines that the technical superiority and/or overall management approach of the higher priced Offeror outweighs the price difference.
b. The Government intends to make Multiple Awards to the Offerors that the Government determines can best satisfy the objectives and requirements set forth in the Solicitation. The Government intends to award a Multiple Award IDIQ as a set-aside for Small Business. It is anticipated that there will be no more than eight (8) Contracts awarded. However, additional awards may be made if it is determined that additional awards would benefit the Government. The Government reserves the right to make less than eight awards if it is determined that there are not a sufficient number of qualified Offerors.
c. The award will be based upon a best value determination. A tradeoff analysis between Relevant Corporate Experience and Management Approach (Factor 1) along with the Technical A pproach to the Live Task Order
(Factor 2) and Proposed Price (Factor 4) will be conducted and will be utilized to support Contract award to multiple successful Offerors. Past Performance (Factor 3) will be evaluated on an Acceptable/Unacceptable basis. The Evaluation Factors listed below are considered to represent key areas of importance and will support meaningful comparison and discrimination between and among competing proposals.
An offeror must receive an “Acceptable” rating for Factors 1, 2 and 3 to be eligible for award.
Source Selection Methodology. This source selection will utilize two evaluation rating methods to determine the best value proposal, as follows:
(Factor 1) Relevant Corporate Experience and Management Approach and (Factor 2) Technical A pproach to the Live Task Order will utilize the Tradeoff Methodology.
(Factor 3) Past Performance will utilize Acceptable/Unacceptable rating method. NO TRADEOFFS ARE
PERMITTED FOR THIS FACTOR.
d. The Government intends to evaluate proposals and award contracts without discussions with Offerors (except clarifications as described in FAR 15.306(a), Clarifications and award without discussions). Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In the event discussions are held, a competitive range determination will be made. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals pursuant to FAR Subpart 15.306(c).
e. Award for All of the Work: The Government intends to award IDIQ Contracts concurrently to all selected Offerors.
f. Award of the Live Task Order, WSMR, NM Task Order: The most highly rated best value proposal will be selected as the single awardee for the WSMR, NM Live Task Order as described in Attachment #2. The most highly rated best value proposal will be based on the Government’s overall assessment of ALL evaluation Factors and Subfactors established within this solicitation.
2. Relative Order of Importance of Factors. The relative importance of each Factor is as follows:
Relevant Corporate Experience and Management Approach (Factor 1) and Technical Approach to Live Task Order (Factor 2) are of equal importance. Within the Technical Approach to Live Task Order (Factor 2), the Subfactors are of equal importance. Past Performance (Factor 3), is Objective criteria and will not be part of any tradeoff analysis.
Price (Factor 4) is of least importance.
In accordance with FAR 15.304(e), all non-cost factors (with the exception of Factor 3), when combined, are significantly more important than Price (Factor 4).
Volume Factors Criteria Description I
MISSION
CAPABILITY
Factor 1 Relevant Corporate Experience and Management Approach
Factor 2
Technical Approach to Live Task Order
Subfactor 1 Discussion of Site Subfactor 2 Staffing Plan Subfactor 3 Operational Effort Subfactor 4 Hazards and Safety Identification Subfactor 5 Quality Management/Quality Control Subfactor 6 Project Schedule
II
PAST
PERFORMANCE
Factor 3
Past Performance
III
PRICE
PROPOSAL
Factor 4
Live Task Order Price Proposal
The evaluation process shall proceed as…