AR_OUST_Proj_2_Spec_Cover_and_Table_of_Contents_FT_Benn.docx

DOCX document 47 KB Posted

Attached to
Armor OSUT 2
Solicitation number
W911SF-19-R-0020
Issued by

About this file

ARMOR OSUT 2 Specifications

View the file

Other files

File Type Posted
W911SF19R00200004.pdf PDF
ARMOR_OSUT_1_-_5_Pre_Award_Addendum_1.pdf PDF
W911SF19R00200003.pdf PDF
Attachment_4_Performance_Assessment_Questionnaire.pdf PDF
ARMOR_OSUT_Site_Visit_Attendees.pdf PDF
44026_Morris_Oscar_5_Nad_83_Site_Plan_Model_Amended_12_July_2019.pdf PDF
Blank_Bid_Breakdown_Form.xlsx XLSX spreadsheet
Armor_OSUT_2_Questions.pdf PDF
ARMOR_OSUT_1_-_5_General_Questions.pdf PDF
OSUT_01_57_20_Environmental_Protection.pdf PDF
W911SF-19-R-0020-0002,_ARMOR_OSUT_2,_wdr,_5Jul19.pdf PDF
OSUT_33_40_00_Storm_Drainage_Utilities.pdf PDF
Stationary_Infantry_Target_(SIT).pdf PDF
OSUT_01_11_0_Summary_of_Work.pdf PDF
OSUT_01_45_01_Quality_Control.pdf PDF
SIT_ED-01.pdf PDF
OSUT_32_05_33_Landscape_Establishment.pdf PDF
OSUT_26_41_01_Lightning_Protection_System.pdf PDF
OSUT_01_32_01_Project_Schedule.pdf PDF
DSIT_ED-01A.pdf PDF
OSUT_32_01_19_Field_Molded_Sealants_for_Sealing_Jts_In_Rigid_Pavg.pdf PDF
OSUT_01_50_00_Temporary_Construction_Faclities_and_Controls.pdf PDF
44026-E5.pdf PDF
SIT_Clusters_ED-05.pdf PDF
26_00_00.00_20.pdf PDF
26_24_16.00_40.pdf PDF
OSUT_01_62_35_Recycled_Recovered_Materails.pdf PDF
OSUT_31_11_00_Clearing_and_Grubbing.pdf PDF
44026-E12.pdf PDF
OSUT_26_00_00_Basic_Electrical_Materials_and_Methods.pdf PDF
OSUT_01_35_29_Safety_and_Occupational_Health_Requirements.pdf PDF
OSUT_32_92_19_Seeding.pdf PDF
44026_Elec.pdf PDF
44026-E6.pdf PDF
OSUT_01_42_00_Sources_for_Referencece_Publications.pdf PDF
44026-E3.pdf PDF
OSUT_01_50_61_Dust_Control.pdf PDF
44026-E7.pdf PDF
OSUT_26_28_01_Coordinated_Power_System_Protection.pdf PDF
44026-E11.pdf PDF
44026-E13.pdf PDF
44026-E14.pdf PDF
OSUT_32_15_00_Aggregate_Surface_Course.pdf PDF
44026-E2.pdf PDF
OSUT_26_20_00_Interior_Distribution_System.pdf PDF
Downrange_Power_&_Data_Distribution_-_Over_300M.pdf PDF
OSUT_31_32_11_Soil_Surface_Erosion_Control.pdf PDF
OSUT_01_74_19_Construction_and_Demolition_Waste_Management.pdf PDF
OSUT_01_78_02_00_10_Closeout_Submittals.pdf PDF
44026-E9.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specification Date 15 February 2019

ONE UNIT STATION TRAINING – ARMOUR

(OUST-AR)

RANGE PROJECT #2 OSCAR 5

Fort Benning, Georgia

Prepared by:

Engineering Division, DPW 6650 Meloy Drive, Building 6 Fort Benning, GA 31905

Specifications Prepared by:

ArchitecturalC. Craig Davis R.A.
DIRECTORATE OF PUBLIC WORKS

ENGINEERING DIVISION

FORT BENNING, GEORGIA

Project #: AROO2

PROJECT TABLE OF CONTENTS DIVISION 01 - GEN ERAL REQUIREMENTS

SUMMARY OF WORK

PROJECT SCHEDULE

01
33
00

SUBMITTAL PROCEDURE

01
35
29

SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS

01
42
00

SOURCES FOR REFERENCE PUBLICATIONS

01
45
01

QUALITY CONTROL

01
50
00

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01
50
61

DUST CONTROL

01
57
20.00
10
ENVIRONMENTAL PROTECTION
01
57
23.00
10
STORM WATER POLLUTION PREVENTION MEASURES
01
62
35

RECYCLED/ RECOVERED MATERIALS

01
74
19

CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01
78
02.00
10
CLOSEOUT SUBMITTALS
01
78
23

OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41
00

DEMOLITION

02 84
16

PCB BALLASTS, TRANSFORMERS AND HAZARDOUS WASTE LAMP REMOVAL AND RECYLING

DIVISION 03 - CONCRETE

03
11
13.00
10
STRUCTURAL CONCRETE FORMWORK
03
15
13.00
10
EXPANSION JOINTS, CONTRACTION JOINTS, AND WATERSTOPS
03
20
01.00
10
CONCRETE REINFORCEMENT
03
31
00.00
10
CAST - IN -PLA CE STRUCTURAL CONCRETE

DIVISION 04 – MASONRY

04 20 00 MASONRY

04 21 13.13 NONBEARING MASONRY VENEER/STEEL STUD WALLS

DIVISION 05 - METALS

05 05
23

WELDING, STRUCTURAL

05 12
00

STRUCTURAL STEEL

05 21
19

OPEN WEB STEEL JOIST FRAMING

05 30
00

STEEL DECKS

05 50
13

MISCELLANEOUS METAL FABRICATIONS

05 51
00

METAL STAIRS

05 52
00

METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

15 FEBUARY 2018

OUST-IN RANGE PROJECTS

Fort Benning, Georgia

PROJECT TABLE OF CONTENTS Page 5

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13BOARD AND BLOCK INSULATION
07 21 16MINERAL FIBER BLANKET INSULATION
07 25 00.00 06BUILDING AIR BARRIER SYSTEM
07 27 26FLUID APPLIED AIR AND MOISTURE BARRIER

07 42 13 METAL WALL PANELS

07 60 00FLASHING AND SHEET METAL
07 61 14.00 20STEEL STANDING SEAM ROOFING
07 84 00FIRESTOPPING
07 92 00JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13STEEL DOORS AND FRAMES
08 33 13METAL ROLLING COUNTER DOORS
08 14 00WOOD DOORS
08 51 13ALUMINUM WINDOWS
08 71 00DOOR HARDWARE
08 81 00GLAZING
08 91 00METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00METAL SUPPORT ASSEMELIES
09 29 00GYPSUM BOARD
09 51 00ACOUSTICAL CEILINGS
09 65 00RESILIENT FLOORING
09 68 00CARPET
09 90 00PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 10 00VISUAL COMMUNICATIOKS SPECIALTIES
10 14 02INTERIOR SIGNAGE

10 22 13 WIRE MESH PARTITIONS

10 44 16 FIRE EXTINGUISHER CABINETS

DIVISION 11 – REFURBISHED EQUIPMENT

11 42 13 FOOD SERVING TABLES

DIVISION 12 - FURNISHINGS

12 24 13
12 48 13.13

ROLLER WINDOW SHADES

ENTRANCE FLOOR MATS

DIVISION 13 – SPECIAL CONSTRUCTION

13 12 05METAL ANGLE FRAMED BLEACHERS
13 34 19METAL BUILDING SYSTEMS

DIVISION 14 - Not Used

DIVISION 21 – Not Used

DIVISION 22 – Not Used

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23
00
00.00
40
GENERAL MECHANICAL PROVISIONS
23
00
00

AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23
05
93

TESTING, ADJUSTING, AND BALANCING FOR HVAC

23
07
00

THERMAL INSULATION FOR MECHANICAL SYSTEMS

23
08
00

COMMISSIONING OF HVAC SYSTEMS

23
23
00

REFRIGERANT PIPING

23
34
23

POWER VENTILATORS

23
36
00

AIR TERMINAL UNITS

23
37
13

DIFFUSERS, REGISTERS, AND GRILLS

23
82
02.00
10
UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 25 - Not Used DIVISION 26 - ELECTRICAL

26
00
00

BASIC ELECTRICAL MATERIALS AND METHODS

26
20
00

INTERIOR DISTRIBUTION SYSTEM

26
28
01.00
10
COORDINATED POWER SYSTEM PROTECTION
26
41
01.00
10
LIGHTNING PROTECTION SYSTEM
26
51
00

INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00

BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00
EARTHWORK
31 11 00
CLEARING AND GRUBBING
31 23 00
ECAVATION AND FILL
31 31 16
SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL
31 32 11
SOIL SURFACE EROSION CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 0119FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIDGID PAVEMENTS
32 05 33LANDSCAPE ESTABLISHMENT
32 11 23AGGREGATE BASE COURSE
32 13 13.06PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE FACILITIES
32 15 00AGGREGATE SURFACE COURSE
32 17 24.00 10PAVEMENT MARKINGS
32 31 13.53HIGH -S ECURITY CHAIN LINK FENCES AND GATES
32 92 19SEEDING

33 40 00 STORM DRAINAGE UTILITIES

- - End of Project Table of Contents - -

SECTION 01 32 01.00 10

image1.png

File details come from the government source that posted it.