44026-E5.pdf

PDF 367 KB Posted

Attached to
Armor OSUT 2 Federal contract opportunity
Solicitation number
W911SF-19-R-0020
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Benning

About this file

E5

View the file

Other files for this federal contract opportunity

Other files attached to Armor OSUT 2, newest first.
File Type Posted
ARMOR_OSUT_1_-_5_Pre_Award_Addendum_1.pdf PDF
Armor_OSUT_2_Questions.pdf PDF
Attachment_4_Performance_Assessment_Questionnaire.pdf PDF
W911SF19R00200003.pdf PDF
44026_Morris_Oscar_5_Nad_83_Site_Plan_Model_Amended_12_July_2019.pdf PDF
ARMOR_OSUT_Site_Visit_Attendees.pdf PDF
44026-E7.pdf PDF
OSUT_32_01_19_Field_Molded_Sealants_for_Sealing_Jts_In_Rigid_Pavg.pdf PDF
44026-E9.pdf PDF
DSIT_ED-01A.pdf PDF
OSUT_01_42_00_Sources_for_Referencece_Publications.pdf PDF
OSUT_01_50_61_Dust_Control.pdf PDF
44026-E8.pdf PDF
44026-E14.pdf PDF
OSUT_32_15_00_Aggregate_Surface_Course.pdf PDF
44026-E10.pdf PDF
OSUT_26_41_01_Lightning_Protection_System.pdf PDF
OSUT_31_00_00_Earthwork.pdf PDF
44026-E3.pdf PDF
OSUT_01_32_01_Project_Schedule.pdf PDF
OSUT_01_78_02_00_10_Closeout_Submittals.pdf PDF
OSUT_32_05_33_Landscape_Establishment.pdf PDF
OSUT_26_28_01_Coordinated_Power_System_Protection.pdf PDF
OSUT_31_11_00_Clearing_and_Grubbing.pdf PDF
OSUT_01_62_35_Recycled_Recovered_Materails.pdf PDF
44026-E13.pdf PDF
OSUT_01_74_19_Construction_and_Demolition_Waste_Management.pdf PDF
SIT_ED-01.pdf PDF
44026-E11.pdf PDF
OSUT_01_57_20_Environmental_Protection.pdf PDF
W911SF-19-R-0020-0001,_ARMOR_OSUT_2,_wdr,_1Jul19.pdf PDF
AR_OUST_Proj_2_Spec_Cover_and_Table_of_Contents_FT_Benn.docx DOCX document
OSUT_01_78_23_Operation_an_Maintenace_Data.pdf PDF
44026-E4.pdf PDF
OSUT_32_11_23_Aggregate_Base_Course.pdf PDF
OSUT_32_13_13_Portland_Cement_Concrete_Pavement.pdf PDF
Downrange_Power_&_Data_Distribution_-_General.pdf PDF
44026-E1.pdf PDF
OSUT_01_33_00_Submittal_Procedure.pdf PDF
OSUT_31_31_16_Soil_Treatment_for_Subt_Termites_Control.pdf PDF
26_20_00.pdf PDF
Stationary_Infantry_Target_(SIT).pdf PDF
OSUT_01_11_0_Summary_of_Work.pdf PDF
Statement_of_Work_-_OSCAR_5_Civil.pdf PDF
Statement_of_Work_-_OSCAR_5_Electrical.pdf PDF
AR_OSUT_2_SOW_Oscar_5_,_wdr,_18Jun19.pdf PDF
AR_OSUT_2_WD_GA20190118_dtd_12Apr19,_wdr,_26Jun19.pdf PDF
W911SF-19-R-0020,_ARMOR_OSUT_2,_wdr,_27Jun19.pdf PDF
AR_OSUT__2_General_Requirements.pdf PDF
SOW_Cover_Page_-_Oscar_5.pdf PDF
Show all 50

Armor OSUT 2 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

44026-E5

E5

E5

NO SCALE1

D A

T E

S Y

M B

O L

R E

V

IS

IO

N S

B Y

DRAWN BY

APPROVED

DRAWING NUMBER SCALE

DATE

L&E NO:

NOTED

D. SAYLOR

K. CHAN

DIRECTORATEDIRECTORATE

OF PUBLIC WORKS

FORT BENNING, GEORGIA

SIT SIT

SITSITSITSITSITSITSIT

SIT X SIT X SIT X SIT X SIT X SIT X SIT X

SIT XSIT X

SITSITSITSIT

SITSITSITSITSIT

SIT X SIT X SIT X SIT X SIT X

SIT X SIT X SIT X SIT X

SITSITSITSITSITSIT

SITSITSIT

SIT X SIT X SIT X

SIT X SIT X SIT X SIT X SIT X SIT X

BID DOCUMENTS

35% DESIGN

SIT

SIT X

SIT

SIT X

SIT

SIT X

TOWER

AT

PANEL

GOTO

AT TOWER

GOTO PANEL

AT TOWER

GOTO PANEL

AT TOWER

GOTO PANEL

FR1-31M FR2-31M FR3-31M FR4-31M FR5-31M FR6-31M FR7-31M

FR8-31M FR9-31M FR10-31M FR11-31M FR12-31M FR13-31M FR14-31M FR15-31M

FR1-27M FR2-27M FR3-27M FR4-27M FR5-27M FR6-27M FR7-27M

FR15-27M FR14-27M FR13-27M FR12-27M FR11-27M FR10-27M FR9-27M FR8-27M

STATIONARY INFANTRY TARGET (SIT) FROM LANE 1 TO LANE 15 AT 27M AND 31M

TARGETS FROM 27M TO 31M

ONELINE SECONDARY POWER DIAGRAM AT SIT

FORT BENNING, GEORGIA

PISTOL QUALIFICATION RANGE

CONVERT OSCAR 5 RANGE TO COMBAT

15 FEB 2019

File details come from the government source that posted it.