Department of the Army Materiel Command Mission and Installation Contracting Command Fort Benning

About this file

Data Over 300M

View the file

Other files for this federal contract opportunity

Other files attached to Armor OSUT 2, newest first.
File Type Posted
W911SF19R00200003.pdf PDF
44026_Morris_Oscar_5_Nad_83_Site_Plan_Model_Amended_12_July_2019.pdf PDF
ARMOR_OSUT_Site_Visit_Attendees.pdf PDF
ARMOR_OSUT_1_-_5_General_Questions.pdf PDF
Blank_Bid_Breakdown_Form.xlsx XLSX spreadsheet
OSUT_31_11_00_Clearing_and_Grubbing.pdf PDF
OSUT_01_62_35_Recycled_Recovered_Materails.pdf PDF
44026-E13.pdf PDF
OSUT_01_74_19_Construction_and_Demolition_Waste_Management.pdf PDF
SIT_ED-01.pdf PDF
44026-E11.pdf PDF
OSUT_01_57_20_Environmental_Protection.pdf PDF
OSUT_01_35_29_Safety_and_Occupational_Health_Requirements.pdf PDF
44026-E5.pdf PDF
26_00_00.00_20.pdf PDF
OSUT_32_31_13_High-Security_Chain_Link_Fences.pdf PDF
OSUT_31_32_11_Soil_Surface_Erosion_Control.pdf PDF
OSUT_01_50_00_Temporary_Construction_Faclities_and_Controls.pdf PDF
26_24_16.00_40.pdf PDF
44026_Elec.pdf PDF
44026-E6.pdf PDF
OSUT_01_57_23_Storm_Water_Pollution_Prevention.pdf PDF
44026-E12.pdf PDF
OSUT_32_92_19_Seeding.pdf PDF
OSUT_26_00_00_Basic_Electrical_Materials_and_Methods.pdf PDF
OSUT_26_20_00_Interior_Distribution_System.pdf PDF
SIT_Clusters_ED-05.pdf PDF
44026-E2.pdf PDF
OSUT_31_23_00_Excavation_and_Fill.pdf PDF
W911SF-19-R-0020-0002,_ARMOR_OSUT_2,_wdr,_5Jul19.pdf PDF
OSUT_01_45_01_Quality_Control.pdf PDF
OSUT_33_40_00_Storm_Drainage_Utilities.pdf PDF
44026-E7.pdf PDF
OSUT_32_01_19_Field_Molded_Sealants_for_Sealing_Jts_In_Rigid_Pavg.pdf PDF
44026-E9.pdf PDF
DSIT_ED-01A.pdf PDF
OSUT_01_42_00_Sources_for_Referencece_Publications.pdf PDF
OSUT_01_50_61_Dust_Control.pdf PDF
44026-E8.pdf PDF
44026-E14.pdf PDF
OSUT_32_15_00_Aggregate_Surface_Course.pdf PDF
44026-E10.pdf PDF
OSUT_26_41_01_Lightning_Protection_System.pdf PDF
OSUT_31_00_00_Earthwork.pdf PDF
44026-E3.pdf PDF
OSUT_01_32_01_Project_Schedule.pdf PDF
AR_OSUT_2_SOW_Oscar_5_,_wdr,_18Jun19.pdf PDF
AR_OSUT_2_WD_GA20190118_dtd_12Apr19,_wdr,_26Jun19.pdf PDF
Statement_of_Work_-_OSCAR_5_Civil.pdf PDF
Statement_of_Work_-_OSCAR_5_Electrical.pdf PDF
Show all 50

Armor OSUT 2 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1/6 Downrange Power & Data Distribution - Over 300M (Rev Aug 09)

Function: The section will explain in general terms, the basic design requirements for downrange power and data distribution to control Next Generation Army Target System (NGATS) range targetry and its associated equipment.

General Summary: Lanes and targets on ranges greater than 300m deep from the firing line to the end of the training area will be powered from downrange power centers (PC) located on the range. All targetry will be controlled over Ethernet based networks. These networks will be comprised of a combination of fiber optics and copper based systems maximizing the use of Commercial Off The Shelf (COTS) electronic components and standard designs. Downrange infrastructure hardware (i.e., switches, routers, media converters, etc.) is avoided where possible due to extreme weather conditions, a high potential for damage due to the nature of live fire ranges and the avoidance of specialized maintenance activities.

Targetry Power Requirements:

EMPLACEMENT

TYPE

POWER FEED

TYPE

PEAK STATIC

LOAD

DESIGN

LOAD

SIT

with Thermal Target

120/240V, Single Phase

700VA while raising or lowering target.

Add 260VA if Thermal Target is utilized.

50VA

Thermal Target

260VA

960VA

SAT

with Thermal Target

120/240V, Single Phase

2kW while raising or lowering target.

Add 1kVA if Thermal Target is utilized.

100VA

Thermal Target 1kVA

2.8kW

MIT 120/240V,

Single Phase

2kVA during system charging

50VA 2kVA

MAT with Thermal Target

120/240V, Single Phase

3.8kVA during system charging

100VA 3.8kVA

Range Control System (RCS)*

120V, Single Phase

Associated Control Equipment

5.37kVA

(ROC-

Tower only)

* PEOSTRI / TACOM-RI supplied equipment, coordinate during design.

TARGETRY POWER TABLE

DOWNRANGE POWER & DATA DISTRIBUTION - OVER 300

METERS

2/6

General: Electrical power distribution will conform to the American Electrical Institute (AEI) and Technical Manual (TM)) 5-811-1. Three phase or single phase primary power will be extended to the range site depending on range load. Voltage regulation and/or metering may be required. The voltage supplied must be maintained within 5% at a frequency of 60Hz, +/-0.5;

the design agency will verify the power supply for each site.

All conduits and/or cables should enter and exit from the side or rear of the emplacements. This cable routing helps to minimize damage to the cables from range operations and maintenance crews performing berm repair.

Downrange Power Distribution: Ranges over 300m shall distribute single phase, primary power downrange via Power Centers (PC). PC’s can contain primary switches, sectionalizers, transformers, and Power Panel’s (PP). From the PP located inside the PC, power cables shall be distributed to the Load Center’s (LC) at the emplacement and shall continue to the next emplacement or cluster if required. The LC at the emplacement provides feed-thru capability for the secondary direct burial power cable to the next adjoining LC. Also fed from the PP’s shall be limit markers, camera enclosures, and defilade position emplacements as required. Operating voltage at the most distant emplacement shall not be less that 95 percent of the supplied secondary voltage. SIT Cluster detailed information is discussed elsewhere in this manual.

On large ranges it is advantageous to run multiple primary feeders down range. The designer should provide the means to back feed targets everywhere practical. The designer should consider phase imbalance on utility system when selecting phases to run down range, and the primary feeders should be sized such that each feeder can carry the load of the entire range if one feeder must back feed targets on other ranges.

It is extremely important that detailed voltage drop calculations be performed on all target load center feeders from power center panels and ROC-Tower power panels prior to determining the feeder wire size. A diversity factor may be applied on these feeders as follows: 100% of the first target load, 75% of the second and third target load, and the static load for all remaining target loads on the feeder. If multiple target types are fed on the same feeder, the largest target load should be used with the highest diversity factor. A sample calculation has been provided for further clarification on how to apply the diversity factor. Additional a target feeder voltage drop calculator application, which includes all standard target loads and diversity factors, is included in the Navigation Pane of the Range Design Guide to assist with this calculation.

3/6

DOWNRANGE POWER DISTRIBUTION

4/6

Power Circuit Voltage Drop Example: (for downrange targetry only)

Number of SATs 1 Number of SITs 7 Number of MITs 1 Thermal Blanket TB Static

SAT (VA) ID #1 2800 1000 100

SIT (VA) ID #2 960 260 50

MIT (VA) ID #3 2000 0 50

Voltage Drop Summary

ID #1 Remain Diversity #1 #2 Remain Diversity #2 #3 Remain Diversity #3 From To Distance-ft Current % V-drop 2 1 1.0 6 0.39360 1 0.75 PC Sit 1 381 28.94 1.746 2 1 1.0 5 0.40538 1 0.75 Sit 1 Sit 2 23 22.96 0.082 2 1 1.0 4 0.42188 1 0.75 Sit 2 Sit 3 23 21.67 0.078 2 1 1.0 3 0.44661 1 0.75 Sit 3 Sit 4 23 20.38 0.073 2 1 1.0 2 0.48785 1 0.75 Sit 4 Sit 5 23 19.08 0.068 2 1 1.0 1 0.57031 1 0.75 Sit 5 Sit 6 23 17.80 0.064 2 1 1.0 0 0.81771 1 0.75 Sit 6 Sit 7 23 16.50 0.059 1 0 1.0 0 0 1 0.75 Sit 7 Sat 1 328 13.23 0.688 3 0 0 0 0 0 1 Sat 1 Mit 1 300 8.33 0.396 Total Voltage Drop 3.254 %

The largest load is at 100% diversity, the next two largest loads are at 75% diversity. All other target loads are static.

Thermal blanket (TB) load is considered a continuous load.

Diversity Example for the SIT: (all target types’ diversity may be calculated similarly) 100%*(SIT load w/out TB[700VA])+75%*(SIT load w/out TB[700VA])+75%*(SIT load w/out TB[700VA])+ (all remaining # of SITs)*(Static SIT load [50VA]) + (Total # of SITs)*(TB load of SIT[260VA])

(Total # of SITs in circuit still)*(SIT load w/ TB[960va])

Per Example above: (100%*0+75%*0+75%*700+6*50+7*260)/(7*960)=0.393

Current = Sum of target loads on circuit x diversity

Voltage

% Voltage Drop = Distance x Volt Loss Number X Current

Voltage X 100%

Volt Loss Number is taken from SPD Electrical Protection Handbook (Bussman) - Ampacity and Voltage Drop Table and multiplied by 10 .-6

The distance in the calculations is the distance from the current target to the previous target, power center, or power panel.

5/6

Targetry Data Requirements:

RANGE

TYPE

MEDIUM SPEED BANDWIDTH WAVELENGTH/

FREQUENCY

Singlemode Fiber Optic Cable, 8.3 Micron.

Minimum 10Mbps Maximum Unlimited

Unlimited 1310 to 1550nm Ranges Over 300 meters

CAT 5E or better Cable

Minimum 10Mbps

200Mhz 200Mhz

TARGETRY DATA TABLE

Downrange Data Distribution: The data distribution originates in the ROC Data Termination Rack (DTR). The ROC-Tower, ROC-Small, ROC-Large, and the DTR details are discussed elsewhere in this manual. Fiber optic cabling shall extend from the DTR downrange to the target emplacements or data enclosures. The target emplacements in each area can be “daisy-chained” or serially connected with the copper and/or fiber optic data cables continuing from emplacement to emplacement Master Target Data Panel (MTDP) or the Target Data Panel (TDP). All 6-strand fiber optic cables / single copper data cables will serve a maximum of 30 single targets per homerun with a SIT cluster being recognized as one single SIT target emplacement. SIT Clusters require special network considerations and are discussed elsewhere in this manual. Copper data cables can on be used when the distance between emplacements does not exceed the 90 meter threshold. All fiber optic cables shall be single mode.

The fiber optic backbone cable leaving the ROC will run to data enclosures installed in power centers, SAT emplacements, MAT emplacements, and MIT emplacements. The back bone cable will be spliced at these locations to break out the 6-strand fiber optic cables that serve targets. The number of strands in the fiber optic backbone cable will be determined by the number of 6-strand cables at the data enclosure and the other downrange fiber optic backbone cable requirements serving data enclosures further down range. The maximum attenuation shall be 20 dB between targets and the ROC. It should be assumed that there is a .4 dB/Km loss for the fiber optic cable, 0.75 dB loss per connector pair, and a 0.1 dB loss at each splice. All splices shall be fusion splices, and shall be made above grade inside the data enclosures.

Moving Armor Targets (MATS): Consideration should be given to the use and operation of MATS in the training events when developing the downrange power and distribution plan. Power and data are used to supply charging stations which charge batteries used to propel the target mechanisms down the tracks. Careful coordination should occur between the designer and TCM-L, Range Control, and the A/E Master Gunner consultants to verify the charging stations are located on the end of the MAT where the Target first presents itself during training exercises. The cost of installing the

6/6 equipment on one end of the MAT versus the other should also be a considered and included in this coordination.

DOWNRANGE DATA DISTRIBUTION