ARMOR OSUT 2 Specific Questions

View the file

Other files

File Type Posted
W911SF19R00200004.pdf PDF
ARMOR_OSUT_1_-_5_Pre_Award_Addendum_1.pdf PDF
W911SF19R00200003.pdf PDF
Attachment_4_Performance_Assessment_Questionnaire.pdf PDF
ARMOR_OSUT_Site_Visit_Attendees.pdf PDF
44026_Morris_Oscar_5_Nad_83_Site_Plan_Model_Amended_12_July_2019.pdf PDF
Blank_Bid_Breakdown_Form.xlsx XLSX spreadsheet
ARMOR_OSUT_1_-_5_General_Questions.pdf PDF
OSUT_01_57_20_Environmental_Protection.pdf PDF
W911SF-19-R-0020-0002,_ARMOR_OSUT_2,_wdr,_5Jul19.pdf PDF
OSUT_33_40_00_Storm_Drainage_Utilities.pdf PDF
Stationary_Infantry_Target_(SIT).pdf PDF
OSUT_01_11_0_Summary_of_Work.pdf PDF
OSUT_01_45_01_Quality_Control.pdf PDF
SIT_ED-01.pdf PDF
OSUT_32_05_33_Landscape_Establishment.pdf PDF
OSUT_26_41_01_Lightning_Protection_System.pdf PDF
OSUT_01_32_01_Project_Schedule.pdf PDF
DSIT_ED-01A.pdf PDF
OSUT_32_01_19_Field_Molded_Sealants_for_Sealing_Jts_In_Rigid_Pavg.pdf PDF
OSUT_01_50_00_Temporary_Construction_Faclities_and_Controls.pdf PDF
44026-E5.pdf PDF
SIT_Clusters_ED-05.pdf PDF
26_00_00.00_20.pdf PDF
26_24_16.00_40.pdf PDF
OSUT_01_62_35_Recycled_Recovered_Materails.pdf PDF
OSUT_31_11_00_Clearing_and_Grubbing.pdf PDF
44026-E12.pdf PDF
OSUT_26_00_00_Basic_Electrical_Materials_and_Methods.pdf PDF
OSUT_01_35_29_Safety_and_Occupational_Health_Requirements.pdf PDF
OSUT_32_92_19_Seeding.pdf PDF
44026_Elec.pdf PDF
44026-E6.pdf PDF
OSUT_01_42_00_Sources_for_Referencece_Publications.pdf PDF
44026-E3.pdf PDF
OSUT_01_50_61_Dust_Control.pdf PDF
44026-E7.pdf PDF
OSUT_26_28_01_Coordinated_Power_System_Protection.pdf PDF
44026-E11.pdf PDF
44026-E13.pdf PDF
44026-E14.pdf PDF
OSUT_32_15_00_Aggregate_Surface_Course.pdf PDF
44026-E2.pdf PDF
OSUT_26_20_00_Interior_Distribution_System.pdf PDF
Downrange_Power_&_Data_Distribution_-_Over_300M.pdf PDF
OSUT_31_32_11_Soil_Surface_Erosion_Control.pdf PDF
OSUT_01_74_19_Construction_and_Demolition_Waste_Management.pdf PDF
OSUT_01_78_02_00_10_Closeout_Submittals.pdf PDF
44026-E9.pdf PDF
44026-E8.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARMOR OSUT 2 RFIs

1. Are there supposed to be two bid line items (0001 and 0002) on the bid form? They have identical descriptions.

Answer: Provide your total pricing only on CLIN 0001.

2. 10.e on the Solicitation references a spreadsheet with a separate cost breakdown to be submitted. Do you have a template for this breakdown we should use? If not, please provide direction on the cost breakdown you are seeking.

Answer: Please see attached sheet labeled Cost Breakdown.

3. Can one QC handle multiple roles?

Answer: One person can fulfill the duties of the QC/Superintendent/SSHO for one range at a time.

4. Can we have only one SSO?

Answer: One person can fulfill the duties of the QC/Superintendent/SSHO for one range at a time.

5. The drawings for Oscar Range 5 show SIT’s, Emplacement Walls and Electrical Distribution to the

SIT’s but the SIT’s are not listed in the SOW or specifications. Please define where our scope of work in regards to the SIT’s shown on the drawings ie: are we to supply and install the SIT’s? Are we responsible for the Emplacement Walls? Are we responsible for bringing the power to the

SIT locations?

Answer: The contractor is only providing the emplacement walls and the power to the SIT locations. SITs are to meet the Huntsville standard design requirements. Contractor is not responsible to provide the target pop up or the equipment for the pop up.

6. Please allow an additional week for RFI’s.

Answer: This is a time sensitive requirement so an additional week will not be granted.

7. Please extend the bid due date to 8/13/2019.

Answer: This is a time sensitive requirement so no extensions are being considered.

8. No site drawings showing grading pans, soil erosion, limits of disturbance or construction details have been provided in the initial solicitation or the AMD1. Additionally, the SOW references contours that have not been provided. Will any of these items be provided to provide accurate pricing?

Answer: This is a design build contract. The contractor was provided a 35% site plan and electrical plans for bidding purposes.

9. Do the civil drawings need to cover erosion control for the electrical work?

Answer: All local and State laws must be followed. This will have to be determined by the design team. All land disturbance must be covered by the ESPCP as required. Fragmenting per site is not allowed.

10. Is the winning contractor required to provide the SIT concrete emplacements or are they existing? The SOW and drawings do not specifically state them as a requirement.

Answer: Yes, Yes, Contractor to provide emplacements.

11. Is the winning contractor responsible for providing the SIT Target mechanisms themselves or only the emplacements and the associated electrical SOW? The targeting components and lifting mechanisms are extremely specialized and very expensive and the SOW does not clarify what is required.

Answer: The contractor is only providing the emplacement walls and the power to the SIT locations. SITs are to meet the Huntsville standard design requirements. Contractor is not responsible to provide the target pop up or the equipment for the pop up.

12. It appears that sheets E6, E7, E8, and E9 were included in error as they duplicate sheets E2, E3, E4, and E5. Please confirm the total number of targets on this site is 120 as shown on sheet E1.

Answer: The design is to meet the Huntsville COE PQC‐C range design in the Huntsville range design guide. The Huntsville design shows 120 targets.

13. Is the emplacement an above grade emplacement or below grade emplacement?

Answer: The design is to meet the Huntsville COE PQC‐C range design in the Huntsville range design guide.

14. Page 3 of the solicitation shows Items 0001 and 0002 for CLIN Proposal Amounts, however there is no designation as to what sites are included within the CLINS. Please clarify what sites are to be included in CLIN 0001 and CLIN 0002.

Answer: There is no designation of sites for each CLIN, provide your total price on CLIN 0001.