Encl-1.2_+In-Cycle.Opportunities_REV_26 Nov 2024.pdf

PDF 171 KB Posted

Attached to
Broad Agency Announcement _ TRMC _ TE-ST _ W900KK-22-R-0012
Solicitation number
W900KK-22-R-0012
Issued by

About this file

This is an enclosure document detailing Test Technology Areas (TTAs) within a Broad Agency Announcement (BAA W900KK-22-R-0012) for "Other Test Technologies" opportunities. The document establishes an open submission timeframe for abstracts, with the Opportunity Notice remaining valid through March 14, 2027, unless rescinded earlier.

The document outlines ten Test Technology Areas including Autonomy and Artificial Intelligence Test (AAIT), Advanced Instrumentation Systems Technology (AIST), Command Control Communications Systems Test (C4T), and others. Nine of the ten TTAs are participating in the In-Cycle opportunity, with only Space Systems Test (SST) not participating. While none of the TTAs have specific topics listed, all participating areas except SST accept submissions under the "Other Test Technologies" category, which encourages research proposals for potentially revolutionary weapon and sensor systems testing capabilities that are currently "unknown unknowns" to the Government. All Out-of-Cycle topics require an abstract submission prior to a white paper submission per Enclosure 1 – Research Opportunity Guidance.

View the file

Other files

File Type Posted
ATTACHMENT-8_SOW.Template_REV_5.18.2026_clean.docx DOCX document
Attach-9_CHESS_Letter_Signed.pdf PDF
Attach-8_SOW.Template_REV_5.18.2026_clean.docx DOCX document
ATTACHMENT-8_SOW.Template_REV_5.07.2026.docx DOCX document
Encl-1.4 _ In-Cycle _ Opportunity Notice 1.4 _ Rev 1 _ 4.15.2026.docx DOCX document
Encl-1.4 _ In-Cycle _ Opportunity Notice 1.4 _ 2.11.2026.docx DOCX document
TE-ST.BAA_W900KK-22-R-0012_Revised 2.4.2026.docx DOCX document
Attach-8_SOW.Template_REV_07.25.2023.docx DOCX document
Attach-8_Draft.SOW.Template_REV_02.06.2023.docx DOCX document
Attach-13_Abstract.Template_REV_02.08.2023.docx DOCX document
Encl-4_Proposal.Submission.Instr_REV_02.08.2023.docx DOCX document
Encl-1.3_Out-of-Cycle Opportunity_3 Nov 2022.pdf PDF
Encl-1.2., Rev 1_Out-of-Cycle_Other.Test.Technologies_3 Nov 2022.pdf PDF
Encl-1.2_Out-of-Cycle_Other Test Technologies_DET-EWT_FINAL.pdf PDF
ON 1.1 _ Industry Day Qestions and Response_25 APR 2022.xlsx XLSX spreadsheet
Attach-1_White.Paper.Data.Sheet.v1.1p_25 APR 2022.xlsx XLSX spreadsheet
Encl-1.1_ In-Cycle.Opportunities_REV_4.19.2022.docx DOCX document
Encl-3_White.Paper.Submission.Instr.REV_4.19.2022.docx DOCX document
NOTICE OF INDUSTRY-ACADEMIA DAYS_FINAL with Link.docx DOCX document
NOTICE OF INDUSTRY-ACADEMIA DAYS_FINAL.docx DOCX document
0.NOTICE OF INDUSTRY-ACADEMIA FORUM_23MAR2022_Final.docx DOCX document
0.TE-ST_BAA_Industry_One-on-One_Registration.xlsx XLSX spreadsheet
Encl-1.1_ In-Cycle.Opportunities_final.draft-11MAR.docx DOCX document
Attach-2_Related.Work.History-Experience.v1.0p_FINAL.xlsx XLSX spreadsheet
Attach-6_Proposal.Data.Sheet.v1.0p _ FINAL.xlsx XLSX spreadsheet
Attach-1_White.Paper.Data.Sheet.v1.0p_FINAL.xlsx XLSX spreadsheet
Encl-3_White.Paper.Submission.Instr_ FINAL.docx DOCX document
Attach-8_Draft.SOW.Template _ FINAL.docx DOCX document
Attach-10_Cost.Volume.Template_FINAL.docx DOCX document
Encl-2_Project.Structure.Guidelines_ FINAL.docx DOCX document
TE-ST.BAA_W900KK-22-R-0012_ FINAL.docx DOCX document
Attach-5_Admin and Natl.Policy.Reqts._ FINAL.docx DOCX document
Attach-3_Govt.Data.Rights.Acknowledgement_ FINAL.docx DOCX document
Encl-5_Admin and Natl.Policy.Reqts_ FINAL.docx DOCX document
Attach-9_CHESS_Letter_ Signed.pdf PDF
Attach-13_Abstract.Template_v1.0_FINAL.docx DOCX document
Annex_TTA.Descriptions.v1_FINAL.docx DOCX document
Attach-4_IP and Data.Rights.Assertions_ FINAL.docx DOCX document
Encl-4_Proposal.Submission.Instr_ FINAL.docx DOCX document
Attach-7_Project_Quad_Chart_Template.v1.0_FINAL.pptx PPTX presentation
Encl-1_Research.Opportunity.Guidance_ FINAL.docx DOCX document
Attach-12_Basis.of.Estimate.Desk.Guide_FINAL.docx DOCX document
Attach-11_Cost.Prop.Workbook_v1.0p_FINAL.xlsx XLSX spreadsheet
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENCLOSURE 1.2: W900KK-22-R-0012

Revision – Dated 26 November 2024

TOPIC: “Other Test Technologies”

I. GENERAL INFORMATION

A. Closing Date/Time: Unspecified / open submission timeframe for abstracts. This

Opportunity Notice shall remain in effect until rescinded, or until such time as a closing date is provided in this section, and such closing date has passed. [Reference Documents: 1) TE-ST BAA, Section II.B. “Out-of-cycle Process”; 2) Enclosure 1, Section I.B.; and 3) Attachment 13]. In no event shall this Opportunity Notice be valid beyond 14 March 2027.

B. TTA-specific Topics: None.

C. Out-of-Cycle - ‘Other Test Technologies’ Topic

This category encourages offeror consideration to address technology research opportunities (which may include studies) in areas that are not identified among currently active/listed topics but may be beneficial and critical to the future of the technologies that address DoD test needs for rapid transition into the T&E infrastructure. This may identify potentially revolutionary weapon and sensor systems needing T&E capabilities that are currently “unknown unknowns” to the Government.

D. Abstract Submission Requirement:

All Out-of-Cycle topics first require an abstract submission prior to a white paper submission per Enclosure 1 – Research Opportunity Guidance.

E. Table Legend In-cycle vs. Out-of-Cycle Opportunity Notice Type TTAs: Test Technology Areas’ initialisms are listed below:

• Autonomy and Artificial Intelligence Test (AAIT)

• Advanced Instrumentation Systems Technology (AIST)

• Command, Control, Communications, Computers, Intelligence, and Software

Intensive Systems Test (C4T)

• Cyberspace Test Technology (CTT)

• Directed Energy Test (DET)

• Electronic Warfare Test (EWT)

• High Speed Systems Test (HSST)

• Space Systems Test (SST)

• Spectrum Efficient Technology (SET)

• Nuclear Environments Test (NET)

‘Part.’: Indicates if the TTA is participating in this opportunity release (Yes/No) Topics: Indicates if TTA-specific topics are listed in this opportunity release (Yes/No) ‘Other’: Indicates if the ‘Other Test Technologies’ topic applies to this release (Yes/No).

ENCLOSURE 1.2: W900KK-22-R-0012

Revision – Dated 26 November 2024

TOPIC: “Other Test Technologies”

Tabular Opportunities Listings The tables below show TTA participation for the listed ‘cycle’ type:

In-Cycle

TTA Part. TTA Topics ‘Other’ AAIT Yes No Yes AIST Yes No Yes C4T Yes No Yes CTT Yes No Yes DET Yes No Yes EWT Yes No Yes HSST Yes No Yes SST No No No SET Yes No Yes NET Yes No Yes

I. GENERAL INFORMATION
A. Closing Date/Time: Unspecified / open submission timeframe for abstracts. This Opportunity Notice shall remain in effect until rescinded, or until such time as a closing date is provided in this section, and such closing date has passed. [Referenc...
B. TTA-specific Topics: None.
C. Out-of-Cycle - ‘Other Test Technologies’ Topic
This category encourages offeror consideration to address technology research opportunities (which may include studies) in areas that are not identified among currently active/listed topics but may be beneficial and critical to the future of the techn...
D. Abstract Submission Requirement:
All Out-of-Cycle topics first require an abstract submission prior to a white paper submission per Enclosure 1 – Research Opportunity Guidance.
E. Table Legend
Tabular Opportunities Listings

File details come from the government source that posted it. Updated .