Attachment_13_-_SF1444-13c.pdf

Standard Form PDF 1 MB Posted

Attached to
TSOMIS II RFP
Solicitation number
W900KK-19-R-0015
Issued by

About this file

This is a draft solicitation for the Threat Systems Operations Maintenance and Integrated Support II (TSOMIS II) contract from the Department of the Army Materiel Command Contracting Command Orlando Contracting Center. The solicitation seeks proposals to provide operations, maintenance, sustainment, and event support for Army testing and training of threat systems. Services include engineering, configuration management, maintenance, operations, transportation, storage, logistics, and training support. The single-award IDIQ contract will have a five-year ordering period and two one-year option periods, with FFP and CPFF CLIN structures. The main places of performance are government facilities at Redstone Arsenal, AL, Fort Irwin, CA, Fort Polk, LA, and White Sands Missile Range, NM. The final solicitation release date is estimated for January 15, 2019, with proposals due March 4, 2019 and target award by November 19, 2019. Questions about the draft solicitation are due by December 21, 2018.

DOL Form 1444 Request for Authorization Additional Classification and Rate

View the file

Other versions and copies of SF 1444

File Revision Posted Attached to
Attachment 11 - SF1444-23b Additional Classification and Rate.pdf Revision not stated Loleta Water System Upgrades
Attachment_8_-_SF_1444_0002.pdf Revision not stated BLUE RIVER FISH BARRIER MAINTENANCE
Standard_Form_1444_-_Request_for_Author__.pdf Revision not stated REPAIR PAINT HISTORIC CORE STRUCTURES
Standard_Form_1444_-_Request_for_Author__.pdf Revision not stated REHABILITATE CHIMNEYS AND BRICK STEPS
Attachment 14 - SF 1444.pdf Revision not stated Repair Hangar Deficiencies
Attachment 11 - SF 1444.pdf Revision not stated Replace 2 AHUs and Ducts B2901 NCOA
Enclosure 4 - Attachment 6 - SF-1444.pdf Revision not stated IFB - 419151 Preparation and Painting of 500k Gallon Water Tower
Enclosure 4 - Attachment 6 - SF-1444.pdf Revision not stated 419151 Preparation and Painting of 500k Gallon Water Tower
Attachment 11 - SF 1444.pdf Revision not stated Renovate LRS Offices
Attachment 14 - SF 1444.pdf Revision not stated Construct Division Street Sidewalks
Attachment 8 - SF 1444.pdf Revision not stated Renovate Blake Gym
Attachment 11 - SF 1444.pdf Revision not stated CDC Renovation
Attachment 14 - SF 1444.pdf Revision not stated Repair Hangar Deficiencies
Attachment 8 - SF 1444.pdf Revision not stated RV Storage Area
Attachment 8 - SF 1444.pdf Revision not stated Demo B4908
Attachment 8 - SF 1444.pdf Revision not stated Demolish B4904 Keesler AFB
Attachment 8 - SF 1444.pdf Revision not stated Demo B5020
Attachment 11 - SF 1444.pdf Revision not stated Repair Runway Depression
Attachment 20 - SF 1444 - Request for Authorization of Additional Classification and Rate.pdf Revision not stated Replace Boilers at Bldg. 210
Attachment 8 - SF 1444.pdf Revision not stated Replace Sanitary Lines Live Oak DFAC
Show all 20

Who attaches SF 1444

Other files

File Type Posted
Amendment4_QA_Set.xlsx XLSX spreadsheet
W900KK-19-R-0015_TSOMIS_II_5-9-19_Amendment_4_Final.pdf PDF
W900KK-19-R-0015_TSOMIS_II_5-9-19_conform_copy_up_to_Amendment_3.pdf PDF
W900KK-19-R-0015_TSOMIS_II_5-9-19_conform_copy_up_to_Amendment_3.docx DOCX document
W900KK-19-R-0015_Draft_TSOMIS_II_5-1-19_Amendment_1.pdf PDF
Attachment_1_-_PWS_-_Follow-on_Appendix_A_Update_Amendment_3.DOCX DOCX document
Attachment_1_-_PWS_-_Follow-on_TSOMIS_Final_Amendment_3.doc DOC document
W900KK-19-R-0015_TSOMIS_II_5-9-19_conform_copy_up_to_Amendment_3_Final.docx DOCX document
Attachment_17-Example_CLIN_Workbook_Ammendment_3.xlsx XLSX spreadsheet
W900KK-19-R-0015_TSOMIS_II_5-9-19_Amendment_3_Final.docx DOCX document
W900KK-19-R-0015_TSOMIS_II_5-9-19_Amendment_3_Final.pdf PDF
W900KK-19-R-0015_TSOMIS_II_5-9-19_conform_copy_up_to_Amendment_3_Final.pdf PDF
Consolidated_Question_Set_5-7-19_Amendment_3_Final.xlsx XLSX spreadsheet
Attachment_19_-_Maintenance_Hrs_per_system_Amendment_2.xlsx XLSX spreadsheet
GAMB_MOD_B_Spare_Parts_Amendment_2.xlsx XLSX spreadsheet
G75-Spare_Parts_Amendment_2.xlsx XLSX spreadsheet
Consolidated_Question_Set_5-6-19_Amendment_2_Final.xlsx XLSX spreadsheet
Attachment_1_-_PWS_-_Follow-on_TSOMIS_Final_Amendment_2.doc DOC document
Attachment_9_Gfp_Attachment_final_Amendment_2.xlsx XLSX spreadsheet
GAMB_MOD_C_Spare_Parts__Amendment_2.pdf PDF
GFE_Master_032919_002_Amendment_2.xlsx XLSX spreadsheet
Attachment_1_-_PWS_-_Follow-on_Appendix_A_Update_Amendment_2.DOCX DOCX document
W900KK-19-R-0015_TSOMIS_II_5-7-19_Amendment_2_Final.pdf PDF
Attachment_3_Notice_of_questionnaire.pdf PDF
Attachment_12-San_Bernardino_CA_15-5629_Rev_9.pdf PDF
Attachment_7_Question_Form.doc DOC document
Attachment_14_-_Final_Comments_of_QnA_Industry_Day.xlsx XLSX spreadsheet
Attachment_18_-_OAWR_Request_form.pdf PDF
Attachment_3_PAST_PERFORMANCE_EVALUATION_QUESTIONNAIRE_FORM.docx DOCX document
Attachment_15_-_TSIJDataSheet.pdf PDF
Attachment_8_Proposal_Receipt_Form.docx DOCX document
Attachment_11_-_Fact_Sheet_67A_-_NQW.pdf PDF
Attachment_15_-_WCCJDataSheet.pdf PDF
Attachment_1_-_PWS_-_Follow-on_Appendix_A.DOCX DOCX document
Attachment_15_-_ITFSlickSheet.pdf PDF
Attachment_14_-_03_-_TSMO_Ops_Overview_Industry_Day.pdf PDF
Attachment_5_-_Data_Item_Transmittal_Form.doc DOC document
Attachment_12-DOL_Vernon_LA_15-5197_Rev_10.pdf PDF
Attachment_21_-_TSOMIS_II_CDRL_Report_4_APR19_Final.pdf PDF
Attachment_6_SF_1408_Checklist.doc DOC document
Attachment_17_-_Example_CLIN_Workbook.xlsx XLSX spreadsheet
Attachment_12-DOL_Dona_Ana_County_NM_AWD_15-5447_Rev_7.pdf PDF
Attachment_15_-_MCNITRSlickSheet.pdf PDF
PREAWA~1.PDF PDF
Attachment_14_-_02_TSMO_Systems_Overview_Industry_Day.pdf PDF
Attachment_2_Seed_Task_PWS_for_TSOMIS_II_Final.DOCX DOCX document
Attachment_16_-_Spare_Parts_list.pdf PDF
Attachment_19_-_Maintenance_Hrs_per_system.xlsx XLSX spreadsheet
Attachment_15_-_NESTSSlickSheet.pdf PDF
Attachment_10_-_TSOMIS_Event_Sample_Task_Scenario_V1.docx DOCX document
Show 40 more

Latest 50 of 102 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR AUTHORIZATION OF

ADDITIONAL CLASSIFICATION AND RATE

INSTRUCTIONS: THE CONTRACTOR SHALL COMPLETE ITEMS 3 THROUGH 16, KEEP A PENDING COPY, AND SUBMIT THE REQUEST, IN

QUADRUPLICATE, TO THE CONTRACTING OFFICER.

1. TO:

ADMINISTRATOR,

WAGE AND HOUR DIVISION

U.S. DEPARTMENT OF LABOR

WASHINGTON, DC 20210

2. FROM: (REPORTING OFFICE)

3. CONTRACTOR 4. DATE OF REQUEST

5. CONTRACT NUMBER 6. DATE BID OPENED (SEALED

BIDDING)

7. DATE OF AWARD 8. DATE CONTRACT WORK

STARTED

9. DATE OPTION EXERCISED (If

APPLICABLE) (SERVICE

CONTRACT ONLY)

10. SUBCONTRACTOR (IF ANY)

11. PROJECT AND DESCRIPTION OF WORK (ATTACH ADDITIONAL SHEET IF NEEDED)

12. LOCATION (CITY, COUNTY AND STATE)

13. IN ORDER TO COMPLETE THE WORK PROVIDED FOR UNDER THE ABOVE CONTRACT, IT IS NECESSARY TO ESTABLISH THE FOLLOWING RATE(S) FOR THE INDICATED CLASSIFICATION(S) NOT INCLUDED IN THE DEPARTMENT OF LABOR DETERMINATION

NUMBER: DATED:

a. LIST IN ORDER: PROPOSED CLASSIFICATION TITLE(S); JOB DESCRIPTION(S); DUTIES;

AND RATIONALE FOR PROPOSED CLASSIFICATIONS (Service contracts only) b. WAGE RATE(S)

c. FRINGE BENEFITS

PAYMENTS

(Use reverse or attach additional sheets, if necessary)

14. SIGNATURE AND TITLE OF SUBCONTRACTOR REPRESENTATIVE

(IF ANY)

15. SIGNATURE AND TITLE OF PRIME CONTRACTOR REPRESENTATIVE

16. SIGNATURE OF EMPLOYEE OR REPRESENTATIVE TITLE CHECK APPROPRIATE BOX-REFERENCING BLOCK 13.

AGREE DISAGREE

TO BE COMPLETED BY CONTRACTING OFFICER (CHECK AS APPROPRIATE - SEE FAR 22.1019 (SERVICE CONTRACT LABOR

STANDARDS) OR FAR 22.406-3 (CONSTRUCTION WAGE RATE REQUIREMENTS))

THE INTERESTED PARTIES AGREE AND THE CONTRACTING OFFICER RECOMMENDS APPROVAL BY THE WAGE AND HOUR DIVISION. AVAILABLE

INFORMATION AND RECOMMENDATIONS ARE ATTACHED.

THE INTERESTED PARTIES CANNOT AGREE ON THE PROPOSED CLASSIFICATION AND WAGE RATE. A DETERMINATION OF THE QUESTION BY THE WAGE AND HOUR DIVISION IS THEREFORE REQUESTED. AVAILABLE INFORMATION AND RECOMMENDATIONS ARE ATTACHED.

(Send 3 copies to the Department of Labor)

SIGNATURE OF CONTRACTING OFFICER OR

REPRESENTATIVE

STANDARD FORM 1444 (REV. 4/2013)

Prescribed by GSA-FAR (48 CFR) 53.222(f)

TITLE AND COMMERCIAL TELEPHONE NUMBER DATE SUBMITTED

CHECK APPROPRIATE BOX

SERVICE CONTRACT

CONSTRUCTION CONTRACT

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS USABLE

PAPERWORK REDUCTION ACT STATEMENT: Public reporting burden for this collection of information is estimated to average .5 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspects of this collection of information, including suggestions for reducing this burden, to U.S. General Services Administration, Regulatory Secretariat (MVCB)/IC 9000-0089, Office of Governmentwide Acquisition Policy, 1800 F Street, NW, Washington, DC 20405.

OMB Control Number: 9000-0089 Expiration Date: 10/31/2019

REQUEST FOR AUTHORIZATION OF

ADDITIONAL CLASSIFICATION AND RATE

INSTRUCTIONS: THE CONTRACTOR SHALL COMPLETE ITEMS 3 THROUGH 16, KEEP A PENDING COPY, AND SUBMIT THE REQUEST, IN

QUADRUPLICATE, TO THE CONTRACTING OFFICER.

1. TO:

ADMINISTRATOR,

WAGE AND HOUR DIVISION

U.S. DEPARTMENT OF LABOR

WASHINGTON, DC 20210

2. FROM: (REPORTING OFFICE)

3. CONTRACTOR

4. DATE OF REQUEST

5. CONTRACT NUMBER

6. DATE BID OPENED (SEALED

BIDDING)

7. DATE OF AWARD

8. DATE CONTRACT WORK

STARTED

9. DATE OPTION EXERCISED (If

APPLICABLE) (SERVICE CONTRACT ONLY)

10. SUBCONTRACTOR (IF ANY)

11. PROJECT AND DESCRIPTION OF WORK (ATTACH ADDITIONAL SHEET IF NEEDED)

12. LOCATION (CITY, COUNTY AND STATE)

13. IN ORDER TO COMPLETE THE WORK PROVIDED FOR UNDER THE ABOVE CONTRACT, IT IS NECESSARY TO ESTABLISH THE FOLLOWING RATE(S) FOR THE INDICATED CLASSIFICATION(S) NOT INCLUDED IN THE DEPARTMENT OF LABOR DETERMINATION

NUMBER:

DATED:

a. LIST IN ORDER: PROPOSED CLASSIFICATION TITLE(S); JOB DESCRIPTION(S); DUTIES;

AND RATIONALE FOR PROPOSED CLASSIFICATIONS (Service contracts only)

b. WAGE RATE(S)

c. FRINGE BENEFITS

PAYMENTS

(Use reverse or attach additional sheets, if necessary)

14. SIGNATURE AND TITLE OF SUBCONTRACTOR REPRESENTATIVE

(IF ANY)

15. SIGNATURE AND TITLE OF PRIME CONTRACTOR REPRESENTATIVE

16. SIGNATURE OF EMPLOYEE OR REPRESENTATIVE

TITLE

CHECK APPROPRIATE BOX-REFERENCING BLOCK 13.

AGREE

DISAGREE

TO BE COMPLETED BY CONTRACTING OFFICER (CHECK AS APPROPRIATE - SEE FAR 22.1019 (SERVICE CONTRACT LABOR STANDARDS) OR FAR 22.406-3 (CONSTRUCTION WAGE RATE REQUIREMENTS)) THE INTERESTED PARTIES AGREE AND THE CONTRACTING OFFICER RECOMMENDS APPROVAL BY THE WAGE AND HOUR DIVISION. AVAILABLE

INFORMATION AND RECOMMENDATIONS ARE ATTACHED.

THE INTERESTED PARTIES CANNOT AGREE ON THE PROPOSED CLASSIFICATION AND WAGE RATE. A DETERMINATION OF THE QUESTION BY THE WAGE AND HOUR DIVISION IS THEREFORE REQUESTED. AVAILABLE INFORMATION AND RECOMMENDATIONS ARE ATTACHED.

(Send 3 copies to the Department of Labor)

SIGNATURE OF CONTRACTING OFFICER OR REPRESENTATIVE

STANDARD FORM 1444 (REV. 4/2013)

Prescribed by GSA-FAR (48 CFR) 53.222(f)

TITLE AND COMMERCIAL TELEPHONE NUMBER

DATE SUBMITTED

CHECK APPROPRIATE BOX

SERVICE CONTRACT

CONSTRUCTION CONTRACT

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS USABLE

PAPERWORK REDUCTION ACT STATEMENT: Public reporting burden for this collection of information is estimated to average .5 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspects of this collection of information, including suggestions for reducing this burden, to U.S. General Services Administration, Regulatory Secretariat (MVCB)/IC 9000-0089, Office of Governmentwide Acquisition Policy, 1800 F Street, NW, Washington, DC 20405.

OMB Control Number: 9000-0089 Expiration Date: 10/31/2019 8.2.1.4029.1.523496.503679

CHECK APPROPRIATE BOX. SERVICE CONTRACT: 0
CHECK APPROPRIATE BOX. CONSTRUCTION CONTRACT: 0
2. FROM: (REPORTING OFFICE):
3. CONTRACTOR:
4. DATE OF REQUEST. Enter 2 digit month, 2 digit day and 4 digit year.:
9. DATE OPTION EXERCISED (If APPLICABLE) (SCA ONLY) Enter 2 digit month, 2 digit day and 4 digit year.:
8. DATE CONTRACT WORK STARTED. Enter 2 digit month, 2 digit day and 4 digit year.:
7. DATE OF AWARD. Enter 2 digit month, 2 digit day and 4 digit year.:
6. DATE BID OPENED (SEALED BIDDING) Enter 2 digit month, 2 digit day and 4 digit year.:
5. CONTRACT NUMBER:
10. SUBCONTRACTOR (IF ANY):
11. PROJECT AND DESCRIPTION OF WORK (ATTACH ADDITIONAL SHEET IF NEEDED):
12. LOCATION (CITY, COUNTY AND STATE):
13. IN ORDER TO COMPLETE THE WORK PROVIDED FOR UNDER THE ABOVE CONTRACT, IT IS NECESSARY TO ESTABLISH THE FOLLOWING RATE(S) FOR THE INDICATED CLASSIFICATION(S) NOT INCLUDED IN THE DEPARTMENT OF LABOR DETERMINATION. NUMBER:
13. IN ORDER TO COMPLETE THE WORK PROVIDED FOR UNDER THE ABOVE CONTRACT, IT IS NECESSARY TO ESTABLISH THE FOLLOWING RATE(S) FOR THE INDICATED CLASSIFICATION(S) NOT INCLUDED IN THE DEPARTMENT OF LABOR DETERMINATION. Enter 2 digit month, 2 digit day and 4 digit year.:
13a. LIST IN ORDER: PROPOSED CLASSIFICATION TITLE(S); JOB DESCRIPTION(S); DUTIES; AND RATIONALE FOR PROPOSED CLASSIFICATIONS 1 of 10.:
13c. FRINGE BENEFITS PAYMENTS:
13b. WAGE RATE(S):
13a. LIST IN ORDER: PROPOSED CLASSIFICATION TITLE(S); JOB DESCRIPTION(S); DUTIES; AND RATIONALE FOR PROPOSED CLASSIFICATIONS 9 of 10.:
13c. FRINGE BENEFITS PAYMENTS:
13b. WAGE RATE(S):
13a. LIST IN ORDER: PROPOSED CLASSIFICATION TITLE(S); JOB DESCRIPTION(S); DUTIES; AND RATIONALE FOR PROPOSED CLASSIFICATIONS 10 of 10.:
13c. FRINGE BENEFITS PAYMENTS:
13b. WAGE RATE(S):
13a. LIST IN ORDER: PROPOSED CLASSIFICATION TITLE(S); JOB DESCRIPTION(S); DUTIES; AND RATIONALE FOR PROPOSED CLASSIFICATIONS 8 of 10.:
13c. FRINGE BENEFITS PAYMENTS:
13b. WAGE RATE(S):
13a. LIST IN ORDER: PROPOSED CLASSIFICATION TITLE(S); JOB DESCRIPTION(S); DUTIES; AND RATIONALE FOR PROPOSED CLASSIFICATIONS 7 of 10.:
13c. FRINGE BENEFITS PAYMENTS:
13b. WAGE RATE(S):
13a. LIST IN ORDER: PROPOSED CLASSIFICATION TITLE(S); JOB DESCRIPTION(S); DUTIES; AND RATIONALE FOR PROPOSED CLASSIFICATIONS 6 of 10.:
13c. FRINGE BENEFITS PAYMENTS:
13b. WAGE RATE(S):
13a. LIST IN ORDER: PROPOSED CLASSIFICATION TITLE(S); JOB DESCRIPTION(S); DUTIES; AND RATIONALE FOR PROPOSED CLASSIFICATIONS 5 of 10.:
13c. FRINGE BENEFITS PAYMENTS:
13b. WAGE RATE(S):
13a. LIST IN ORDER: PROPOSED CLASSIFICATION TITLE(S); JOB DESCRIPTION(S); DUTIES; AND RATIONALE FOR PROPOSED CLASSIFICATIONS 4 of 10.:
13c. FRINGE BENEFITS PAYMENTS:
13b. WAGE RATE(S):
13a. LIST IN ORDER: PROPOSED CLASSIFICATION TITLE(S); JOB DESCRIPTION(S); DUTIES; AND RATIONALE FOR PROPOSED CLASSIFICATIONS 3 of 10.:
13c. FRINGE BENEFITS PAYMENTS:
13b. WAGE RATE(S):
13a. LIST IN ORDER: PROPOSED CLASSIFICATION TITLE(S); JOB DESCRIPTION(S); DUTIES; AND RATIONALE FOR PROPOSED CLASSIFICATIONS 2 of 10.:
13b. WAGE RATE(S):
13c. FRINGE BENEFITS PAYMENTS:
14. TITLE OF SUBCONTRACTOR REPRESENTATIVE (IF ANY):
SIGNATURE OF CONTRACTING OFFICER OR REPRESENTATIVE:
14. SIGNATURE OF SUBCONTRACTOR REPRESENTATIVE (IF ANY):
TITLE:
14. SIGNATURE OF PRIME CONTRACTOR REPRESENTATIVE (IF ANY):
SIGNATURE OF CONTRACTING OFFICER OR REPRESENTATIVE:
CHECK APPROPRIATE BOX-REFERENCING BLOCK 13. AGREE: 0
CHECK APPROPRIATE BOX-REFERENCING BLOCK 13. DISAGREE: 0
THE INTERESTED PARTIES AGREE AND THE CONTRACTING OFFICER RECOMMENDS APPROVAL BY THE WAGE AND HOUR DIVISION. AVAILABLE INFORMATION AND RECOMMENDATIONS ARE ATTACHED.: 0
THE INTERESTED PARTIES CANNOT AGREE ON THE PROPOSED CLASSIFICATION AND WAGE RATE. A DETERMINATION OF THE QUESTION BY THE WAGE AND HOUR DIVISION IS THEREFORE REQUESTED. AVAILABLE INFORMATION AND RECOMMENDATIONS ARE ATTACHED.: 0
TITLE :
COMMERCIAL TELEPHONE NUMBER:
DATE SUBMITTED. Enter 2 digit month, 2 digit day and 4 digit year.:

File details come from the government source that posted it. Updated .