Attachment_6_SF_1408_Checklist.doc
DOC document 98 KB Posted
- Attached to
- TSOMIS II RFP
- Solicitation number
- W900KK-19-R-0015
About this file
This document provides details of a solicitation for Threat Systems Operations Maintenance and Integrated Support II (TSOMIS II) services. The solicitation seeks operations, maintenance, sustainment of threat systems and event support for Army testing and training. Services include engineering, configuration management, technical inspections, testing, evaluations, validation and accreditation, transportation, site surveys, transportation upload and download support, logistics, developmental support, integration, storage, maintenance, operations, and training. The period of performance is a five-year ordering period with two one-year option periods. The preponderance of work will be under firm-fixed-price contracts with cost-plus-fixed-fee contracts for ancillary work. Questions are due by May 13th, 2019 with proposals due by May 28th, 2019 and award anticipated for November 2019. The Department of the Army Materiel Command Contracting Command Orlando Contracting Center will make a single-award indefinite-delivery/indefinite-quantity contract.
SF 1408 Checklist
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 6
Preaward Survey of Prospective Contractor Accounting System Checklist
Instructions:
1. Mark “X” in the appropriate column.
2. On Page 2 provide a narrative describing how the current accounting system supports your response to each item.
| Yes |
| No |
| N/A |
| Note |
1. Is the accounting system in accord with generally accepted accounting principles?
2. ACCOUNTING SYSTEM PROVIDES FOR:
a. Proper segregation of direct costs from indirect costs.
b. Identification and accumulation of direct costs by contract.
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)
d. Accumulation of costs under general ledger control.
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.
g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.
j. Segregation of preproduction costs from production costs.
3. Accounting system provides financial information:
a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16).
b. Required to support requests for progress payments.
4. Is the accounting system designed, and are the records maintained in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?
5. Is the accounting system currently in full operation? (If not, describe in Page 2 narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.) Do you currently have existing contracts with the U.S. Government?
Instruction: Use this section to explain how the current accounting system supports your response to each item. If a response is N/A provide further explanation. Use as much space as needed. Provide references to current policies and procedures if applicable.
| Note |
| Narrative |
File details come from the government source that posted it. Updated .