RTS-comms-shelter_B3.pdf

PDF 3 MB Posted

Attached to
eXportable Combat Training Capability (XCTC)
Solicitation number
W900KK-19-R-0003
Issued by

About this file

This document outlines requirements for a federal contract opportunity to provide an eXportable Combat Training Capability (XCTC) system. The Army Contracting Command - Orlando intends to award a contract on behalf of the Army National Guard to enable brigade combat teams to conduct force-on-force and live-fire training exercises to assess mission essential task proficiency. Interested offerors are encouraged to submit any questions, comments or recommendations on the draft solicitation to the contract specialist by March 4, 2019 to help refine the final solicitation requirements. This pre-solicitation notice provides an opportunity for industry engagement but does not constitute a commitment to award a contract.

TDP Item 50 - FlexTrain System Communications Shelter Assembly Manual

View the file

Other files

File Type Posted
Exhibit_02_XCTC_CDRL_(Mo_Rpt)_A001.pdf PDF
IC-OUM-08001_4.4_v2_B3.pdf PDF
IC-OUM-09000_Rev_1.2_v1_B3.pdf PDF
5300_ES_Mobile_Operating_Manual_B3.pdf PDF
IC-OUM-07006_Rev_2_B3.pdf PDF
Field_Support_Center_Design_Documents.zip ZIP file
Mobile_After_Action_Review_Center_Design_Documents.zip ZIP file
0020600045.06_Viking_Portable_Radio_Operating_Manual_B3.pdf PDF
3344000101_Atlas_4000_Technical_Manual_B3.pdf PDF
3346200101_Rev2_Atlas_6100_6200_NMS_Technical_Manual_B3.pdf PDF
Attachment_12_XCTC_Frequency_Request.pptx PPTX presentation
Attachment_16_Ft_Drum_WD_15-5776_Rev_08.pdf PDF
Attachment_18_Ft_Pickett_WD_15-4324_Rev_11.pdf PDF
XCTC_IDIQ_RFP.docx DOCX document
Attachment_19_Ft_Stewart_WD_15-4492_Rev_10.pdf PDF
Attachment_24_Camp_Roberts_WD_15-5644_Rev_07.pdf PDF
Attachment_16_Ft_Drum_WD_15-5776_Rev_08.pdf PDF
Attachment_07_Potential_XCTC_training_locations_2019-03-21.xlsx XLSX spreadsheet
Attachment_01_IDIQ_PWS_20190318.docx DOCX document
IC-OUM-09071_1.2_v2_B3.pdf PDF
Hand-held_Video_(HHV)_Camera_Kit_BoM.zip ZIP file
Base-X_Dome_manual_Rev_B3.pdf PDF
Quintuple_UHF_Site_for_Five_channel_System_Design_Documents.zip ZIP file
Video_Editing_Station_BoM.zip ZIP file
5300_ES_Mobile_Operating_Manual_B3.pdf PDF
MBITR_Battery_Transit_Cases_-_Empty_BoM.zip ZIP file
IC-OUM-07032_B3.pdf PDF
100-300_Manual_Rev_B3.pdf PDF
M2K_Cable_Transit_Case_Design_Documents.zip ZIP file
Network_Operations_Center_Design_Documents.zip ZIP file
IC-OUM-07006_Rev_2_B3.pdf PDF
IC-OUM-09043_v1.1_B3.pdf PDF
FREDI-2_Basic_Pouch_Transit_Case_BoM.zip ZIP file
Communications_Cable_Set_Design_Documents.zip ZIP file
IC-OUM-09072_1.2_v2_B3.pdf PDF
MBITR_Battery_Transit_Cases_-_Full_BoM.zip ZIP file
5100_ES_Model_I_Operating_Manual_B3.pdf PDF
Mobile_After_Action_Review_Center_Design_Documents.zip ZIP file
IC-OUM-07022_Rev1.2_B3.pdf PDF
Example_02_Six-Month_event_calendar.xlsx XLSX spreadsheet
Example_13_Academy_Trng_Schedule.pptx PPTX presentation
Example_12_XCTC_Mission_Book.pdf PDF
Exhibit_06_XCTC_CDRL_(RMF)_A005.pdf PDF
Exhibit_01_XCTC_DD254-DRAFT.pdf PDF
Exhibit_07_XCTC_CDRL_(DAL)_A006.pdf PDF
Exhibit_09_XCTC_CDRL_(OPSEC_Pln)_A008.pdf PDF
Attachment_08_IAAR_Overview.pptx PPTX presentation
Attachment_03_Govt_TDP.docx DOCX document
Attachment_06_XCTC_White_Paper.pdf PDF
Attachment_05_NGR_350-50-1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SETUPREQUIREMENTS:Quantitythreemen,1.5hours TEARDOWNREQUIREMENTS:Quantitythreemen,45mins EQUIPMENTREQUIREDforSetupandTeardown:

Quantitytwo:6+feetA-frameladders Quantityone:bubblelevel(bestif<4ftinlength) Quantitythree:leveragetool(multitoolorscrewdriverissufficient)topryoffthesnapsduring disassembly

ForFirst-timeinstallers:

SRI International FlexTrain System Communications Shelter Assembly Manual

G

H

I

J

K

L

46" Wall Panel 88" X 46" 1/2" 1 VC-Panel-Wall-46

Back Ceiling 93" X 46" 1/2" 1 VC-Panel-Ceiling-8

Panel

Front Ceiling 93" X 46" 1/2" 1 VC-Panel-Ceiling-8F-SRI

Panel

34" Wall Panel 88" X 34" 1 VC-Panel-Wall-34-SRI

Door Wall Panel 88" X 461/2" 1 VC-Panel-Wall-46D

6" Wall Panel 88" X 6" 1 VC-Panel-Wall-6-SRI

Roof Panel 94" X 46 1/4" 2 VC-Panel-Roof-8-SRI

NOTE:Thesepieceswereactually numberednotletterdesignatedwhenwe openedupthetransitcrate.Disregardthe lettersinthisdiagram.

Noneedtomeasurethisspacingyet.Floorpanelswilldoitforyou inalaterstep...

BackFloorPanelisidentifiablebythemarkerlabel"PatchPanel"onthewood-grainsurface, longedgeofthepanel.

Theslotsareevenlyspaced ontheBackFloorPanelwhile theFrontFloorPanelhasa uniqueslotorientationthat hastwoslotsclosetogether wheretheDOORwillbe.

Thisisanotherwaytoidentify BackfromFrontFloorPanel ifthemarkerlabelshavefaded.

PATCH

PANEL

closest markerlabelreads:

Levelthestructureandorientthefloorplanbasedonthemarkerlabelsonthefloor.Showninblueabove.

HVACDOOR

Note:thereare fourscrewholes andaholepassthru onthis20"panel.

Itishardtoseehere.

NOT

THE

DOOR.

Thisisthebackwallpanel.

WARNING:

Snapasyougoor thestructurewillfall down!!!

Inthepictureit doesn'tshowthatall theslotshavea snapyet..wrong.

Snapasmanyas youcanasyougo.

Makesuretocheckthelevel oftheflooragainhere.The shelterwillsettleaswallsare installed.

Noticethatthereareslots ontheexteriorface onallfoursidesof thisBackCeilingpanel.

Youwillneedtheladders forthisstep.Bestresults experiencedwithtwo guysontheladdershere andathirdguytoguidethe ceilingpaneldownthetrack insidetheshelter

Thethirdmanwillknow youhaveitrightwhen helooksuponinteriorface andseethat

REAR

CEILING

arrowpointtowardtheRear shelterwallwithPatch Panel

Youcannowsnap onalltheceiling panelslots EXCEPTforthe nearestsloton eachside.There willbewiggleroom togettheDoorside onlater.

Tryfeedingthe6"panelintotheseams fromthetop.Willrequireaguyona ladder.

Thisdrawingseems exaggerated.With thesnapsonmostof thestructureyouwill NOTseethismuch separation.However, therewillbeenough givetomakethelast seamfitbetween frontfaceandfront ceilingpanel.

Haveaguyontheinsideliftingup,andasecondguyonaladderreadytosliptheseaminplace.

Notethattherearenospareparts...eachpieceofhardwareisneededsobecarefulto accountforallwhenputtingashelterupandtearingitdown

GettingtheHVACunitoutofitsshippingboxis quiteachallenge.Pleasebepatientandtrynotto destroythebox.Thewoodisveryweak!

TryplacingtheHVACintoatruckbedandbackingituptotheshelter.Fromhereyoucanget twoguystoliftitfromtruckbedintoHVACmount.Itwillslideinnicely.

Thissquidcoveriswherethe50Ageneratorcablewillfeedintotheshelterandsupplythe powerdistributionboxwithpower.

Besuretotapeupandseal thepassthruholehere.

Itwasbuiltforfutureexpansion andwillbeunusedthissummer.

StrappingthebuildingisOPTIONAL.Itisuptotheteamtodetermineif theenvironmentalconditionswarrantstrapdownstopreventdestructioninwindstorms.

Theshelterhasbeentestedunanchoredat45MPHwinds.