Exhibit_06_XCTC_CDRL_(RMF)_A005.pdf

PDF 141 KB Posted

Attached to
eXportable Combat Training Capability (XCTC)
Solicitation number
W900KK-19-R-0003
Issued by

About this file

This document contains a Contract Data Requirements List (CDRL) and related federal contract opportunity notice. The CDRL requires quarterly deliverables for the Risk Management Framework package for the eXportable Combat Training Capability program. Deliverables are due at scheduled Program Management Reviews to the Army National Guard Technical Review Council Project Manager and Army Contracting Command Orlando organizations. The opportunity notice is for a draft solicitation for the XCTC program to attain Brigade Combat Team training readiness. Comments on the draft are due by March 4, 2019 to improve the final solicitation. The anticipated contract will be full and open competition for operating the XCTC program to develop adaptive leaders and train platoons in core functions through force-on-force and live-fire training.

Exhibit 06: CDRL A005, DOD Risk Management Framework Package

View the file

Other files

File Type Posted
XCTC_IDIQ_RFP_Amendment_0002.docx DOCX document
Attachment_02_GFP_List_2019-04-30.xlsx XLSX spreadsheet
Attachment_31_Sample_Task_Order_2019-04-30.docx DOCX document
Exhibit_01_XCTC_DD254.pdf PDF
Exhibit_05_XCTC_CDRL_(RISK_Man_Pln)_A004.pdf PDF
Example_14_MILES_Request.pdf PDF
Example_11_Horse_Blanket_20190318.xlsx XLSX spreadsheet
Video_Editing_Station_BoM.zip ZIP file
IC-OUM-07000_2.0_B3.pdf PDF
Communications_Cable_Set_Design_Documents.zip ZIP file
EDI_Drawings.zip ZIP file
IC-OUM-09072_1.2_v2_B3.pdf PDF
MCD_23-101A_B3.pdf PDF
IC-OUM-07032_B3.pdf PDF
MBITR_Battery_Transit_Cases_-_Empty_BoM.zip ZIP file
Vehicle_Kit_Design_Documents.zip ZIP file
FREDI-2,_MBITR_Battery,_Cables_Design_Documents.zip ZIP file
Quintuple_UHF_Site_for_Five_channel_System_Design_Documents.zip ZIP file
IC-OUM-09001_Rev1.2_v4_B3.pdf PDF
Attachment_22_Camp_Shelby_WD_15-5152_Rev_09.pdf PDF
Attachment_14_XCTC_Pricing_Workbook_20190402.xlsx XLSX spreadsheet
Attachment_17_Ft_Knox_WD_15-4682_Rev_07.pdf PDF
Attachment_09_Baseline_Resource_Matrix_20190318.xlsx XLSX spreadsheet
Attachment_30_Camp_Blanding_WD_15-4540_Rev_08.pdf PDF
Example_11_Horse_Blanket_20190318.xlsx XLSX spreadsheet
FREDI-2_Basic_Transit_Case_Design_Documents.zip ZIP file
3344000101_Atlas_4000_Technical_Manual_B3.pdf PDF
Relay_Aluma_Tower_TM_DRAFT_051310_GPM_B3.pdf PDF
Battery_Support_Center_Design_Documents.zip ZIP file
ITS_MANUAL_SR-106_Portable_Tower_System-120VAC-60Hz-15k_Rev6-12D_Rev_B3.pdf PDF
FREDI-2,_MBITR_Battery,_Cables_Design_Documents.zip ZIP file
IC-OUM-08000_7.1_B3.pdf PDF
IC-OUM-07010_1.4_v2_(002)_B3.pdf PDF
MCD_23-101A_B3.pdf PDF
Masthead_Assembly_Design_Documents.zip ZIP file
3346200101_Rev2_Atlas_6100_6200_NMS_Technical_Manual_B3.pdf PDF
Example_04_Planning_Conferences.pptx PPTX presentation
Example_06_Concept_Brief.pptx PPTX presentation
Example_09_Exercise_Directive.pdf PDF
Example_03_Five-year_Rotation_Tracker.xlsx XLSX spreadsheet
Example_07_XCTC_Leader_Book_.pdf PDF
Example_05_Rotation_Brief.pptx PPTX presentation
Example_14_MILES_Request.pdf PDF
Exhibit_08_XCTC_CDRL_(GFE_INV_RPT)_A007.pdf PDF
Exhibit_05_XCTC_CDRL_(RISK_Man_Pln)_A004.pdf PDF
Attachment_07_Potential_XCTC_training_locations.xlsx XLSX spreadsheet
Attachment_10_FlexTrain_System.pptx PPTX presentation
Attachment_09_Baseline_Resource_Matrix.xlsx XLSX spreadsheet
Attachment_12_XCTC_Frequency_Request.pptx PPTX presentation
XCTC_Draft_IDIQ_RFP_2019-02-09.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A005
title: DOD Risk Management Framework (RMF) Package Deliverables
sub: XCTC RMF Package Deliverables
auth: DI-MGMT-82001
ref: PWS Paragraph 3.5.3
req_ofc: ARNG TRC PM
dd250: NO
appcode: N/A
dist: B
freq: QRTLY
asof: N/A
firstsub: 90DAC
subsub: QRTLY
addressee1: ARNG TRC PM
draft1:
reg1: 1
repro1:
addressee2: ACC ORL KO
draft2:
reg2: 1
repro2:
addressee3: ACC ORL COR
draft3:
reg3: 1
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 3
total_repro: 0
remarks: #4 - Contractor format is acceptable.

#4 - Entirety of document; omit reference and use of term Navy Authorizing Official (NAO), and Navy CA.

#4 - Under requirements: paragraph #2: delete the words Interim Authority to Test (IATT).

Delete paragraph 2.1.1 IATT Request in its entirety and renumber paragraphs below accordingly.

#12 and 13 - First submission due at first PMR after award of contract and subsequently at every scheduled PMR.

#14 - Distribution will be in electronic format.

group:
total_price:
prep_name: Saul Godinez
line_item: 001
exhibit:
xtdp: Off
xtm: Off
othercat: RMF Package Deliverables
system: XCTC
ctr_no: RFP W900KK-19-R-003
contr: Vendor Name + CAGE Code
remarksb:
Page2:
Reset:
2018-11-14T10:44:45-0500
GODINEZ.SAUL.1126690599
prep_date: 14NOV2018
app_by: MAJ Dusablon, Matthew F.
2018-11-16T10:17:26-0500
DUSABLON.MATTHEW.FRANCIS.1034025602
app_date: 16NOV18
Page:
of_pages:
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .