This document outlines requirements for a federal contract opportunity to provide an eXportable Combat Training Capability (XCTC) program. The U.S. Army Contracting Command - Orlando is issuing a draft solicitation on behalf of the Army National Guard to award a full and open contract competition for the XCTC program. The XCTC program enables Brigade Combat Teams to attain T-Level 3 training readiness through force-on-force and live fire training environments to develop adaptive leaders and train platoons in core functions. Interested parties are encouraged to submit any questions, comments or recommendations on the draft solicitation by March 4, 2019 to improve the final solicitation requirements. No pricing or award details are provided.

Item 50: FlexTrain System Communications Shelter Assembly Manual

View the file

Other files

File Type Posted
XCTC_IDIQ_RFP_Amendment_0002_conformed_track_changes.docx DOCX document
XCTC_IDIQ_RFP_Amendment_0002.docx DOCX document
Attachment_33_Camp_Guernsey_WD_15-5414_Rev_07.pdf PDF
Attachment_14_XCTC_Pricing_Workbook_2019-04-30.xlsx XLSX spreadsheet
Attachment_32_Sample_Task_Order_PWS_2019-04-30_track_changes.docx DOCX document
XCTC_IDIQ_RFP_Amendment_0001.docx DOCX document
Attachment_31_Sample_Task_Order_2019-04-30_track_changes.docx DOCX document
Attachment_07_Potential_XCTC_training_locations_2019-04-30.xlsx XLSX spreadsheet
Attachment_34_RFP_Q_and_A_2019-04-30.xlsx XLSX spreadsheet
XCTC_IDIQ_RFP_Amendment_0001_conformed_track_changes.docx DOCX document
Attachment_01_IDIQ_PWS_2019-04-30_track_changes.docx DOCX document
Attachment_31_Sample_Task_Order_2019-04-30.docx DOCX document
Attachment_02_GFP_List_2019-04-30.xlsx XLSX spreadsheet
Exhibit_11_XCTC_CDRL_(SB_Sub_Report)_A010.pdf PDF
Exhibit_10_XCTC_CDRL_(SBU_Use_Report)_A009.pdf PDF
Exhibit_12__XCTC_CDRL_(QCP)_A011.pdf PDF
Exhibit_02_XCTC_CDRL_(Mo_Rpt)_A001.pdf PDF
Exhibit_07_XCTC_CDRL_(DAL)_A006.pdf PDF
Exhibit_09_XCTC_CDRL_(OPSEC_Pln)_A008.pdf PDF
Exhibit_04_XCTC_CDRL_(STIG_Rpt)_A003.pdf PDF
Exhibit_06_XCTC_CDRL_(RMF)_A005.pdf PDF
Exhibit_08_XCTC_CDRL_(GFE_INV_RPT)_A007.pdf PDF
Exhibit_03_XCTC_CDRL_(Meet_min)_A002.pdf PDF
Exhibit_01_XCTC_DD254.pdf PDF
Exhibit_05_XCTC_CDRL_(RISK_Man_Pln)_A004.pdf PDF
Example_04_Planning_Conferences.pptx PPTX presentation
Example_01_RD_Monthly_Telecon_Slides.pptx PPTX presentation
Example_03_Five-year_Rotation_Tracker.xlsx XLSX spreadsheet
Example_06_Concept_Brief.pptx PPTX presentation
Example_08_Trng_Res_Req_Matrix.xlsx XLSX spreadsheet
Example_13_Academy_Trng_Schedule.pptx PPTX presentation
Example_07_XCTC_Leader_Book_.pdf PDF
Example_10_EXROE.pptx PPTX presentation
Example_05_Rotation_Brief.pptx PPTX presentation
Example_12_XCTC_Mission_Book.pdf PDF
Example_02_Six-Month_event_calendar.xlsx XLSX spreadsheet
Example_09_Exercise_Directive.pdf PDF
Example_11_Horse_Blanket_20190318.xlsx XLSX spreadsheet
Example_14_MILES_Request.pdf PDF
100-300_Manual_Rev_B3.pdf PDF
Masthead_Assembly_Design_Documents.zip ZIP file
5100_ES_Model_I_Operating_Manual_B3.pdf PDF
Network_Operations_Center_Design_Documents.zip ZIP file
Base-X_Dome_manual_Rev_B3.pdf PDF
Video_Take_Home_Package_BoM.zip ZIP file
FREDI-2_Basic_Transit_Case_Design_Documents.zip ZIP file
Administrative_Communications_Center.zip ZIP file
IC-OUM-08002_2.3_B3.pdf PDF
IC-OUM-07010_1.4_v2_(002)_B3.pdf PDF
IC-OUM-08001_4.4_v2_B3.pdf PDF
Show 40 more

Latest 50 of 233 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SETUPREQUIREMENTS:Quantitythreemen,1.5hours TEARDOWNREQUIREMENTS:Quantitythreemen,45mins EQUIPMENTREQUIREDforSetupandTeardown:

Quantitytwo:6+feetA-frameladders Quantityone:bubblelevel(bestif<4ftinlength) Quantitythree:leveragetool(multitoolorscrewdriverissufficient)topryoffthesnapsduring disassembly

ForFirst-timeinstallers:

SRI International FlexTrain System Communications Shelter Assembly Manual

G

H

I

J

K

L

46" Wall Panel 88" X 46" 1/2" 1 VC-Panel-Wall-46

Back Ceiling 93" X 46" 1/2" 1 VC-Panel-Ceiling-8

Panel

Front Ceiling 93" X 46" 1/2" 1 VC-Panel-Ceiling-8F-SRI

Panel

34" Wall Panel 88" X 34" 1 VC-Panel-Wall-34-SRI

Door Wall Panel 88" X 461/2" 1 VC-Panel-Wall-46D

6" Wall Panel 88" X 6" 1 VC-Panel-Wall-6-SRI

Roof Panel 94" X 46 1/4" 2 VC-Panel-Roof-8-SRI

NOTE:Thesepieceswereactually numberednotletterdesignatedwhenwe openedupthetransitcrate.Disregardthe lettersinthisdiagram.

Noneedtomeasurethisspacingyet.Floorpanelswilldoitforyou inalaterstep...

BackFloorPanelisidentifiablebythemarkerlabel"PatchPanel"onthewood-grainsurface, longedgeofthepanel.

Theslotsareevenlyspaced ontheBackFloorPanelwhile theFrontFloorPanelhasa uniqueslotorientationthat hastwoslotsclosetogether wheretheDOORwillbe.

Thisisanotherwaytoidentify BackfromFrontFloorPanel ifthemarkerlabelshavefaded.

PATCH

PANEL

closest markerlabelreads:

Levelthestructureandorientthefloorplanbasedonthemarkerlabelsonthefloor.Showninblueabove.

HVACDOOR

Note:thereare fourscrewholes andaholepassthru onthis20"panel.

Itishardtoseehere.

NOT

THE

DOOR.

Thisisthebackwallpanel.

WARNING:

Snapasyougoor thestructurewillfall down!!!

Inthepictureit doesn'tshowthatall theslotshavea snapyet..wrong.

Snapasmanyas youcanasyougo.

Makesuretocheckthelevel oftheflooragainhere.The shelterwillsettleaswallsare installed.

Noticethatthereareslots ontheexteriorface onallfoursidesof thisBackCeilingpanel.

Youwillneedtheladders forthisstep.Bestresults experiencedwithtwo guysontheladdershere andathirdguytoguidethe ceilingpaneldownthetrack insidetheshelter

Thethirdmanwillknow youhaveitrightwhen helooksuponinteriorface andseethat

REAR

CEILING

arrowpointtowardtheRear shelterwallwithPatch Panel

Youcannowsnap onalltheceiling panelslots EXCEPTforthe nearestsloton eachside.There willbewiggleroom togettheDoorside onlater.

Tryfeedingthe6"panelintotheseams fromthetop.Willrequireaguyona ladder.

Thisdrawingseems exaggerated.With thesnapsonmostof thestructureyouwill NOTseethismuch separation.However, therewillbeenough givetomakethelast seamfitbetween frontfaceandfront ceilingpanel.

Haveaguyontheinsideliftingup,andasecondguyonaladderreadytosliptheseaminplace.

Notethattherearenospareparts...eachpieceofhardwareisneededsobecarefulto accountforallwhenputtingashelterupandtearingitdown

GettingtheHVACunitoutofitsshippingboxis quiteachallenge.Pleasebepatientandtrynotto destroythebox.Thewoodisveryweak!

TryplacingtheHVACintoatruckbedandbackingituptotheshelter.Fromhereyoucanget twoguystoliftitfromtruckbedintoHVACmount.Itwillslideinnicely.

Thissquidcoveriswherethe50Ageneratorcablewillfeedintotheshelterandsupplythe powerdistributionboxwithpower.

Besuretotapeupandseal thepassthruholehere.

Itwasbuiltforfutureexpansion andwillbeunusedthissummer.

StrappingthebuildingisOPTIONAL.Itisuptotheteamtodetermineif theenvironmentalconditionswarrantstrapdownstopreventdestructioninwindstorms.

Theshelterhasbeentestedunanchoredat45MPHwinds.