Example_01_RD_Monthly_Telecon_Slides.pptx
PPTX presentation 1 MB Posted
- Attached to
- eXportable Combat Training Capability (XCTC)
- Solicitation number
- W900KK-19-R-0003
About this file
This is a draft solicitation synopsis for the eXportable Combat Training Capability (XCTC) program, issued by the Army Contracting Command - Orlando on behalf of the Army National Guard.
The anticipated contract will be competed under full and open competition for the XCTC program, which is the Army National Guard's capstone training event for Brigade Combat Teams to attain T-Level 3 readiness. The XCTC mission is to develop adaptive leaders and enable platoons to achieve trained proficiency in core functions through force-on-force and live fire training. Potential offerors are encouraged to submit questions, comments, and recommendations on all aspects of the draft solicitation by March 4th to help improve the final solicitation. This notice does not constitute a commitment to contract and is issued to allow industry exchange on the XCTC requirements.
PWS Example 01: RD Monthly Telecon Slides
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TY 19
4 October 2018 XCTC Monthly Rotation Director Teleconference
All Data As Of 12 AUG 2018 XCTC Rotation 19-01 81 SBCT (WA) COL Hodge 81st Full Time POC/Contact Info: MAJ Cooper; S3; Office 253-512-7970; william.c.cooper32.mil@mail.mil Approximately 3200 Soldiers BCT Task Org: 7 Battalions, 37 Companies, Platoons- approx. 70 Yakima Training Center, WA 8-28 June 2019 Exercise Director: COL Buzzard DCG-O, 7 ID
HICON: 7 ID
Scenario: DATE 3.0, NTC Order with NK RAFTE modifications MCTSP Integration: None forecasted at this time Higher Order/Suspense: Set the Box Order- Spring timeframe; FTX FRAGO- 8 JUN FTX Status (Bns/BDE): 72 hours-FTX D-1 TLP / ISR; FTX D-Day MTC; FTX D+1 FRAGORD; FTX D+2 Urban ATK OCTs –7 ID / 2 ID- 260 (T)
OPFOR- 7 ID / 2 ID- 550 (T) (BN TF)
Enabler Status: 81st BCT to confirm PAX and Dates per LTC Perrin (XO) Planning Timeline
IPC: 6-7 MAR 18, JBLM
CDC:8-10 MAY 18, Yakima TC
CB: TBD OCT 18, JBLM
MPC: 30 OCT – 1 NOV 18 Yakima TC FPC: 5-6 MAR 19, Yakima TC CAR/ROC Drill: 3-5 MAY 19(T), JBLM
XCTC Monthly Rotation Director Teleconference Rotation Challenges/Status Ex Dir/HICON/Higher Order
OPFOR Status
FIRST ARMY OC/T SUPPORT (7 ID)
TRAINING SITE
Rotation Director briefs by exception, 2-3 minutes per rotation.
Unit/Partnership: 7 ID AUP Task Organization: 1 x BN- 2 ID Planning Conferences Attended. All XCTC Resourced Training Planned: None TRC actions: N/A
7 ID Lead – NO 1A support to the BCT.
Requirement/Sourced: est. 260 / UKN.
Plan to use OGW: No Full Academy attendance/ w/ MTT No required TRC actions Exercise Director will be COL Buzzard, DCG-O, 7 ID
HICON- 7 ID
Higher Order- DATE 3.0; NTC OPORD with NK RAFTE modifications Out of Sector FRAGO will drive FTX TA/Range Status: needs confirmed in RFMSS Environmental restrictions in southern training areas resulting in 1-161 IN and 3-161 IN to co-use northern expansion areas at YTC.
Concerns about MPRC throughput. Looking at non-standard range solution.
No required TRC actions
XCTC 19-01 and NTC 20-07
XCTC Rotation 19-02
2/28 IBCT (PA) (COL Zimmerman) 81st Full Time POC/Contact Info: CPT Joseph Ladisic Office, 724.233.4570 x130 joseph.m.ladisic.mil@mail.mil Approximately 3500 Soldiers 2/28 IBCT Org: 8 Battalions, 47 Companies, 126 Platoons FT Pickett, VA
10-30 JUN 19
Exercise Director: TBD 28th ID HICON: 28th ID Scenario: Caspian Sea/Date Scenario MCTSP Integration: Yes. Mr Bullock ICW ESC Higher Order/Suspense: FTX order at FPC 16 MAR 19 FTX Status (BNs/BDE): 72 hours-FTX D-1 TLP / ISR; FTX D-Day-D+3 BDE DEF OCTs -174 CATB- 250 (T) OPFOR- 82d ABN (T) (350 est) Enabler Status: AVN and RSG locked; working 275 QM (SLCR) Planning Timeline Rotation Brief: 27 JAN 2018 (FTIG)
IPC: 1-2 MAR 2018 (FTIG)
CDC: 22-23 AUG 2018 (FPVA)
Concept Brief: TBD (FTIG)(T)
PWG: 30 OCT – 1 NOV
MPC: 5-7 DEC (FPVA)
FPC: 16-17 MAR (FTIG)
ROC Drill: 13-14 APR(Washington PA)(T) Exercise dates: 10 JUN – 1 JUL 2019 (FPVA)
Rotation Challenges/Status Ex Dir/HICON/Higher Order
OPFOR Status
FIRST ARMY OC/T SUPPORT
TRAINING SITE
Rotation Director briefs by exception, 2-3 minutes per rotation.
Unit/Partnership: (T) 82d ABN Task Organization: 1 x BN Planning Conferences Attended. None XCTC Resourced Training Planned: None TRC actions: N/A
174th CATB.
Requirement/Sourced: est. 250 /Yes.
Plan to use OGW: No Full Academy attendance/ w/ MTT: Yes. No MTT Requested No required TRC actions Exercise Director: TBD 28th ID HICON- 28th ID Higher Order- Caspian Sea/Date Scenario
TA/Range Status: Working Post CDC Environmental restrictions: None.
Planning to conduct MTD CAV gunnery at FT AP Hill.
No required TRC actions
XCTC 19-02
XCTC Rotation 19-03 2/34th IBCT (IA) COL Adams 2/34th Full Time POC/Contact Info: CPT Ruden; AS3 Plans; Office 515-432-3108 ext 17811; jonathan.j.ruden.mil@mail.mil Approximately 3500 Soldiers BCT Task Org: 7 Battalions, 42 Companies, Platoons- approx. 80 Camp Ripley, MN 13 July-2 August 2019 Exercise Director: BG Donahoe, JFHQ-IA DCG Maneuver
HICON: JFHQ-IA
Scenario: DATE 3.0, ATROPIA with NK RAFTE modifications MCTSP Integration: C/T/M IBCT CMD/Staff.
Higher Order/Suspense: Set the Box Order- May 2019 timeframe; FTX FRAGO- 13 JUL FTX Status (Bns/BDE): 72 hours. FTX D-1 TLP; FTX D-Day ISR; FTX D+1 Continue ISR/seize TAIs that drive maneuver/FRAGORD; FTX D+2 Urban ATK/CWMD OCTs –157 CATB- 225 (T) + support OPFOR- 1/101 318 (T) (Composite) Enabler Status: 2/34th IBCT finalizing PAX and Dates per MAJ Gledhill JFHQ-IA J6 Planning Timeline IPC: 15-17 MAY 2018 (Camp Ripley, MN)
CDC: 21-23 AUG 2018
Concept Back Brief: 7 SEP 2018
MPC: 6-8 NOV 2018
FPC/ROC Drill: 16-18 April 2019 Exercise dates: 13 JUL-2 AUG 2019
Rotation Challenges/Status Ex Dir/HICON/Higher Order
OPFOR Status
FIRST ARMY OC/T SUPPORT
TRAINING SITE
Unit/Partnership: 1/101 IBCT Task Organization: Composite Planning Conferences Attended:
IPC
CDC did not attend/New PROJO XCTC Resourced Training Planned: None Possible reduction in OPFOR PAX availability. Awaiting unit update No TRC actions required
157 CATB Lead Requirement/Sourced: est. 225 + Support Plan to use OGW: No Full Academy attendance No TRC actions required Exercise Director will be JFHQ-IA DCG Maneuver
HICON- JFHQ-IA
Higher Order- DATE 3.0; ATROPIA OPORD with NK RAFTE modifications Out of Sector FRAGORD will drive BN FTXs TA/Range Status: confirmed in RFMSS LFXs approved by Range Operations Lack of village infrastructure requires the use of RHUs at 3 sites (Area Security).
1/34th HBCT Rail Operations 13-26 JUL (Cantonment Max Capacity) No TRC actions required
XCTC 19-03
XCTC Rotation 19-04 116th IBCT (VA), (COL DiNonno as of 10JUN18) 116th Full Time POC/Contact Info: 1LT Andrew Dodson; XCTC PROJO; Office 540-834-9384; andrew.w.dodson2.mil@mail.mil Approximately 3500 soldiers BCT Task Org: 9 Battalions, 47 Companies, 126 Platoons (Includes CSSB and OPFOR) FT Pickett, VA.
13 JUL – 2 AUG 19
Exercise Director: MG Epperly, CDR 29ID.
HICOM: 29ID
Scenario: DATE 3.0, JRTC Order MCTSP Integration: none (Working with 29 ID for OPORD) Higher Order/Suspense: Set the Box Order- Spring timeframe; FTX FRAGO- 21 JUL FTX Status (Bns/BDE): 72 hours. Defense. D+10 Issue BDE OPORD. D+14 secure DEF terrain and establish the screen. D+14 EN Recon / SPF. D+15 Spoiling ATTK. D+16 ATTK.
OC/Ts – 188 CATB – 225 (T) OPFOR – 82nd ABN – 310 Enabler Status: 116th IBCT to confirm PAX and Dates per 1LT Dodson (PROJO) Planning Timeline Rotation Brief: 2 DEC 17, 116th IBCT HQ, Staunton, VA.
IPC: 2-3 May 18, Ft. Pickett, VA.
CDC / PWG: 4-10 AUG 18 Ft. Pickett, VA.
Site Survey: 11-13 SEP 18, Ft. Pickett, VA.
Concept Back Brief: 9 NOV 18, Staunton, VA.
MPC: 23-24 JAN 19, Ft. Pickett, VA.
FPC: 27-28 MAR 19, Ft. Pickett, VA.
CAR / LDR Recon: 7-9 JUN 19, Ft. Pickett, VA. (T)
Rotation Challenges/Status Ex Dir/HICON/Higher Order
OPFOR Status
FIRST ARMY OC/T SUPPORT
TRAINING SITE (FT Pickett, VA)
Rotation Director briefs by exception, 2-3 minutes per rotation.
Unit/Partnership: 82nd ABN Task Organization: Make up Team Planning Conferences Attended. CDC XCTC Resourced Training Planned: None TRC actions: N/A
188 CATB with OGW Requirement/Sourced: est. 225 / UKN.
Plan to use OGW: Yes Full Academy attendance/ w/ MTT No required TRC actions Exercise Director – MG Epperly, 29ID CDR.
HICOM- 29 ID
Higher Order- DATE 3.0; JRTC OPORD FRAGO will drive BN DEF FTX across BDE Sector.
TA/Range Status: needs confirmed in RFMSS - Working Standard throughput issues at FT Pickett may drive some units to LF during the FTX Not using FT AP Hill at this time.
XCTC 19-04 and JRTC 20-09
XCTC Rotation 19-05 53 IBCT (FL) (LTC(P) Acosta) Full Time POC/Contact Info: MAJ Swinford; S3; 727-568-5303; ryan.m.swinford.mil@mail.mil Approximately 3600 Soldiers BCT Task Org: 7 Battalions, 38 Companies, 97 Platoons Camp Shelby, MS
3-23 AUG 2019
Exercise Director: LTC(P) Acosta HICON: JFHQ-FL (MCTSP team assisting) Scenario: DATE 3.0; JRTC Scenario (will execute JRTC 20-07) MCTSP Integration: Yes Higher Order/Suspense: DIV OPORD/JAN 2019; FTX FRAGO/6AUG2019 FTX Status (BDE): 72-hour FTX; BDE ATK/Hasty Defense OC/Ts – 177 CATB / 250 pax (T) OPFOR – BN TF (2nd BDE, 3ID) Enabler Status: Ongoing Planning Timeline
RB: 25 OCT 17
IPC: 22-23 MAR 18
CDC: 18-20 SEP 18
MPC: 23-24 JAN 19
FPC/ROC Drill: 7-9 MAY 19
Rotation Challenges/Status Ex Dir/HICON/Higher Order
OPFOR Status
FIRST ARMY OC/T SUPPORT
TRAINING SITE
Rotation Director briefs by exception, 2-3 minutes per rotation.
Unit/Partnership: 2/3 ID (Partnership BDE) Task Organization: BN TF Planning Conferences Attended: None Coord. MTG with 2/3 @ FSGA in NOV XCTC Resourced Training Planned: None TRC actions: N/A
177 CATB
Requirement/Sourced: est. 260 / UKN.
Plan to use OGW: No 40 x NGB augmentees will be crucial MTT requested No required TRC actions Exercise Director will be LTC(P) Acosta HICON- JFHQ-FL (MCTSP assisting) Higher Order- DATE 3.0; JRTC Scenario BDE FTX tailored after JRTC mission TA/Range Status: BCT has primacy for CSJFTC Lane and LFX locations selected On-going coordination for LFX/Gunnery
XCTC 19-05 and JRTC 20-07
XCTC Rotation 19-06 1/34 ABCT (MN) (COL Kemp) 1/34 Full Time POC/Contact Info: Maj Luke Wright; S3; Cell 612-702-6110, Lukas.b.wright.mil@mail.mil Approximately 3500 Soldiers 1/34 IBCT- 7 Battalions, 42 Companies, 87 Platoons FT Hood, TX 2-24 Aug 2019 Exercise Director: BG Lowell Kruse, AAG-MNARNG HICON: JFHQ-MN (34th ID will be deployed) Scenario: Caspian Sea/Date Scenario MCTSP Integration: None Higher Order/Suspense: Set the Box Order-Spring timeframe FTX Status (Bns): 5-6 day fully immersed battalion FTX O/CTs –157th CATB- 250 (T) OPFOR- 1-1 CAV (T) COL Kemp meeting 26 Sept with III Corps G3 to discuss OPFOR Enabler Status: Waiting on a AV TF, Signal CO, PLS CO Planning Timeline Rotation Brief: 27 JAN 2018, Bloomington, MN IPC: 1-2 MAY 2018, Bloomington, MN CDC: 11-15 OCT 2018, FT Hood, TX CB: 7 NOV 2018, Bloomington, MN MPC: 15-17 JAN 2019, Bloomington, MN FPC: 21-25 MAR 2019, FT Hood, TX ROC Drill: 7-9 JUN 2019, Bloomington, MN
Rotation Challenges/Status Ex Dir/HICON/Higher Order
OPFOR Status
FIRST ARMY OC/T SUPPORT
TRAINING SITE
Unit/Partnership: 1/1 CD Task Organization: 1 x BN – potential of needing just 2 companies.
Corps G3 and BCT Cdr meet 26 Sept – OPFOR not likely from III Corps Planning Conferences Attended. Not IPC, potentially CDC – XCTC Resourced Training Planned: Potentially, but unknown at this time
157 IN BDE (CATB).
Requirement/Sourced: est. 250 / UKN.
Plan to use OGW: Yes Full Academy attendance/ w/ MTT Conflict between 157 CATB supporting 19-03 ends 2 Aug and 19-06 that begins 2 Aug.
Exercise Director will be BG Kruse, AAG-MNARNG
HICON- JFHQ-MN
Higher Order- No Division order, No MDMP @ Bde Level No required TRC actions TA/Range Status: Need confirmation in RFMSS CALFEX – limited digging.
XCTC 19-06 and NTC 20-08
AYST Rotation 19-01 56 SBCT (PA) COL Wegscheider 56th Full Time POC/Contact Info: MAJ Fittipoldi; S3; Office 215-328-2309; david.w.fittipoldi.mil@mail.mil Approximately 1500 Soldiers BCT Task Org: 1xIN BN(-), 1xCAV SQDN, 1xBSB(-), 1xFA BN (T)
OCTC, ID
10-31 MAY 2019 or 24JUL – 2 AUG 2019 Exercise Director: COL Wegscheider
HICON: TBD
Scenario: DATE 3.0, NTC-type Scenario MCTSP Integration: TBD Higher Order/Suspense: TBD FTX Status (Bns/BDE): TBD OCTs – 174 CATB OPFOR- Internal Enabler Status: None Planning Timeline
IPC: 26-27 FEB 18, FPVA
CDC: 15-19 OCT 2018, OCTC
CB: TBD
MPC: 4-5 DEC 2018, FPVA
FPC: 5-6 MAR 2019, FPVA
CAR/ROC Drill: TBD (APR), Horsham, PA
Rotation Challenges/Status Ex Dir/HICON/Higher Order
OPFOR Status
FIRST ARMY OC/T SUPPORT
TRAINING SITE
Rotation Director briefs by exception, 2-3 minutes per rotation.
Unit/Partnership: Internal Task Organization: TBD Planning Conferences Attended. N/A XCTC Resourced Training Planned: N/A TRC actions: None
174 CATB Lead Requirement/Sourced: est. 200 / UKN.
Plan to use OGW: Yes Full Academy attendance: Yes No required TRC actions Exercise Director will be COL Wegscheider
HICON- TBD
Higher Order- DATE 3.0; NTC OPORD TA/Range Status: Site Visit conducted 6-7 SEP No MPRC available during AYST due to range upgrades (Shut Down begins 12 APR 2019) No required TRC actions at this time
AYST 19-01
FAB Rotation 19-01 45th FAB (OK) COL Elmer Holt 45th FAB Full Time POC/Contact Info: MAJ Spencer Wood; PROJO; 405.350.4635; spencer.p.wood.mil.mail Approximately 1100 Soldiers (EST) FAB Task Org: 3 Battalions, 7 Companies, 14 Platoons Camp Grayling, MI; FT Chaffee AR (TBD)
1-20 JUN 2019 (T)
Exercise Director: TBD HICON: 36th ID TBD Scenario: TBD MCTSP Integration: Yes Higher Order/Suspense: TBD FTX Status (Bns/BDE): TBD OCTs – TBD
OPFOR- TBD
Enabler Status: TBD Planning Timeline
IPC: 2-4 OCT
CDC: 3-7 DEC
CB: TBD
MPC: 4-7 FEB
FPC: 8-11 APR
CAR/ROC Drill: TBD
Rotation Challenges/Status Ex Dir/HICON/Higher Order
OPFOR Status
FIRST ARMY OC/T SUPPORT
TRAINING SITE
Rotation Director briefs by exception, 2-3 minutes per rotation.
Exercise Director TBD
HICON- TBD
Higher Order- TBD
TBD
Requirement/Sourced: est. 200 / UKN.
Plan to use OGW: NO Full Academy attendance:
No required TRC actions Unit/Partnership: TBD Task Organization: TBD Planning Conferences Attended. N/A XCTC Resourced Training Planned: N/A TRC actions: ID OPFOR
FAB 19-01
FAB Rotation 19-02 142 FAB (AR) LTC Jaskolski 142 FAB Full Time POC/Contact Info: TBD Approximately 1200 Soldiers BCT Task Org: 3 Battalions, 9 Companies, 18 Platoons Camp Grayling, MI
13 JUL-2 AUG 19
Exercise Director: TBD
HICON: TBD
Scenario: TBD MCTSP Integration: TBD Higher Order/Suspense: TBD FTX Status (Bns/BDE): TBD OCTs –TBD
OPFOR- TBD
Enabler Status: TBD Planning Timeline IPC: 11-13 Sep CGMI
CDC:
CB:
MPC:
FPC:
CAR/ROC Drill:
Rotation Challenges/Status Ex Dir/HICON/Higher Order
OPFOR Status
FIRST ARMY OC/T SUPPORT
TRAINING SITE
Exercise Director TBD
HICON- TBD
Higher Order- TBD
TBD
Requirement/Sourced: est. 200 / UKN.
Plan to use OGW: NO Full Academy attendance:
No required TRC actions Unit/Partnership: TBD Task Organization: TBD Planning Conferences Attended. N/A XCTC Resourced Training Planned: N/A TRC actions:
FAB 19-02
ARNG-TR Action Items
ARNG-TR Guidance
Back Up Slides
DIV OPORD
General explanation on OPORD DIV OPORD and Scenario based on DATE 3.0 NTC OPORD/Order of Battle with North Korean RAFTE applicable modifications.
Order written by ESC in coordination with 7 ID HICON cell.
Timeline The “Set the Box” OPORD will be issued- TBD The “Out of Sector” FTX FRAGORD will be issued o/a 8 JUN (D-Day) by 7 ID. Resulting actions:
BDE MDMP / BDE OPORD Brief drives BN MDMP resulting in BN OPORD Brief BDE Combined Arms Rehearsal and BDE Retrograde to FTX TAAs / Reset Box D-1 TLP / ISR - FTX D-Day MTC - D+1 FRAGORD- D+2 Urban ATK
Mission Command at the DIV level 7 ID will act as the exercise DIV HICON COL Buzzard, 7 ID DCG-O will be the Exercise Director Systems to stimulate MC will be unit MCS and JCR/JBC-P set to 7 ID configuration.
Discussion on adjusted lanes (i.e. PLT lanes in Company AO) Lane book adjustments. Lane books reflect PLT STX lanes grouped in time and space to allow CO/TRP/BTRY mission command New lane book process. Lane book FRAGORDs will be written at the BN/SQDN level to ensure CO/TRP/BTRY orders to drive PLT missions.
Instrumented AAR Changes Editing process Recommending the BDE CDR focus on the Leader and Critical tasks annotated in the T&EOs as a baseline for an I-AAR build. TAC SMEs then pull those items out of the T&EOs to develop a check list for capture. TAC SMEs must recognize those tasks ands capture them regardless of whether the OC/T call them in or not.
I-AAR MTT
OC/Ts will be coming from 7ID or 2ID. We will need to have a MTT to train them up on I-AAR build process.
XCTC Rotation 19-01 Confirmation Brief
All Data As Of 12 AUG 2018
DIV OPORD
General explanation on OPORD DIV OPORD and Scenario based on Caspian Sea/Date Scenario.
ESC will prepare Order with guidance from BCT CDR and assistance from PA STA.
Timeline The “Set the Box” OPORD will be issued- at the FPC 16MAR19 The “Out of Sector” FTX FRAGORD will be issued o/a (D-Day) by 28th ID. Resulting actions:
BDE MDMP / BDE OPORD Brief drives BN MDMP resulting in BN OPORD Brief BDE Combined Arms Rehearsal and BDE Retrograde to FTX TAAs / Reset Box FTX D-1 TLP / ISR; FTX D-Day-D+3 BDE DEF
Mission Command at the DIV level 28th ID will act as the exercise DIV HICOM Exercise Director TBD Systems to stimulate MC will be unit MCS and JCR/JBC-P set to 28th ID configuration.
MC team- Doctrinal Training Team 4 with additional Doctrinal Training Teams in reserve.
Discussion on adjusted lanes (i.e. PLT lanes in Company AO) Lane book adjustments. Lane books reflect PLT STX lanes grouped in time and space to allow CO/TRP/BTRY mission command Then platoons will rotate on the terrain for the following Company lane. (MTC/ATK)
Instrumented AAR Changes Editing process Recommending the BDE CDR focus on the Leader and Critical tasks annotated in the T&EOs as a baseline for an I-AAR build. TAC SMEs then pull those items out of the T&EOs to develop a check list for capture. TAC SMEs must recognize those tasks ands capture them regardless of whether the OC/T call them in or not.
I-AAR MTT
174th CATB has not requested an MTT.
XCTC Rotation 19-02
DIV OPORD:
The Base “Set the Box” OPORD and the “Out of Sector” FTX FRAGORD will be prepared and issued by ESC Team.
Scenario. DATE 3.0 Atropian PMESII-PT/Order of Battle with North Korean RAFTE applicable modifications.
Currently the RTU has requested the “Set the Box” OPORD be issued during the MAY 2018 (D-75/60) time period. A specific DTG for the OPORD has not been established. The “Out of Sector” FTX FRAGORD will be issued o/a 13 JUL (D-Day).
Plan for executing Mission Command at the DIV level?
JHFQ-IA will replicate the HICON with MCTSP support.
AMCS. The JFHQ-IA will utilize Army MCS for HICON mission command.
MC Team. ESC Team 5 will be in support.
Discussion on adjusted lanes (i.e. PLT lanes in Company AO) Lane book adjustments. All PLT LTX lanes have been grouped in time and space to allow CO/TRP/BTRY mission command.
New lane book process. All Lane book FRAGORDs will be written at the BN/SQDN level to ensure CO/TRP/BTRY TLPs/orders to drive PLT missions.
Instrumented AAR Changes Editing process. Focus efforts on the primary task in the T&EO along with one or two “BCT/BN CDR Focus Items” (TLPs, PCIs etc) to establish the framework for each AAR. TAC OC/Ts/SMEs then pull those items out of the T&EOs to develop a check list for capture. TAC OC/Ts/SMEs monitor execution against the T&EOs and Focus Items checklists.. TAC SMEs must recognize those tasks ands capture them regardless of whether the OC/T call them in or not. TAC SMEs QA/QC data packages prior to departing the TAC.
I-AAR MTT. 157 CATB has not requested. OGW has requested an MTT for NOV 18
XCTC Rotation 19-03
DIV OPORD
General explanation on OPORD DIV OPORD and Scenario based on DATE 3.0 JRTC OPORD/Order of Battle.
Order written by ESC along with 29 ID HICOM cell.
Timeline The “Set the Box” OPORD will be issued- TBD The FTX FRAGORD will be issued o/a 21 JUL (D+8) by 29 ID. Resulting actions:
BDE MDMP / BDE OPORD Brief drives BN MDMP resulting in BN OPORD Brief BDE Combined Arms Rehearsal and BDE Retrograde to FTX TAAs / Reset Box D+13 TLP / ISR / Entry Operations – D+14 Through D+16 Defense FTX (D+14 OPFOR RECON, D+15 Spoiling Attacks, D+16 Main Attack)
Mission Command at the DIV level 29 ID will act as the exercise DIV HICOM MG Epperly, 29 ID CDR will be the Exercise Director Systems to stimulate MC will be unit MCS and JCR/JBC-P set to 29 ID configuration.
MC team- Doctrinal Training Team 4 with additional Doctrinal Training Teams in reserve.
Discussion on adjusted lanes (i.e. PLT lanes in Company AO) Lane book adjustments. Lane books reflect PLT STX lanes grouped in time and space to allow CO/TRP/BTRY mission command followed by a true Company Lane. (MTC, ATK, DEF)
Instrumented AAR Changes Editing process Recommending the BDE CDR focus on the Leader and Critical tasks annotated in the T&EOs as a baseline for an I-AAR build. TAC SMEs then pull those items out of the T&EOs to develop a check list for capture. TAC SMEs must recognize those tasks ands capture them regardless of whether the OC/T call them in or not.
I-AAR MTT
188 CATB has requested an MTT close in to Execution. May require assistance since I will be conducting 2/28 IBCT.
XCTC Rotation 19-04
General explanation on OPORD DIV OPORD and Scenario based on DATE 3.0 JRTC OPORD/Order of Battle Order written by ESC Team along with MCTSP (POC: Will Deem) Timeline The DIV “Set the Box” OPORD will be issued JAN 2019 BDE MDMP conducted JAN-MAY during IDT BDE OPORD issued in MAY 2019 The FTX FRAGORD will be issued o/a 6 AUG (D+3) by HICON. Resulting actions:
BDE MDMP / BDE OPORD Brief followed by BN MDMP resulting in BN OPORD Brief BDE Combined Arms Rehearsal
Mission Command at the DIV level JFHQ will act as the exercise DIV HICON Systems to stimulate MC will be unit MCS and JCR/JBC-P
Discussion on adjusted lanes (i.e. PLT lanes in Company AO) All lanes currently designed as Company lanes with focus on Platoon proficiency in select collective tasks Treat cantonment area like the RUBA and have movement into the TA as a contested move into the Area of Operations Set conditions and create events that will train platoons and prepare the BN and BDE Staffs for JRTC
Instrumented AAR Changes Editing process Continue to focus the I-AARs on fundamentals of maneuver and battlefield geometry, instead of TLP discussions
I-AAR MTT
No MTT planned at this time; 177 CATB executed an MTT and XCTC Rotation last year
XCTC Rotation 19-05
General explanation on OPORD 1/34 ABCT will be conducting their BWFX 10-19 May so will not have a full up BDE Staff present for the rotation. They have decided that they will not be conducting any MDMP during the rotation so no Division OPORD required.
Set the Box OPORD will be issued 30 days after the MPC by ESC Team 1.
Mission Command 34th ID will be deployed overseas during 19-06 so the only HICON will be the JFHQ-MN that will focus on Admin and Logistics support.
The Exercise Director will be BG Lowell Kruse, AAG-MN MC will be exercised at BDE level and below although the BCT is currently planning to be analog only with the exception of AFATDS to support the CALFEX.
Discussion on adjusted lanes Battalions will produce and issue nested OPORDs to support maneuver training within their AOs. Units will conduct a 5-6 day FTX in a fully immersive environment exercising PLT though BN level training supported by a complex and dynamic threat with a continuous roving OPFOR and incorporating sustainment in a tactical environment.
Maneuver companies will conduct ATK, ATK with breach and MTC. CAV Troops will conduct Area, Zone, Route Recons and Screen. The CALFEX will be a two day evaluated Company Defense. The BCT CDR accepts risk in not executing Area Security.
Instrumented AAR Changes Editing process Each mission should focus on the same talking points pulled from the T&EOs. A standardized list should be developed in which TAC OC/Ts and SMEs annotate events and focus on capturing data that supports the talking point. A standard AAR format should be used that allows comments/notes that include start and end times and the tools to be used, 2D/3D (shot lines, LOS, distance, names/bumper #s, KMZ, IDF, model sizes). Video and Audio should be reviewed prior to transporting to the MAARC tent and identify cuts that support the talking points. The SME reviews the completed data package to ensure the AAR build is complete and flows per the talking points.
I-AAR MTT
Although they have not requested an MTT, plan is to move forward to conduct an MTT for 157 CATB. The MTT should consist of the TAC Analyst SMEs to introduce the OC/Ts to the process and products they will be provided to best assist the OC/T facilitate the IAAR.
XCTC Rotation 19-06
DIV OPORD: ESC Team will assist HICON with orders prep.
Mission Command at the DIV level
Discussion on adjusted lanes (i.e. PLT lanes in Company AO)
Instrumented AAR Changes
XCTC Rotation 19-01 Confirmation Brief
XCTC Team attending FAB IPC (Scott Sarver, Scott Frazier and Dave Gunn) concurrent with AAR/PMR. FAB Rotations will be updated as information is available.
DIV OPORD: ESC Team will assist HICON with orders prep.
Mission Command at the DIV level
Discussion on adjusted lanes (i.e. PLT lanes in Company AO)
Instrumented AAR Changes
FAB Rotation 19-02
XCTC Team attending FAB IPC (Scott Sarver, Scott Frazier and Dave Gunn) concurrent with AAR/PMR. FAB Rotations will be updated as information is available.
image2.png image3.emf
Microsoft_Excel_Worksheet.xlsx EAB tracker - FY19
XCTC Rotation 19-01 81 SBCT (WA) 8-28JUN19 Yakima, WA
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation 1-149 ARB TX TBD HQ- TBD
Aviation 168 AVN WA TBD lift Company
Engineer 861 ESC ECC RI / TBD TBD need the horizontal capability
Logistics 190 CSSB MTARNG 16 Logistics MSN CMD
Transportation 1158 TC HET WI / TBD SQD Deploy/Redeploy time periods
Transportation 121 TC PAARNG SQD QM CO
Ammunition Spt. 63 OD AC PLT
Maintenance 150 SMC NVARNG wheeled recovery team
JTAC/ALO 7ID JBLM TBD Aready requested thru 7ID
HICON 7ID JBLM TBD HICON and interrogators- already requested thru 7ID
BCT POC: MAJ Cooper; S3; Office 253-512-7970; william.c.cooper32.mil@mail.mil
JFHQ-WA POC for EAB Enablers: MAJ Suyat, JFHQ XCTC POC; Phone 253-512-7647; adam.s.suyat.mil@mail.mil
XCTC Rotation 19-02 2/28 IBCT (PA) 10JUN-1JUL19 Ft Pickett, VA
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation C/1-130 AVN BN NC
Sustainment/Trans 213 RSG PA
Mission Command 28th ID PA
SLCR 275th QM (T) VA
BCT POC: CPT Ladisic, S3 Training Officer. Office 724-223-4570 X 130. BB 717-943-4612
JFHQ-PA POC for EAB Enablers:
XCTC Rotation 19-03 2/34 IBCT (IA) 13JUL-2AUG19 Cp Ripley, MN
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation 1-147 AVN REG WI MC; UH-60 and LUH-72 (19JUL-2AUG)
DET 1/ B/2-211 GSAB (-) MN CH-47 (17-31 JUL)
B/2-211 GSAB (-) IA CH-47 (13-27 JUL)
Sustainment 185 CSSB IA CSSB (-) MC Sustainment
Engineer 831 CO (Horizontal) IA 15 CM/S: 3x Blade Teams
833 CO (Sapper) IA M: 2-3 Sapper Platoons
Mission Command JFHQ-IA IA 108 EXDIR and HICON CMD/Staff
White Cell JFHQ-IA IA
JVB JFHQ-IA IA
LFX JFHQ-IA IA
Medical JASR JFHQ-IA IA Cantonment patient holding/transportation
Transportation 224th TRANS CO MN 140 6 Commodity/Troop/OPFOR Movement (13JUL-2AUG) (6 days pending funding)
Not Confirmed
Protection CBRN 48th CHEM BDE AC 16 RECON
Protection CBRN 48th CHEM BDE AC 20 DECON
Protection MP TBD Wide Area Security/Detainee OPS
Fires 1-151 FA (-) MN Replicate Reinforcing Fires
BCT POC: CPT Ruden BCT AS3; Cell 712-898-2211; Work 515-432-3108 ext 17811; jonathan.j.ruden.mil@mail.mil
JFHQ-IA POC for EAB Enablers: MAJ Gledhill; JFHQ-IA: Cell 515-321-6941; Work 515-252-4392; jared.a.gledhill.mil@mail.mil
XCTC Rotation 19-04 116 IBCT (VA) 13JUL-2AUG19 Ft Pickett, VA
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation 2-224th AVN VA 250 CPT Ryan Strait (S3) 6
Sustainment 731 CSSB AL 15 MAJ Brian Spivey (XO) 6 Sel. PAX to fill CSSB HQ
Mobility / Counter-mob 1036 Sapper Co AR 30 CPT Walter Rau (Tng Off) 6 Fill gaps for 229 BEB
Survivability 843 EN Co LA 70 CPT Gordon Hanson (Tng Off) 6 Would need LOE equipment from VA MATES or Line-haul
Mission Command 29th ID VA 15 LTC Edward Lewis (G3) 6
TACP - ANG 118th ASOS NC 12 Capt Devin Rockel 6 Limited availability due to NTC rotation
| Sustainment | 1231 TC | MO | 100 | 1LT Jonathan Swyres (Tng Off) / | |
| CPT James Fountain | 6 | COA2: Utilize 1173 TC (VAARNG), but won't know until mid-Oct. |
Sustainment 778 SMC AL 20 MAJ Brian Spivey (CSSB XO) 6 Need maint team to support additional Sustain assets
Protection 222 CBRN Co NY 30 CPT Ryan Gonch (BN Tng Off) 6 1x Decon Platoon to facilitate Decon Sites
Protection 233 MP Co IL 25 1LT Erin Speck (Tng Off) 6 1x MP Plt for Armed Escort
Mission Command (Sentinal TM) 29th ID VA 8 LTC Edward Lewis (G3) 6 Air space management
Survivability 843 EN Co LA 12 CPT Gordon Hanson (Tng Off) 4 Recovery after (clean heavy equipment)
BCT POC: 1LT Andrew Dodson 540-834-9384 andrew.w.dodson2.mil@mail.mil
JFHQ-VA POC for EAB Enablers: 29ID POC for EAB Enablers: LTC Lewis (Awaiting Contact information)
XCTC Rotation 19-05 53 IBCT (FL) 3-23 AUG19 Cp Blanding, FL
Function Unit State Pax POC Days Above Statutory Required Notes
Air Defense 164th ADA FL SPO section
Aviation 1-111 GSAB FL Subordinate of 1297
Logistics 3-116 FSC FL Distro PLT
356th QM FL
256th ASMC FL
Transportation 144th TC FL Pending Confirmation
TACP 165th ASOS Confirmed
Logistics 1297th CSSB MD
Maintenance 1729 MC MD
Ordinance 1108th EOD NY
BCT POC: CPT Demorest, 813-401-4123, stephanie.m.demorest.mil@mail.mil
JFHQ-FL POC for EAB Enablers:
XCTC Rotation 19-06 1-34 ABCT (MN) 6-27SEP19 Ft Hood, TX
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation TBD TBD TBD 6 Require +6 days funding ATK: Support Lanes and CALFEX Lift: AASLT Training MEDEVAC: Lane Training
Signal TBD TBD TBD 6 Require +6 days funding.
Capability to replace C/BEB and their participation in BWFX.
Engineer 374 EN Co (Sapper) CA 75 Reserve Unit
Engineer 211 MAC SD TBD 6 Require +6 days funding
Mission Command JFHQ-MN MN TBD HICON
Transportation PLS Platoon TBD 6 Require +6 days funding.
Commodity Support
Transportation 224 Trans MN TBD 6 Require +6 days funding
Transportation HET Company WI(?) 55 6 HET company; require +6 days funding.
WI expressed interest; not confirmed.
Will save on maintenance.
TACP 145 ASOS (ANG) OK TBD 6 Require +6 days funding
BCT POC: MAJ Luke Wright; Office 612-702-6110; lukas.b.wright.mil@mail.mil
JFHQ-MN POC for EAB Enablers:
AYST Rotation 19-01 56 SBCT (PA) 10-31MAY19 Ft Pickett, VA
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation
Sustainment
Engineer
Mission Command
Transportation
Other
BCT POC: MAJ Fittipold; BDE S3; david.w.fittipoldi.mil@mail.mil ; 215-328-2309
JFHQ-PA POC for EAB Enablers:
image1.jpeg image3.png image4.png image5.png image6.png image7.png image5.emf
Microsoft_Excel_Worksheet1.xlsx EAB tracker - FY19
XCTC Rotation 19-01 81 SBCT (WA) 8-28JUN19 Yakima, WA
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation 1-149 ARB TX TBD HQ- TBD
Aviation 168 AVN WA TBD lift Company
Engineer 861 ESC ECC RI / TBD TBD need the horizontal capability
Logistics 190 CSSB MTARNG 16 Logistics MSN CMD
Transportation 1158 TC HET WI / TBD SQD Deploy/Redeploy time periods
Transportation 121 TC PAARNG SQD QM CO
Ammunition Spt. 63 OD AC PLT
Maintenance 150 SMC NVARNG wheeled recovery team
JTAC/ALO 7ID JBLM TBD Aready requested thru 7ID
HICON 7ID JBLM TBD HICON and interrogators- already requested thru 7ID
BCT POC: MAJ Cooper; S3; Office 253-512-7970; william.c.cooper32.mil@mail.mil
JFHQ-WA POC for EAB Enablers: MAJ Suyat, JFHQ XCTC POC; Phone 253-512-7647; adam.s.suyat.mil@mail.mil
XCTC Rotation 19-02 2/28 IBCT (PA) 10JUN-1JUL19 Ft Pickett, VA
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation C/1-130 AVN BN NC
Sustainment/Trans 128 BSB PA BDE organic
Engineer 876 BEB PA BDE organic
Mission Command 28th ID PA
SLCR 275th QM (T) VA
Transportation 213 RSG PA
Other 28 ECAB PA MEDEVAC
BCT POC: CPT Ladisic, S3 Training Officer. Office 724-223-4570 X 130. BB 717-943-4612
JFHQ-PA POC for EAB Enablers:
XCTC Rotation 19-03 2/34 IBCT (IA) 13JUL-2AUG19 Cp Ripley, MN
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation 1-147 AVN REG WI MC; UH-60 and LUH-72 (19JUL-2AUG)
DET 1/ B/2-211 GSAB (-) MN CH-47 (17-31 JUL)
B/2-211 GSAB (-) IA CH-47 (13-27 JUL)
Sustainment 185 CSSB IA CSSB (-) MC Sustainment
Engineer 831 CO (Horizontal) IA 15 CM/S: 3x Blade Teams
833 CO (Sapper) IA M: 2-3 Sapper Platoons
Mission Command JFHQ-IA IA 108 EXDIR and HICON CMD/Staff
White Cell JFHQ-IA IA
JVB JFHQ-IA IA
LFX JFHQ-IA IA
Medical JASR JFHQ-IA IA Cantonment patient holding/transportation
Transportation 224th TRANS CO MN 140 6 Commodity/Troop/OPFOR Movement (13JUL-2AUG) (6 days pending funding)
Not Confirmed
Protection CBRN 48th CHEM BDE AC 16 RECON
Protection CBRN 48th CHEM BDE AC 20 DECON
Protection MP TBD Wide Area Security/Detainee OPS
Fires 1-151 FA (-) MN Replicate Reinforcing Fires
BCT POC: CPT Ruden BCT AS3; Cell 712-898-2211; Work 515-432-3108 ext 17811; jonathan.j.ruden.mil@mail.mil
JFHQ-IA POC for EAB Enablers: MAJ Gledhill; JFHQ-IA: Cell 515-321-6941; Work 515-252-4392; jared.a.gledhill.mil@mail.mil
XCTC Rotation 19-04 116 IBCT (VA) 13JUL-2AUG19 Ft Pickett, VA
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation 2-224th AVN VA 250 CPT Ryan Strait (S3) 6
Sustainment 731 CSSB AL 15 MAJ Brian Spivey (XO) 6 Sel. PAX to fill CSSB HQ
Mobility / Counter-mob 1036 Sapper Co AR 30 CPT Walter Rau (Tng Off) 6 Fill gaps for 229 BEB
Survivability 843 EN Co LA 70 CPT Gordon Hanson (Tng Off) 6 Would need LOE equipment from VA MATES or Line-haul
Mission Command 29th ID VA 15 LTC Edward Lewis (G3) 6
TACP - ANG 118th ASOS NC 12 Capt Devin Rockel 6 Limited availability due to NTC rotation
| Sustainment | 1231 TC | MO | 100 | 1LT Jonathan Swyres (Tng Off) / | |
| CPT James Fountain | 6 | COA2: Utilize 1173 TC (VAARNG), but won't know until mid-Oct. |
Sustainment 778 SMC AL 20 MAJ Brian Spivey (CSSB XO) 6 Need maint team to support additional Sustain assets
Protection 222 CBRN Co NY 30 CPT Ryan Gonch (BN Tng Off) 6 1x Decon Platoon to facilitate Decon Sites
Protection 233 MP Co IL 25 1LT Erin Speck (Tng Off) 6 1x MP Plt for Armed Escort
Mission Command (Sentinal TM) 29th ID VA 8 LTC Edward Lewis (G3) 6 Air space management
Survivability 843 EN Co LA 12 CPT Gordon Hanson (Tng Off) 4 Recovery after (clean heavy equipment)
BCT POC: 1LT Andrew Dodson 540-834-9384 andrew.w.dodson2.mil@mail.mil
JFHQ-VA POC for EAB Enablers: 29ID POC for EAB Enablers: LTC Lewis (Awaiting Contact information)
XCTC Rotation 19-05 53 IBCT (FL) 3-23 AUG19 Cp Blanding, FL
Function Unit State Pax POC Days Above Statutory Required Notes
Air Defense 164th ADA FL SPO section
Aviation 1-111 GSAB FL Subordinate of 1297
Logistics 3-116 FSC FL Distro PLT
356th QM FL
256th ASMC FL
Transportation 144th TC FL Pending Confirmation
TACP 165th ASOS Confirmed
Logistics 1297th CSSB MD
Maintenance 1729 MC MD
Ordinance 1108th EOD NY
BCT POC: CPT Demorest, 813-401-4123, stephanie.m.demorest.mil@mail.mil
JFHQ-FL POC for EAB Enablers:
XCTC Rotation 19-06 1-34 ABCT (MN) 6-27SEP19 Ft Hood, TX
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation TBD TBD TBD 6 Require +6 days funding ATK: Support Lanes and CALFEX Lift: AASLT Training MEDEVAC: Lane Training
Signal TBD TBD TBD 6 Require +6 days funding.
Capability to replace C/BEB and their participation in BWFX.
Engineer 374 EN Co (Sapper) CA 75 Reserve Unit
Engineer 211 MAC SD TBD 6 Require +6 days funding
Mission Command JFHQ-MN MN TBD HICON
Transportation PLS Platoon TBD 6 Require +6 days funding.
Commodity Support
Transportation 224 Trans MN TBD 6 Require +6 days funding
Transportation HET Company WI(?) 55 6 HET company; require +6 days funding.
WI expressed interest; not confirmed.
TACP 145 ASOS (ANG) OK TBD 6 Require +6 days funding
BCT POC: MAJ Luke Wright; Office 612-702-6110; lukas.b.wright.mil@mail.mil
JFHQ-MN POC for EAB Enablers:
AYST Rotation 19-01 56 SBCT (PA) 10-31MAY19 Ft Pickett, VA
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation
Sustainment
Engineer
Mission Command
Transportation
Other
BCT POC: MAJ Fittipold; BDE S3; david.w.fittipoldi.mil@mail.mil ; 215-328-2309
JFHQ-PA POC for EAB Enablers:
image7.emf
Microsoft_Excel_Worksheet2.xlsx EAB tracker - FY19
XCTC Rotation 19-03 2/34 IBCT (IA) 13JUL-2AUG19 Cp Ripley, MN
Unit State Pax Days Above Statutory Required Notes
Aviation 1-147 AVN REG WI MC; UH-60 and LUH-72 (19JUL-2AUG)
DET 1/ B/2-211 GSAB (-) MN CH-47 (17-31 JUL)
B/2-211 GSAB (-) IA CH-47 (13-27 JUL)
Sustainment 185 CSSB IA CSSB (-) MC Sustainment
Engineer 831 CO (Horizontal) IA 15 CM/S: 3x Blade Teams
833 CO (Sapper) IA M: 2-3 Sapper Platoons
Mission Command JFHQ-IA IA 108 EXDIR and HICON CMD/Staff
White Cell JFHQ-IA IA
JVB JFHQ-IA IA
LFX JFHQ-IA IA
Medical JASR JFHQ-IA IA Cantonment patient holding/transportation
Transportation 224th TRANS CO MN 140 6 Commodity/Troop/OPFOR Movement (13JUL-2AUG) (6 days pending funding)
Not Confirmed
Signal CO HICON signal support
Protection CBRN 48th CHEM BDE AC 16 RECON
Protection CBRN 48th CHEM BDE AC 20 DECON
Protection MP TBD Wide Area Security/Detainee OPS
Fires 1-151 FA (-) MN 6 Replicate Reinforcing Fires (6 days pending funding)
BCT POC: CPT Ruden BCT AS3; Cell 712-898-2211; Work 515-432-3108 ext 17811; jonathan.j.ruden.mil@mail.mil
JFHQ-IA POC for EAB Enablers: MAJ Gledhill; JFHQ-IA: Cell 515-321-6941; Work 515-252-4392; jared.a.gledhill.mil@mail.mil image8.png image9.emf
Microsoft_Excel_Worksheet3.xlsx EAB tracker - FY19
XCTC Rotation 19-01 81 SBCT (WA) 8-28JUN19 Yakima, WA
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation 1-149 ARB TX TBD HQ- TBD
Aviation 168 AVN WA TBD lift Company
Engineer 861 ESC ECC RI / TBD TBD need the horizontal capability
Logistics 190 CSSB MTARNG 16 Logistics MSN CMD
Transportation 1158 TC HET WI / TBD SQD Deploy/Redeploy time periods
Transportation 121 TC PAARNG SQD QM CO
Ammunition Spt. 63 OD AC PLT
Maintenance 150 SMC NVARNG wheeled recovery team
JTAC/ALO 7ID JBLM TBD Aready requested thru 7ID
HICON 7ID JBLM TBD HICON and interrogators- already requested thru 7ID
BCT POC: MAJ Cooper; S3; Office 253-512-7970; william.c.cooper32.mil@mail.mil
JFHQ-WA POC for EAB Enablers: MAJ Suyat, JFHQ XCTC POC; Phone 253-512-7647; adam.s.suyat.mil@mail.mil
XCTC Rotation 19-02 2/28 IBCT (PA) 10JUN-1JUL19 Ft Pickett, VA
Function Unit State Pax POC Days Above Statutory Required Notes
BCT POC: CPT Ladisic, S3 Training Officer. Office 724-223-4570 X 130. BB 717-943-4612
JFHQ-PA POC for EAB Enablers:
XCTC Rotation 19-03 2/34 IBCT (IA) 13JUL-2AUG19 Cp Ripley, MN
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation 1-147 AVN REG WI MC; UH-60 and LUH-72 (19JUL-2AUG)
DET 1/ B/2-211 GSAB (-) MN CH-47 (17-31 JUL)
B/2-211 GSAB (-) IA CH-47 (13-27 JUL)
Sustainment 185 CSSB IA CSSB (-) MC Sustainment
Engineer 831 CO (Horizontal) IA 15 CM/S: 3x Blade Teams
833 CO (Sapper) IA M: 2-3 Sapper Platoons
Mission Command JFHQ-IA IA 108 EXDIR and HICON CMD/Staff
White Cell JFHQ-IA IA
JVB JFHQ-IA IA
LFX JFHQ-IA IA
Medical JASR JFHQ-IA IA Cantonment patient holding/transportation
Transportation 224th TRANS CO MN 140 6 Commodity/Troop/OPFOR Movement (13JUL-2AUG) (6 days pending funding)
Not Confirmed
Protection CBRN 48th CHEM BDE AC 16 RECON
Protection CBRN 48th CHEM BDE AC 20 DECON
Protection MP TBD Wide Area Security/Detainee OPS
Fires 1-151 FA (-) MN Replicate Reinforcing Fires
BCT POC: CPT Ruden BCT AS3; Cell 712-898-2211; Work 515-432-3108 ext 17811; jonathan.j.ruden.mil@mail.mil
JFHQ-IA POC for EAB Enablers: MAJ Gledhill; JFHQ-IA: Cell 515-321-6941; Work 515-252-4392; jared.a.gledhill.mil@mail.mil
XCTC Rotation 19-04 116 IBCT (VA) 13JUL-2AUG19 Ft Pickett, VA
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation 2-224th AVN VA 250 CPT Ryan Strait (S3) 6
Sustainment 731 CSSB AL 15 MAJ Brian Spivey (XO) 6 Sel. PAX to fill CSSB HQ
Mobility / Counter-mob 1036 Sapper Co AR 30 CPT Walter Rau (Tng Off) 6 Fill gaps for 229 BEB
Survivability 843 EN Co LA 70 CPT Gordon Hanson (Tng Off) 6 Would need LOE equipment from VA MATES or Line-haul
Mission Command 29th ID VA 15 LTC Edward Lewis (G3) 6
TACP - ANG 118th ASOS NC 12 Capt Devin Rockel 6 Limited availability due to NTC rotation
| Sustainment | 1231 TC | MO | 100 | 1LT Jonathan Swyres (Tng Off) / | |
| CPT James Fountain | 6 | COA2: Utilize 1173 TC (VAARNG), but won't know until mid-Oct. |
Sustainment 778 SMC AL 20 MAJ Brian Spivey (CSSB XO) 6 Need maint team to support additional Sustain assets
Protection 222 CBRN Co NY 30 CPT Ryan Gonch (BN Tng Off) 6 1x Decon Platoon to facilitate Decon Sites
Protection 233 MP Co IL 25 1LT Erin Speck (Tng Off) 6 1x MP Plt for Armed Escort
Mission Command (Sentinal TM) 29th ID VA 8 LTC Edward Lewis (G3) 6 Air space management
Survivability 843 EN Co LA 12 CPT Gordon Hanson (Tng Off) 4 Recovery after (clean heavy equipment)
BCT POC: 1LT Andrew Dodson 540-834-9384 andrew.w.dodson2.mil@mail.mil
JFHQ-VA POC for EAB Enablers: 29ID POC for EAB Enablers: LTC Lewis (Awaiting Contact information)
XCTC Rotation 19-05 53 IBCT (FL) 3-23 AUG19 Cp Blanding, FL
Function Unit State Pax POC Days Above Statutory Required Notes
Air Defense 164th ADA FL SPO section
Aviation 1-111 GSAB FL Subordinate of 1297
Logistics 3-116 FSC FL Distro PLT
356th QM FL
256th ASMC FL
Transportation 144th TC FL Pending Confirmation
TACP 165th ASOS Confirmed
Logistics 1297th CSSB MD
Maintenance 1729 MC MD
Ordinance 1108th EOD NY
BCT POC: CPT Demorest, 813-401-4123, stephanie.m.demorest.mil@mail.mil
JFHQ-FL POC for EAB Enablers:
XCTC Rotation 19-06 1-34 ABCT (MN) 6-27SEP19 Ft Hood, TX
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation TBD TBD TBD 6 Require +6 days funding ATK: Support Lanes and CALFEX Lift: AASLT Training MEDEVAC: Lane Training
Signal TBD TBD TBD 6 Require +6 days funding.
Capability to replace C/BEB and their participation in BWFX.
Engineer 374 EN Co (Sapper) CA 75 Reserve Unit
Engineer 211 MAC SD TBD 6 Require +6 days funding
Mission Command JFHQ-MN MN TBD HICON
Transportation PLS Platoon TBD 6 Require +6 days funding.
Commodity Support
Transportation 224 Trans MN TBD 6 Require +6 days funding
Transportation HET Company WI(?) 55 6 HET company; require +6 days funding.
WI expressed interest; not confirmed.
TACP 145 ASOS (ANG) OK TBD 6 Require +6 days funding
BCT POC: MAJ Luke Wright; Office 612-702-6110; lukas.b.wright.mil@mail.mil
JFHQ-MN POC for EAB Enablers:
AYST Rotation 19-01 56 SBCT (PA) 10-31MAY19 Ft Pickett, VA
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation
Sustainment
Engineer
Mission Command
Transportation
Other
BCT POC: MAJ Fittipold; BDE S3; david.w.fittipoldi.mil@mail.mil ; 215-328-2309
JFHQ-PA POC for EAB Enablers:
image10.png image11.emf
EAB tracker - FY19
XCTC Rotation 19-01 81 SBCT (WA) 8-28JUN19 Yakima, WA
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation 1-149 ARB TX TBD HQ- TBD
Aviation 168 AVN WA TBD lift Company
Engineer 861 ESC ECC RI / TBD TBD need the horizontal capability
Logistics 190 CSSB MTARNG 16 Logistics MSN CMD
Transportation 1158 TC HET WI / TBD SQD Deploy/Redeploy time periods
Transportation 121 TC PAARNG SQD QM CO
Ammunition Spt. 63 OD AC PLT
Maintenance 150 SMC NVARNG wheeled recovery team
JTAC/ALO 7ID JBLM TBD Aready requested thru 7ID
HICON 7ID JBLM TBD HICON and interrogators- already requested thru 7ID
BCT POC: MAJ Cooper; S3; Office 253-512-7970; william.c.cooper32.mil@mail.mil
JFHQ-WA POC for EAB Enablers: MAJ Suyat, JFHQ XCTC POC; Phone 253-512-7647; adam.s.suyat.mil@mail.mil
XCTC Rotation 19-02 2/28 IBCT (PA) 10JUN-1JUL19 Ft Pickett, VA
Function Unit State Pax POC Days Above Statutory Required Notes
BCT POC: CPT Ladisic, S3 Training Officer. Office 724-223-4570 X 130. BB 717-943-4612
JFHQ-PA POC for EAB Enablers:
XCTC Rotation 19-03 2/34 IBCT (IA) 13JUL-2AUG19 Cp Ripley, MN
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation 1-147 AVN REG WI MC; UH-60 and LUH-72 (19JUL-2AUG)
DET 1/ B/2-211 GSAB (-) MN CH-47 (17-31 JUL)
B/2-211 GSAB (-) IA CH-47 (13-27 JUL)
Sustainment 185 CSSB IA CSSB (-) MC Sustainment
Engineer 831 CO (Horizontal) IA 15 CM/S: 3x Blade Teams
833 CO (Sapper) IA M: 2-3 Sapper Platoons
Mission Command JFHQ-IA IA 108 EXDIR and HICON CMD/Staff
White Cell JFHQ-IA IA
JVB JFHQ-IA IA
LFX JFHQ-IA IA
Medical JASR JFHQ-IA IA Cantonment patient holding/transportation
Transportation 224th TRANS CO MN 140 6 Commodity/Troop/OPFOR Movement (13JUL-2AUG) (6 days pending funding)
Not Confirmed
Protection CBRN 48th CHEM BDE AC 16 RECON
Protection CBRN 48th CHEM BDE AC 20 DECON
Protection MP TBD Wide Area Security/Detainee OPS
Fires 1-151 FA (-) MN Replicate Reinforcing Fires
BCT POC: CPT Ruden BCT AS3; Cell 712-898-2211; Work 515-432-3108 ext 17811; jonathan.j.ruden.mil@mail.mil
JFHQ-IA POC for EAB Enablers: MAJ Gledhill; JFHQ-IA: Cell 515-321-6941; Work 515-252-4392; jared.a.gledhill.mil@mail.mil
XCTC Rotation 19-04 116 IBCT (VA) 13JUL-2AUG19 Ft Pickett, VA
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation 2-224th AVN VA 250 CPT Ryan Strait (S3) 6
Sustainment 731 CSSB AL 15 MAJ Brian Spivey (XO) 6 Sel. PAX to fill CSSB HQ
Mobility / Counter-mob 1036 Sapper Co AR 30 CPT Walter Rau (Tng Off) 6 Fill gaps for 229 BEB
Survivability 843 EN Co LA 70 CPT Gordon Hanson (Tng Off) 6 Would need LOE equipment from VA MATES or Line-haul
Mission Command 29th ID VA 15 LTC Edward Lewis (G3) 6
TACP - ANG 118th ASOS NC 12 Capt Devin Rockel 6 Limited availability due to NTC rotation
| Sustainment | 1231 TC | MO | 100 | 1LT Jonathan Swyres (Tng Off) / | |
| CPT James Fountain | 6 | COA2: Utilize 1173 TC (VAARNG), but won't know until mid-Oct. |
Sustainment 778 SMC AL 20 MAJ Brian Spivey (CSSB XO) 6 Need maint team to support additional Sustain assets
Protection 222 CBRN Co NY 30 CPT Ryan Gonch (BN Tng Off) 6 1x Decon Platoon to facilitate Decon Sites
Protection 233 MP Co IL 25 1LT Erin Speck (Tng Off) 6 1x MP Plt for Armed Escort
Mission Command (Sentinal TM) 29th ID VA 8 LTC Edward Lewis (G3) 6 Air space management
Survivability 843 EN Co LA 12 CPT Gordon Hanson (Tng Off) 4 Recovery after (clean heavy equipment)
BCT POC: 1LT Andrew Dodson 540-834-9384 andrew.w.dodson2.mil@mail.mil
JFHQ-VA POC for EAB Enablers: 29ID POC for EAB Enablers: LTC Lewis (Awaiting Contact information)
XCTC Rotation 19-05 53 IBCT (FL) 3-23 AUG19 Cp Blanding, FL
Function Unit State Pax POC Days Above Statutory Required Notes
Air Defense A/3-265 ADA FL 80 6
Aviation 1-111 GSAB FL 400 6
256 ASMC FL 40 6
Logistics 1297 CSSB MD 68 6 CSSB HQ
1729 MAINT CO MD 60 6 Subordinate of 1297 CSSB
356th QM FL 93 6
Transportation 144th TC FL 167 6
1087 TC LA 81 6 Trans PLT and CO HQ
TACP 165th ASOS FSGA 6
BCT POC: CPT Demorest, 813-401-4123, stephanie.m.demorest.mil@mail.mil
JFHQ-FL POC for EAB Enablers:
XCTC Rotation 19-06 1-34 ABCT (MN) 6-27SEP19 Ft Hood, TX
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation TBD TBD TBD 6 Require +6 days funding ATK: Support Lanes and CALFEX Lift: AASLT Training MEDEVAC: Lane Training
Signal TBD TBD TBD 6 Require +6 days funding.
Capability to replace C/BEB and their participation in BWFX.
Engineer 374 EN Co (Sapper) CA 75 Reserve Unit
Engineer 211 MAC SD TBD 6 Require +6 days funding
Mission Command JFHQ-MN MN TBD HICON
Transportation PLS Platoon TBD 6 Require +6 days funding.
Commodity Support
Transportation 224 Trans MN TBD 6 Require +6 days funding
Transportation HET Company WI(?) 55 6 HET company; require +6 days funding.
WI expressed interest; not confirmed.
TACP 145 ASOS (ANG) OK TBD 6 Require +6 days funding
BCT POC: MAJ Luke Wright; Office 612-702-6110; lukas.b.wright.mil@mail.mil
JFHQ-MN POC for EAB Enablers:
AYST Rotation 19-01 56 SBCT (PA) 10-31MAY19 Ft Pickett, VA
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation
Sustainment
Engineer
Mission Command
Transportation
Other
BCT POC: MAJ Fittipold; BDE S3; david.w.fittipoldi.mil@mail.mil ; 215-328-2309
JFHQ-PA POC for EAB Enablers:
image12.emf
Microsoft_Excel_Worksheet4.xlsx EAB tracker - FY19
XCTC Rotation 19-01 81 SBCT (WA) 8-28JUN19 Yakima, WA
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation 1-149 ARB TX TBD HQ- TBD
Aviation 168 AVN WA TBD lift Company
Engineer 861 ESC ECC RI / TBD TBD need the horizontal capability
Logistics 190 CSSB MTARNG 16 Logistics MSN CMD
Transportation 1158 TC HET WI / TBD SQD Deploy/Redeploy time periods
Transportation 121 TC PAARNG SQD QM CO
Ammunition Spt. 63 OD AC PLT
Maintenance 150 SMC NVARNG wheeled recovery team
JTAC/ALO 7ID JBLM TBD Aready requested thru 7ID
HICON 7ID JBLM TBD HICON and interrogators- already requested thru 7ID
BCT POC: MAJ Cooper; S3; Office 253-512-7970; william.c.cooper32.mil@mail.mil
JFHQ-WA POC for EAB Enablers: MAJ Suyat, JFHQ XCTC POC; Phone 253-512-7647; adam.s.suyat.mil@mail.mil
XCTC Rotation 19-02 2/28 IBCT (PA) 10JUN-1JUL19 Ft Pickett, VA
Function Unit State Pax POC Days Above Statutory Required Notes
BCT POC: CPT Ladisic, S3 Training Officer. Office 724-223-4570 X 130. BB 717-943-4612
JFHQ-PA POC for EAB Enablers:
XCTC Rotation 19-03 2/34 IBCT (IA) 13JUL-2AUG19 Cp Ripley, MN
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation 1-147 AVN REG WI MC; UH-60 and LUH-72 (19JUL-2AUG)
DET 1/ B/2-211 GSAB (-) MN CH-47 (17-31 JUL)
B/2-211 GSAB (-) IA CH-47 (13-27 JUL)
Sustainment 185 CSSB IA CSSB (-) MC Sustainment
Engineer 831 CO (Horizontal) IA 15 CM/S: 3x Blade Teams
833 CO (Sapper) IA M: 2-3 Sapper Platoons
Mission Command JFHQ-IA IA 108 EXDIR and HICON CMD/Staff
White Cell JFHQ-IA IA
JVB JFHQ-IA IA
LFX JFHQ-IA IA
Medical JASR JFHQ-IA IA Cantonment patient holding/transportation
Transportation 224th TRANS CO MN 140 6 Commodity/Troop/OPFOR Movement (13JUL-2AUG) (6 days pending funding)
Not Confirmed
Protection CBRN 48th CHEM BDE AC 16 RECON
Protection CBRN 48th CHEM BDE AC 20 DECON
Protection MP TBD Wide Area Security/Detainee OPS
Fires 1-151 FA (-) MN Replicate Reinforcing Fires
BCT POC: CPT Ruden BCT AS3; Cell 712-898-2211; Work 515-432-3108 ext 17811; jonathan.j.ruden.mil@mail.mil
JFHQ-IA POC for EAB Enablers: MAJ Gledhill; JFHQ-IA: Cell 515-321-6941; Work 515-252-4392; jared.a.gledhill.mil@mail.mil
XCTC Rotation 19-04 116 IBCT (VA) 13JUL-2AUG19 Ft Pickett, VA
Function Unit State Pax POC Days Above Statutory Required Notes
Aviation 2-224th AVN VA 250 CPT Ryan Strait (S3) 6
Sustainment 731 CSSB AL 15 MAJ Brian Spivey (XO) 6 Sel. PAX to fill CSSB HQ
Mobility / Counter-mob 1036 Sapper Co AR 30 CPT Walter Rau (Tng Off) 6 Fill gaps for 229 BEB
Survivability 843 EN Co LA 70 CPT Gordon Hanson (Tng Off) 6 Would need LOE equipment from VA MATES or Line-haul
Mission Command 29th ID VA 15 LTC Edward Lewis (G3) 6
TACP - ANG 118th ASOS NC 12 Capt Devin Rockel 6 Limited availability due to NTC rotation
| Sustainment | 1231 TC | MO | 100 | 1LT Jonathan Swyres (Tng Off) / | |
| CPT James Fountain | 6 | COA2: Utilize 1173 TC (VAARNG), but won't know until mid-Oct. |
Sustainment 778 SMC AL 20 MAJ Brian Spivey (CSSB XO) 6 Need maint team to support additional Sustain assets
Protection 222 CBRN Co NY 30 CPT Ryan Gonch (BN Tng Off) 6 1x Decon Platoon to facilitate Decon Sites
Protection 233 MP Co IL 25 1LT Erin Speck (Tng Off) 6 1x MP Plt for Armed Escort
Mission Command (Sentinal TM) 29th ID VA 8 LTC Edward Lewis (G3) 6 Air space management
Survi…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .