Attachment 17 Industry Questions & Government Responses Part II
View the file
Other files
Show 40 more
Latest 50 of 65 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Post RFP Release Q&A
| No# | Date submitted | Reference Section | Question or Discussion | Gov Response | Notes |
| 1 | 8/21/17 | L-Volume VI | Request elimination of the requirement for small business participation plans from small businesses, IAW Small Business Act (15 U.S.C. 637(d)) as implemented by FAR 19.702(b)(1)? |
RECOMMENDED ACTION: Addition of new para. 5.2.6.1.1, reading “Small business contractors are exempted from the requirements of section 5.2.6.1, IAW FAR 19.702(b)(1).”
| SECTION OF RFP: Paragraph 5.2.6.1(p. 32) | The Government will not eliminate the requirement for a Small Business Participation Plan. Offerors should ensure to refresh their understanding of the difference between a small business participation plan and small business subcontracting plan. | |||
| 2 | 8/21/17 | SECTION OF RFP: 4.1.4 | Can exceptions be made at the TO level to the requirement that all contract employees must read, write, speak, and understand English? We can envision situations where, for example, hiring Local National life support personnel (e.g., cooks, housekeepers, drivers) would be cost effective and in the best interest of the Government. The requirement for English fluency would be unnecessary and costly for such low-level support positions. |
RECOMMENDED ACTION: Add language to At the TO level, the Contracting Officer may authorize hiring Local National or Third-Country National personnel without English fluency to fulfill non-operational functions (e.g., cooks, cleaners).
| When appropriate, exceptions to speaking, reading, writing or understanding English will be made at the TO level and will be identified in the TORFP. | |||
| 3 | 8/21/17 | I-171(c) (p. 70) | Should the total period of performance a base of 5 years and one possible extension of 5 years, or a total of 120 months? |
| RECOMMENDED CHANGE: Change “60 months” to “120 months.” | You are correct. I-171 should read, "(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 120 months. | |||
| 4 | 8/21/17 | Section L (D)(1)(b)(ii) at p. 132 | Can the 12-month overseas Prior Performance “entry gate” criterion for small business prime offerors be eliminated? |
Reference: “Entry Gate Criteria” in paragraph L-19 D1(b)(ii) at p. 132.
Recommendation: Contractor requests the last sentence of the above-referenced “Entry Gate Criteria” subparagraph be deleted, allowing small businesses to meet the entire entry-gate requirement for 24 months of overseas rotary-wing CLS experience through selection of appropriate subcontractor teammates. Discussion posted in the Notes column. No. The Government gave careful consideration in establishing the Entry Gate criteria and believe OCONUS experience performed by the prime offeror to be important to the success of TO performance. NOTE: This experience could be obtained by an offeror while performing as either a prime, JV partner, or subcontractor on a previous acquisition over the past five years. Discussion: After examining the applicable small business market space, under the current terms of this draft RFP it seems unlikely the “Rule of Two” will be satisfied by two responsible and responsive small businesses in this NAICS category satisfying both the CONUS AND the OCONUS minimum requirement at the prime level without a joint venture. As a result, the small business opportunity in this Request for Proposals appears to be rendered de facto nonexistent.
It has been U.S. Government policy for 60 years to maximize opportunities for small business participation in all procurements. 15 U.S. Code § 631 states:
It is the declared policy of the Congress that the Government should aid, counsel, assist, and protect, insofar as is possible, the interests of small-business concerns in order to preserve free competitive enterprise, to insure that a fair proportion of the total purchases and contracts or subcontracts for property and services for the Government (including but not limited to contracts or subcontracts for maintenance, repair, and construction) be placed with small-business enterprises, to insure that a fair proportion of the total sales of Government property be made to such enterprises, and to maintain and strengthen the overall economy of the Nation. (emphasis added) In implementing the public policy established in 15 U.S. Code § 631, federal agencies have adopted the so-called “Rule of Two” when determining whether a procurement should be set aside for award to small businesses wholly or partially. The Rule of Two is set out in FAR 19.502-2(b):
The contracting officer shall set aside any acquisition over $100,000 for small business participation when there is a reasonable expectation that, (1) offers will be obtained from at least two responsible small business concerns… and, (2) award will be made at fair market prices. Total small business set-asides shall not be made unless such a reasonable expectation exists.
In addition, when considering multiple awards, Contracting Officers are required to consider whether the requirement is severable into multiple lots. If so, as is the case with this Request for Proposals, the Contracting Officer is required to make maximum use of small business capacity. FAR 19.502-3(b)(2).
The U.S. Supreme Court recently affirmed that all federal agencies must allow small business set asides if the Rule of Two is reasonably satisfied regardless of the type of contract, including multiple-award contract vehicles. Kingdomware Technologies, Inc. v. United States, No. 14-916 (2016).
The “entry gate” criteria in the Draft RFP include a minimum requirement for all offerors—large or small—to have, in addition to CONUS experience of the same duration:
OCONUS CLS Experience: Prime Offeror and proposed Key Subcontractors together must reflect a minimum of 24 months of performance within the last five years of CLS experience performed outside of the United States and its territories (e.g. Guam, the Northern Marianas, US Virgin Islands, Puerto Rico, and America Samoa). At least 12 of the 24 months of experience must be performed by the Prime Offeror. (emphasis added) Because of this requirement, contractor’s market research shows that it is reasonably unlikely the Government will receive responsible and responsive offers from two qualified small businesses.
It is this contractor’s belief this requirement is overly restrictive in the context of the services sought by the Government. FAR 11.002(a)(1)(ii) requires Contracting Officers to “only include restrictive provisions or conditions to the extent necessary to satisfy the needs of the agency or as authorized by law.” Although the Draft RFP contemplates performance anywhere in the world, requiring this level of OCONUS experience unduly penalizes small businesses without providing a clear benefit to the Government in that the requirement paints with too broad a brush. The Government may adequately distinguish between these widely varying locations at the task-order level. This is in keeping with the DoD/AQ Policy letter of 26 Jul 12 that directs making restricted/unrestricted decisions at the order level on IDIQ contracts, thereby allowing appropriate overseas experience levels, if and as required, to be determined on a TO-by-TO basis.
5 8/24/17 L-20.D.(5).c) Completed Section J Attachments as Required Would the Government specify which Section J attachments should be completed and submitted within the contracts volume? It seems the RPP specifies the Section J attachments for each particular volume except this one (i.e., PP, Pricing, SB, and technical crosswalk attachments are mentioned by name to be included within their respective volumes). Here is a list of attachments that are required to be submitted with the proposal and the volume they are to be submitted in as described in Sections L and M of the RFP.
Attachment 2 - Pricing volume (See Section L - Volume IV for further instructions) Attachment 4 - Past Performance volume Attachment 5 - Small Business Participation volume Attachment 6 - Small Business Participation volume Attachment 7 - Contract Documentation volume Attachment 9 - Technical volume Attachment 10 - Pricing volume Attachment 12 - Pricing volume
| 6 | 8/24/17 | L-20.D.(4).(b).ii Task Order Management Plan; Attachment 15, STO PWS paragraph 5.2.5; and L-20.D.(6).b, Small Business Participation Plan (Volume VI) | RFP paragraph L-20.D.(4).(b).ii, Task Order Management Plan, instructs offerors to submit the Small Business Participation Plan (identified in the Sample Task Order [STO] PWS paragraph 5.2.5) IAW L-20.D.(6).b. RFP paragraph L-20.D.(6).b provides the instructions for completion of Volume VI, Small Business Participation, which specifically references the total value of the STO and the extent SB firms are identified in the STO proposal. Is it the Government's intent that Volume VI, Small Business Participation, be accomplished specifically in relation to the STO? | Yes |
| 7 | 8/24/17 | L-20 C.(6) on page 132 of 145 and L-20 D.(6)c. on page 140 of 145 | Whereas the Small Business Participation Plan and the Small Business Subcontracting Plan are both required to be in Volume VI - Small Business Participation (per Section L), whereas the Small Business Subcontracting Plan must respond to all subparagraphs of FAR 52.219-9(d), and whereas a Master Subcontracting Plan may be incorporated by reference, per FAR 52.219-9(f), will the Government exclude the Small Business Subcontracting Plan from the 20-page limit on the volume, or allow the Small Business Subcontracting Plan -- or the Master Subcontracting Plan incorporated into an Individual Subcontracting Plan -- to be provided as an attachment to the volume, as page-count relief? | The Small Business Subcontracting Plan will not count toward the overall page count of Volume VI Small Business Participation. We will include language in Section L to state this. |
| 8 | 8/24/17 | Attachment_10_FFP_Labor_Rate_Table Column J | Will the government please clarify if Terminal Indemnity is to be included in the Differentials/Allowances %, or is it only to be priced at the Task Order Level as an ODC? | Please refer to Note 3 on the "NOTES" tab of Attachment 0010. Offerors should follow its own standard business practices and any other regulatory guidelines to determine which overheads are applicable to a labor rate. |
| 9 | 8/24/17 | W58RGZ15R0166 Page 56 H-17, H.17.1, H.17.2, H.17.3 and Page 137 Section L Volume 4 PART e. Paragraph (iii). | H-17 states that the Service Contract Act is not applicable to any work performed outside the United States. Section L Volume 4 PART e. Paragraph (iii), states, “Pursuant to the Service Contract Labor Standards (SCLS) (formerly known as the Service Contract Act of 1965), the determination by the Secretary of Labor as to the applicable minimum monetary wage and fringe benefits will be made part of any resulting contract and task orders for work performed within the United States. The offeror shall map the RFP specified labor categories to the appropriate SCLS Wage Determination categories. The offeror's mapping shall be provided in Attachment 0010- FFP Contract Labor Rate Table. Further, offerors shall attach the applicable Wage Determination to their proposal.” |
| Since the Base ID/IQ contract wages are to be based upon Afghanistan and Iraq laws, should the wages used be exempt from SCLS? No wage determination exists for Afghanistan and Iraq to be mapped to the RFP specified labor categories. Should Wage Determinations instead be applicable only at the Task Order level when the Task Order is located in a CONUS location? | The rates will serve as ceiling rates for all FFP task orders and for O&A and changes to FFP task orders whether employees work CONUS or OCONUS. Therefore, the base rates must meet the minimum wage determination rates to be in compliance with the SCLS in the event that labor performance is CONUS based. | ||||
| 10 | 8/24/17 | Attachment_0010-_FFP_ Labor_Rate_Table and W58RGZ15R0166 Section H-13.1 | The labor rate table lists several project management positions that could be classified as indirect or direct employees such as “Contracts Manager” and “Program Manager”. These are positions that may not normally be located at an OCONUS location as a full time position would not be required for these titles in most contracts. Do the ceiling rates apply to any employee who works on the program as CONUS support, or must the cost of CONUS support employees be included in the fully burdened ceiling rates effectively making CONUS support employees indirectly billed. | The ceiling rates apply to all employees directly charging to the Task Order, CONUS or OCONUS. | |
| 11 | 8/24/17 | Attachment_14_TORP_Letter_STO & Attachment_15_STO_PWS 5.1.5 | Attachment 14 states a 90 day Transition in paragraph 4. 5.1.5 of Attachment 15 states a 60 day Transition. Will the Government please clarify the Period of Performance the offeror is to use for Transition? | The transition period will be updated to reflect 90 days in the STO PWS. | |
| 12 | 8/24/17 | Attachment_14_TORP_Letter_STO Paragraph 4 | The referenced paragraph states an anticipated award date of the fourth quarter of 2019. Will the government please provide a start date for the STO for consistency among offerors and subcontractors? Is the offeror to assume a January 1, 2020 start date? | For the STO, the offer shall assume a start date of 1 December 2018. | |
| 13 | 8/24/17 | Attachment 15 STO PWS paragraph 4.2.1.1.1, 4.2.1.1.2, and 5.2.5, 5.6.2. | The STO PWS lists flight hours and quantity of aircraft, but provides no further information on maintenance requirements for the aircraft included in the STO. No workload data such as Maintenance Man-Hours per Flight Hour, monthly utilization, daily launch cycles or other required data points for determining the full maintenance requirements has been provided. Additionally, there are multiple sites listed, and manpower will be divided among them, but there is insufficient information to determine how many aircraft are at each location or what the site staffing requirements will be. Will the government provide additional information to enable staffing analysis, or shall the contractor make stated assumptions when developing fully staffed organizational charts as required in paragraph 5.2.5 Task Order Management Plan (TOMP). | Offerors need to make stated assumptions in completing the Contract Management Plan, Task Order Management Plan, and Risk Management Plan. |
Additional information/clarification has been provided in Attachment 0015 in paragraphs 5.1.5 and 5.2.5.2. Also, Appendix E has been included as a part of Attachment 0015 describing the aircraft density. A separate aircraft configuration will not be provided.
14 8/24/17 Section C - Description/Specification/Work Statement Section 5.2.6.1.1 Small Business Subcontracting Plan. The IDIQ Section C 5.2.6.1.1, Small Business Subcontracting Plan, contains the small business (SB) goals for the overall program. The Sample Task Order (STO) PWS, however, does not specifically identify SB goals for this STO. Is it the Government's intent that the SB goals specified in the IDIQ PWS (paragraph C.5.2.6.1.1) apply to the offeror's STO plan for small business participation as provided in Volume VI? The Small Business Goals listed in the PWS are the Army's Goals, and should not be misconstrued as required goals for the specific Tasks in the Solicitation.
There are no specific goals for the sample tasks so as to drive competition among bidders. Offerors are requested to submit their competitive small business participation goals for evaluation.
15 8/25/17 L-20 Can you clarify the deadline for the receipt of questions?
Section L-20 Instruction to Offerors – A. Solicitation Points of Contact says “All questions shall be submitted in writing via e-mail to the POC's below no later than1600 hours on the 15th calendar day following release of RFP”.
| However C. PROPOSAL PREPARATION AND FORMAT INSTRUCTIONS within the same section (L-20) says “e. If an offeror believes that any part of this solicitation contains errors, omissions, or ambiguities, the offeror shall notify the Contracting Officer in writing with supporting rationale no later than 10 calendar days after solicitation release.” | Questions, IAW Instructions to Offerors, are due electronically by 5 September 2017. Notification of solicitation errors, omissions, or ambiguities, IAW PROPOSAL PREPARATION AND FORMAT INSTRUCTIONS, were due 28 August 2017. | ||||
| 16 | 8/28/17 | Overall | How was the ceiling value estimate was determined? | The ceiling value was calculated through an internal Government estimate of all known potential customers flying rotary wing aircraft classified as non-standard. | |
| 17 | 8/29/17 | Overall | K-7 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS JAN/2017 |
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 488190.
(2) The small business size standard is $32,500,000.00.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
Question:
1. Because the WLSS-C is a Services contract and the IDIQ or STO PWS are not requesting that the Offeror provide a product, is the size limitation a dollar value or an employee size standard for this contract?
2. If the dollar value is strictly enforced, Will your office consider a waiver for the size to either of these thresholds in the restricted pool due to the period performance?
3. [Will the Government give] consideration of the complexities and austere environments this work will be performed in when placing the dollar thresholds for small business[?] 1. The size limitation is based off of the dollar value specified in paragraph (2).
2. Small Business size standards are set by the Small Business Administration. The Government will not allow for a waiver of the size standard for this NAICS.
3. FAR 19.102 (b) and paragraph (1) states, "Small business size standards are applied by --
(1) Classifying the product or service being acquired in the industry whose definition, as found in the North American Industry Classification System (NAICS) Manual (available at http://www.census.gov/eos/www/naics/ ), best describes the principal nature of the product or service being acquired;
Consideration was given to the principal nature of the service being acquired. Small Business size standards are set by the Small Business Administration.
| 18 | 8/29/17 | Attachment 14 and Section L | Per attachment 14, "In accordance with the instructions at Section L and evaluation criteria in Section M, a Firm-Fixed Price Sample Task Order (STO) Proposal is requested for the Contractor Logistics Support (CLS) services identified in the STO Performance Work Statement, Section J Attachment 15." however, no instructions were provided in Section L with regard of how to price the STO. Please provide detailed instructions pertaining to the pricing requirements of the sample task order. | Attachment 0014 contains the pricing detail which states, "Proposal costs will be captured in Attachment 0005..." Section L-20 paragraph D(6)b. contains information regarding the volume in which the attachment is to be provided. | |
| 19 | 8/29/17 | Attachment 14 TORP Letter STO; Section M 2-a-3 | Per attachment 14, offerors are required to complete attachment 5 based on the total price of the STO, however per section M, "the sample task order will not be evaluated for price". How can the Government evaluate the Sub Contractor Participation Plan based on Total price of the STO, without evaluating the price of the STO? | The price factor will be evaluated IAW M-2E.(3) et seq. The Small Business Participation factor will be evaluated IAW M-2E.(4) et. seq. | |
| 20 | 8/29/17 | Attachment 14 and Attachment 5 | Per Attachment 14 TORP Letter STO, Offerors are required to price the STO and to populate Attachment 5 with the total value. Must offerors develop a BOE for the Labor, parts and materials for the STO in order to complete this pricing requirement? If so, suggest the Government provide an additional 30 day extension and additional historical staffing levels and parts/materials usage by region. | Offerors must make their own determination as to what must be completed in order to price the STO. The Government has not requested that offerors provide BOEs for the labor, parts and materials for the STO with its proposal. | |
| 21 | 8/29/17 | L20-D-2-4-e-iii | Per this section: "The place(s) of performance will be determined and based on the task order requirements and may include Government sites and/or contractor sites. The place of performance may be CONUS, OCONUS, or a combination of CONUS and OCONUS locations to support requirements throughout the world. The Task Order RFP (TORFP)shall identify the place(s) of performance for the task order." and "Pursuant to the Service Contract Labor Standards (SCLS) (formerly known as the Service Contract Act of 1965), the determination by the Secretary of Labor as to the applicable minimum monetary wage and fringe benefits will be made part of any resulting contract and task orders for work performed within the United States. The offeror shall map the RFP specified labor categories to the appropriate SCLS Wage Determination categories. The offeror's mapping shall be provided in Attachment 0010-FFP Contract Labor Rate Table. Further, offerors shall attach the applicable Wage Determination to their proposal." How are offerors to determine the appropriate wage determination for attachment 10 if the Government can not articulate which locations are applicable? Please provide a list of likely CONUS locations. | If an offeror anticipates any work to be performed CONUS in support of a future TO, and the labor category performing the work has a corresponding SCLS minimum wage rate, the offeror shall provide the SCLS rate from the location from which it will be performed. A good example or baseline would be the STO PWS at Attachment 0015 | |
| 22 | 8/29/17 | Attachment 5 | Please confirm that offerors are required to populate/calculate attachment 5 based on the total price of the STO over FIVE YEARS and nothing else. | Offerors are required to complete Attachment 0005 in its entirety based off of the STO. Nothing more. | |
| 23 | 8/29/17 | Draft RFP Q&A Dated 8/21/2017 | Per Draft RFP Q&A Dated 8/21/2017: "No separate RFP or pricing template will be provided for the STO. All dollar values associated with the STO will be captured in Attachment 0005, entitled, "Utilization of Small Business and Small Disadvantaged Business". The Government has provided a CLIN breakout in Attachment 0014 entitled, "TORFP Letter for STO", to assist in the overall pricing of the STO for the Small Business Participation Plan breakout dollar value. | ||
| See Section M-2 A.(3)" Industry slides indicated that Attachment 11 would be used by offerors to price task orders. Why isn't the Government providing this attachment if it will be used as the basis of evaluating tats orders upon a ID/IQ Contract Awards? | Any industry slides or DRAFT RFPs were notional only. Proposals shall be submitted IAW the final RFP guidance only. The Government didn't provide Attachment 0011 from earlier DRAFT RFPs or industry days because it isn't taking that approach to selecting contractors for each of the two pools. | ||||
| 24 | 8/29/17 | Attachment 10 | Attachment 10 requires offerors to enter one Wage Determination Rate and then to apply one set of burdened rates to each labor category. The offerors are required to add allowances for work in Iraq and Afghanistan Most companies will use a different fringe rate for an LCAT for CONUS vs OCONUS. In most cases the OCONUS hourly rate will be higher than the CONUS one. However, the OCUNS work week is 60 hours vs 40. So it is possible in some cases that the CONUS rate would b higher. In addition, it is generally considered inappropriate to base OCUNUS compensation on CONUS wages. Ideally, these wages should be based on recent OCONUS market data. Suggest Government require bidders to supply separate ceiling rates for CONUS and OCONUS work. | Wage Determination minimums should be applied to those labor categories in Attachment 0010 that; |
1) are subject to wage determination; and
2) the offeror proposes to utilize CONUS in performance of any future TO.
NOTE: A good representative of future work is the STO PWS, Attachment 0015.
The Government will not change the requirement. The requirement to provide one set of ceiling rates for the 75 labor categories in Attachment 0010 will remain.
| 25 | 8/29/17 | Attachment 10 | Attachment 10 only allows offers to provide one set of ceiling rates per labor category for the entire 5 year base period. Shall offerors include escalation in their ceiling rates through year five? | Each of the first 10 years are broken out in Attachment 0010 from row 1 to row 3056. All offerors should ensure it has downloaded the latest Attachment 0010 with the formal RFP. | |
| 26 | 8/29/17 | Section K, page 119 | Government provided Q&A; PWS 5.2.6.1.2 requires the contractor to pay small business subcontractors within 15 days of receiving the subcontractors invoice; however, FAR 52.232-40, Providing Accelerated Payments to Small Business Subcontractors, is contained in the final FRP. This clause clearly states that accelerated payments shall only be made to small business upon receipt of accelerated payments from the Government. As the PWS langauge doesn't provide for accelerated payments from the Government to the Prime contractror, it would appear that the FAR clause and the PWS language are in conflict. Question: will the Govnerment revise the PWS language to recognize FAR 52.232-40? | In reading OMB Memorandum M-12-16, Providing Prompt Payment to Small Business Subcontractors (and as extended by OMB Memoranda M-13-15 and M-14-10) the Government doesn't see how 5.2.6.1.2 is in conflict with the prompt payment clause 52.232-40. The OMB Memoranda set out a goal for agencies to pay small businesses within 15 days of receipt of relevant documents and prime contractors to pay their small business subcontractors in a prompt fashion. The PWS language sets out further clarification that prime contractors are required to pay their subcontractors within 15 days of receipt of an invoice. | |
| 27 | 8/29/17 | Section K | This section included FAR 52.222-57, Regarding Compliance with Labor Laws (Executive Order 13673). In March 2017 Congress enacted a bill which the President signed which prohibited the implementation of the Fair Pay and Safe Workplaces rule. This was done by means of a Congressional Review Act ("CRA") resolution. (See, e.g., https://www.pscouncil.org/News2/NewsReleases/2017/PSC_Applauds_Senate_Passage_of_Fair_Pay_Rule_CRA.aspx). This means the EO on Fair Play and Safe Workplaces, and the corresponding FAR clause (FAR 52.222-57), are no longer valid. | ||
| The agency therefore cannot include the FAR clause (52.222-57) in the Solicitation for WLSS-C, contingently or otherwise, because to do so would violate the CRA, an act of Congress. Moreover, because the Rule was invalidated pursuant to the CRA, 5 U.S.C. §§ 801 et seq., agencies are prohibited from promulgating future regulations in “substantially the same form” as the disapproved rule, absent express congressional authorization. Based on this, will the Government remove this FAR clause from the final RFP? | FAR 52.222-57 is currently referenced as part of FAR 52.204-8. The Government is aware of both the federal court injunction that prohibits the enforcement of the provision and the subsequent Congressional action. As a result, the Government has no intention of attempting to enforce FAR 52.222-57. However, FAR 52.204-8 is still a required provision, and in light of the Administration's review of all federal regulations, there have been no amendments to the FAR (including FAR 52.204-8) since January 19, 2017. Until an appropriate deviation from the FAR is approved or until a new version of FAR 52.204-8 is approved in accordance with 41 U.S.C. § 1707, the Government cannot remove FAR 52.204-8 from the solicitation. | ||||
| 28 | 8/30/17 | Section L L-20.D.(3).a.(ii).(a).S7 Section 7 | “Offeror shall complete Part I of the Past Performance Risk Assessment Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the past/current contract.” |
Issue: Form fields are missing for some of the requested sections and can’t be filled in. Other form fields are too small for the required information.
| Can the Offeror modify the Questionnaire to accommodate our responses and responses of our POCs? | The Quesionnaire will be modified and provided with Amendment 0002 to the solicitation. | ||||
| 29 | 8/30/17 | Section C, IDIQ PWS paragraph 5.2.3 and TO PWS 5.2.5. | The IDIQ PWS 5.2.3 asks for "processes, events, and milestones critical to the execution of the TO. The STO PWS 5.2.5 asks for process, events, and milestones critical to the execution of the Program. | ||
| Did these two requirements get reversed, meaning the IDIQ reference is asking about the Program, and the STO PWS is asking about the TO? | No. Both requirements directs all offeror's to provide a Management approach for TO execution, one from a holistic viewpoint, the other more focused. | ||||
| 30 | 8/30/17 | Attachment 15 STO PWS, paragraph 5.2.4 | Is the Bi-weekly Teleconference requirement for twice a week of every other week? | Every other week | |
| 31 | 8/30/17 | Section B - Schedule and Section H - Special Provisions, specifically, H-12.4 through H-12.8 | CLIN 0010 is for FFP Over & Above. CLIN 0011 is for CNF Over & Above. What are the criteria for determining which CLIN the effort will be performed under? | It will be a determination made by the contracting officer for each TO. | |
| 32 | 8/30/17 | L-20.D.(3).a.(ii).(a).S7 Section 7; L-20.D.(3).a.(ii).(a).S3.i-xiii Section 3; Part I of Attachment 0003; Attachment 0004 | DISCUSSION IN NOTES COLUMN F |
Issue: There is a disconnect between the instructions in Section L and the form fields required in Attachment 0003 and 0004. Each document uses different terminology for the POC titles and it is unclear as to whether these POCs should all be the same.
Can the Government clarify which POCs should receive a Questionnaire (Attachment 0003)?
Are these the same contacts that should be identified in Attachment 0004?
Will the Government update the instructions and Attachment 0003 and 0004 to reflect the same lexicon for all required POCs? Section L-20 states that the offeror should provide one copy of attachment 0003 to the Government contracting activity (the Contracting Officer) and one copy to the technical representative (COR) responsible for the past/current contract.
Yes. These are the same contacts needed in Attachment 0004.
Attachment 0004 will be revised in Amendment 0002 to clarify Point of Contact knowledgeable about the program. DISCUSSION: L-20.D.(3).a.(ii).(a).S7 Section 7: For all contracts identified in Section 3, Summary of Relevant Contract Experience, a Past Performance Risk Assessment Questionnaire using Attachment 0003 and Past Performance Risk Reference Sheet using Attachment 0004 shall be completed and submitted. For Attachment 0003, the Offeror shall complete Part I of the Past Performance Risk Assessment Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the past/current contract (One Point of Contact (POC) and one contract per questionnaire.
L-20.D.(3).a.(ii).(a).S3.i-xiii Section 3: Summary of Relevant Contract Experience.: iii. PCO name, e-mail address, telephone and fax numbers; iv. Government's technical representative/ COR name, e-mail address, telephone and fax numbers; v. Government contract administration activity/cognizant DCAA/DCMA and the Administrative Contracting Officers (ACOs) name, e-mail address, telephone and fax numbers.
Part I of Attachment 0003 Past Performance Risk Assessment Questionnaire: Contracting Officer, Contract Administrator, Customer POC
Attachment 0004 Risk Reference Sheet: Contracting Officer, Point of Contact knowledgeable about the Program, Alternate Point of Contact knowledgeable about the Program 33 L-20.D.(3).a.(ii).(a).S7 Section 7 “Offeror shall complete Part I of the Past Performance Risk Assessment Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the past/current contract.”
Issue: Form fields are missing for some of the requested sections and can’t be filled in. Other form fields are too small for the required information.
| Question: Can the Offeror modify the Questionnaire to accommodate our responses and responses of our POCs? | Form fields were updated as part of Amendment 0001. | |||
| 34 | 8/30/17 | Section L, technical volume, section 4(a), and Section C, PWS 5.2.3 | Multiple portions of the CMP requirements for PWS 5.2.3 a) - h) appear to apply only to a post award CDRL A001 submission or to a TO bid. For example, PWS 5.2.3 (b) is asking for a list of site management personnel. |
| Which paragraphs of PWS 5.2.3 a) - h) does the government wish addressed in the MAIDIQ response | The Offeror shall address all sub-paragraphs of ID/IQ PWS paragraph 5.2.3 in its MA ID/IQ response; 5.2.3a through 5.2.3h, including 5.2.3.1 through 5.2.3.4. | |||
| 35 | 8/30/17 | L-19.D(2).S4.B.ii, Volume II Technical, Section 4: Technical Approach, B. Sample Task Order, (ii) Task Order Management Plan (TOMP); Attachment 0013, Sample Task Order (STO) Performance Work Statement (PWS); L-19.D(6).i, Volume VI Small Business Participation, (i) Small Business Participation Plan | DISCUSSION IN NOTES COLUMN F |
1. Can the Government please clarify what exactly should be included in Volume II under the STO for the Small Business Participation Plan?
2. Can the Government please revise the instructions for Section L for both Volume II under the STO and for Volume VI Small Business Participation Plan? The Small Business Participation Plan identified in the STO PWS paragraph 5.2.5 shall be submitted in accordance with L-20 D (6) b.
There is adequate guidance in the RFP for submission of the Small Business Participation Plan, no revision is needed. It is unclear if the offeror should submit the Small Business Participation Plan in both Volume II and Volume VI.
a. In section L-19.D(2).S4.B.ii the RFP requires the offeror to submit a Task Order Management Plan in accordance with the STO PWS (Att 0013). The STO PWS 5.2.5, Task Order Management Plan, states that the offeror should provide a Small Business Participation plan as part of the TOMP.
b. In section L-19.D(6).i the RFP states that the Small Business Participation Plan required for Volume VI should be completed for the Sample Task Order (STO).
he Government answered part of this question in the initial DRFP round of questions as question #18 released 21 Apr 2017. The Government stated that section L would be updated to accurately reflect where this information should be presented. However, Section L still states to include the Attachment 0005 with the Small Business Participation Plan for the STO.
Additionally, Volume VI, Section L-19.D.(6).b.(iii).(b).i says:
36 8/30/17 STO-PWS Attachment 15 5.8 Training Support/Mentorship The Government states the contractor shall develop and maintain an on-the-job/mentorship training plan that provides continuation of skills and knowledge for Host Nation… In order for the contractor to properly allocate personnel and resources to the training/mentorship program, the number of students, the frequency of traingin, and the types of instruction must be provided.
Please provide the number of students, frequency of training, and types of instruction.
Will the Government provide the required training support packages?
If the Government is not providing the training support packages, will the contractor be required to provide the training support packages?
| The number of Host Nation personnel and their frequency of work is unknown at this time. The Offeror is required to provide an OJT/Mentorship training support proposal. | |||
| 37 | 8/30/17 | STO-PWS Attachment 15 5.6.2 CLS Support Operations and Locations | The Government provides the split-site operations to include Kabul, Kandahar, Mazar-e-Sharif, Jalalabad, and Herat. The Government does not provide the type and quantify of aircraft at each location. |
| Please provide type and quantity of aircraft by location so the contractor can properly allocate resources by location. | See STO PWS Appendix E | |||
| 38 | 8/30/17 | Solicitation H-24 Representative Parts List | Does the Government have an existing RPL by platform? |
If no, how will the Government establish an RPL by platform?
Will future RPLs be task order-specific or platform-specific? No.
RPL's will be defined and provided by TO.
Both.
39 8/30/17 STO-PWS Attachment 15, Appendix C ASL In the Draft Q&A, the Government states the MI-17 and MD-530 ASLs will not be provided, however the Governmnent provided the ASL for the spare parts on the MD-530, and the ASL for POL on the MI-17 platforms. The Government did not provide the MD-530 POL and did not provide the MI-17 spares.
Does the Government expect the contractor to price the quantities as listed in Appendix C?
Will the Government be issuing an MI-17 spare parts ASL, and MD-530 POL ASL for the contractor to price?
On the MI-17 ASL for POL, many of the items are listed three times with the same part number, nomenclature, and quantity; please clarify or confirm this is correct? The ASL's are provided as GFP, all other material support identified by the Offeror to support this effort should be appropriately accounted for in their estimates.
The ASL's for both aircraft have been updated and can be found at Appendix C to the STO PWS.
| 40 | 8/30/17 | RFP:L-20.c.(2) Teaming Agreements | The Government requirement states when creating teaming arrangements, due to possible Organizational Conflicts of Interest and the potential for decreased competition, Prime Offerors are not allowed to participate as a subcontractor/team members with another Prime Offeror in the same pool. If the Prime Offeror is the aircraft OEM, how does the Government want bidders to handle this requirement so other Prime Offerors have access to that OEM for reachback? | Examples of agreements could be either Associate Contractor Agreements or Letters of Commitment. |
| 41 | 8/30/17 | Section J Attachment 0001 Performance Requirements Summary Matrix | In reference to the first Performance Objective to provide responses to Task Order request for proposals (TORFP's), does submitting a no bid for a TORFP meet the requirement of a response in calculating the performance rating? | No. |
| 42 | Volume VI, Section L-20.D.(6).b.(iii).(b).i., page 139 of 145 | This section states “Include copies of all applicable and current SAM records which includes the size assertions for the applicable NAICS code(s). SAM records shall identify certification in specific socio-economic categories and that the SAM registration is not expired.” The print out copies of the SAM records are four pages each, therefore if an offeror has three subcontractors, this requirement takes up 12 pages of the 20 page limitation set forth for Volume VI in the RFP. |
Question A: Will the Government accept the copies of SAM records as an attachment to Volume VI?
| Question B: Will the Government exclude these print outs from the page limitation of Volume VI? | Offerors shall submit SAM records as an attachment to Volume VI. These attachments will not be counted toward the overall page limitation of this volume. | ||
| 43 | Volume VI, Section L-20.D.(6).b.(iii).(b).v, page 140 of 145 | This section states “If possible, submit last three years electronic Subcontracting Reporting System (eSRS) showing evidence of goal attainment or progress toward goal attainment.” For a large business, three years of ISR reports could be well over 30 separate contracts that require ISR reports. These reports are on average four pages a piece. Therefore, to include ISRs for all contracts in the past three years, the page allocation would be near 120 pages. |
Question A: Will the Government accept the copies of ISR records as an attachment to Volume VI?
| Question B: Will the Government exclude these print outs from the page limitation of Volume VI? | Offerors shall only submit eSRS reports on like/similar contracts, not every contract over the last three years. eSRS reports shall be added as an attachment without page limitations. | ||
| 44 | Volume VI, Section L-20.D.(6).c, page 140 of 145 | Per the Question and Answer document that was provide on the Draft RFP, the Government advised to place the Small Business Subcontracting Plan in Volume IV as a separate document from the Small Business Participation Plan. However, the Government did not advise as to whether or not the Small Business Subcontracting Plan was to be included in the Volume VI page limitations of 20 pages. |
Question A: Will the Government accept this plan as an attachment to Volume VI?
| Question B: Will the Government exclude this plan from the page limitations of Volume VI? | The latest Section L-20 states, "The Small Business Subcontracting Plan will not count toward the page limitation of Volume VI. " | ||||
| 45 | 9/5/17 | H-20 "Task Orders Restricted to Small Businsess | Cites that the dollar amount of the TOs to be set aside in the Restricted category will be $15M or less. After reviewing the STO that was provided by the USG, this task exceeds the $15M dollar threshold. Will Small Businesses be evaluated to the same standard as Large Business on this task or does the USG plan on submitting another STO for the Restricted Pool? | Small Businesses will be evaluated to the same standard as Large Business on this task. No separate STO will be provided to the restricted pool. | |
| 46 | 9/5/17 | Attachment 14 paragraph 1 | States that all proposal costs will be captured in Attachment 0005 of the MA IDIQ. However, Attachment 5 provides no place to capture cost by separate CLIN? How is the Offeror supposed to represent costs broken out by CLIN on Attachment 5? | The CLINs were provided for pricing purposes. The Government will not evaluate prices broken out by CLIN, therefore, it doesn't request CLIN prices as part of the proposal. | |
| 47 | 9/5/17 | Reference Question above | Will the USG consider providing the Offeror an Attachment that captures the cost per CLIN on the STO? | The CLINs were provided for pricing purposes. The Government will not evaluate prices broken out by CLIN, therefore, it doesn't request CLIN prices as part of the proposal. | |
| 48 | 9/5/17 | Attachment 5 Section J | On 18 August, the US Government provided industry with its first look at their strategy to evaluate the small business plan and the weight that it carries. The data being evaluated is placed on Attachment 5. However it is not broken into CLINs as being requested on Attachment 14. Will a company that has percentages or workshare in every category be evaluated higher than those that have small businesses performing at least 20% or more work share? | See Section M-2E.(4) et. seq. for how Small Business Participation will be rated. | |
| 49 | 9/5/17 | paragraph 3 of page 27 of RFP | This paragraph cites that key subcontractors are team members that are performing at least 20% workshare. If we have multiple key subcontractors that can perform functional tasks outlined in Section C, does every member that has the potential of being a Key Subcontractor need to submit a Past Performance Exhibit in the Prime Offerors proposal? | Offerors shall base the initial teaming upon the STO estimated value and the workshare of each subcontractor. | |
| 50 | 9/5/17 | Section L.20 Paragraph 3 Past Peformance Section 5 | [This section] states that the offeror shall provide a list of key subcontractors and the dollar value of the work they will perform. How will the Prime know what the dollar value will be when tasks haven’t been awarded against this effort to date? Are we only supposed to put Past Performance Exhibits for team members involved with the STO? | Offerors shall base the dollar value in the Small Business Participation Plan upon the STO PWS at Attachment 0015. |
Yes. Past Performance information shall be provided on proposed team members in performance of the STO.
| 51 | 9/5/17 | Paragraph 3.10 titled Key Subcontractors | [This section] states that any Subcontractors that perform or provide 20 percent or more of the proposed task order labor or material values. Due to the fact that the value of a Multiple Award IDIQ is unknown for all proposed team members because all team members will not be performing work on the STO, are we to provide Past Performance Exhibits for each team mate?. | Offerors shall base the initial teaming upon the STO estimated value and the workshare of each subcontractor. |
| 52 | 9/5/17 | Volume VI Section L | The Offeror shall provide a proposed TOTAL CONTRACT VALUE, not total subcontract value, identify the proposed dollar value and percentage of anticipated awards to small business. All percentages shall use TOTAL CONTRACT VALUE as a baseline. Question. How will a Small Business in the Restricted Category know how many task orders will be awarded to determine the percentage necessary to satisfy this requirement? | These values should be calculated off of the STO. |
| 53 | 9/5/17 | Section L | If the JV has a member with AS9100 certification, does that have to be novated to the JV itself, in order to be qualified to bid the WLSS-C? | No. |
| 54 | 9/5/17 | Section L | Is the pricing associated with the Sample Task Order to be included along with the parts listing for delivery to the client. Is this priced to deliver only to a US exit port? | Pricing shall include delivery to theater. |
| 55 | 9/5/17 | Attachment 0010 | Is there a desired format for the pricing associated with the labor categories? | Format is provided in Attachment 0010 |
| 56 | 9/5/17 | Industry Day WLSS-C and WLSS-D | “This question and answer was provided during the analogue discussion for WWLS-D that recently occurred between USG and Industry in March 2016. Does this guidance still apply in the context of WWLS-CLS? |
Q: Request the USG identify current US Army Recognized Civil or Military Airworthiness Authorities within NATO and outside the Russian Federation (RF) or CIS for the Mi-17/35 aircraft.
| A: The Czech Republic is currently recognized as a military airworthiness authority. Croatia's recognition has expired but could be renewed with a reassessment if required. Pertaining to Civil Airworthiness Authority, no assessments have been performed or recognitions formalized to date | Specific airworthiness requirements will be defined at the TO level. Currently (as of 8 Sep 2017), only the CLS effort supporting the Mi-17 in the country of Afghanistan has a requirement for Airworthiness and it is covered under the Aviation Engineering Directorate (AED) memorandum TN98085A, dated 15 May 13. This memorandum recognizes the Ministry of Defense(s) of: Russian Federation, Czech Republic and the Republic of Croatia. | |||
| 57 | 9/5/15 | Section L Volume V | With respect to Volume V, we have completed an internal review of the entire solicitation and have attempted to comply with the request for completing "Fill-in" clauses. In Volume V, other than the SF-33, and Section K, Certs and Reps, we have not located any additional clauses in any other sections requiring "Fill-in". | |
| Question A: To ensure full compliance, will the Government please identify any other [ ] or fill-ins requiring completion? | The Government reminds all offerors that each offeror is solely responsible for complying with all terms and conditions of the solicitation in order to prepare a well-written proposal, including compliance with all required provisions and clauses. | |||
| 58 | 9/5/15 | Section L.20.D.3.a.5 Subcontracts | The second sentence of Section 5 states "The offeror shall provide a list of key subcontractors and the dollar value of the work they will perform." |
| Is the Government asking the offeror to provide the dollar value of the work the key subcontractor will perform on the IDIQ or the Sample Task Order? It is not possible for the offeror to provide the dollar value of work the key subcontractor will perform on the IDIQ due to the unknown quantity or value of future task orders. | Provide the dollar value of the work the key subcontractor will perform on the Sample Task Order. | |||
| 59 | 9/5/15 | Question and Answer number 13. Attachment 15Attachment 15, sections 5.1.5 and 5.2.5.2. Appendix E | Appendix E identifies aircraft density at primary CS3 locations but does not provide aircraft density at secondary locations (Jalalabad and He'rat). The answer to question 13 states additional information/clarification has been provided in Attachment 15 in paragraphs 5.1.5 and 5.2.5.2. However, Attachment 15 does not provide additional information in the two sections. |
| Please confirm there are no permanent aircraft at the two secondary locations. Attachment 15 also states in section 5.6.2.1 that the contractor shall provide CLS at the primary locations, while providing support of launch, flight, recovery, and maintenance operations at the secondary locations. Please provide the quantity of aircraft the contractor is required to support at the secondary locations to support attachment 15 requirements identified in section 5.6.2.1. | Additional information/clarification has been provided in Attachment 0015 in paragraphs 5.1.5 and 5.2.5.2. Also, Appendix E has been included as a part of Attachment 0015 describing the aircraft density. A separate aircraft configuration will not be provided. |