AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0004 2017MAR15
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
MEAGAN ASKEW
EMAIL: MEAGAN.E.ASKEW.CIV@MAIL.MIL
W58RGZ-15-R-0045
2016MAR04
X
X 2017APR05 02:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 9
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: MEAGAN ASKEW
Buyer Office Symbol/Telephone Number: CCAM-AR-A/(256)876-5146
Type of Contract 1: Firm Fixed Price
Type of Contract 2: Cost Plus Fixed Fee
Kind of Contract: Service Contracts
*** End of Narrative A0000 ***
The purpose of Amendment 0004 of RFP W58RGZ-15-R-0045 is to accomplish the following:
General Changes:________________
1. Formally change the Contracting Officer from Karen L. Fletcher to Jody Byrd.
2. To formally close discussions and request Final Proposal Revisions from offerors included in the competitive range due by 5 April
2017 at 1400 CST. The revisions shall be in writing and the Government intends to make award without obtaining further revisions.
Offerors shall submit one (1) hard copy and one (1) electronic copy to the following address:
Fixed Wing Project Office
Attention: Jody Byrd
650 Discovery Drive
Huntsville, Alabama 35806
3. In accordance with, Section L (paragraph 2.4), the Government requests that offerors' proposals be valid for 210 days after the closing date for FPRs. The first page of the solicitation (block 12 of SF33) should reflect this 210 day proposal validity.
4. At Final Proposal Revision, all proposal pages which have changes shall be submitted on blue paper. The change pages may be labeled with original page number and letter (for example, a change to page 15 may be labeled as "15a"). The Government requires the use of change bars. The change bars shall also reflect the corresponding Evaluation Notice(s) identified on the change pages.
5. Volume I, Technical: The page count limitation has been increased by 60 pages; from 250 pages to 310 pages inclusive of change pages. To be used at the discretion of the offeror.
6. Volume IV, Small Business Participation Plan: The page limitation has been increased by 10 pages; from 25 pages to 35 pages inclusive of change pages. To be used at the discretion of the offeror.
7. All other page count limitations in the solicitation remain the same.
8. The Offeror shall highlight in green any cells with changes in the spreadsheets at Volume II, Price.
9. All Pricing changes in Section B should be reflected in offerors final proposed Volume II, Price.
10. Offerors may submit any questions regarding Amendment 0004 changes by 20 March 2017, 1500 p.m. CST. Questions must be submitted in writing and be related only to the changes in Amendment 0004.
11. Remove "second tier" from paragraph 2 in Attachment 0024, "Section L Narrative", Volume IV Small Business Participation.
Solicitation Section B:_______________________
1. Delete SEMA Phase-Out CLINs: 1016, 2016,3016, 4016, 5016, 6016, 7016, and 8016.
2. Revise SEMA Phase Out CLIN 9016 to include fill-in requirement for each performance period pricing.
3. Delete SEMA Phase-Out Incentive CLINs: 1017, 2017, 3017, 4017, 5017, 6017, 7017, and 8017.
4. Revise SEMA Phase-Out Incentive CLIN 9017 to indicate that total payment not to exceed $1,500,000 regardless of which period of performance Phase-Out occurs.
5. Delete Option to Extend Services CLINs: 1018, 2018, 3018, 4018, 5018, 6018, 7018, and 8018.
6. Revise Option to Extend Services CLIN 9018 to include fill-in requirement for each performance period pricing.
2 9
W58RGZ-15-R-0045 0004
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Solicitation Section I:_______________________
1. Add DFARs Clause 252.232-7007, "Limitation of Government's Obligation".
2. Add FAR Clause 52.222-2, "Payment for Overtime Premiums".
Solicitation Section J:_______________________
Note: All Section J Attachment revisions (identified in Amendment 0004) will be reflected as follows:
*Black Bold and Highlighted in Attachments 0001 and 0002.
*Red Bold in Attachments 0007, 0012, 0022, 0024, 0035, 0037, 0045, 0048, 0050, and 0051.
1. Revise/clarify the following in Attachment 0001, "Performance Work Statement (PWS)":
a) Clarify requirement for storage, preservation, and divestiture of aircraft in PWS Section 3.1.8.
b) Remove references to DoDI Instruction 3020.37 and replace with DoDI Instruction 1100.22 in PWS Section 3.3.1.
c) Remove requirement for the annual inventory to be performed jointly and clarify requirement in PWS Section 4.4.4.
d) Remove travel language from Over and Above sentence found in PWS Section 4.7.11.
e) Revise Transition language in PWS Sections 8.0 and 8.1.5.
2. Remove references to DoDI Instruction 3020.37 and replace with DoDI Instruction 1100.22 in Attachment 0002, "Document Survey List
(CDRLs)".
3. Revise aircraft types, quantities, and locations in Attachment 0007, "APP C to SEMA PWS-Acft Type, Qty, and Location".
4. Revise Beddown Base locations and remove Site ID Column in Attachment 0012, "PWS Appendix H: Beddown Base Gov't Facility Support
List".
5. Revise the Partial Mission Capable calculation for reduced payment to reflect for each Aircraft Maintenance Deviation List in
Attachment 0022, "PWS Appendix R: SEMA Aircraft Maintenance Deviation List".
6. Revise the deployed aircraft locations and quantities and cell formula errors in Attachment 0035, "SEMA Labor B1 Matrix".
7. Revise the number of days, beddown base and deployed locations, and travel team assignments in Attachment 0037, "Government
Transition Phase In Schedule".
8. Revise the following in Attachment 0045, "SECTION H NARRATIVE":
a) Revise aircraft models and locations in Section H-26.
b) Revise Section H-28 to add the Partial Mission Capable calculation for reduced payment to reflect for each Aircraft
Maintenance Deviation List.
c) Remove references to DoDI Instruction 3020.37 and replace with DoDI Instruction 1100.22 in Section H-40.
9. Revise the deployed aircraft total count, locations, models, and quantities for Base Year and included a note in Attachment 0048, "Manning Table".
10. Revise aircraft quantities and locations in Attachment 0050, "CLIN X002 Zero Flying Hour-Material".
11. Revise aircraft quantities for CLIN 1003 in Attachment 0051, "CLIN X003 Flying Hour-Material".
Unless otherwise noted herein, all other terms and conditions of the Solicitation W58RGZ-15-R-0045 remain unchanged.
*** END OF NARRATIVE A0005 ***
3 9
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
9016 SEMA - TRANSITION PHASE-OUT OPTION PERIOD 8 3 MO $ ____________________________________________ __________________
SERVICE REQUESTED: TRANSITION PHASE OUT (OP 8)
CLIN CONTRACT TYPE:
Firm Fixed Price
SEMA FLEET LIFE CYCLE SERVICES (FLCS) - GOVERNMENT
TRANSITION PHASE OUT - OPTION PERIOD 8
Firm Fixed Price Transition Phase-Out IAW the
Performance Work Statement and Attachment 0049, "SEMA Government Transition Phase Out Schedule".
The period of performance for CLIN 9016 is Day
276 through Day 365 of option period 8.
This is an incremental Transition Phase-out IAW the PWS and RFP Attachment 0049- "Government
Transition Phase-Out Schedule".
Proposed costs should reflect the contractor's proposed transition costs for phase-out effort and full performance under CLINs 9001, 9002, 9003, and
9005 until each Beddown Base (BB) is fully transitioned out.
This option will be exercised in the 10th month of the current option period.
NOTE: This will be in lieu of funding CLINs 9001, 9002, 9003, and 9005 in months 10,11, and 12 of the current option period.
Offerors should provide a FFP for Phase-Out in the event the Phase-Out option is exercised at the end of the specific periods of performance listed in the fill-ins. ONLY the amount proposed for Option
Period 8 should be included in the "Amount" column for CLIN 9016 Section B.
Base Period
$____________ (Do NOT include in "Amount" column)
Option Period 1
$_____________(Do NOT include in "Amount" column)
Option Period 2
$_____________(Do NOT include in "Amount" column)
Option Period 3
$_____________(Do NOT include in "Amount" column)
Option Period 4
$_____________(Do NOT include in "Amount" column)
Option Period 5
4 9
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
$_____________(Do NOT include in "Amount" column)
Option Period 6
$_____________(Do NOT include in "Amount" column)
Option Period 7
$_____________(Do NOT include in "Amount" column)
Option Period 8
$______________ (INCLUDE in "Amount" column)
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
9017 SEMA PHASE OUT INCENTIVE (OY 8) 1 LO $ _______________________________ __________________
SERVICE REQUESTED: SEMA INCENTIVE PH OUT (OY 9)
CLIN CONTRACT TYPE:
Cost No Fee
SEMA FLEET LIFE CYCLE SERVICES (FLCS) TRANSITION
PHASE OUT - INCENTIVE - OPTION
See Incentive Fee Payment Clause in Section H and
Section J - Attachment 0026 "Incentive Plan".
Total payment not not to exceed $1,500,000, regardless of which period of performance Phase
Out occurs.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
9018 OPTION TO EXTEND SERVICES (IAW FAR 52.217-8) ____________________________________________
OPTION YEAR 8 $ _____________ __________________
SERVICE REQUESTED: OPTION TO EXTEND SERVICES
FIXED WING - SPECIAL ELECTRONIC MISSION AIRCRAFT
5 9
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(SEMA)
The Contractor shall propose a Firm Fixed Price for the Option to Extend Services CLIN (IAW FAR
52.217-8, Option to Extend Services).
The option will be priced at the Service Contract
Labor Standards rates in effect when the option is exercised. The rate will be the monthly rate of the current year of performance under CLIN
X001 times six.
Section L, Price Volume/Factor, provides pricing
Instructions to Offerors.
Offerors should provide a FFP for Option to
Extend Services CLIN (IAW 52.217-8, Option to
Extend Services) in the event the Option to
Extend Services is exercised at the end of a specific period of performance listed below.
Base Period
$___________(Do NOT include in the Amount column)
Option One
$___________(Do NOT include in the Amount column)
Option Two
$___________(Do NOT include in the Amount column)
Option Three
$___________(Do NOT include in the Amount column)
Option Four
$___________(Do NOT include in the Amount column)
Option Five
$___________(Do NOT include in the Amount column)
Option Six
$___________(Do NOT include in the Amount column)
Option Seven
$___________(Do NOT include in the Amount column)
Option Eight
$____________(INCLUDE in the Amount column)
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
6 9
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
I-1 CHANGED 52.222-2 PAYMENT FOR OVERTIME PREMIUMS JUL/1990
(a) The use of overtime is authorized under this contract if the overtime premium does not exceed $0.00 or the overtime premium is paid for work --
(1) Necessary to cope with emergencies such as those resulting from accidents, natural disasters, breakdowns of production equipment, or occasional production bottlenecks of a sporadic nature;
(2) By indirect-labor employees such as those performing duties in connection with administration, protection, transportation, maintenance, standby plant protection, operation of utilities, or accounting;
(3) To perform tests, industrial processes, laboratory procedures, loading or unloading of transportation conveyances, and operations in flight or afloat that are continuous in nature and cannot reasonably be interrupted or completed otherwise; or
(4) That will result in lower overall costs to the Government.
(b) Any request for estimated overtime premiums that exceeds the amount specified above shall include all estimated overtime for contract completion and shall --
(1) Identify the work unit; e.g., department or section in which the requested overtime will be used, together with present workload, staffing, and other data of the affected unit sufficient to permit the Contracting Officer to evaluate the necessity for the overtime;
(2) Demonstrate the effect that denial of the request will have on the contract delivery or performance schedule;
(3) Identify the extent to which approval of overtime would affect the performance or payments in connection with other Government contracts, together with identification of each affected contract; and
(4) Provide reasons why the required work cannot be performed by using multishift operations or by employing additional personnel.
(End of Clause)
I-2 CHANGED 252.232-7007 LIMITATION OF GOVERNMENT'S OBLIGATION APR/2014
(a) Contract line item(s) -1- is/are incrementally funded. For this/these item(s), the sum of $ -2- of the total price is presently available for payment and allotted to this contract. An allotment schedule is set forth in paragraph (j) of this clause.
(b) For item(s) identified in paragraph (a) of this clause, the Contractor agrees to perform up to the point at which the total amount payable by the Government, including reimbursement in the event of termination of those item(s) for the Governments convenience, approximates the total amount currently allotted to the contract. The Contractor is not authorized to continue work on those item(s) beyond that point. The Government will not be obligated in any event to reimburse the Contractor in excess of the amount allotted to the contract for those item(s) regardless of anything to the contrary in the clause entitled Termination for Convenience of the Government.
As used in this clause, the total amount payable by the Government in the event of termination of applicable contract line item(s) for convenience includes costs, profit, and estimated termination settlement costs for those item(s).
(c) Notwithstanding the dates specified in the allotment schedule in paragraph (j) of this clause, the Contractor will notify the
Contracting Officer in writing at least ninety days prior to the date when, in the Contractors best judgment, the work will reach the point at which the total amount payable by the Government, including any cost for termination for convenience, will approximate 85 percent of the total amount then allotted to the contract for performance of the applicable item(s). The notification will state (1) the estimated date when that point will be reached and (2) an estimate of additional funding, if any, needed to continue performance of applicable line items up to the next scheduled date for allotment of funds identified in paragraph (j) of this clause, or to a mutually agreed upon substitute date. The notification will also advise the Contracting Officer of the estimated amount of additional funds that will be required for the timely performance of the item(s) funded pursuant to this clause, for a subsequent period as may be specified in the allotment schedule in paragraph (j) of this clause or otherwise agreed to by the parties. If after such notification additional funds are not allotted by the date identified in the Contractors notification, or by an agreed substitute date, the Contracting Officer will terminate any item(s) for which additional funds have not been allotted, pursuant to the clause of this contract entitled
Termination for Convenience of the Government.
(d) When additional funds are allotted for continued performance of the contract line item(s) identified in paragraph (a) of this clause, the parties will agree as to the period of contract performance which will be covered by the funds. The provisions of paragraphs
(b) through (d) of this clause will apply in like manner to the additional allotted funds and agreed substitute date, and the contract will be modified accordingly.
(e) If, solely by reason of failure of the Government to allot additional funds, by the dates indicated below, in amounts sufficient for timely performance of the contract line item(s) identified in paragraph (a) of this clause, the Contractor incurs additional costs or is delayed in the performance of the work under this contract and if additional funds are allotted, an equitable adjustment will be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of the item(s), or in the time of delivery, or both. Failure to agree to any such equitable adjustment hereunder will be a dispute concerning a question of fact within the meaning of the clause entitled Disputes.
(f) The Government may at any time prior to termination allot additional funds for the performance of the contract line item(s)
7 9
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
identified in paragraph (a) of this clause.
(g) The termination provisions of this clause do not limit the rights of the Government under the clause entitled Default. The provisions of this clause are limited to the work and allotment of funds for the contract line item(s) set forth in paragraph (a) of this clause. This clause no longer applies once the contract is fully funded except with regard to the rights or obligations of the parties concerning equitable adjustments negotiated under paragraphs (d) and (e) of this clause.
(h) Nothing in this clause affects the right of the Government to terminate this contract pursuant to the clause of this contract entitled Termination for Convenience of the Government.
(i) Nothing in this clause shall be construed as authorization of voluntary services whose acceptance is otherwise prohibited under 31
U.S.C. 1342.
(j) The parties contemplate that the Government will allot funds to this contract in accordance with the following schedule:
On execution of contract $-3-
(End of clause)
8 9
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION J - LIST OF ATTACHMENTS
List of Number List of Number
Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________
Attachment 0001 SEMA CLS PERFORMANCE WORK STATEMENT (PWS), REV II 19-JAN-2017 049 EMAIL
Attachment 0002 SEMA CLS DOCUMENT SUMMART LIST (CDRLS) REV II 19-MAY-2016 009 EMAIL
Attachment 0007 PWS APPENDIX C AIRCRAFT TYPE QUANTITY AND SITE LOCATION REV 13-MAY-2016 003 EMAIL
III
Attachment 0012 PWS APPENDIX H BEDDOWN BASE GOVT FACILITY SUPPORT LIST REV 25-FEB-2016 001 EMAIL
I
Attachment 0022 PWS APPENDIX R SEMA AIRCRAFT MAINTENANCE DEVIATION LISTS 18-AUG-2015 077 EMAIL
REV I
Attachment 0035 SEMA B1 MATRIX- BASE SUPPORT LABOR REV II 09-JUN-2016 009 EMAIL
Attachment 0037 SEMA GOVERNMENT TRANSITION PHASE IN SCHEDULE REV III 19-JAN-2017 002 EMAIL
Attachment 0045 SECTION H NARRATIVE REV III 19-JAN-2017 058 EMAIL
Attachment 0048 MANNING TABLE REV II 03-MAY-2016 007 EMAIL
Attachment 0050 CLIN X002 ZERO FLYING HOUR-MATERIAL REV III 09-JUN-2016 009 EMAIL
Attachment 0051 CLIN X003 FLYING HOUR- MATERIAL REV III 09-JUN-2016 009 EMAIL
9 9
MOD/AMD
ATT/EXH ID
PAGE
Attachment 0001
W58RGZ-15-R-0045
| SECTION A |
| SECTION B |
| SECTION I |
| SECTION J |
W58RGZ-15-R-0045 Attachment 0002 REV 02 08 March 2017
DOCUMENT SUMMARY LIST (DSL)
for the
US Army Special Electronics Mission Aircraft (SEMA) Fixed Wing Life Cycle Services
1. Contractors are encouraged to offer suggestions, comments, or alternatives to the documents cited herein. Tailoring, category of application, revision levels, and the documents cited are all candidates.
2. Definition of Document Categories
a. Category 0 (Cat. 0). The requirements contained in the directly cited document are non-mandatory and are for reference or information only.
b. Category 1 (Cat. 1). The requirements contained in the directly cited document are contractually applicable to the extent specified. All requirements contained in reference and subsequently referenced documents are contractually for information only unless otherwise specified in the solicitation, contract, or contract modification.
c. Category 2 (Cat. 2). The requirements contained in the directly cited document are contractually applicable to the extent specified. All requirements contained in referenced documents are also imposed to the extent specified. All requirements contained in subsequently referenced documents are contractually for information only unless otherwise specified in the solicitation, contract or contract modification.
CDRL # DID # Title DID Date/ Category
A001 DI-MGMT-81837/T Mobilization Plan 22 Aug 11 Contingency Operations Planning CAT 1
Tailoring is delineated as the following:
2.1.b Delete “vessel of opportunity (VOO)”
A002 DI-MISC-81419 Personnel Report 14 Nov 94 Contractor Employee Census Report CAT 1
A003 DI-MGMT-81834A/T Contractor’s Personnel Roster 18 Jan 13
CAT 1
2.1 j Delete Physical Work Location – Base Name
2.1 m Delete Physical Work Location – Building Number
2.1 n Delete Physical Work Location – Room Number
A004 DI-MGMT-81468 Contract Funds Status Report 19 Oct 95
(CFSR) CAT 1
A005 DI-MGMT-81334D Contract Work Breakdown Structure 18 May 11
A006 DI-FNCL-81565C Cost Data Summary Report 18 May 11 (DD Form 1921) CAT 1 Contractor Cost Data Reporting (CCDR)
A007 DI-FNCL-81992 Sustainment Functional Cost-Hour Report 21 Sep 15 (DD Form 1921-5) CAT 1 Contractor Cost Data Reporting (CCDR)
A008 DI-FNCL-81765B Contractor Business Data Report 18 May 11 (DD Form 1921-3) CAT 1
A009 DI-SAFT-81626 System Safety Program Plan (SSPP) 01 Aug 01
A010 DI-SAFT-81563 Accident/Incident Report 09 Jun 14 Class A, B and C CAT 1
A011 DI-SAFT-81563 Accident/Incident Report 09 Jun 14 Other Accident/Incident Reports CAT 1
A012 DI-SAFT-81563/T Accident/Incident Report 09 Jun 14 Information Assurance/Cybersecurity CAT 1 Incident Report
2(g) Delete Casualties 2(h) Delete Estimated property damage, if applicable 2(k) Delete Other damage or injuries sustained 3(c) Delete Production lot number(s)
A013 DI-MGMT-81398C Hazardous Materials Management 19 Jun 14 Program (HMMP) Plan CAT 1
A014 DI-MISC-81397C Hazardous Materials Management 19 Jun 14 Program (HMMP) Report CAT 1
A015 DI-MGMT-81948 Diminishing Manufacturing Sources 18 Sep 13 And Material Shortages (DMSMS) CAT 1 Management Plan
A016 DI-MGMT-81941 Obsolescence Alert Notice 27 Aug 13
A017 DI-SESS-81656/T Source Data for Forecasting 9 May 05 Diminishing Manufacturing Sources CAT 1 and Material Shortages (DMSMS) DMSMS Forecast
1. Delete Format
A018 DI-MGMT-80259 Physical Inventories Report 31 Oct 86 Equipment and Parts Report CAT 1
A019 DI-MFFP-81403 Corrosion Prevention and Control 06 Jun 94 Plan CAT 1
A020 DI-MISC-80508B/T Technical Report – Study/Services 14 Nov 06 Aircraft Induction Discrepancies CAT 1
2. (a) Format shall be in contractor format
2. (b) Format shall be in contractor format
A021 DI-MISC-80508B/T Technical Report – Study/Services 14 Nov 06 AC Inspection Maint Records (2408-13-1) CAT 1
2. (a) Delete Format
2. (b) Delete Format
A022 DI-MISC-80508B/T Technical Report – Study/Services 14 Nov 06 Engine Trend Monitoring (ETM) Report CAT 1
2. (b) Format shall be in contractor format
A023 DI-FNCL-81116/T Manhour Estimate, Technical Cost 19 Dec 90 Proposals CAT 1
Tailoring is delineated as the following:
10.1.2 Delete
A024 DI-TMSS-80527C Commercial Off-The-Shelf (COTS) 12 Aug 11
Manuals and Associated CAT 1 Supplemental Data FW TM Library
A025 DI-MISC-81241 Airworthiness Directives/Service 11 Oct 91 Bulletins/Advisory Data CAT 1
A026 DI-MISC-81241 Airworthiness Directives/Service 11 Oct 91 Bulletins/Advisory Data CAT 1 Contractor Generated Bulletins
A027 DI-SESS-81768 Airworthiness Certification Criteria 18 May 09 Report CAT 1 Substantiation Data
A028 DI-MGMT-81910 Repair Procedure 20 May 13 Non-Standard Repairs CAT 1
A029 DI-SESS-81704/T Test Plans/Test Procedures 22 Nov 06 Airworthiness Test and Evaluation CAT 1
3.3.10.2 Delete “Air Force”
A030 DI-NDTI-80809B Test/Inspection Report 24 Jan 97 Airworthiness Test and Evaluation CAT 1
A031 DI-SESS-80858C Supplier’s Configuration Management 30 Sep 00 Plan CAT 1
A032 DI-SESS-81253B Configuration Status Accounting 07 Apr 15 (CSA) Information CAT 1
A033 DI-SESS-80640D Request for Variance (RFV) 07 Apr 15
A034 DI-MGMT-81453A Data Accession List (DAL) 18 Jul 12
CAT 1
A035 DI-MISC-80508B/T Technical Report – Study/Services 14 Nov 06 Data Accession List (DAL) Delivery CAT 1
A036 DI-QCIC-81794 Quality Assurance Program Plan 01 Oct 14
A037 DI-ALSS-81534 Teardown Deficiency Report 24 Jan 97 Component or System CAT 1
A038 DI-SESS-81613A Reliability and Maintainability (R&M) 15 Jul 14 Program Plan CAT 1
A039 DI-SESS-81315B Failure Analysis and Corrective 28 Mar 12 Action Report (FACAR) CAT 1
A040 DI-SESS-81497A Reliability and Maintainability 19 Dec 14 Predictions Report CAT 1
A041 DI-SESS-80639D Engineering Change Proposal (ECP) 07 APR 15
A042 DI-SESS-80642D Notice of Revision (NOR) 07 APR 15
A043 DI-MGMT-81945/T Phase-Out Transition Plan 16 Sep 13
2.a. Delete “sixty (60)”
A044 DI-QCIC-80736 Quality Deficiency Report 17 Jan 89
A045 DI-MISC-80508B/T Technical Report – Study/Services 14 Nov 06 Government Flight Rep (GFR) CAT 1
Tailoring is delineated as the following:
A046 DI-SESS-81785A Systems Engineering Management 29 Sep 15 Plan (SEMP) CAT 2
Document Number
Document Title Document
Date
ANSI/EIA-649-B Configuration Management Standard 1 Apr 11
AR 25-2 Information Assurance 23 Mar 09
AR 381-12
Threat Awareness and Reporting Program
(TARP)
4 Oct 10
AR 385-10 The Army Safety Program 27 Nov 13
AR 420-1 Army Facilities Management 12 Feb 08
AR 530-1 Operations Security 26 Sep 14
AR 600-55
The Army Driver and Operation Standardization Program (Selection, Training, and Licensing)
18 Jun 07
AR 70-62
Airworthiness Qualification of Aircraft Systems
21 May 07
AR 750-59
Corrosion Prevention and Control for Army Materiel
19 Mar 14
AR 750-6
Army Equipment Safety and Maintenance Notification System
21 Dec 10
AR 95-1 Flight Regulations 11 Mar 14
AR 95-20 Contractor`s Flight and Ground Operations 21 Aug 13
Army Directive 2014-05
Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors
7 Mar 14
AS9100C
Quality Management Systems - Requirements for Aviation, Space and Defense Organizations
15 Jan 09
AS9110B
Quality Management Systems – Requirements for Aviation Maintenance Organizations
1 Apr 12
ASTM D 3951
Standard Practice for Commercial Packaging
15 Aug 10
DA PAM 385-40
Army Accident Investigations and Reporting
18 Mar 15
DA PAM 738-751
Functional Users Manual for the Army Maintenance Management System-- Aviation
28 Feb 14
DLM 4000.25-1
Change 4
Military Standard Requisitioning and Issue Procedures (MILSTRIP)
18 Jul 14
DoD 5220.22-M National Industrial Security Program Operating Manual (NISPOM)
28 Mar 13
DOD SD-22
Diminishing Manufacturing Sources and Material Shortages
1 Feb 15
CAT 0
DoDD 8570.01 Information Assurance (IA) Training, Certification, and Workforce Management
15 Aug 04
DoDD 8570.01-M Information Assurance Workforce Improvement Program
24 Jan 12
DoDI 1100.22 Policy and Procedures for Determining Workforce Mix
12 Apr 10
DoDI 5000.67 Prevention and Mitigation of Corrosion on DOD Military Equipment and Infrastructure
1 Feb 10
DoDI 8500.01 Cybersecurity 14 Mar 14
DoDI 8582.01 Security of Unclassified DOD Information On Non-DOD Information Systems
6 Jun 12 aaron.kelly3
Highlight
FAA AC 21-29C
Detecting and Reporting Suspected Unapproved Parts Including Changes 1 and 2
22 Jul 08
FAA AC 43.13-1B
Acceptable Methods, Techniques and Practices – Aircraft Inspection and Repair
8 Sep 98
FAA Reg Part
Repair Stations
FAA Reg Part 145.221
Service Difficulty Reports
FAA Reg Part 21 Certification Procedures for Products and Parts
FAA Reg Part 43 Maintenance, Preventive Maintenance, Rebuilding, and Alteration
FAA Reg Part 65 Certification: Airmen other than Flight Crewmembers
FAA Reg Part 91 General Operating and Flight Rules CAT 1
GEIA-STD-0009
Reliability Program Standard for Systems Design, Development, and Manufacturing
20 Aug 09
GEIA-STD-0016
Standard for Preparing a DMSMS Management Plan
14 Feb 12
MIL-HDBK-61A Configuration Management Guidance 7 Feb 01
MIL-STD-129R Military Marking for Shipment and Storage 18 Feb 14
MIL-STD-130N
Identification Marking of U.S. Military Property
16 Nov 12
MIL-STD-882E Standard Practice System Safety 11 May 12
NAS 411 Rev 3 Hazardous Materials Management Program
30 Sep 13
NIST SP 800-53
Rev 4
Security and Privacy Controls for Federal Information Systems and Organizations
Apr 13
NIST SP 800-88 Guidelines for Media Sanitization
TB 43-0211
Army Oil Analysis Program (AOAP) Guide for Leaders and Users
30 Apr 10
TM 55-1500-342-
Army Aviation Engineering Manual Weight and Balance
30 Sep 11
TM 55-1500-344-
Aircraft Weapons System Cleaning and Corrosion Control
1 Mar 05
Joint Travel Regulations Uniformed Service Members and DOD Civilian Employees
1 Nov 14
Cost Assessment and Program Evaluation (CAPE) Operating and Support Cost Estimating Guide
14 Mar 15
Federal Information Systems Management Act (FISMA) of 2002
DOD Corrosion Prevention and Control Planning Guidebook
FW PO Corrosion Prevention and Control Plan
CLIN 1002
CLIN 1002 Region State City Base Model Aircraft QTY Per Acft Per Month Unit Price Monthly Total (Column G X the A/C quantity in column F) Annual Zero Hour Price (Column HX9)
CONUS Fixed Sites
AZ
Fort Huachuca
MC-12S 4 $ - 0
RC-12X 3 $ - 0 $ - 0
B300 2 $ - 0 $ - 0
TOTAL $ - 0
CA
Sacramento
RC-12X 2 $ - 0 $ - 0
TOTAL $ - 0
GA
Hunter AAF
MC-12S 10 $ - 0 $ - 0
TOTAL $ - 0
WV
FWAATS, Bridgeport
C-12R 1 $ - 0 $ - 0
TOTAL $ - 0
NJ
Lakehurst
RC-12N 2 $ - 0 $ - 0
RC-12D 3 $ - 0 $ - 0
B300 0 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Bliss
RO-6A 6 $ - 0 $ - 0
TO-5C 1 $ - 0 $ - 0
EO-5C 4 $ - 0 $ - 0
RC-12X 7 $ - 0 $ - 0
C-12U 3 $ - 0 $ - 0
Model 300 7 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Hood
MC-12S 10 $ - 0 $ - 0
TOTAL $ - 0
OCONUS Fixed Sites
Korea
Camp Humpreys
EO-5C 3 $ - 0 $ - 0
RC-12X 7 $ - 0 $ - 0
TOTAL $ - 0
CUMULATIVE TOTAL 75 $ - 0
&"Arial,Bold"CLIN 1002- SEMA AIRCRAFT
&"Arial,Bold"BASE PERIOD
ATTACHMENT 050 &KFF0000REV3 3/8/2017&K000000
ZERO FLYING HOUR
SECTION B - CLIN 1002 MATERIAL PRICES
&"Arial,Bold"W5RGZ-15-R-0045
CLIN 2002
CLIN 2002 Region State City Base Model Aircraft QTY Per Acft Per Month Unit Price Monthly Total (Column G X the A/C quantity in column F) Annual Zero Hour Price (Column HX12)
CONUS Fixed Sites
AZ
Fort Huachuca
MC-12S 4 $ - 0 $ - 0
RC-12X 3 $ - 0 $ - 0
TOTAL $ - 0
GA
Hunter AAF
MC-12S 10 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Bliss
RO-6A 6 $ - 0 $ - 0
TO-5C 1 $ - 0 $ - 0
EO-5C 2 $ - 0 $ - 0
RC-12X 8 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Hood
MC-12S 10 $ - 0 $ - 0
TOTAL $ - 0
OCONUS Fixed Sites
Korea
Camp Humpreys
EO-5C 3 $ - 0 $ - 0
RC-12X 8 $ - 0 $ - 0
TOTAL $ - 0
CUMULATIVE TOTAL 55 $ - 0
&"Arial,Bold"CLIN 2002- SEMA, AIRCRAFT&"Arial,Regular" &"Arial,Bold"OPTION PERIOD 1
ATTACHMENT 050&KFF0000 REV3 3/8/2017&K000000
ZERO FLYING HOUR
SECTION B - CLIN 2002 MATERIAL PRICES W58RGZ-15-R-0045
CLIN 3002
CLIN 3002 Region State City Base Model Aircraft QTY Per Acft Per Month Unit Price Monthly Total (Column G X the A/C quantity in column F) Annual Zero Hour Price (Column HX12)
CONUS Fixed Sites
AZ
Fort Huachuca
MC-12S 4 $ - 0 $ - 0
RC-12X 3 $ - 0 $ - 0
TOTAL $ - 0
GA
Hunter AAF
MC-12S 10 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Bliss
RO-6A 6 $ - 0 $ - 0
TO-5C 1 $ - 0 $ - 0
EO-5C 1 $ - 0 $ - 0
RC-12X 8 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Hood
MC-12S 10 $ - 0 $ - 0
$ - 0
OCONUS Fixed Sites
Korea
Camp Humpreys
EO-5C 3 $ - 0 $ - 0
RC-12X 8 $ - 0 $ - 0
TOTAL $ - 0
CUMULATIVE TOTAL 54 $ - 0
&"Arial,Bold"
CLIN 3002-SEMA AIRCRAFT
&"Arial,Bold"OPTION PERIOD 2
ATTACHMENT 050 &KFF0000REV3 3/8/2017&K000000
SECTION B - CLIN 3002 MATERIAL PRICES W58RGZ-15-R-0045
CLIN 4002
CLIN 4002 Region State City Base Model Aircraft QTY Per Acft Per Month Unit Price Monthly Total (Column G X the A/C quantity in column F) Annual Zero Hour Price (Column HX12)
CONUS Fixed Sites
AZ
Fort Huachuca
MC-12S 4 $ - 0 $ - 0
RC-12X 3 $ - 0 $ - 0
TOTAL $ - 0
GA
Hunter AAF
MC-12S 10 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Bliss
RO-6A 6 $ - 0 $ - 0
EO-5C 1 $ - 0 $ - 0
RC-12X 8 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Hood
MC-12S 10 $ - 0 $ - 0
TOTAL $ - 0
OCONUS Fixed Sites
Korea
Camp Humpreys
EO-5C 3 $ - 0 $ - 0
RO-6A 1 $ - 0 $ - 0
RC-12X 8 $ - 0 $ - 0
TOTAL $ - 0
CUMULATIVE TOTAL 54 $ - 0
&"Arial,Bold"CLIN 4002- SEMA AIRCRAFT&"Arial,Regular" &"Arial,Bold"BASE PERIOD 3
ATTACHMENT 050 &KFF0000REV3 3/8/2017&K000000
SECTION B - CLIN 4002 MATERIAL PRICES W58RGZ-15-R-0045
CLIN 5002
CLIN5002 Region State City Base Model Aircraft QTY Per Acft Per Month Unit Price Monthly Total (Column G X the A/C quantity in column F) Annual Zero Hour Price (Column HX12)
CONUS Fixed Sites
AZ
Fort Huachuca
MC-12S 4 $ - 0 $ - 0
RC-12X 3 $ - 0 $ - 0
TOTAL $ - 0
GA
Hunter AAF
MC-12S 10 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Bliss
RO-6A 6 $ - 0 $ - 0
EO-5C 1 $ - 0 $ - 0
RC-12X 8 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Hood
MC-12S 10 $ - 0 $ - 0
TOTAL $ - 0
OCONUS Fixed Sites
Korea
Camp Humpreys
EO-5C 2 $ - 0 $ - 0
RO-6A 2 $ - 0 $ - 0
RC-12X 8 $ - 0 $ - 0
TOTAL $ - 0
CUMULATIVE TOTAL 54 $ - 0
&"Arial,Bold"CLIN 5002- SEMA AIRCRAFT &"Arial,Bold"OPTION PERIOD 4
ATTACHMENT 050 &KFF0000REV3 3/8/2017&K000000
SECTION B - CLIN 5002 MATERIAL PRICES W58RGZ-15-R-0045
CLIN 6002
CLIN 6002 Region State City Base Model Aircraft QTY Per Acft Per Month Unit Price Monthly Total (Column G X the A/C quantity in column F) Annual Zero Hour Price (Column HX12)
CONUS Fixed Sites
AZ
Fort Huachuca
MC-12S 4 $ - 0 $ - 0
RC-12X 3 $ - 0 $ - 0
TOTAL $ - 0
GA
Hunter AAF
MC-12S 10 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Bliss
RO-6A 6 $ - 0 $ - 0
RC-12X 8 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Hood
MC-12S 10 $ - 0 $ - 0
TOTAL $ - 0
OCONUS Fixed Sites
Korea
Camp Humpreys
RO-6A 3 $ - 0 $ - 0
RC-12X 8 $ - 0 $ - 0
TOTAL $ - 0
CUMULATIVE TOTAL 52 $ - 0
&"Arial,Bold"CLIN 6002- SEMA AIRCRAFT &"Arial,Bold"OPTION PERIOD 5
ATTACHMENT 050 &KFF0000REV3 3/8/2017&K000000
SECTION B - CLIN 6002 MATERIAL PRICES W58RGZ-15-R-0045
CLIN 7002
CLIN 7002 Region State City Base Model Aircraft QTY Per Acft Per Month Unit Price Monthly Total (Column G X the A/C quantity in column F) Annual Zero Hour Price (Column HX12)
CONUS Fixed Sites
AZ
Fort Huachuca
MC-12S 4 $ - 0 $ - 0
RC-12X 3 $ - 0 $ - 0
TOTAL $ - 0
GA
Hunter AAF
MC-12S 10 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Bliss
RO-6A 6 $ - 0 $ - 0
RC-12X 8 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Hood
MC-12S 10 $ - 0 $ - 0
TOTAL $ - 0
OCONUS Fixed Sites
Korea
Camp Humpreys
RO-6A 3 $ - 0 $ - 0
RC-12X 8 $ - 0 $ - 0
TOTAL $ - 0
CUMULATIVE TOTAL 52 $ - 0
&"Arial,Bold"CLIN 7002- SEMA AIRCRAFT &"Arial,Bold"OPTION PERIOD 6
ATTACHMENT 050 &KFF0000REV3 3/8/2017&K000000
SECTION B - CLIN 7002 MATERIAL PRICES W58RGZ-15-R-0045
CLIN 8002
CLIN 8002 Region State City Base Model Aircraft QTY Per Acft Per Month Unit Price Monthly Total (Column G X the A/C quantity in column F) Annual Zero Hour Price (Column HX12)
CONUS Fixed Sites
AZ
Fort Huachuca
MC-12S 4 $ - 0 $ - 0
RC-12X 3 $ - 0 $ - 0
TOTAL $ - 0
GA
Hunter AAF
MC-12S 10 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Bliss
RO-6A 6 $ - 0 $ - 0
RC-12X 8 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Hood
MC-12S 10 $ - 0 $ - 0
TOTAL $ - 0
OCONUS Fixed Sites
Korea
Camp Humpreys
RO-6A 3 $ - 0 $ - 0
RC-12X 8 $ - 0 $ - 0
TOTAL $ - 0
CUMULATIVE TOTAL 52 $ - 0
&"Arial,Bold"CLIN 8002-SEMA AIRCRAFT &"Arial,Bold"OPTION PERIOD 7
ATTACHMENT 050 &KFF0000REV3 3/8/2017&K000000
SECTION B - CLIN 8002 MATERIAL PRICES W58RGZ-15-R-0045
CLIN 9002
CLIN 9002 Region State City Base Model Aircraft QTY Per Acft Per Month Unit Price Monthly Total (Column G X the A/C quantity in column F) Annual Zero Hour Price (Column HX9)
CONUS Fixed Sites
AZ
Fort Huachuca
MC-12S 4 $ - 0 $ - 0
RC-12X 3 $ - 0 $ - 0
TOTAL $ - 0
GA
Hunter AAF
MC-12S 10 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Bliss
RO-6A 6 $ - 0 $ - 0
RC-12X 8 $ - 0 $ - 0
TOTAL $ - 0
TX
Fort Hood
MC-12S 10 $ - 0 $ - 0
TOTAL $ - 0
OCONUS Fixed Sites
Korea
Camp Humpreys
RO-6A 3 $ - 0 $ - 0
RC-12X 8 $ - 0 $ - 0
TOTAL $ - 0
CUMULATIVE TOTAL 52 $ - 0
&"Arial,Bold"CLIN 9002- SEMA AIRCRAFT &"Arial,Bold"OPTION PERIOD 8
ATTACHMENT 050 &KFF0000REV3 3/8/2017&K000000
SECTION B - CLIN 9002 MATERIAL PRICES W58RGZ-15-R-0045
Sheet1
FIXED SITES
Region State/ Country/ AOR City/ Site Model Tail # Aircraft # User Class Note
CONUS Fixed Sites
AZ
Fort Huachuca
B300 1300282 FL-797 A Small
B300 1300283 FL-663 A Small
MC-12S 1100265 FL-731 A Small
MC-12S 1100266 FL-734 A Small
MC-12S 1100267 FL-736 A Small
MC-12S 1100268 FL-738 A Small
RC-12X 8900275 FE-021 A Small
RC-12X 8900276 FE-022 A Small
RC-12X 9213121 FE-027 A Small
CA
Sacramento
RC-12X 9100516 FE-023 A Small
RC-12X 9100517 FE-024 A Small
GA
Hunter AAF Savannah
MC-12S 1100282 FL-456 A Small
MC-12S 1200278 FL-388 A Small
MC-12S 1200279 FL-416 A Small
MC-12S 1200280 FL-449 A Small
MC-12S 1200281 FL-450 A Small
MC-12S 1100288 FL-751 A Small
MC-12S 1100289 FL-737 A Small
MC-12S 1100283 FL-716 A Small
MC-12S 1100284 FL-757 A Small
MC-12S 1100285 FL-758 A Small
Bush Field Augusta Closed Site A/C Moved to WV
NJ
Lakehurst
RC-12N 8900268 FE-014 A Small
RC-12N 8900269 FE-015 A Small
RC-12D 8023373 BP-014 A Small
RC-12D 8023377 BP-018 A Small
RC-12D 8123452 BP-023 A Small
900642 FL-642 A Small B-300 Removed
900644 FL-644 A Small B-300 Removed
900646 FL-646 A Small B-300 Removed
TX
Fort Bliss
E/TO-5C N34HG 34 A Large
EO-5C N177RA 85 A Large
EO-5C N53993 104 A Large
EO-5C N705GG 48 A Large
EO-5C N765MG 65 A Large
RO-6A 1510332 332 A Large
RO-6A 1510348 348 A Large
RO-6A 1510577 577 A Large
RO-6A 1510338 338 A Large
RO-6A 1510352 352 A Large
RO-6A 1510358 358 A Large
C-12U 8400170 BL-100 A Small
C-12U 8400177 BL-107 A Small
C-12U 8400181 BL-111 A Small
RC-12X 9213120 FE-026 A Small
RC-12X 9213122 FE-028 A Small
RC-12X 9213123 FE-029 A Small
RC-12X 9213125 FE-031 A Small
RC-12X 9300698 FE-033 A Small
RC-12X 9300699 FE-034 A Small
RC-12X 9300701 FE-036 A Small
Model 300 761013 FA-144 A Small
Model 300 761011 FA-152 A Small
Model 300 761012 FA-057 A Small
Model 300 761017 FA-044 A Small
Model 300 761018 FA-217 A Small
761008 FA-147 A Small Model 300 Removed
Model 300 761015 FA-177 A Small
Model 300 761016 FA-090 A Small
Ft. Hood
MC-12S 800329 FL-329 A Small
MC-12S 800336 FL-336 A Small
MC-12S 800376 FL-376 A Small
MC-12S 1000728 FL-728 A Small
MC-12S 1000729 FL-729 A Small
MC-12S 1000730 FL-730 A Small
MC-12S 1000739 FL-739 A Small
MC-12S 1000742 FL-742 A Small
MC-12S 1100286 FL-780 A Small
MC-12S 1100287 FL-834 A Small
WV
FWAATS - Bridgeport
C-12R 9500100 BW-028 A Small Relocated from Bush Field, Augusta, GA
OCONUS Fixed Sites
KOREA
Camp Humphrey’s
EO-5C N158CL 58 A Large
EO-5C N59AG 59 A Large
EO-5C N89068 88 A Large
RC-12X 9300700 FE-035 A Small
RC-12X 8800325 FE-010 A Small
RC-12X 8900273 FE-019 A Small
RC-12X 8900274 FE-020 A Small
RC-12X 9100518 FE-025 A Small
RC-12X 9213124 FE-030 A Small
RC-12X 9300697 FE-032 A Small
Total Acft 75
DEPLOYED AIRCRAFT
Region AOR Site Model Tail # Aircraft # User Class Note
USACENTCOM
Site 1
Model 300 761011 FA-152 A Small Assigned above
Model 300 761012 FA-057 A Small Assigned above
Model 300 761017 FA-044 A Small Assigned above
RTB * Model 300 761018 FA-217 A Small Assigned Above
MC-12S 1100285 FL-758 A Small Assigned above
MC-12S 1100286 FL-780 A Small Assigned above
B300 1300282 FL-797 A Small Assigned above
RO-6A 1510352 352 A Large Assigned above
RC-12X 8900274 FE-020 A Small Assigned above
RC-12X 9213120 FE-026 A Small Assigned above
RC-12X 9300698 FE-033 A Small Assigned above
RC-12X 9300701 FE-036 A Small Assigned above
Site 2
Off Contract Model 300 761008 FA-147 A Small Removed
Model 300 761015 FA-177 A Small Assigned above
Model 300 761016 FA-090 A Small Assigned above
RTB * MC-12S 1100284 FL-757 A Small Assigned above
RTB * MC-12S 1100288 FL-751 A Small Assigned above
RTB * MC-12S 1200278 FL-388 A Small Assigned above
RTB * MC-12S 1200281 FL-450 A Small Assigned above
USASOUTHCOM
Site 3
C-12U 8400177 BL-107 A Small Assigned above
MC-12S 1100265 FL-731 A Small Assigned above
Site 4
EO-5C N705GG 48 A Large Assigned above
USAAFRICOM
Site 5
EO-5C N765MG 65 A Large Assigned above
Site 6
MC-12S 1100266 FL-734 A Small Assigned above
MC-12S 1100267 FL-736 A Small Assigned above
*Aircraft returned to Beddown Base from deployed location
Note: Aircraft tail numbers, quantities and locations may change prior to and after contract award. The locations, quantities, and tail numbers in this Appendix are accurate as of the date of this revision.
&"Arial,Regular"Appendix C To SEMA PWS &"Arial,Bold"Attachment 0007, SEMA Aircraft Quantity Type and Location &KFF0000REV3 3/8/2017 &"Arial,Regular"W58RGZ-15-R-0045
&P
CLIN 1003
CLIN 1003 AIRCRAFT MODEL UNIT PRICE (per F/H) PROGRAM MONTHLY F/H (per acft) TOTAL (column C x D)= AIRCRAFT QUANTITY TOTAL (column E x F)= ANNUAL TOTAL PER A/C MODEL (column G x 9 months)= CUMULATIVE CLIN 1003 TOTAL ALL MODELS BASE PERIOD
MC-12S 71 $ - 0 24 $ - 0 $ - 0
RC-12D 50 $ - 0 3 $ - 0 $ - 0
RC-12N 50 $ - 0 2 $ - 0 $ - 0
RC-12X 50 $ - 0 19 $ - 0 $ - 0
EO-5C 90 $ - 0 7 $ - 0 $ - 0
TO-5C 90 $ - 0 1 $ - 0 $ - 0
RO-6A 90 $ - 0 6 $ - 0 $ - 0
C-12 50 $ - 0 4 $ - 0 $ - 0
B300 50 $ - 0 2 $ - 0 $ - 0
MODEL 300 50 $ - 0 7 $ - 0 $ - 0
CUMULATIVE TOTAL $ - 0
&12CLIN 1003-SEMA AIRCRAFT &"Arial,Bold"&12FLYING HOUR-MAT'L BASE PERIOD
ATTACHMENT 051 &KFF0000REV3 3/9/2017&K000000
SECTION B - CLIN 1003 MATERIAL PRICES &12
CLIN 2003
CLIN 2003 AIRCRAFT MODEL UNIT PRICE (per F/H) PROGRAM MONTHLY F/H (per acft) TOTAL (column C x D)= AIRCRAFT QUANTITY TOTAL (column E x F)= ANNUAL TOTAL PER A/C MODEL (column G x 12 months)= CUMULATIVE CLIN 2003 TOTAL ALL MODELS OPTION PERIOD
MC-12S 71 $ - 0 24 $ - 0 $ - 0
RC-12X 50 $ - 0 19 $ - 0 $ - 0
EO-5C 90 $ - 0 5 $ - 0 $ - 0
TO-5C 90 $ - 0 1 $ - 0 $ - 0
RO-6A 90 $ - 0 6 $ - 0 $ - 0
CUMULATIVE TOTAL $ - 0
&12CLIN 2003-SEMA AIRCRAFT &"Arial,Bold"&12&K000000FLYING HOUR-MAT'L OPTION PERIOD 1
SECTION B - CLIN 2003 MATERIAL PRCES &12
CLIN 3003
CLIN 3003 AIRCRAFT MODEL UNIT PRICE (per F/H) PROGRAM MONTHLY F/H (per acft) TOTAL (column C x D)= AIRCRAFT QUANTITY TOTAL (column E x F)= ANNUAL TOTAL PER A/C MODEL (column G x 12 months)= CUMULATIVE CLIN 3003 TOTAL ALL MODELS OPTION PERIOD
MC-12S 71 $ - 0 24 $ - 0 $ - 0
RC-12X 50 $ - 0 19 $ - 0 $ - 0
EO-5C 90 $ - 0 4 $ - 0 $ - 0
TO-5C 90 $ - 0 1 $ - 0 $ - 0
RO-6A 90 $ - 0 6 $ - 0 $ - 0
CUMULATIVE TOTAL $ - 0
&12CLIN 3003-SEMA AIRCRAFT &"Arial,Bold"&12&K000000FLYING HOUR-MAT'L OPTION PERIOD 2
SECTION B - CLIN 3003 MATERIAL PRICES &12
W5RGZ-15-R-0045
CLIN 4003
CLIN 4003 AIRCRAFT MODEL UNIT PRICE (per F/H) PROGRAM MONTHLY F/H (per acft) TOTAL (column C x D)= AIRCRAFT QUANTITY TOTAL (column E x F)= ANNUAL TOTAL PER A/C MODEL (column G x 12 months)= CUMULATIVE CLIN 3003 TOTAL ALL MODELS OPTION PERIOD
MC-12S 71 $ - 0 24 $ - 0 $ - 0
RC-12X 50 $ - 0 19 $ - 0 $ - 0
EO-5C 90 $ - 0 4 $ - 0 $ - 0
RO-6A 90 $ - 0 7 $ - 0 $ - 0
CUMULATIVE TOTAL $ - 0
&12CLIN 4003-SEMA AIRCRAFT &"Arial,Bold"&12 FLYING HOUR-MAT'L OPTION PERIOD 3
SECTION B - CLIN 3003 MATERIAL PRICES &12
CLIN 5003
CLIN 5003 AIRCRAFT MODEL UNIT PRICE (per F/H) PROGRAM MONTHLY F/H (per acft) TOTAL (column C x D)= AIRCRAFT QUANTITY TOTAL (column E x F)= ANNUAL TOTAL PER A/C MODEL (column G x 12 months)= CUMULATIVE CLIN 5003 TOTAL ALL MODELS OPTION PERIOD
MC-12S 71 $ - 0 24 $ - 0 $ - 0
RC-12X 50 $ - 0 19 $ - 0 $ - 0
EO-5C 90 $ - 0 3 $ - 0 $ - 0
RO-6A 90 $ - 0 8 $ - 0 $ - 0
CUMULATIVE TOTAL $ - 0
&12CLIN 5003-SEMA-AIRCRAFT &"Arial,Bold"&12FLYING HOUR-MAT'L OPTION PERIOD 4
SECTION B - CLIN 5003 MATERIAL PRICES
CLIN 6003
CLIN 6003 AIRCRAFT MODEL UNIT PRICE (per F/H) PROGRAM MONTHLY F/H (per acft) TOTAL (column C x D)= AIRCRAFT QUANTITY TOTAL (column E x F)= ANNUAL TOTAL PER A/C MODEL (column G x 12 months)= CUMULATIVE CLIN 6003 TOTAL ALL MODELS OPTION PERIOD
MC-12S 71 $ - 0 24 $ - 0 $ - 0
RC-12X 50 $ - 0 19 $ - 0 $ - 0
RO-6A 90 $ - 0 9 $ - 0 $ - 0
CUMULATIVE TOTAL $ - 0
&12CLIN 6003-SEMA AIRCRAFT &"Arial,Bold"&12FLYING HOUR-MAT'L-OPTION PERIOD 5
SECTION B - CLIN 6003 MATERIAL PRICES &12
CLIN 7003
CLIN 7003 AIRCRAFT MODEL UNIT PRICE (per F/H) PROGRAM MONTHLY F/H (per acft) TOTAL (column C x D)= AIRCRAFT QUANTITY TOTAL (column E x F)= ANNUAL TOTAL PER A/C MODEL (column G x 12 months)= CUMULATIVE CLIN 7003 TOTAL ALL MODELS OPTION PERIOD
MC-12S 71 $ - 0 24 $ - 0 $ - 0
RC-12X 50 $ - 0 19 $ - 0 $ - 0
RO-6A 90 $ - 0 9 $ - 0 $ - 0
CUMULATIVE TOTAL $ - 0
&12CLIN 7003-SEMA AIRCRAFT &"Arial,Bold"&12FLYING HOUR-MAT'L-OPTION PERIOD 6
SECTION B - CLIN 7003 MATERIAL PRICES &12
CLIN 8003
CLIN 8003 AIRCRAFT MODEL UNIT PRICE (per F/H) PROGRAM MONTHLY F/H (per acft) TOTAL (column C x D)= AIRCRAFT QUANTITY TOTAL (column E x F)= ANNUAL TOTAL PER A/C MODEL (column G x 12 months)= CUMULATIVE CLIN 8003 TOTAL ALL MODELS OPTION PERIOD
MC-12S 71 $ - 0 24 $ - 0 $ - 0
RC-12X 50 $ - 0 19 $ - 0 $ - 0
RO-6A 90 $ - 0 9 $ - 0 $ - 0
CUMULATIVE TOTAL $ - 0
&12CLIN 8003-SEMA AIRCRAFT &"Arial,Bold"&12FLYING HOUR-MAT'L-OPTION PERIOD 7
SECTION B - CLIN 8003 MATERIAL PRICES &12
CLIN 9003
CLIN 9003 AIRCRAFT MODEL UNIT PRICE (per F/H) PROGRAM MONTHLY F/H (per acft) TOTAL (column C x D)= AIRCRAFT QUANTITY TOTAL (column E x F)= ANNUAL TOTAL PER A/C MODEL (column G x 9 months)= CUMULATIVE CLIN 9003 TOTAL ALL MODELS OPTION PERIOD
MC-12S 71 $ - 0 24 $ - 0 $ - 0
RC-12X 50 $ - 0 19 $ - 0 $ - 0
RO-6A 90 $ - 0 9 $ - 0 $ - 0
CUMULATIVE TOTAL $ - 0
&12CLIN 9003-SEMA AIRCRAFT &"Arial,Bold"&12FLYING HOUR-MAT'L-OPTION PERIOD 8
SECTION B - CLIN 9003 MATERIAL PRICES &12
Generic list of what the Govt/Unit will be responsible for providing
Attachment 0012, APPENDIX H SEMA Revision 1 3/8/2017 Site Facility Rollup
3/9/2017
Attachment 12 Site Fac Rollup SEMA 2017-03-09.xlsx
Contra ct
Sta te
Sit e
BB POC
POC Em ail
POC Phone
Mail ing A ddress
.m il a va il f or A
CN
".c om" c ommerci all y p rovid ed?
T2C2 Ava ila ble at Deploye d Si te
BB Able to Req Clas s IX
Regt Able to
Req Clas s IX
Hanga r S pac
Offic e Sp ace
Desk, fil ing c ab inets…
Utili tie s
Wash Rack
Engin e W ash Rack
Hanga r E lectr ic P lugs
AC
APO/P
ost
Offic
USG
In ternet A cce ss
Fir e Exti ngu ish ers
Fa cili ty
Main t
Defuelin g S ervi ce
Refuelin g S ervi
Si te Refuse Colle cti on te Se cu rit y P olice & Fi re P sect & Rodent C ontro l
Fa cili tie s M ain tenan
Airfi eld W eath er F orecas tin
Notes
Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No No Hangar Ramp Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No
G ov
Ci vi lia n
U ni st al la tio
Co nt ra ct or ng le P ha se ng le P ha se
Lo ca l P ow er V ol ta ge
Yes No Yes No U
U
SEMA AFRICOM EO5
MAJ Michael Meador Force Mod 204th MI michael.r.meador8.mil@mail.mil
915-744-2082 C 905-270-1052
204th MI BN, ATTN MAJ Michael Meador, 11176 SSG Sims St, Fort Bliss, TX 79918 x x x x x x x x x x x x x x x x x x x x x x x
SEMA AFRICOM MC-12 TBD TBD TBD TBD
SEMA CA Sacramento DAC Kevin Remback DAC Andrew Cline kevin.m.rembach.civ@mail.mil andrew.c.cline3.civ@mail.mil 732-323-2271 x x x x x x x x x x x x x x x x x x x x x x x
SEMA CENTCOM Kandahar CW2 Kevin O'Connor kevin.m.oconnor.mil@mail.mil 318-421-5042
TF ODIN/GRCS,
Kandahar Airfield, APO AE 09355 x x x x x x x x x x x x x x x x x x x x x x x x x x x
SEMA CENTCOM Baghram CW2 Kevin O'Connor kevin.m.oconnor.mil@mail.mil 318-421-5042
TF ODIN/GRCS,
Kandahar…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .