This document contains a federal solicitation and vendor questions and responses related to a water storage distribution system procurement. The U.S. Army Contracting Command-Detroit Arsenal intends to award multiple IDIQ contracts to procure up to 123 water storage distribution systems, including 87 systems with 100,000 gallon capacity and 36 systems with split 50,000 gallon capacity. The systems will provide bulk water storage and distribution capabilities. The solicitation also includes an option for up to 150 spare 350 GPM fluid pumps. Awards will be made to up to five small businesses initially for test articles, with one vendor to be downselected for full production. The resulting IDIQ contracts will have a five-year base and two one-year options and utilize firm fixed pricing. The vendor questions and agency responses provide additional requirements details on material certifications, packaging, and proposal submissions.

View the file

Other files

File Type Posted
Attachment 0010 SESAME.xlsx XLSX spreadsheet
W56HZV21R0011-0003.pdf PDF
W56HZV21R0011-0002.pdf PDF
WSDS VENDOR QA (10 June) (questions 36-90) Final.pdf PDF
Attachment 0009 WSDS FDSC Certified 16 Apr 21.pdf PDF
Attach 0009 WSDS FDSC Certified 16 Apr 21.pdf PDF
Attachment_0042_Pricing_Workbookv2 (4 Jun 21).xlsx XLSX spreadsheet
Attachment_0040_Pricing_Workbookv2 (4 Jun 21).xlsx XLSX spreadsheet
Attachment_0040_Pricing_Workbookv2.xlsx XLSX spreadsheet
Attachment_0042_Pricing_Workbookv2.xlsx XLSX spreadsheet
Notice to Offerors.pdf PDF
WSDS Amendment 0001 6-1-21 - signed.pdf PDF
Attachment 0003 ATPD-2425A WSDS.pdf PDF
Attachment_0040_Pricing_Workbookv2.xlsx XLSX spreadsheet
Attachment_0042_Pricing_Workbookv2.xlsx XLSX spreadsheet
WSDS VENDOR QA (as of 25 May 2021).pdf PDF
ATPD-2425A WSDS.pdf PDF
Instructions as of 25 May 2021.docx DOCX document
WSDS VENDOR QA (as of 10 May 2021).pdf PDF
Attachment 0024-TPG 2016-01 Rev 1 Source Data.pdf PDF
Attachment 0033- Department of Defense Guide to Item Unique Identification Quality Assurance.doc DOC document
Instructions.docx DOCX document
Attachment 0018-DE Style Guide 1-26-18.pdf PDF
Attachment 0009- Failure Definition and Scoring Criteria (FDSC).docx DOCX document
Attachment 0022-TABLE A-VII-NMWR Requirements Matrix.docx DOCX document
Attachment 0020-TABLE A-IV - TM Requirements Matrix -23.docx DOCX document
Attachment 0035- MOS Operator and Maintenance Tasks 92W-91J.docx DOCX document
Copy of Attachment 0040 - Pricing Workbook revised 4 20 2021.xlsx XLSX spreadsheet
Attachment 0021-TABLE A-VI - TM Requirements Matrix -23P RPSTL.DOCX DOCX document
Copy of Attachment 0005- HMMR Format.XLSX XLSX spreadsheet
Attachment 0037 PKG1_LPD Coded Data Products Packaging.docx DOCX document
Attachment 0004- Request for Use of Prohibited Materials.doc DOC document
Attachment 0019-TABLE A-II - TM Requirements Matrix -10.docx DOCX document
Attachment 0031-Microscan UID Compliance Results.pdf PDF
Attachment 0008- Product Format Government TDP Requirements.docx DOCX document
Attachment 0030 - Pump Reliability and Mobility PQT Plan WSDS-v16.docx DOCX document
Copy of Attachment 0041 - Use of Existing Government-Furnished Property.xlsx XLSX spreadsheet
Attachment 0016-Tool Criteria and Approval.docx DOCX document
Attachment 0006- CARC Paint Drawing 12585018.pdf PDF
Attachment 0007 - WSDS Technical Data Package (TDP).zip ZIP file
Attachment 0002-PEO CSCSS OPSEC Program.pdf PDF
Attachment 0038_Technical Review Criteria.docx DOCX document
Attachment 0034- Additional Guidelines for Controlled Unclassified Information.docx DOCX document
Copy of Attachment 0010-SESAME.xlsx XLSX spreadsheet
Attachment 0017- AMPS Procedures for Users and Administrators.pdf PDF
Copy of Attachment 0042 - Updated Pricing Workbook.xlsx XLSX spreadsheet
Attachment 0026-IADS Dataset_TOC File Template.docx DOCX document
Attachment 0029- Provisioning Requirements Worksheet.docx DOCX document
Attachment 0039 - Copyright Release Letter Template.docx DOCX document
Attachment 0032- IUID Data Plate Examples.docx DOCX document
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VENDOR QUESTION USG RESPONSE

91.As a follow up to question/answer #32 regarding NSF-61 requirements. We have been provided the following feedback from

NSF, when questioned about the NSF-61 requirements for anodized aluminum: “in 25-years of material audits that they have never tested anodized aluminum and are doubtful it would pass.” Based on that response, either (1) the FDA and NSF-61 requirements need to be deleted for anodized aluminum components, or (2) anodized aluminum components need to be replaced with stainless steel components.

Every one of our component suppliers have responded the same, that they cannot certify their anodized aluminum components to meet the requirements of NSF-61. Please advise if the NSF-61 requirements will be removed and if not, will the requirement be changed to stainless steel for those components. The cost of stainless is much higher so there is a substantial cost consideration and also weight increase to

All materials that come in contact with the potable water shall conform to either CFR Title 21, Parts 173-189 or NSF 61, with the exception of components made from anodized aluminum. Replacing aluminum components with stainless steel is not an option for this application. All anodized aluminum components shall be IAW MIL-PRF-8625, Type III (Hard anodic coatings), using a non-chromate bath or process, Class I (Non-dyed), with a nickel acetate seal. The WSDS ATPD 2425 will be updated to address this compliance requirement and the exception for anodized aluminum. All applicable drawings of the WSDS TDP will be updated to reflect this anodization process requirement.

92. Could the Government define "Level Surface?" Will the contractor have the latitude to stack Tricons (and to what level if so), or does

“level” mean “ground level?” ( REF. F1.3)

Level surface means ground level

93. Could you please clarify the packaging instructions for CLINs 1004-

7004 ( 350 GPM Fuel Pump Production), 1005-7005 ( 350 GPM Water

Pump Production), and 1006-7006 (50k Water Storage Bag Production).

Section D.1.2 states “The contractor shall preserve and package the special tool kit and all spares IAW the Government approved packaging data as generated and submitted by the contractor.” Specifically, are the spare pumps and the 50K Water Storage Bags to be packed in a

Tricon as they would be delivered in the WSDS system?”

The spares for storage bags and pumps will not be packed into Tricons. That is part of the packaging data development laid out in the contract. Once that packaging is developed and tested in accordance with MIL-STD-2073 and approved by the Government, that same information can be applied to section D for the spares that will be ordered on the contract. In other words, the packaging data created will be used to ship the spare parts as ordered on the contract.

VENDOR QUESTION USG RESPONSE

94. In reference to Amendment 0002, L.2. Method of Submission:

a. Note 5 which states that “… Offerors are strongly cautioned when submitting proposals to allow adequate time for upload”. Knowing that the DoD SAFE Drop-Off site could be slow, can offeror upload the files as they get to upload even though complete proposal still not ready?

b. Note 4 states that once proposal file is uploaded by clicking Drop-Off

File , DoD SAFE Request for Drop-Off link will no longer be active. So if we want to upload another file or revised file then we need to request another link?

c. Note 6 states that offeror only upload files if ready to submit its Drop-

Off to the Government. But if we submit only few files which are ready for Drop-Off but not all remaining files are ready then we have to request another links for submitting the proposal?

a. Yes, the Government will accept proposal submittal in batches. Please make sure your company's name is somewhere on each document or file.

b. Yes, if you want to submit your proposal in batches, multiple drop-off requests are required.

c. Only final versions of your proposal should be submitted, and proposal submissions should be done within the same day.

95. Realizing that a request was previously made for a submission date extension, your consideration is kindly requested. Provided that the

Government ended the Q&A period 10 days earlier than originally communicated, coupled with the fact that there are questions asked that remain unanswered, and industry continues to see slower than normal responses from vendors due to COVID-19 impacts, we respectfully request that the Government consider extending the proposal due date by 30 days

The draft scope and drawings were first posted to Sam.gov on 12 Apr. A copy of the draft RFP and all attachments were posted on 26 Apr;

feedback/questions was requested at that time. The final RFP was issued 12

May with proposals originally due 14 June. Since then, a one-week extension has been granted.

File details come from the government source that posted it. Updated .