Attachment 0029- Provisioning Requirements Worksheet.docx

DOCX document 33 KB Posted

Attached to
Water Storage Distribution System (Solicitation) Federal contract opportunity
Solicitation number
W56HZV21R0011
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

This document contains a Provisioning Requirements Worksheet and related Solicitation for a Water Storage Distribution System. The Provisioning Requirements Worksheet provides guidance for contractors to submit Logistics Management Information data products including drawings, part numbers, and maintenance information for procuring National Stock Numbers for a collapsible fabric water tank assembly. Contractors must attend a provisioning meeting within 45 days of award and provide screening results and drawings sequenced by part number in electronic format. The related Solicitation seeks up to five Indefinite Delivery Indefinite Quantity contracts to procure up to 123 Water Storage Distribution Systems for storing and distributing water, including pumps, meters, hoses and chlorination units. The Army intends to award a single follow-on IDIQ contract after testing prototype pump assemblies. The resulting contracts will have a five-year base and two one-year options with firm fixed pricing for this 100% small business set-aside.

View the file

Other files for this federal contract opportunity

Other files attached to Water Storage Distribution System (Solicitation), newest first.
File Type Posted
WSDS QA 91-95.pdf PDF
Attachment 0010 SESAME.xlsx XLSX spreadsheet
W56HZV21R0011-0002.pdf PDF
WSDS VENDOR QA (10 June) (questions 36-90) Final.pdf PDF
Attachment 0009 WSDS FDSC Certified 16 Apr 21.pdf PDF
Attach 0009 WSDS FDSC Certified 16 Apr 21.pdf PDF
Attachment_0042_Pricing_Workbookv2 (4 Jun 21).xlsx XLSX spreadsheet
Attachment_0040_Pricing_Workbookv2 (4 Jun 21).xlsx XLSX spreadsheet
Attachment_0042_Pricing_Workbookv2.xlsx XLSX spreadsheet
Notice to Offerors.pdf PDF
Attachment_0040_Pricing_Workbookv2.xlsx XLSX spreadsheet
Attachment_0042_Pricing_Workbookv2.xlsx XLSX spreadsheet
WSDS VENDOR QA (as of 25 May 2021).pdf PDF
Attachment 0038_Technical Review Criteria.docx DOCX document
Attachment 0034- Additional Guidelines for Controlled Unclassified Information.docx DOCX document
Attachment 0033- Department of Defense Guide to Item Unique Identification Quality Assurance.doc DOC document
Attachment 0011- LPD Attribute Selection Sheet.pdf PDF
Copy of Attachment 0005- HMMR Format.XLSX XLSX spreadsheet
Attachment 0004- Request for Use of Prohibited Materials.doc DOC document
Attachment 0002-PEO CSCSS OPSEC Program.pdf PDF
Instructions.docx DOCX document
Copy of Attachment 0042 - Updated Pricing Workbook.xlsx XLSX spreadsheet
Attachment 0039 - Copyright Release Letter Template.docx DOCX document
Attachment 0037 PKG1_LPD Coded Data Products Packaging.docx DOCX document
Attachment 0026-IADS Dataset_TOC File Template.docx DOCX document
Attachment 0017- AMPS Procedures for Users and Administrators.pdf PDF
Copy of Attachment 0010-SESAME.xlsx XLSX spreadsheet
Attachment 0007 - WSDS Technical Data Package (TDP).zip ZIP file
Attachment 0006- CARC Paint Drawing 12585018.pdf PDF
Attachment 0024-TPG 2016-01 Rev 1 Source Data.pdf PDF
Attachment 0028-SSI.DOCX DOCX document
Attachment 0027-ATPD 2232 Packaging.pdf PDF
Attachment 0025-TM Crosswalk Form.xls XLS spreadsheet
Copy of Attachment 0015-LORA.xlsx XLSX spreadsheet
Attachment 0013-GMTK CL.pdf PDF
Attachment 0003 - ATPD-2425 WSDS.pdf PDF
Solicitation WSDS.pdf PDF
Attachment 0009- Failure Definition and Scoring Criteria (FDSC).docx DOCX document
Attachment 0018-DE Style Guide 1-26-18.pdf PDF
Copy of Attachment 0041 - Use of Existing Government-Furnished Property.xlsx XLSX spreadsheet
Copy of Attachment 0040 - Pricing Workbook revised 4 20 2021.xlsx XLSX spreadsheet
Attachment 0036- Incoming Transaction Format Packaging.docx DOCX document
Attachment 0035- MOS Operator and Maintenance Tasks 92W-91J.docx DOCX document
Attachment 0032- IUID Data Plate Examples.docx DOCX document
Attachment 0031-Microscan UID Compliance Results.pdf PDF
Attachment 0030 - Pump Reliability and Mobility PQT Plan WSDS-v16.docx DOCX document
Attachment 0023-General Publications Requirements for Page-Based Manuals.doc DOC document
Attachment 0022-TABLE A-VII-NMWR Requirements Matrix.docx DOCX document
Attachment 0020-TABLE A-IV - TM Requirements Matrix -23.docx DOCX document
Attachment 0021-TABLE A-VI - TM Requirements Matrix -23P RPSTL.DOCX DOCX document
Show all 50

Water Storage Distribution System (Solicitation) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 6 30 January 2017

ATTACHMENT X – Provisioning Requirements Worksheet

Worksheet 1

SUMMARY TITLE: LMI Summary titles are as indicated below

SPECIFIC INSTRUCTIONS: Logistics Management Information Data Products (Drawings)/ Engineering Data for Provisioning (EDFP) (Formally known as: Supplementary Provisioning Technical Documentation (SPTD) are required for the purpose of assigning National Stock Numbers. The Government will review for acceptance each of the Contractor’s offered drawings.

DATA IN LMI SPECIFICATION (Please provide the data product title):

Media Format Delivery for all LMI Data Products:

· Electronic delivery (e-mail) attachment in ASCII Format.

· CD-ROM delivery in 1388-2A, 1388-2B, or 1552 Format.

LMI Summaries:

· Logistics Management Information Data Products (PPL)

DATA NOT IN LMI SPECIFICATION (Please provide the data product title, its definition and its format):

1. Logistics Management Information Data Products Pre-procurement Screening: Screening of all part numbers used on system to identify National Stock Numbers (NSN)

1. LMI Tools and Test Equipment. Peculiar support items required to support and maintain the system throughout its life.

Worksheet 1

DATA PRODUCT DELIVERABLE: Data product information required as stated below.

SELECT EXPLANATION

1. Data required for all piece parts and special tools identified on equipment

1. Data required for Repair Parts and Special Tools List (RPSTL) 3 Data required for part number changes only

DATA PRODUCT TITLE
SELECT
ADDITIONAL INFORMATION
GOV’T SUPPLIED DATA

PROVISIONING CONTRACT CONTROL NUMBER (PCCN)

1,3
LMI 0870
X

PROVISIONING LIST ITEM SEQUENCE NUMBER (PLISN)

1,3
LMI 0890

INDENTURE CODE

· KITS AND HARDWARE

1
LMI 0370

COMMERCIAL GOVERNMENT ENTITY (CAGE) CODE

1,3
LMI 0140

CAGE CODE – ADDITIONAL REFERENCE NUMBER

1,3
LMI 0140

REFERENCE NUMBER (Part Number)

1,3
LMI 1050

REFERENCE NUMBER CATEGORY CODE (RNCC)

1,3
LMI 1060

ITEM NAME

1
LMI 0480

QUANTITY PER ASSEMBLY

1
LMI 0930

QUANTITY PER END ITEM (QPEI)

1
LMI 0950

UNIT OF MEASURE (UM)

1
LMI 1510

SOURCE, MAINTENANCE AND RECOVERABILITY (SMR) CODE

1
LMI 1220

DEMILITARIZATION CODE (DMIL)

1
LMI 0230

USABLE ON CODE (UOC)

1
LMI 1560
X
MAINTENANCE REPLACEMENT RATE 1 (MRR 1)
1
LMI 0560

(AKA FAILURE FACTOR 1)

MAINTENANCE REPLACEMENT RATE 2 (MRR 2)
1
LMI 0570

(AKA FAILURE FACTOR 2)

MAINTENANCE REPLACEMENT RATE MODIFIER (MMR MOD)
1
SEE DA PAM 700-25

(AKA FAILURE FACTOR 3)

ESSENTIALITY CODE
1
LMI 0280
SHELF LIFE
1
LMI 1190
PRODUCTION LEADTIME (PLT)
1
LMI 0830

X

UNIT OF MEASURE PRICE (UM PRICE)
1
LMI 1500

NEXT HIGHER ASSY PROVISIONING LIST ITEM SEQUENCE NUMBER (NHA PLISN)

1
LMI 0690

NEXT HIGHER ASSY PROVISIONING LIST ITEM SEQUENCE NUMBER INDICATOR (NHA IND)

1
LMI 0700

OVERHAUL REPLACEMENT RATE (ORR)

1
LMI 0740

MAINTENANCE TASK DISTRIBUTION (MTD)

1
LMI 0580
X

REPLACEMENT TASK DISTRIBUTION (RTD)

1
LMI 1110
X

UNIT OF ISSUE (UI)

1
LMI 1470

UNIT OF ISSUE PRICE (UI PRICE)

1
LMI 1500

UNIT OF ISSUE CONVERSION FACTOR

1
LMI 1480

REPAIR CYCLE TIME (RCT)

1
LMI 1080

TECHNICAL MANUAL NUMBER (AND ASSOCIATED TECHNICAL MANUAL CODE)

2
LMI 1370
X

FIGURE NUMBER

2
LMI 0300

ITEM NUMBER

2
LMI 0500

TECHNICAL MANUAL CHANGE NUMBER (TM CHG)

2
LMI 1350

TECHNICAL MANUAL INDENTURE CODE (TM IND)

2
LMI 1360

QUANTITY PER FIGURE

2
LMI 0960

FUNCTIONAL GROUP CODE

2
LMI 0330

PROVISIONING NOMENCLATURE

2
LMI 0900

GOVERNMENT SUPPLIED PROVISIONING DATA

PROVISIONING CONTRACT CONTROL NUMBER (PCCN) — LMI 0870

The PCCN is assigned by the government and will provided at the provisioning start of work meeting.

USEABLE ON CODE (UOC) — LMI 1560

The UOC is assigned by the government and will be provided at the provisioning start of work meeting.

Consumable Items = 1 month Repair Parts = 3 months Long Lead Time Items (ie. Made to order) = 8 months

MAINTENANCE TASK DISTRIBUTION (MTD) — LMI 0580

MAINTENANCE TASK DISTRIBUTION (MTD) WILL BE IN COMPLIANCE WITH THE MOST CURRENT VERSION OF AR 700-82, ‘JOINT REGULATION GOVERNING THE USE AND APPLICATION OF UNIFORM SOURCE MAINTENANCE AND RECOVERABLITY CODES’, ADSM 18-LEA-JBE-ZZZ-UM-06, ‘COMMODITY COMMAND STANDARD SYSTEM USERS MANUAL – PROVISIONING SYSTEM’ AND COINCIDE WITH THE ARMY’S TWO-LEVEL MAINTENANCE CONCEPT.

REPLACEMENT TASK DISTRIBUTION (RTD) – LMI 1110

REPLACEMENT TASK DISTRIBUTION (RTD) WILL BE IN COMPLIANCE WITH THE MOST CURRENT VERSION OF AR 700-82, ‘JOINT REGULATION GOVERNING THE USE AND APPLICATION OF UNIFORM SOURCE MAINTENANCE AND RECOVERABLITY CODES’, ADSM 18-LEA-JBE-ZZZ-UM-06, ‘COMMODITY COMMAND STANDARD SYSTEM USERS MANUAL – PROVISIONING SYSTEM’ AND COINCIDE WITH THE ARMY’S TWO-LEVEL MAINTENANCE CONCEPT.

REPLACEMENT CYCLE TIME (RCT) — LMI 1080

REPLACEMENT CYCLE TIME (RCT) WILL BE IN COMPLIANCE WITH THE MOST CURRENT VERSION OF AR 700-82, ‘JOINT REGULATION GOVERNING THE USE AND APPLICATION OF UNIFORM SOURCE MAINTENANCE AND RECOVERABLITY CODES’, ADSM 18-LEA-JBE-ZZZ-UM-06, ‘COMMODITY COMMAND STANDARD SYSTEM USERS MANUAL – PROVISIONING SYSTEM’ AND COINCIDE WITH THE ARMY’S TWO-LEVEL MAINTENANCE CONCEPT.

PROVISIONING REQUIREMENTS STATEMENT

Equipment Nomenclature: TANK, FABRIC, COLLAPSIBLE (3K Water Tank Assembly) Model Number:

Contract Number:

Provisioning Activity (address and zip code): U.S. Army Tank-automotive and Armaments Command ATTN: AMSTA-LCC-JAP/Mail Stop: 120 6501 E. 11 Mile Rd.

Warren, MI 48397-5000

Contractor (name, address and zip code): TBD

1. This Provisioning Requirements Statement (PRS) is furnished and will be prepared in accordance with Statement of Work (SOW). The contractor shall annotate all EDFP with the PLISN and the PCCN. The contractor shall furnish EDFP that is legible and representative of each part number and CAGE in accordance with SOW paragraph C.XXX.

PROVISIONING REQUIREMENTS

1. Provisioning/Maintenance/ Guidance Meeting: 1

1. Location: TBD

1. Date: WITH-IN 15 DAYS OF CONTRACT AWARD, AT THE START OF WORK MEETING (SOW)

1. Time: TBD

1. Estimated number of days: 1

1. Provisioning Meeting(s): Are Required

1. Location: TACOM Warren, MI or CONTRACTOR FACILITY

1. Date: Within 45 DAYS AFTER START OF WORK OR CONTRACT AWARD

1. Time: TBD

1. Estimated number of days: 5

1. The Contractor will not be required to have a sample of the component/end item at the TACOM Warren, MI conference.

1. The sample article will not be disassembled at the conference.

1. A Provisioning Preparedness Review Meeting is not required.

1. Incremental submission of PTD (LMI Data & Drawings) is authorized.

1. Provisioning Screening is required.

Screening results will be required to be entered into the PMR.

1. LMI Drawing Support will be sequenced by:

1. PLISN order for hard copy review at meeting

1. Part Number order for electronic submission

1. Tools and Test Equipment will be included as part of the LMI Data Products (PPL).

1. Repair Kits and Repair Part Sets will be included in the LMI Data Products (PPL).

1. Repair Kits will be included in the LMI Data Products (PPL).

1. Bulk material that is required to fabricate items that are coded “M” (make) will also be listed on the LMI Data Products (PPL).

File details come from the government source that posted it. Updated .