Attachment 0004- Request for Use of Prohibited Materials.doc
DOC document 72 KB Posted
- Attached to
- Water Storage Distribution System (Solicitation) Federal contract opportunity
- Solicitation number
- W56HZV21R0011
About this file
This document outlines a solicitation for water storage distribution systems. The U.S. Army Contracting Command-Detroit Arsenal intends to procure up to 123 water storage distribution systems with capacities of 100,000 gallons or split capacities of 2 units at 50,000 gallons each. The systems will provide potable water storage and distribution capabilities. Additionally, the Army may procure up to 150 spare 350 GPM fluid distribution pumps. The resulting contracts will be fixed-price IDIQ agreements with the Army for five years and two optional additional ordering years. The Army aims to award up to five IDIQ contracts initially based on testing a 125 GPM pump assembly and 350 GPM pump assembly to downselect to one contractor for production orders, logistics, and potential spare pumps. This procurement is exclusively reserved for small businesses. Interested parties should contact the named buyer by December 2021.
View the file
Other files for this federal contract opportunity
Show all 50
Water Storage Distribution System (Solicitation) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
Attachment 0004 Request for Use of Prohibited Materials
04 November 2014 Distribution Statement A – Approved for Public Release; distribution unlimited
(*Distribution Statement A only applies when form is not filled in. Once filled check the Security Class Guide for proper distribution statement/markings)
1. General Information
Requesting Company
Date of Request
Point of Contact
Prohibited material for which waiver is requested
2. Explanation of Use
Instructions: Provide a description of the parts/processes where the prohibited material will be used. Identify all components/parts that will contain the prohibited materials upon vehicle delivery including quantities of these parts. Indicate the specific variant and/or trailer the components/parts are on. Identify whether or not the material will be required for operation or maintenance (including during vehicle rebuild). A separate spreadsheet may be attached listing the specific parts/processes, if needed.
3. Health Hazard
Instructions: Provide an explanation of any health hazards associated with the use or presence of the prohibited material. Include likely routes of exposure to both the operator and the maintainer. Identify if any personal protective equipment (PPE) that would be required as a result of using this material. Include the type of PPE and under what circumstances it would be required (manufacturing, operation, maintenance, etc.).
4. Analysis of Alternatives
Instructions: Identify all alternatives that were considered for the prohibited material. If the alternative is only for specific applications, identify what type of parts it is a potential alternative for. Include explanation as to why each cannot be implemented.
5. Technical Justification
Instructions: Provide technical justification for the use of prohibited material. Explain why it is necessary and why it cannot be eliminated.
6. Program Risk
Instructions: Describe the program risk(s) (cost, schedule, and performance) associated with denial of this request by the Government.
7. Get Well Plan
Instructions: Identify which parts where an alternative may be integrated at a later date. Provide a get well plan explaining how this will be accomplished. Also, indicate which parts you will not be able to eliminate and provide a brief explanation.
The following Sections will be filled in by the Government
8. Environmental Safety and Occupational Health Working Group (ESOH WG) Evaluation/ Recommendation
Instructions: Government ESOH WG will to provide evaluation of the above information and a recommendation to the Product Director/Project Manager regarding approval/disapproval of the prohibited material request.
{Name1}
{Date1}
JPO XXXX, ESOH WG Date
9. Concurrence
I concur that use of {prohibited material} as described above under the {Contractor Name} Contract –{Contract Number} is acceptable and justified:
{Name2}
{Date2}
JPO XXXX, CHIEF ENGINEER Date {Name3}
{Date3}
Lead Engineer, XXXX Date {Name4}
{Date4}
Product Director, XXXX Date
10. Approval
Upon the basis of the findings above, I hereby determine that use of {prohibited material} in the parts identified in Section 1 for {Contractor Name} Contract {Contract Number}is acceptable and justified.
{Name5}
{Date5}
Project Manager, XXXX Date
UNCLASSIFIED
File details come from the government source that posted it. Updated .