Copy of Attachment 0015- LORA.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Water Storage Distribution System (WSDS) Federal contract opportunity
- Solicitation number
- W56HZV21R0011
About this file
This document outlines a two-phase federal procurement opportunity for Water Storage Distribution Systems and fluid distribution pumps. The U.S. Army Contracting Command-Detroit Arsenal intends to award multiple IDIQ contracts to up to five vendors for delivery of test pumps. The Army Materiel Command TACOM Life Cycle Management Command will conduct testing at Aberdeen Proving Ground and allow price adjustments. The selected vendor will then receive a modification for full-scale production of up to 123 Water Storage Distribution Systems in two configurations, along with 350 GPM fluid distribution pumps and logistics packages. The opportunity is a 100% small business set-aside with a potential seven-year ordering period. Phase I will result in pump delivery and testing contracts, while Phase II will begin full-scale production and provision of related products and services.
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| Tabs | Values | Notes | |
| End Item Information | |||
| Number of Systems | 2607 | AAO | |
| System Life | 25 | CPD | |
| Annual Operating Hours | 7300 | Wartime 20 hrs/day 365 | |
| Availability Target | 0.9 | Pre-populates, but merits discussion | |
| End Item Floats Available | No | ||
| Echelons | |||
| ORG Number of Shops | |||
| Supply Data | |||
| Initial Bin Cost ($) | 303.57 | Pre-populated but may need to be adjusted | |
| Recurring Bin Cost ($) | 48.7 | Pre-populated but may need to be adjusted | |
| Cost per Requisition ($) | 25.89 | Pre-populated but may need to be adjusted | |
| Initial Catalog Cost ($) | 1043.14 | Pre-populated but may need to be adjusted | |
| Recurring Catalog Cost ($) | 441.48 | Pre-populated but may need to be adjusted | |
| Procurement Lead Time (days) | 365 | This value represents ALT+PLT. PSMIPT agreed to (ALT 12 months). Need AVG PLT | |
| Hold Cost Fraction (%) | 6 | Pre-populated but may need to be adjusted | |
| Documentation Cost Per Page ($/page) | 591.61 | TM- Looks low based previous experience | |
| Discount Rate (%) | 2.2 | Pre-populated but may need to be adjusted | |
| Wholesale Fill Rate (%) | 90 | PSMIPT (Recent guidence from AMC CG) | |
| Common Labor Data | ORG | Depot | |
| Unloaded Based Hourly Rate ($) | Discuss with Sierra | ||
| Productivity Factor % | 85 | 85 | Pre-populated but may need to be adjusted |
| Loading Factor % | 90 | 45 | Pre-populated but may need to be adjusted |
| Effective Labor Rate ($) | Non-zero entries override Unloaded Based Hourly Rate | ||
| Shipping | ORG to DEP | ||
| Order Ship Time (days) | |||
| Military Trans | |||
| Cost $/lb.*mi | One or the other, but not both | ||
| Cost ($/lb.) | |||
| Distance (miles) | |||
| Global Settings | |||
| Turn Around Days | |||
| ORG | 1 | Pre-populates, but further analysis may be needed. | |
| DSU | 15 | ||
| GSU | 45 | ||
| Depot | 180 | ||
| Echelon Labels | |||
| ORG | Field | AR 750-1 | |
| Depot | Sustainment | AR 750-1 | |
| Contractor Repair Allowed | Yes | Default |
File details come from the government source that posted it. Updated .