Attachment 0029- Provisioning Requirements Worksheet.docx
DOCX document 33 KB Posted
- Attached to
- Water Storage Distribution System (WSDS) Federal contract opportunity
- Solicitation number
- W56HZV21R0011
About this file
This document contains a Provisioning Requirements Worksheet and related information for the Water Storage Distribution System procurement. The Army intends to solicit fixed price IDIQ contracts for up to five vendors to deliver test pumps and support for the WSDS program. Vendors will submit revised pricing after government testing, and one will be selected for a contract modification exercising options for 123 WSDS units in two configurations, with associated 350 GPM pumps and logistics support. The 100% small business set-aside solicitation will be issued by ACC-DTA. Interested parties should contact the buyer for additional details. Test results and fair opportunity procedures will determine the awardee, who will then proceed to Phase II for full production.
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 6 30 January 2017
ATTACHMENT X – Provisioning Requirements Worksheet
Worksheet 1
SUMMARY TITLE: LMI Summary titles are as indicated below
SPECIFIC INSTRUCTIONS: Logistics Management Information Data Products (Drawings)/ Engineering Data for Provisioning (EDFP) (Formally known as: Supplementary Provisioning Technical Documentation (SPTD) are required for the purpose of assigning National Stock Numbers. The Government will review for acceptance each of the Contractor’s offered drawings.
DATA IN LMI SPECIFICATION (Please provide the data product title):
Media Format Delivery for all LMI Data Products:
· Electronic delivery (e-mail) attachment in ASCII Format.
· CD-ROM delivery in 1388-2A, 1388-2B, or 1552 Format.
LMI Summaries:
· Logistics Management Information Data Products (PPL)
DATA NOT IN LMI SPECIFICATION (Please provide the data product title, its definition and its format):
1. Logistics Management Information Data Products Pre-procurement Screening: Screening of all part numbers used on system to identify National Stock Numbers (NSN)
1. LMI Tools and Test Equipment. Peculiar support items required to support and maintain the system throughout its life.
Worksheet 1
DATA PRODUCT DELIVERABLE: Data product information required as stated below.
SELECT EXPLANATION
1. Data required for all piece parts and special tools identified on equipment
1. Data required for Repair Parts and Special Tools List (RPSTL) 3 Data required for part number changes only
| DATA PRODUCT TITLE |
| SELECT |
| ADDITIONAL INFORMATION |
| GOV’T SUPPLIED DATA |
PROVISIONING CONTRACT CONTROL NUMBER (PCCN)
| 1,3 |
| LMI 0870 |
| X |
PROVISIONING LIST ITEM SEQUENCE NUMBER (PLISN)
| 1,3 |
| LMI 0890 |
INDENTURE CODE
· KITS AND HARDWARE
| 1 |
| LMI 0370 |
COMMERCIAL GOVERNMENT ENTITY (CAGE) CODE
| 1,3 |
| LMI 0140 |
CAGE CODE – ADDITIONAL REFERENCE NUMBER
| 1,3 |
| LMI 0140 |
REFERENCE NUMBER (Part Number)
| 1,3 |
| LMI 1050 |
REFERENCE NUMBER CATEGORY CODE (RNCC)
| 1,3 |
| LMI 1060 |
ITEM NAME
| 1 |
| LMI 0480 |
QUANTITY PER ASSEMBLY
| 1 |
| LMI 0930 |
QUANTITY PER END ITEM (QPEI)
| 1 |
| LMI 0950 |
UNIT OF MEASURE (UM)
| 1 |
| LMI 1510 |
SOURCE, MAINTENANCE AND RECOVERABILITY (SMR) CODE
| 1 |
| LMI 1220 |
DEMILITARIZATION CODE (DMIL)
| 1 |
| LMI 0230 |
USABLE ON CODE (UOC)
| 1 |
| LMI 1560 |
| X |
| MAINTENANCE REPLACEMENT RATE 1 (MRR 1) |
| 1 |
| LMI 0560 |
(AKA FAILURE FACTOR 1)
| MAINTENANCE REPLACEMENT RATE 2 (MRR 2) |
| 1 |
| LMI 0570 |
(AKA FAILURE FACTOR 2)
| MAINTENANCE REPLACEMENT RATE MODIFIER (MMR MOD) |
| 1 |
| SEE DA PAM 700-25 |
(AKA FAILURE FACTOR 3)
| ESSENTIALITY CODE |
| 1 |
| LMI 0280 |
| SHELF LIFE |
| 1 |
| LMI 1190 |
| PRODUCTION LEADTIME (PLT) |
| 1 |
| LMI 0830 |
X
| UNIT OF MEASURE PRICE (UM PRICE) |
| 1 |
| LMI 1500 |
NEXT HIGHER ASSY PROVISIONING LIST ITEM SEQUENCE NUMBER (NHA PLISN)
| 1 |
| LMI 0690 |
NEXT HIGHER ASSY PROVISIONING LIST ITEM SEQUENCE NUMBER INDICATOR (NHA IND)
| 1 |
| LMI 0700 |
OVERHAUL REPLACEMENT RATE (ORR)
| 1 |
| LMI 0740 |
MAINTENANCE TASK DISTRIBUTION (MTD)
| 1 |
| LMI 0580 |
| X |
REPLACEMENT TASK DISTRIBUTION (RTD)
| 1 |
| LMI 1110 |
| X |
UNIT OF ISSUE (UI)
| 1 |
| LMI 1470 |
UNIT OF ISSUE PRICE (UI PRICE)
| 1 |
| LMI 1500 |
UNIT OF ISSUE CONVERSION FACTOR
| 1 |
| LMI 1480 |
REPAIR CYCLE TIME (RCT)
| 1 |
| LMI 1080 |
TECHNICAL MANUAL NUMBER (AND ASSOCIATED TECHNICAL MANUAL CODE)
| 2 |
| LMI 1370 |
| X |
FIGURE NUMBER
| 2 |
| LMI 0300 |
ITEM NUMBER
| 2 |
| LMI 0500 |
TECHNICAL MANUAL CHANGE NUMBER (TM CHG)
| 2 |
| LMI 1350 |
TECHNICAL MANUAL INDENTURE CODE (TM IND)
| 2 |
| LMI 1360 |
QUANTITY PER FIGURE
| 2 |
| LMI 0960 |
FUNCTIONAL GROUP CODE
| 2 |
| LMI 0330 |
PROVISIONING NOMENCLATURE
| 2 |
| LMI 0900 |
GOVERNMENT SUPPLIED PROVISIONING DATA
PROVISIONING CONTRACT CONTROL NUMBER (PCCN) — LMI 0870
The PCCN is assigned by the government and will provided at the provisioning start of work meeting.
USEABLE ON CODE (UOC) — LMI 1560
The UOC is assigned by the government and will be provided at the provisioning start of work meeting.
Consumable Items = 1 month Repair Parts = 3 months Long Lead Time Items (ie. Made to order) = 8 months
MAINTENANCE TASK DISTRIBUTION (MTD) — LMI 0580
MAINTENANCE TASK DISTRIBUTION (MTD) WILL BE IN COMPLIANCE WITH THE MOST CURRENT VERSION OF AR 700-82, ‘JOINT REGULATION GOVERNING THE USE AND APPLICATION OF UNIFORM SOURCE MAINTENANCE AND RECOVERABLITY CODES’, ADSM 18-LEA-JBE-ZZZ-UM-06, ‘COMMODITY COMMAND STANDARD SYSTEM USERS MANUAL – PROVISIONING SYSTEM’ AND COINCIDE WITH THE ARMY’S TWO-LEVEL MAINTENANCE CONCEPT.
REPLACEMENT TASK DISTRIBUTION (RTD) – LMI 1110
REPLACEMENT TASK DISTRIBUTION (RTD) WILL BE IN COMPLIANCE WITH THE MOST CURRENT VERSION OF AR 700-82, ‘JOINT REGULATION GOVERNING THE USE AND APPLICATION OF UNIFORM SOURCE MAINTENANCE AND RECOVERABLITY CODES’, ADSM 18-LEA-JBE-ZZZ-UM-06, ‘COMMODITY COMMAND STANDARD SYSTEM USERS MANUAL – PROVISIONING SYSTEM’ AND COINCIDE WITH THE ARMY’S TWO-LEVEL MAINTENANCE CONCEPT.
REPLACEMENT CYCLE TIME (RCT) — LMI 1080
REPLACEMENT CYCLE TIME (RCT) WILL BE IN COMPLIANCE WITH THE MOST CURRENT VERSION OF AR 700-82, ‘JOINT REGULATION GOVERNING THE USE AND APPLICATION OF UNIFORM SOURCE MAINTENANCE AND RECOVERABLITY CODES’, ADSM 18-LEA-JBE-ZZZ-UM-06, ‘COMMODITY COMMAND STANDARD SYSTEM USERS MANUAL – PROVISIONING SYSTEM’ AND COINCIDE WITH THE ARMY’S TWO-LEVEL MAINTENANCE CONCEPT.
PROVISIONING REQUIREMENTS STATEMENT
Equipment Nomenclature: TANK, FABRIC, COLLAPSIBLE (3K Water Tank Assembly) Model Number:
Contract Number:
Provisioning Activity (address and zip code): U.S. Army Tank-automotive and Armaments Command ATTN: AMSTA-LCC-JAP/Mail Stop: 120 6501 E. 11 Mile Rd.
Warren, MI 48397-5000
Contractor (name, address and zip code): TBD
1. This Provisioning Requirements Statement (PRS) is furnished and will be prepared in accordance with Statement of Work (SOW). The contractor shall annotate all EDFP with the PLISN and the PCCN. The contractor shall furnish EDFP that is legible and representative of each part number and CAGE in accordance with SOW paragraph C.XXX.
PROVISIONING REQUIREMENTS
1. Provisioning/Maintenance/ Guidance Meeting: 1
1. Location: TBD
1. Date: WITH-IN 15 DAYS OF CONTRACT AWARD, AT THE START OF WORK MEETING (SOW)
1. Time: TBD
1. Estimated number of days: 1
1. Provisioning Meeting(s): Are Required
1. Location: TACOM Warren, MI or CONTRACTOR FACILITY
1. Date: Within 45 DAYS AFTER START OF WORK OR CONTRACT AWARD
1. Time: TBD
1. Estimated number of days: 5
1. The Contractor will not be required to have a sample of the component/end item at the TACOM Warren, MI conference.
1. The sample article will not be disassembled at the conference.
1. A Provisioning Preparedness Review Meeting is not required.
1. Incremental submission of PTD (LMI Data & Drawings) is authorized.
1. Provisioning Screening is required.
Screening results will be required to be entered into the PMR.
1. LMI Drawing Support will be sequenced by:
1. PLISN order for hard copy review at meeting
1. Part Number order for electronic submission
1. Tools and Test Equipment will be included as part of the LMI Data Products (PPL).
1. Repair Kits and Repair Part Sets will be included in the LMI Data Products (PPL).
1. Repair Kits will be included in the LMI Data Products (PPL).
1. Bulk material that is required to fabricate items that are coded “M” (make) will also be listed on the LMI Data Products (PPL).
File details come from the government source that posted it. Updated .