Attachment 0023-General Publications Requirements for Page-Based Manuals.doc

DOC document 46 KB Posted

Attached to
Water Storage Distribution System (WSDS) Federal contract opportunity
Solicitation number
W56HZV21R0011
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

This document contains details for a federal solicitation seeking a Water Storage Distribution System. The U.S. Army Contracting Command-Detroit Arsenal intends to solicit for the procurement of up to 123 Water Storage Distribution Systems to provide large water intake, purification and distribution capacity for the Army. The systems will include collapsible fabric storage tanks, pumps, meters, hoses, fittings and nozzles as well as hypochlorination units. The solicitation will utilize a two-phase approach, first awarding multiple IDIQ contracts for pump testing, then selecting a single vendor through a fair opportunity evaluation of test results and updated price proposals to receive the production and logistics line items order. The resultant IDIQ contracts will have a potential seven-year term. This procurement is set aside exclusively for small businesses.

View the file

Other files for this federal contract opportunity

Other files attached to Water Storage Distribution System (WSDS), newest first.
File Type Posted
BOM Indentured WSDS.xlsx XLSX spreadsheet
Attachment 0019- TABLE A-II - TM Requirements Matrix -10.pdf PDF
DRAFT- REQUEST FOR PROPOSAL.pdf PDF
Copy of Attachment 0041 - Use of Existing Government-Furnished Property.xlsx XLSX spreadsheet
DRAFT REQUEST FOR PROPOSAL.pdf PDF
Copy of Attachment 0042 - Updated Pricing Workbook.xlsx XLSX spreadsheet
Attachment 0030 - Pump Reliability and Mobility PQT Plan WSDS-v16.docx DOCX document
Attachment 0029- Provisioning Requirements Worksheet.docx DOCX document
Attachment 0027-ATPD 2232 Packaging.pdf PDF
Attachment 0020- TABLE A-IV - TM Requirements Matrix -23.docx DOCX document
Attachment 0009-Failure Definition and Scoring Criteria (FDSC).docx DOCX document
Copy of Attachment 0005- HMMR Format.XLSX XLSX spreadsheet
Attachment 0002-PEO CSCSS OPSEC Program.pdf PDF
DRAFT REQUEST FOR PROPOSAL.docx DOCX document
Attachment 0037- PKG1_LPD Coded Data Products Packaging.docx DOCX document
Attachment 0035- MOS Operator and Maintenance Tasks 92W-91J.docx DOCX document
Attachment 0034- Additional Guidelines for Controlled Unclassified Information.docx DOCX document
Attachment 0031- Microscan UID Compliance Results.pdf PDF
Copy of Attachment 0015- LORA.xlsx XLSX spreadsheet
Copy of Attachment 0010- SESAME.xlsx XLSX spreadsheet
WSDS RFP 4-26-21.pdf PDF
Attachment 0038_Technical Review Criteria.docx DOCX document
Attachment 0036- Incoming Transaction Format Packaging.docx DOCX document
Attachment 0022-TABLE A-VII-NMWR Requirements Matrix.docx DOCX document
Attachment 0018- DE Style Guide 1-26-18.pdf PDF
Attachment 0011-LPD Attribute Selection Sheet.pdf PDF
Attachment 0008- Product Format Government TDP Requirements.docx DOCX document
WSDS VENDOR Q-A (final).pdf PDF
Copy of Attachment 0040 - Pricing Workbook revised 4 20 2021.xlsx XLSX spreadsheet
Attachment 0039 - Copyright Release Letter Template.docx DOCX document
Attachment 0033- Department of Defense Guide to Item Unique Identification Quality Assurance.doc DOC document
Attachment 0032-IUID Datta Plate Embedded IUID Marking.docx DOCX document
Attachment 0028- SSI.DOCX DOCX document
Attachment 0026- IADS Dataset_TOC File Template.docx DOCX document
Attachment 0025- TM Crosswalk Form.xls XLS spreadsheet
Attachment 0024- TPG 2016-01 Rev 1 Source Data.pdf PDF
Attachment 0021-TABLE A-VI - TM Requirements Matrix -23P RPSTL.DOCX DOCX document
Attachment 0017- AMPS Procedures for Users and Administrators.pdf PDF
Attachment 0016-Tool criteria and Approval.docx DOCX document
Attachment 0013-GMTK CL.pdf PDF
Attachment 0012- Decision Tree BII COEI AAL.pdf PDF
Attachment 0007 - WSDS Technical Data Package (TDP).zip ZIP file
Attachment 0006- CARC Paint Drawing 12585018.pdf PDF
Attachment 0004-Request for Use of Prohibited Materials.doc DOC document
Attachment 0003 - ATPD-2425 WSDS.pdf PDF
Instructions.docx DOCX document
WSDS SOW_CDRLS_Final.pdf PDF
Binder1.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Publications Requirements for Page-Based Manuals

1.0 Preparation for storage or shipment.

1.1 Actions to be taken to process the system to Level A and Level B protection are defined below. Include special preservation requirements for outside storage, Controlled Humidity Storage and any unique non-cyclic exercising requirements. If there are any unique mechanisms such as, hydraulic systems, pumps, electric motors, engines, transmissions, etc., requiring exercising at a frequency level other than the specified maintenance cycle, develop and include these requirements.

1.1.1 Level A protection is processing of the system for outside storage for a period of up to 2 years in any environment and for storage up to 48 months in an unheated warehouse environment without any exercising or maintenance. Systems processed to Level A are not authorized for deck loading on ships without additional protection. Systems processed to Level A may require disassembly and tarping.

1.1.2 Level B protection is processing of the system for controlled humidity storage for a period of up to 48 months and temporary outside storage not to exceed 90 days without any exercising or maintenance. Vehicles processed to Level B must be processed for shipment and shall be operational with drive-on drive-off capabilities. Vehicles processed to Level B are not authorized for deck loading on ships and may require additional care of supplies in storage to maintain the system or equipment.

1.2 Develop instructions for environmental deterioration (includes corrosion, rust, UV attack, mold, mildew, rodent, and insect damage) prevention processing of systems and related equipment for shipment and storage in the following conditions:

1.2.1 Level A. Instructions shall include special preservation, packaging, packing, marking, electrostatic discharge (ESD) protective and control measures, shelf-life, instructions on special use of corrosion-preventive compounds, moisture barriers, and desiccant materials. Instructions are required for both placing the equipment into storage and for the removal from storage. Instructions shall be developed for shipment and storage worldwide in an unfavorable, non-humidity controlled environment, such as the weather deck of an ocean going vessel, for a period up to 24 months from the date of processing, preferably without exercising, inspection, or maintenance.

1.2.2 Level B. Instructions shall provide for all fluids and lubricants to be at operating levels and fuel tanks to contain enough fuel to permit loading, off loading, and movement of 10 miles at the receiving point (detail amount of fuel). All batteries are to be activated and fully charged. Battery cables are to be disconnected from battery terminals and protective wrapped/secured from movement while vehicle is in storage or transit mode.

1.2.3 For Level A & Level B. Prepare processing instructions for mounted equipment and attachments of the system at a preservation level equal to that of the system. Processing instructions shall include direction for environmental, physical protection and security against pilferage of the mounted equipment and attachments.

1.2.3.1 Prepare instructions for the preservation, packaging, packing, marking and shelf-life of the Basic Issue Items, Initial Service Package and Components of End Item shall be in accordance with MIL-STD-2073. BII shall be packed separately from the COEI. Provide for environmental, physical protection and security against pilferage of these items.

General Publications Requirements for Page-Based Manuals

1.2.3.2 Include de-preservation instructions for all levels of preservation.

1.2.3.3 Large items that cannot withstand exposure to the elements shall be consolidated into containers. Examples of consolidation containers include ISO and MILVAN containers. Packing lists shall be included and developed IAW MIL-STD-129P.

1.3 Compliance with Federal and Industry Transportation Requirements: The Government ships using truck, rail, plane, and ship. The contractor shall develop shipment and storage instructions for each mode of transportation and identify their unique requirements. This will allow the Government to process each shipment based on the intended mode of transport. The contractor shall comply with the following applicable codes and standards: (1) Code of Federal Regulation Titles 29, 40 and 49, (2) International Maritime Dangerous Goods Code, for vessel transport, and (3) AFMAN 24-204, Preparing Hazardous Materials for Military Air Shipments. The contractor shall include disassembly procedures to meet the requirements of the aforementioned codes and standards.

1.4 MIL-STD-3003 (available at http://quicksearch.dla.mil/ ) is the Standard Practice for the Preparation for Shipment and Storage of Wheeled Vehicles and can be used as a guiding document.

File details come from the government source that posted it. Updated .