Attachment 0038_Technical Review Criteria.docx

DOCX document 22 KB Posted

Attached to
Water Storage Distribution System (WSDS) Federal contract opportunity
Solicitation number
W56HZV21R0011
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

This document provides technical review criteria and entrance/exit criteria for evaluating proposals submitted in response to a federal contract opportunity for Water Storage Distribution Systems. Key requirements include the delivery of 123 water storage and distribution systems with storage capacities of 100,000 gallons or configurable as two 50,000 gallon units each. A minimum of 150 centrifugal water pumps ranging from 125 to 350 gallons per minute must also be provided. Testing will be conducted at Aberdeen Proving Grounds on initial pumps delivered under IDIQ contracts awarded to up to five vendors. Following tests, vendors may update pricing for a downselect to a single vendor to produce the systems, pumps, and logistics packages. The resultant IDIQ contracts will have a potential term of seven years and contain small business set-aside requirements. The Department of the Army Materiel Command TACOM Life Cycle Management Command is listed as the agency.

View the file

Other files for this federal contract opportunity

Other files attached to Water Storage Distribution System (WSDS), newest first.
File Type Posted
BOM Indentured WSDS.xlsx XLSX spreadsheet
Attachment 0019- TABLE A-II - TM Requirements Matrix -10.pdf PDF
DRAFT- REQUEST FOR PROPOSAL.pdf PDF
Copy of Attachment 0041 - Use of Existing Government-Furnished Property.xlsx XLSX spreadsheet
DRAFT REQUEST FOR PROPOSAL.pdf PDF
Copy of Attachment 0042 - Updated Pricing Workbook.xlsx XLSX spreadsheet
Attachment 0037- PKG1_LPD Coded Data Products Packaging.docx DOCX document
Attachment 0035- MOS Operator and Maintenance Tasks 92W-91J.docx DOCX document
Attachment 0034- Additional Guidelines for Controlled Unclassified Information.docx DOCX document
Attachment 0031- Microscan UID Compliance Results.pdf PDF
Attachment 0023-General Publications Requirements for Page-Based Manuals.doc DOC document
Copy of Attachment 0015- LORA.xlsx XLSX spreadsheet
Copy of Attachment 0010- SESAME.xlsx XLSX spreadsheet
WSDS RFP 4-26-21.pdf PDF
Attachment 0036- Incoming Transaction Format Packaging.docx DOCX document
Attachment 0022-TABLE A-VII-NMWR Requirements Matrix.docx DOCX document
Attachment 0018- DE Style Guide 1-26-18.pdf PDF
Attachment 0011-LPD Attribute Selection Sheet.pdf PDF
Attachment 0008- Product Format Government TDP Requirements.docx DOCX document
WSDS VENDOR Q-A (final).pdf PDF
Copy of Attachment 0040 - Pricing Workbook revised 4 20 2021.xlsx XLSX spreadsheet
Attachment 0030 - Pump Reliability and Mobility PQT Plan WSDS-v16.docx DOCX document
Attachment 0029- Provisioning Requirements Worksheet.docx DOCX document
Attachment 0027-ATPD 2232 Packaging.pdf PDF
Attachment 0020- TABLE A-IV - TM Requirements Matrix -23.docx DOCX document
Attachment 0009-Failure Definition and Scoring Criteria (FDSC).docx DOCX document
Copy of Attachment 0005- HMMR Format.XLSX XLSX spreadsheet
Attachment 0002-PEO CSCSS OPSEC Program.pdf PDF
DRAFT REQUEST FOR PROPOSAL.docx DOCX document
Attachment 0039 - Copyright Release Letter Template.docx DOCX document
Attachment 0033- Department of Defense Guide to Item Unique Identification Quality Assurance.doc DOC document
Attachment 0032-IUID Datta Plate Embedded IUID Marking.docx DOCX document
Attachment 0028- SSI.DOCX DOCX document
Attachment 0026- IADS Dataset_TOC File Template.docx DOCX document
Attachment 0025- TM Crosswalk Form.xls XLS spreadsheet
Attachment 0024- TPG 2016-01 Rev 1 Source Data.pdf PDF
Attachment 0021-TABLE A-VI - TM Requirements Matrix -23P RPSTL.DOCX DOCX document
Attachment 0017- AMPS Procedures for Users and Administrators.pdf PDF
Attachment 0016-Tool criteria and Approval.docx DOCX document
Attachment 0013-GMTK CL.pdf PDF
Attachment 0012- Decision Tree BII COEI AAL.pdf PDF
Attachment 0007 - WSDS Technical Data Package (TDP).zip ZIP file
Attachment 0006- CARC Paint Drawing 12585018.pdf PDF
Attachment 0004-Request for Use of Prohibited Materials.doc DOC document
Attachment 0003 - ATPD-2425 WSDS.pdf PDF
Instructions.docx DOCX document
WSDS SOW_CDRLS_Final.pdf PDF
Binder1.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Water Storage and Distribution System (WSDS) Technical Review Criteria

Pump Critical Design Review (CDR)/ Test Readiness Review (TRR)

Entrance Criteria

1
Pump CDR meeting agenda
2
Pump assembly design established
3
Assessment of long lead items and availability of critical pump assembly components
4
Risk assessment completed (safety, performance, RAM)
5
Training materials available
6
Test support package list developed
7
Field Service Representative (FSR) support identified
8
Test plan completed and approved

Exit Criteria

1
Action items identified and responsibility assigned
2
Risks identified and mitigation plans in place where required
3
Critical safety issues mitigated to acceptable level
4
Post Pump CDR assessment complete

System Critical Design Review (CDR)/ Test Readiness Review (TRR)

Entrance Criteria (System CDR/TRR)

1
System CDR meeting agenda
2
Product Baseline established for the system (proposed changes to Gov’t TDP)
3
Assessment of long lead items and availability of critical components
4
Prototype fabrication plan
5
Test support plan
6
Risk assessment
7
Safety Assessment Report (SAR)
8
Human Factors Engineering (HFE) assessment
9
Hazardous Materials Management Plan (HMMP)
10
Configuration Management Plan (CMP)
11
Training Materials available
12
Test support package list developed
13
Field Service Representative (FSR) support identified
14
Test plan completed and approved

Exit Criteria (System CDR/TRR)

1
Actions items identified and responsibility assigned
2
Risks identified and mitigation plans in place where required
3
Critical safety issues mitigated to acceptable level
4
Post System CDR assessment complete

Production Readiness Review (PRR)

Entrance Criteria (PRR)

1
PRR meeting agenda
2
PQT complete
3
System Technical Data Package updated with Engineering Change Proposals (ECPs) resulting from test
4
Pump and Hypochlorinator Technical Data Package (TDP) delivered
5
Updated Risk assessment
6
Updated SAR
7
Updated HFE
8
Updated HMMP
9
Contractor properly staffed (engineering, production, quality, manufacturing)
10
Manufacturing processes and quality control system in place
11
Acceptance system including test procedures in place
12
Production facilities ready and required personnel trained
13
Supply chain is stable and adequate to support production

Exit Criteria (PRR)

1
Actions items identified and responsibility assigned
2
Risks identified and mitigation plans in place where required
3
Critical safety issues mitigated to acceptable level
4
Post PRR assessment complete

Physical Configuration Audit (PCA)

Entrance Criteria (PRR)

1
PCA plan complete
2
Technical Data Package (TDP) and all Engineering Change Proposals (ECPs) available
3
Detailed schedule for review complete

Exit Criteria (PRR)

1
Actions items identified and responsibility assigned
2
Risks identified and mitigation plans in place where required
3
Critical safety issues mitigated to acceptable level
4
Configuration audit summary report complete